1 RFB for Wiring in the Outagamie County Courtrooms Attachment B September 1, 2016 CABLING STANDARDS FOR

2 GENERAL The purpose of this document is to provide guidelines for all structured cable installations for Outagamie County. These guidelines should be followed unless otherwise noted and approved by the Project Manager or representative for Outagamie County. It is the responsibility of the installing contractor to ensure that each person working on the installation reads this document prior to commencing work on the project. Areas not covered within these guidelines should be addressed with the Project Manager or representative for Outagamie County prior to installation. TELECOMMUNICATION CLOSET (TC) At the Telecommunication Closet (TC) there will be data termination hardware and voice termination hardware. Where applicable, the following guidelines will be followed. All other situations will require approval by the Project Manager or representative for Outagamie County. Secure the vertical ladder rack(s) to the wall. Assemble and installs relay rack(s) to vertical ladder rack(s) and secure to the floor. Install enclosed cabinet(s) (when used in place of relay rack(s)). Install the shelf(s) on the rack(s). Install patch panel(s) per the drawings provided by Outagamie County. Install vertical and/or horizontal wire manager(s) per the drawings provided by Outagamie County. Install the fiber patch panel(s) per the drawing provided by Outagamie County. All cabinets will have usable depth of 24 for electronics and components. Provide and install a ¾ thick piece of fire rated plywood painted off-white with a fire-rated paint, per the drawings provided by Outagamie County (two coatings on all sides of fire rated plywood - painted off-white). Proof of fire rating must be visible (do not paint over fire rating seal). Install horizontal and other vertical ladder rack(s) as necessary for the project. Install 110 voice blocks per the voice backplane drawings provided by Outagamie County. Install all J-hooks, mushrooms and D-rings per the voice backplane drawings and the overview provided by Outagamie County. Install J-hooks for the service cable per the drawings. Install D-rings or cable management modules on the side of the relay rack (if applicable), for patch cable management per the drawings. F:\Courts\Technology UG 2016\Wire Bid\Attachment B Cabling Standards.doc 09/15/16 2

3 TELECOMMUNICATION CLOSET (TC) Install D-rings along the side of the voice backplane and across the bottom for riser and station cable management, per the drawings. Install mushrooms on the voice backplane at the top for cross-connect field. All racks and cabinets shall be grounded using #6 AWG green insulated grounding wire. Station and riser cables shall enter the voice back plane through the bottom. PANDUIT S INSTALLATION REQUIREMENTS Each link and/or channel submitted for warranty registration must be 100% constructed of Panduit connectivity hardware and a Panduit approved Cable Manufacturer s cable for the performance level specified for each link or channel. When installing a fiber system, 100% of the installation technicians must have received and have completed at least two days of formalized fiber optic installation course work. Cable types and hardware shall be: At Highway facilities, Solid Waste, UW Extension, Airport, Parks, and Brewster Village: Wired Voice, Category 5e, 4 pair, blue color. At Highway facilities, Solid Waste, UW Extension, Airport, and Parks: Wired Data, Category 5e+, 4 pair, blue jacket.. At Brewster Village: Wired Data, Category 5e+, 4 pair, green jacket. At Highway facilities, Solid Waste, UW Extension, Airport, Parks, and Brewster Village: Wireless Access Point Data, Category 5e+ & 5, 4 pair, purple jacket. At Downtown Campus: Wired Voice, Category 3, 4 pair, neutral color At Downtown Campus: Wired Data, Category 6, 4 pair, white jacket. At Downtown Campus: Wireless Access Point Data, Category 6, 4 pair, white jacket. Approved Unshielded Cable Manufacturer s: Plenum Panduit certified cables. Approved Shielded Cable Manufacturer s: Plenum Panduit certified cables. Approved Fiberoptics Cable Manufacturer s: Belden or any other Panduit Certified cables. Patch panels Modular Patch Panel, Part #CP24BL (24 ports), Part #CP48BL (48 ports) Note: Modular jacks are not included with the above Patch Panels Note: DO NOT USE ANY PATCH PANEL LARGER THAN 48 PORTS! Wire mangers Panduit horizontal wire managers for front applications, Part #NCMHF2 Wire managers Panduit horizontal wire managers for front and back applications, Part # NCMH2. F:\Courts\Technology UG 2016\Wire Bid\Attachment B Cabling Standards.doc 09/15/16 3

4 Wire managers Panduit vertical wire manager for front applications, Part #WMPVF45E (4 wide for 7 racks), Part # WMPVHCF45E (6 wide for 7 racks). Wire managers Panduit vertical wire managers for front and back applications, Part #WMPVF45E (4 wide for 7 racks) Part #WMPVHC45E (6 wide for 7 racks). At Highway facilities, Solid Waste, UW Extension, Airport, and Parks Faceplates Panduit mini-com classic faceplates (Electrical Ivory) 2 port, 3 port, 4 port, and 6 port faceplates, Part # CFPEI, CFP3EI, CFP4EI, CFPL6EIY. At Downtown Campus, Brewster, Hwy Garages (Hortonville, Shiocton Seymour) - Faceplates - Panduit mini-com classic faceplates (Off White) 2 port, 3 port, 4 port, and 6 port faceplates, Part # CFP2IW, CFP3IW, CFP4IW and CFPL6IWY. Surface Mount Boxes Panduit 1 port, 2 port, 4 port surface mount boxes, Part # CBX1IW-A, CBX2IW-A, CBX4IW-A At Highway facilities, Solid Waste, UW Extension, Airport, Parks, and Brewster Village: Ten pack of Panduit electrical ivory blanks Panduit Part # CMBEIX At Downtown Campus: Ten pack of Panduit Off White blanks Panduit Part # CMBIWX At Downtown Campus: Category 5e Modular jacks Panduit mini-jack Category 5e Modular Jack, Part #CJ588TIW (Off White) - FOR VOICE CONNECTIVITY! At Highway facilities, Solid Waste, UW Extension, Airport, Parks, and Brewster Village: Category 5e Modular jacks Panduit mini-jack Category 5e Modular Jack, Part #CJ588TEI (Electrical Ivory for Voice) FOR VOICE CONNECTIVITY! At Highway facilities, Solid Waste, UW Extension, Airport, Parks, and Brewster Village: Category 5e Modular jacks Panduit mini-jack TX5e Modular Jack (Black), Part #CJ5E88TBL (Black for Data) FOR DATA CONNECTIVITY! At Highway facilities, Solid Waste, UW Extension, Airport, Parks, and Brewster Village: Category 5e Shielded Modular jacks Panduit mini-jack TX- 5e Shielded Modular Jack, Part CJS5E88T At downtown campus: Category 6 Modular jacks Panduit s giga-channel mini-jack TX-6 modular jack (color black), part # CJ688TPBL At all facilities: Category 6 Patch Cords Data communications patch cords shall be black in color and 14 in length at the work station end. Systimax Part #CPC F014 At all facilities: Category 6 Patch Cords Data communications patch cords shall be yellow in color and 3, 5, 7, 10 in length at the Telecommunications Closet (TC) end. Variable lengths shall be supplied to accommodate a F:\Courts\Technology UG 2016\Wire Bid\Attachment B Cabling Standards.doc 09/15/16 4

5 patching organization on the relay racks with minimal slack. Panduit Part #UTP28SP3YL, UTP28SP5YL, UTP28SP7YL, UTP28SP10YL. Backbox Panduit backbox with a 2 depth or greater (New construction must use 4-11/16 x4-11/16 x2½ metal backbox for inside walls). Fiber All fiber installations shall be singlemode All fiber optic cable shall either be placed inside existing innerduct, newly provided innerduct, or use fiber optic cable with Interlock Armor when installing fiber optic cable. Fiber Optic Enclosures 1U use Panduit Part # FCE1U, 4U use Panduit Part # FCE4U Singlemode Fiber Optic Termination in 1U Panduit Enclosure Part #FCE1U terminate the fiber optic cables with singlemode SC connectors using fusion splicing with Panduit Pigtails (F91BN3NNNSNM001), Panduit adapter panel (FAP6WBUDSCZ), the proper Panduit splice trays (FOSMF), and Panduit splice tray holder (FOSMH1U). Provide blank adapter panels in any unused fiber enclosure slots, Panduit blank (FAPB). Singlemode Fiber Optic Termination 4U Panduit Enclosure Part #FCE4U terminate the fiber optic cables with singlemode SC connectors using fusion splicing with Panduit Pigtails (F91BN3NNNSNM001), Panduit adapter panel (FAP6WBUDSCZ), the proper Panduit splice trays (FOSMF), and Panduit splice tray holder (FOSMH4U). Provide blank adapter panels in any unused fiber enclosure slots, Panduit blank (FAPB). COPPER CABLE INSTALLATION Copper cable runs will be utilized for voice and data cables for station runs, riser cable (also known as backbone cables) and link lines, unless otherwise indicated in the specific overview for the project. The media used for these runs will be UTP, unless otherwise indicated by the specific overview for the project. Downtown Campus: Install all copper cables per Category 6 for data applications and Category 3 for voice applications. Highway facilities, Solid Waste, UW Extension, Airport, Parks, and Brewster Village: Install all copper cables per Category 5e for data applications and voice applications. Install all copper cables a minimum of 5 from all sources of electrical noise interference of 2 kv or less, a minimum of 12 from all sources of electrical noise interference of greater than 2kV and up to 5kV, and a minimum of 24 from all sources of electrical noise interference of 5kV or larger. Install cable management hardware to manage all cable bundles and individual cable runs as specified in this standard, the written overview, or as directed during the physical walk through. J-hooks are to be placed every 4, F:\Courts\Technology UG 2016\Wire Bid\Attachment B Cabling Standards.doc 09/15/16 5

6 unless otherwise approved by a representative of Outagamie County. The preferred hardware will be J-hooks. If J-hooks are not used, cable tray or conduit will be substituted, unless otherwise indicated by Outagamie County. The minimum bend radius of any UTP cable runs shall be 4 times the size of the diameter or greater. Pulling tension for all CAT 3, 5e, 6 UTP cable shall be less than 25lb or lower if so specified by the manufacturer. Pulling tension for all cable shall not exceed manufacturer s specification. All conduit runs, pull boxes and junction boxes shall be installed per the National Electrical Code (NEC) and local codes. As stated in the NEC, all conduit shall be supported every 10 and there shall be a junction box every 100. Minimum size for junction box shall be 4-11/16 x4-11/16 x2½. The recommended EIA/TIA fill ratios for conduit shall be adhered to with all conduit runs. Conduit Size # of UTP CAT 3, 5e, or 6 Cables Conduit Size ¾ ½ 30 1¼ ½ 15 # of UTP CAT 3, 5e, or 6 Cables For conduit stubs that extend from the station back box location to the ceiling area, a plastic or metal bushing will be placed at the end of the conduit. The conduit may bend at the top or go straight up depending on the application and cable routing. The bend will be determined by the direction that the cable will travel after leaving the conduit. All vertical cable runs not placed inside walls or ceilings shall be enclosed within a vertical raceway. No cable shall be visible. All cables and cable bundles passing through walls that are smoke partitions and/or fire rated walls shall be sleeved with EMT conduit and shall be firestopped per National Electrical Code (NEC). All station cable runs going to work stations in moveable partitions shall be protected the entire distance using flexible conduit (Sealtite or equivalent), power poles, or communication poles. If power poles are not integrated, then flexible conduit shall run from the power pole to the furniture. There shall be service cable installed at all TCs. This service cable shall be a minimum of 10 for UTP. There shall be no service cable left at the station end, unless other wise noted in the overview. All vertical cable runs placed in a plant or production area shall be placed inside metal conduit with a steel back box. This conduit run will be a vertical F:\Courts\Technology UG 2016\Wire Bid\Attachment B Cabling Standards.doc 09/15/16 6

7 1 stub from the jack location to the ceiling area or the height of the main cable bundle in that area. The steel back box should be a 4-11/16 x 4-11/16 x 2½ back box with a flush single gang opening. All station locations will be terminated with 6 to 12 of cable left out of the wall. This excess cable will be managed in a circular motion back into the box when placing the faceplate. The faceplate will be placed prior to the cable being qualified. Proper pulling techniques shall be used for both copper and fiber cable runs. FIBER OPTIC CABLE INSTALLATION Install cable management hardware per EIA/TIA Standards to manage all cable bundles and individual cable runs as specified in this standard, the written overview, or as directed during the physical walk through. J-hooks are to be placed every 4, unless otherwise approved by a representative of Outagamie County. The preferred hardware will be J-hooks. If J-hooks are not used it will be cable tray or conduit unless otherwise indicated by Outagamie County. Innerduct or conduit shall be used the entire distance from the TC to the TC or the TC to the workstation to protect the fiber. The minimum bend radius for fiber will be based upon the manufacturer s minimum bend radius for that specific cable. Pulling tension for all fibers shall be as per manufacturer s specification. All station cable runs going to work stations in moveable partitions shall be protected the entire distance using flexible conduit (Sealtite or equivalent), power poles, or communication poles. If power poles are not integrated, then flexible conduit shall run from the power pole to the furniture. All vertical cable runs not placed inside walls or ceilings shall be enclosed within a vertical raceway. No cable shall be visible. All cables and cable bundles passing through walls that are smoke partitions and/or fire rated walls shall be sleeved with EMT conduit and shall be fire stopped per National Electrical Code (NEC). There shall be service cable installed at all TCs. The total amount of cable left in the TC shall be 40. This allows 20 for service cable and 20 for termination purposes. There shall be no service cable left at the station end, unless other wise noted in the overview. All vertical cable runs placed in a plant or production area shall be placed inside metal conduit with a steel back box. This conduit run will be a vertical 1 stub from the jack location to the ceiling area or the height of the main cable bundle in that area. The steel back box should be a 4-11/16 x 4-11/16 x 2½ back box with a flush single gang opening. All station locations will be terminated with 6 to 12 of cable left out of the wall. This excess cable will be managed in a circular motion back into the box F:\Courts\Technology UG 2016\Wire Bid\Attachment B Cabling Standards.doc 09/15/16 7

8 when placing the faceplate. The faceplate will be placed prior to the cable being qualified. Proper pulling techniques shall be used for both copper and fiber cable runs. All conduit runs, pull boxes and junction boxes shall be installed per the National Electrical Code (NEC) and local codes. As stated in the NEC, all conduit shall be supported every 10 and there shall be a junction box every 100. Minimum size for junction box shall be 12 x12 x6. COPPER CABLE TERMINATIONS All terminations shall be done per Category 5e, or 6 Standards as indicated in this standard, the written overview, or discussed at the physical walk through. All cables shall be terminated in numeric order on the patch panels and the 110 blocks. The pre-numbered patch panels will NOT be re-numbered. The 110 blocks (when used for voice terminations) will be numbered in numeric sequence. Port 1 being the first position on the 110 block and port 24 being the last position, using a 100 pair block. The letter designation and floor number will be added to the numbering sequence only. All terminations shall be made with the proper punch down tools. All terminations shall be made per the written pinouts provided with the installation package. There shall be no split pairs at termination points. Split pairs may only be done with an external adapter. There shall be no splice points in any cable runs for Category 5e, 6. There shall be no under-carpet cable runs allowed. There shall be no transition points. All voice and data terminations will be kept in numeric order on the patch panels and the voice 110 blocks if that is the termination hardware. The numeric sequence should be maintained that is already imprinted in the patch panels. The same sequence will be used on the matching voice blocks. FIBER OPTIC CABLE TERMINATIONS All fiber terminations will be done according to EIA/TIA Standards. For splice points; fusion or mechanical splicing will follow proper fiber termination practices. COPPER CABLE TESTING F:\Courts\Technology UG 2016\Wire Bid\Attachment B Cabling Standards.doc 09/15/16 8

9 All cables shall be tested and the test results shall be provided to Outagamie County within 4 workdays of completion of the project. All Category 5e cables shall be tested and must pass per Category 5e Standards. All Category 6 cables shall be tested and must pass per Category 5e Standards. All cables shall be tested and the results of the test shall be provided to Outagamie County immediately upon the completion of the project. These test results shall be provided as a hardcopy printout from the cable analyzer or ed to the Telecommunications Coordinator in electronic format, or as otherwise indicated by the Project Manager within 4 workdays of completion of the project. All station data cables shall be tested per Category 5e or 6 Standards, depending on the cable type installed. All station voice cables shall be tested per Category 3, or 5e Standards. FIBER OPTIC CABLE TESTING All fiber cables shall be scanned for light losses with an OTDR. The fiber shall be scanned for multi-mode at 850nm and 1300nm and scanned for single mode at 1550nm. The tests shall be bi-directional. Test results should be provided for all of the above. These test results shall be provided as a hardcopy printout from the cable analyzer or in electronic format ed to the Outagamie County Project Manager, or otherwise indicated by the Project Manager within 4 workdays of completion of the project. LABELING All cables will be labeled with their ID number as assigned by Outagamie County. All station cable ends will be labeled within the last 4-6 of the cable. All labels shall be computer generated. Handwritten labels will not be acceptable. All faceplates will follow the same labeling scheme provided by Outagamie County. FIBER OPTIC CABLE LABELING F:\Courts\Technology UG 2016\Wire Bid\Attachment B Cabling Standards.doc 09/15/16 9

10 All fiber optic station cables will be labeled with their ID number as assigned by Outagamie County. All fiber optic backbone cable needs to be labeled with the source and destination locations on both ends. All fiber cables are color-coded. Documentation shall be provided to Outagamie County for fiber numbers correlating to Outagamie County coloring scheme. FIBER OPTIC CABLE LABELING (continued) All fiber cables will be labeled in areas of potential danger of damage so that it is identifiable as fiber. DOCUMENTATION All projects shall require an installation package from Outagamie County prior to it starting. All packages shall include, however, not be limited to: Inside Site Information Sheet Overview Floor Plans Drawings ID sheets There shall be a complete installation package provided to the customer and to the installation crew prior to the start of the project. It shall be required of the installation crew that all changes to the project be approved by a representative of Outagamie County and that the installation crew document all the changes. All documentation must be returned to Outagamie County within 4 business days after the completion of a project. AS BUILT DRAWINGS: As built documentation complying with the contract documents shall be provided as part of the Premise (Cabling) Distribution System contract. As build drawings shall be a complete set of floor plans or lot plans showing all outlets as numbered and their locations. All cable routing and cross connect locations indicating terminations shall be required. All test reports for fiber and copper cables shall be included. All required as built documentation is mandatory and shall be required prior to the Premise (Cabling) Distribution System acceptance. F:\Courts\Technology UG 2016\Wire Bid\Attachment B Cabling Standards.doc 09/15/16 10

11 NOTES 1. All TC s will have the same standards. 2. Daily updates should be provided to the representative of Outagamie County. Outagamie County must approve all change orders prior to installation. This approval can only be granted via a Change Order Form by Outagamie County. Any additional costs incurred by the contractor without prior approval will be the sole responsibility of the contractor. 3. Whenever possible, electrical conduit feeding any cabinet shall be Installed inside the cabinet on the hinged side. F:\Courts\Technology UG 2016\Wire Bid\Attachment B Cabling Standards.doc 09/15/16 11

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE

UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE Prepared in cooperation and approval from BICSI Building Industry Consulting Services International and

More information

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus

REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus PART 1: GENERAL REQUIREMENTS A. Contractor Work 1. Provide and install (except as noted in this document), cable,

More information

Section Communications Optical Fiber Backbone Cabling

Section Communications Optical Fiber Backbone Cabling Part 1 1.1 Related Documents 1.1.1 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specifications Sections apply to this Section. 1.2 Related

More information

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.

California Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1. PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017

Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM Date: 05/26/2017 Pre-bid Supplement #01 Communications Specifications and Additional Scope Project Bid: CM-2017-2 Date: 05/26/2017 Additional specification information for data communication to cameras and between Library

More information

STRUCTURED CABLE SYSTEM (SCS)

STRUCTURED CABLE SYSTEM (SCS) PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

Mfgr. Berk Tek ea , Berk Tek ea , Berk Tek ea. Berk Tek ea ,350.

Mfgr. Berk Tek ea , Berk Tek ea , Berk Tek ea. Berk Tek ea ,350. 8. Pricing Schedule The undersigned has rd and understands all conditions and terms of RFP 336-, is authorized to submit this proposal on behalf of the company, and hereby offers to perform the services

More information

A. All communications equipment rooms shall be installed in a neat and workmanlike manner.

A. All communications equipment rooms shall be installed in a neat and workmanlike manner. SECTION 27 11 00 - COMMUNICATIONS EQUIPMENT ROOM FITTINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION COMMUNICATIONS HORIZONTAL CABLING SECTION 271500 COMMUNICATIONS HORIZONTAL CABLING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. UTP cabling. 2. Telecommunications outlet/connectors including patch panels. 3. Cabling identification

More information

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street

More information

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION COMMUNICATIONS HORIZONTAL CABLING (NOTE TO DESIGNER: These Specifications are basic minimum criteria to be met in preparing the final specifications for this section, which is the responsibility of the Designer.) PART 1 - GENERAL 1.1 SECTION

More information

APPENDIX A Verify All Part Numbers (Partial List of Approved Products)

APPENDIX A Verify All Part Numbers (Partial List of Approved Products) SECTION 16651 APPENDIX A Verify All Part Numbers (Partial List of Approved Products) SYSTIMAX SCS: OVER-VOLTAGE PROTECTION 1. Over-voltage Protection Device, 100-Pair with Enclosure, Product 489ACAI-100,

More information

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents PART 1 - GENERAL 1.1 SUMMARY SECTION 271500 COMMUNICATIONS HORIZONTAL CABLING A. Section Includes: 1. UTP cabling. 2. Telecommunications outlet/connectors. 3. Cabling system identification products. 1.2

More information

SECTION FIBER OPTIC STATION CABLES

SECTION FIBER OPTIC STATION CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications shall include all labor necessary to perform and complete such construction, all materials and equipment incorporated

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD, applicable TC -, and CEHNC Design Guide 0-- (Standard is single UTOs and Double UTOs) B. Roads-Service, Lanes Adequate access is provided to the and AAR D. Testing Results-provided

More information

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)

Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) PART 1: GENERAL 1.01 Telecommunications Engineer Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) B. Registered Communications Distribution Designer

More information

B. All work shall be in accordance with Building Industry Consulting Services International (BICSI) guidelines.

B. All work shall be in accordance with Building Industry Consulting Services International (BICSI) guidelines. PART 1 - GENERAL 1.1 SUMMARY A. This section includes: 1. Support Structures 2. Cable trays and ladder rack 3. Racks (including wire managers) 4. Cables (copper and optical fiber) 5. Jacks and faceplates

More information

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT

CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Purchasing and Warehouse Services Department October 1, 2007 Addendum No. 1 INVITATION FOR BID No. 08-09 Temporary Faculty Offices, Chabot College All Prospective

More information

Division 27 COMMUNICATION/DATA, PATHWAYS, AND WIRING

Division 27 COMMUNICATION/DATA, PATHWAYS, AND WIRING Revision 05/01/2017 Division 27 COMMUNICATION/DATA, PATHWAYS, AND WIRING PART 1 GENERAL 1.1 SECTION INCLUDES A. Voice, Data, and Fiber Cable Product materials B. Voice, Data, and Fiber Cable Execution

More information

UNM IT/Telecommunications Guide Specification Labeling 11/07/

UNM IT/Telecommunications Guide Specification Labeling 11/07/ Labeling 1 PART 1: GENERAL 1.01 SCOPE OF WORK A. Work covered by this Section shall consist of furnishing labor, equipment, supplies, materials, and testing unless otherwise specified, and in performing

More information

Public Works Division Lighting District Fiber Optic Specifications April 2009

Public Works Division Lighting District Fiber Optic Specifications April 2009 Public Works Division Lighting District Fiber Optic Specifications April 2009 7000 Florida Street Punta Gorda, Florida 33950 Tele: 941.575.3600 Fax : 941.637.9265 www.charlottecountyfl.com/publicworks

More information

Information Technology Services DESIGN AND INSTALLATION STANDARDS

Information Technology Services DESIGN AND INSTALLATION STANDARDS Requirements and Guidelines for: New Construction, Renovations, Upgrades, and Retrofits. Revised: June 5, 2015 VIU ITS Network Services 2 TABLE OF CONTENTS 0 GENERAL... 5 1 FIBER OPTIC CABLING... 5 1.1

More information

SECTION 7 -- CROSS-CONNECT SYSTEMS

SECTION 7 -- CROSS-CONNECT SYSTEMS DETAIL ENGINEERING REQUIREMENTS AT&T March, 2016 Section 7, ATT-TP-76400 Revised NA SECTION 7 -- CROSS-CONNECT SYSTEMS CONTENTS PAGE 1. GENERAL... 7-2 1.1. Introduction... 7-2 1.2. Cable Holes... 7-2 1.3.

More information

Michigan State University Construction Standards EXTERIOR FIBER OPTIC CABLE SYSTEM PAGE

Michigan State University Construction Standards EXTERIOR FIBER OPTIC CABLE SYSTEM PAGE PAGE 271800-1 SECTION 271800 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SPECIAL SPECIFICATION 8540 Telecommunication Cable

SPECIAL SPECIFICATION 8540 Telecommunication Cable 2004 Specifications CSJ 0914-00-307 & CSJ 0914-25-003 SPECIAL SPECIFICATION 8540 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing,

More information

Liberty Mutual Structured Cabling Specification Bid and Build Structured Cabling Technical Specification for:

Liberty Mutual Structured Cabling Specification Bid and Build Structured Cabling Technical Specification for: Bid and Build Structured Cabling Technical Specification for: Horizontal & Backbone Requirements Page 1 of 30 PUBLICATION RECORD Document Version Publication Date Primary Author Description Revision 1.0

More information

A. The requirements of Section govern the work specified in this section.

A. The requirements of Section govern the work specified in this section. SECTION 27 05 10 - COMMUNITY ANTENNA TELEVISION CABLING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. The requirements of Section 27 01 00 govern the work specified in this section. B. Refer to the following

More information

Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5

Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5 Telecommunications Cabling System Technical Specification for the K-12 Educational Environment Enhanced Category 5 1.0 INTRODUCTION Customer to define background and introduction to the project based on

More information

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab*

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* General Scope of Work: Supply and installation of Computer Laboratory setup in MIU Location of Installation:

More information

Follow The Leader In Shielded Technology

Follow The Leader In Shielded Technology 1970s Vampire Tap 1990s Shielded Modular Jack 190s 4 Position Data Connector Follow The Leader In Shielded Technology The new AMP-TWIST Jack is our latest shielded product evolution. It can be terminated

More information

Cable Installation Tips

Cable Installation Tips Cable Installation Tips Campus Network Design & Operations Workshop These materials are licensed under the Creative Commons Attribution-NonCommercial 4.0 International license (http://creativecommons.org/licenses/by-nc/4.0/)

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS BH, CB, CH, ED, MH, LH, Camera Project 1.1.0 GENERAL The purpose of this specification is to establish a requirement for the installation of a voice, video and data cable network. The cable (copper), wire, hardware, equipment racks, jumpers,

More information

ADDENDUM NO. 2 This addendum consists of 8 pages. Kenai Peninsula Borough Purchasing & Contracting

ADDENDUM NO. 2 This addendum consists of 8 pages. Kenai Peninsula Borough Purchasing & Contracting KENAI PENINSULA BOROUGH Purchasing and Contracting 144 North Binkley Street Soldotna, Alaska 99669-7520 Toll-free within the Borough: 1-800-478-4441, Ext. 2260 PHONE: (907) 714-2260 FAX: (907) 714-2373

More information

SPECIAL SPECIFICATION 6559 Telecommunication Cable

SPECIAL SPECIFICATION 6559 Telecommunication Cable 2004 Specifications CSJ 0015-09-147, etc. SPECIAL SPECIFICATION 6559 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing, training,

More information

Cable Installation Tips

Cable Installation Tips Cable Installation Tips Campus Network Design & Operations Workshop These materials are licensed under the Creative Commons Attribution-NonCommercial 4.0 International license (http://creativecommons.org/licenses/by-nc/4.0/)

More information

SECTION TESTING OF COPPER CABLES

SECTION TESTING OF COPPER CABLES SECTION 27 08 13 TESTING OF COPPER CABLES PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction,

More information

Preferred ordering guide for NETCONNECT

Preferred ordering guide for NETCONNECT Preferred ordering guide for NETCONNECT MEA Region Contents Copper solutions Category 6A products 3 Category 6A and Category 7 shielded copper cables 3 Category 6A modular shielded panels 3 Category 6A

More information

OASIS CSI (Certified Security Integrators) Direct Attach Warranty for ESS Devices

OASIS CSI (Certified Security Integrators) Direct Attach Warranty for ESS Devices OASIS CSI (Certified Security Integrators) Direct Attach Warranty for ESS Devices Berk-Tek recommends installing a well-designed structured cabling channel per the TIA standards. This includes up to 100

More information

Telecommunication Infrastructure Project September 20, 2002

Telecommunication Infrastructure Project September 20, 2002 PART 1 - GENERAL 1.1 SECTION INCLUDES A. Testing Publications and Standards B. Category rated UTP systems shall be provided and tested in accordance with the performance level established in Specification

More information

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017

NYULMC AMBULATORY CARE CENTER FIT-OUT PHASE 1 Perkins & Will Architects PC 222 E 41st ST, NYC Project: Issued for GMP March 15, 2017 SECTION 27 15 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION

SECTION TESTING, IDENTIFICATION AND ADMINISTRATION PART 1 - GENERAL 1.1 SUMMARY SCOPE SECTION 25170 TESTING, IDENTIFICATION AND ADMINISTRATION 1. This section includes the minimum requirements for the testing, certification administration and identification

More information

Special Specification 6242 Special Fiber Optic Cable

Special Specification 6242 Special Fiber Optic Cable Special Specification 6242 Special Fiber Optic Cable 1. DESCRIPTION 2. MATERIALS The contractor to install, splice, field terminate, test and document all fiber systems. A. General Requirements. Provide

More information

1.0 GENERAL. 1.2 SUMMARY.1 Section Includes:

1.0 GENERAL. 1.2 SUMMARY.1 Section Includes: 1.0 GENERAL 1.1 DOCUMENTS.1 This section of the Specification forms part of the Contract Documents and is to be read, interpreted, and coordinated with all other parts. 1.2 SUMMARY.1 Section Includes:

More information

Aldine ISD Structured Cabling System Installation Guidelines. Category 6 and OM1 Technical Specification

Aldine ISD Structured Cabling System Installation Guidelines. Category 6 and OM1 Technical Specification Aldine ISD Structured Cabling System Installation Guidelines Category 6 and OM1 Technical Specification Table of Contents PART 1 - GENERAL... 3 1.1 Summary of work... 3 1.2 Special requirements for cable

More information

DATA/TELECOMMUNICATIONS REQUEST FOR PRICING

DATA/TELECOMMUNICATIONS REQUEST FOR PRICING Category 6A 10Gig DATA/TELECOMMUNICATIONS REQUEST FOR PRICING TABLE OF CONTENTS 1. GENERAL 3 1.1. Work Included... 3 1.2. Scope of Work... 3 1.3. Regulatory References... 4 1.4. Quality Assurance... 4

More information

SECTION TELECOMMUNICATIONS FIBER OPTIC DISTRIBUTION

SECTION TELECOMMUNICATIONS FIBER OPTIC DISTRIBUTION SECTION 16747 TELECOMMUNICATIONS FIBER OPTIC DISTRIBUTION PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: Requirements for installation and modification of fiber optic distribution systems by Tenants,

More information

Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS

Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS VOFP Cabling RFP 1 Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS For The Village of Franklin Park 2014 VOFP Cabling RFP 2 TABLE OF CONTENTS I. PROJECT DESCRIPTION

More information

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points

Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points Due Date: Allowable Contract Date from Posted 470 The Palo Verde Elementary School District is requesting

More information

Data Network Wiring Standard. Part 1: General Section Includes Publications and Standards

Data Network Wiring Standard. Part 1: General Section Includes Publications and Standards Part 1: General 1.01 Section Includes A. Fiber Optic Cable B. Fiber Optic Distribution Cabinets C. Interbuilding Fiber Optic Cabling/Patch Cords D. Fiber Optic Connectors E. Interbuilding Distribution

More information

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components PART 1 - GENERAL 1.1 SECTION INCLUDES A. Broadband radio frequency active and passive components B. Broadband optical active and passive components C. Coaxial cable and connectors D. Support and termination

More information

10Gb/s Copper Physical Infrastructure Next Generation Category 6A Cabling System

10Gb/s Copper Physical Infrastructure Next Generation Category 6A Cabling System 10Gb/s Copper Physical Infrastructure Next Generation Category 6A Cabling System Next-Generation Category 6A UTP Cabling System Drivers for 10 GbE Aggregation of Gigabit Links Server Consolidation and

More information

جامعة مؤتة العطاءات املركزية توريد وتركيب وتشغيل أجهزة شبكات/كلية الزراعة. Central Tenders Mu tah University

جامعة مؤتة العطاءات املركزية توريد وتركيب وتشغيل أجهزة شبكات/كلية الزراعة. Central Tenders Mu tah University عطاء رقم 3 /ل/ 2019 توريد وتركيب وتشغيل أجهزة شبكات/كلية الزراعة 1. 20U Network Rack: (QTY:- 1 pieces) 1. Wall Mounted Type. 2. Dimension (H x W x D): 20U x 600 x 600. 3. Material: Steel. 4. Front Door:

More information

Information & Communications Technology Network Infrastructure Group. Network Infrastructure Standards June 2008

Information & Communications Technology Network Infrastructure Group. Network Infrastructure Standards June 2008 Information & Communications Technology Group Standards June 2008 Appendix F UTP cabling Version 1.1 Appendix F UTP cabling 1. Introduction This Section details the required standards for Unshielded Twisted

More information

Technical Specifications Florida Gulf Coast University

Technical Specifications Florida Gulf Coast University Technical Specifications Florida Gulf Coast University 9/19/2018 Page 1 of 21 Approved Vendors (alphabetical order) Aztek (CIP) Certified Installer Plus Mr. Scott Coyne 4730 Enterprise Avenue Suite #308

More information

Northwestern University Information Technology Building Infrastructure Requirements for Communication Facilities ( January 2010)

Northwestern University Information Technology Building Infrastructure Requirements for Communication Facilities ( January 2010) Northwestern University Information Technology Building Infrastructure Requirements for Communication Facilities ( January 2010) I. Introduction This document presents the current Northwestern University

More information

DESIGN!!GUIDELINES!!!!!

DESIGN!!GUIDELINES!!!!! DESIGNGUIDELINES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 1. Testing General 1.1. For acceptance, 100% of the media

More information

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM

NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM NC-1000 INSTALLATION MANUAL NC-1000 FIBRE OPTIC CROSS-CONNECTION SYSTEM Content 1. General 5 2. The products of NC-1000 system 6 3. Mounting of the frame 8 4. Earthing of the frame 8 NC-1000 FIBRE OPTIC

More information

WJHW, Inc. 6 April 2016 Texas Tech University Issue for CD Set Sports Performance Complex Lubbock, Texas

WJHW, Inc. 6 April 2016 Texas Tech University Issue for CD Set Sports Performance Complex Lubbock, Texas SECTION 27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Provide materials, labor, and methods for telecommunications grounding and bonding system in accordance with

More information

Brown University. Communications Standard Parts List

Brown University. Communications Standard Parts List CIS - NTG Brown University Communications Standard Parts List All data installations must receive the 25-year Mission Critical Warrantee from Hubbell Premise Wiring. All fiber installations must receive

More information

The Uniduct Nonmetallic Latching Raceway

The Uniduct Nonmetallic Latching Raceway Uniduct One-Piece Latching Raceway The Uniduct Nonmetallic Latching Raceway System is a one-piece single channel design, ideally suited to route and protect fiber optic, UTP, and and other low-voltage

More information

Connected Solutions. April $ Post, 19 Rack ELERK1FR BK

Connected Solutions. April $ Post, 19 Rack ELERK1FR BK Connected Solutions April 2018 $30.97 Punch & Go Tool ONQAC3400 $139.97 per 305M Category 6 Riser, UTP, 23 AWG, Blue 305 Meter/1000 FT Pull Box CAB24/4PS6FT4BLUHYP $137.97 2 Post, 19 Rack ELERK1FR1194400BK

More information

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents

ADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents WESLEYAN U N I V E R S I T Y Facilities 170 Long Lane Middletown, Connecticut 06457 (860) 685-3476 FAX (860) 685-3101 ADDENDUM #3 Date: March 4, 2013 Project: To: CFA A Rehearsal Hall AHU Replacement Annual

More information

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD

COMMON WORK RESULTS FOR INTEGRATED AUTOMATION DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

SPECIAL SPECIFICATION 2284 Fiber Optic Cable (Self-Supporting)

SPECIAL SPECIFICATION 2284 Fiber Optic Cable (Self-Supporting) 2004 Specifications CSJ 0086-14-046 SPECIAL SPECIFICATION 2284 Fiber Optic Cable (Self-Supporting) 1. Description. Furnish, install, splice, field terminate, and test the fiber optic cables. 2. Materials.

More information

Cable Certification. General Testing Criteria (Applies to all cable certification testing) Attachment E Cable Certification

Cable Certification. General Testing Criteria (Applies to all cable certification testing) Attachment E Cable Certification General Testing Criteria (Applies to all cable certification testing) 1. RCIT reserves the right to be present during any or all cable testing procedures. The Contractor shall obtain authorization from

More information

THE OHIO STATE UNIVERSITY COMMUNICATIONS WIRING STANDARD

THE OHIO STATE UNIVERSITY COMMUNICATIONS WIRING STANDARD THE OHIO STATE UNIVERSITY COMMUNICATIONS WIRING STANDARD The objective of the standard wiring plan for the University is to provide an acceptable outlet for any communication device that requires connection

More information

SOLICITATION ADDENDUM NO. 1 ITB THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED.

SOLICITATION ADDENDUM NO. 1 ITB THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED. Beaverton School District Capital Program Purchasing 16550 SW Merlo Road, Beaverton, OR 97006 Phone: 503-591-4539 SOLICITATION ADDENDUM NO. 1 ITB 15-0012 THE FOLLOWING CHANGES TO THE ABOVE CITED SOLICITATION

More information

Belden IBDN System 10GX 10GX Modules and 10GX Patch Panels

Belden IBDN System 10GX 10GX Modules and 10GX Patch Panels C O M M E R C I A L N E T W O R K I N G C O P P E R 5.6 Belden IBDN System GX GX Modules and GX Patch Panels AX2272 GX Module, Black GX Module The GX Module is a revolutionary punch down UTP connector

More information

CABLE MANAGEMENT PRODUCTS Cable Managers & Accessories

CABLE MANAGEMENT PRODUCTS Cable Managers & Accessories CABLE MANAGEMENT PRODUCTS Cable Managers & Accessories Evolution Cable Management Page 5-3 Velocity Cable Management Page 5-8 Velocity Standard Pack Page 5-12 Vertical Cable Management Page 5-13 Global

More information

C. Link offers a standard 1-year warranty on all parts and labor. Manufacturer's warranty is available for larger projects.

C. Link offers a standard 1-year warranty on all parts and labor. Manufacturer's warranty is available for larger projects. DIR-SDD-1898 Cabling Services and Related Products C. Link offers a standard 1-year warranty on all parts and labor. Manufacturer's warranty is available for larger projects. Please address all returns

More information

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING WIRING CHAPTER 14 WIRING The installation of all wiring, including electrical cables and conductors, must conform to the National Electrical Code (NEC). The Code represents the minimum required standard.

More information

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION TELECOMMUNICATIONS SYSTEM INFRASTRUCTURE

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION TELECOMMUNICATIONS SYSTEM INFRASTRUCTURE PART 0 DESIGN STANDARDS 0.01 GENERAL DESIGN GUIDELINES A. The intent of this standard is to describe the requirements of the telecommunications system infrastructure. Part of this system is the responsibility

More information

Best Friends General Trading FZE

Best Friends General Trading FZE Welcome to Best Friends General Trading FZE Tel. +97 1 50-5426 202, Fax. +971 6 7407428, info@bestfgt.com, besttrd@eim.ae Infrastructure Product Guide Best fgt is UAE based company, operational for last

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0553 Identification for Communications Systems 1 General 1.1 Scope of work 1.1.1 The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the completion of

More information

QuickNet Copper Cabling in the Data Center

QuickNet Copper Cabling in the Data Center Application Guide QuickNet Copper Cabling in the Data Center QuickNet Copper Cabling Systems With the benefits of quick network deployment, assured performance, quality, and easy redeployment, the Panduit

More information

SPECIAL SPECIFICATION 6191 Fiber Optic Cable

SPECIAL SPECIFICATION 6191 Fiber Optic Cable 2004 Specifications CSJ 0014-02-014, etc SPECIAL SPECIFICATION 6191 Fiber Optic Cable 1. Description. Furnish, install, splice, field terminate, and test the fiber optic cables. 2. Materials. A. General

More information

SECTION COMMUNICATIONS STRUCTURED CABLING

SECTION COMMUNICATIONS STRUCTURED CABLING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 27 15 00 COMMUNICATIONS STRUCTURED CABLING SPEC WRITER NOTES: 1. Edit this specification section between // //, to fit project, or delete if not applicable. 2.

More information

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION COMMUNICATIONS HORIZONTAL CABLING SECTION 27 15 00 COMMUNICATIONS HORIZONTAL CABLING PART 1 GENERAL 1.1 RELATED DOCUMENTS AND SECTIONS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling

Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling Due Date: Allowable Contract Date from Posted 470 The Clarkdale- Jerome School District is requesting

More information

Project No. # Page 1

Project No. # Page 1 PART 1 - GENERAL This section of the has references, products, procedures, processes, and work descriptions/summaries that are common to many Washington State University Pullman (WSUP) campus telecommunications

More information

Panduit Recommended Best Case Practice Split Fibre

Panduit Recommended Best Case Practice Split Fibre Panduit Recommended Best Case Practice Split Fibre Panduit Corp. 2009 BEST PRACTICES PN526 Table of Contents 1.0 Enclosure Prep... 2 2.0 Fibre Cable Prep and Installation... 2 3.0 Pigtail Installation...

More information

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes. SECTION 33 71 49.23 MEDIUM VOLTAGE CABLE INSTALLATION PART 1 GENERAL 1.1 SCOPE A. Work included in this Section: Medium Voltage Cable (4 kv and 12 kv) Installation and Termination. Removal and return of

More information

IP-LINX Fiber :: X-XXXX

IP-LINX Fiber :: X-XXXX Fiber :: 055-797X-XXXX User Manual Telect, Inc. All rights reserved. 146653-A0 Table of Contents Chapter 1: Introduction...3 1.1 Tools Required...3 1.2 Additional Parts...3 1.3 Assemblies...3 Chapter 2:

More information

STANDARDS SECTION (16651) COMMUNICATIONS DISTRIBUTION SYSTEM (Rev. Jun 2011)

STANDARDS SECTION (16651) COMMUNICATIONS DISTRIBUTION SYSTEM (Rev. Jun 2011) PART 1 GENERAL 1.00 DESCRIPTION STANDARDS SECTION 271000 (16651) COMMUNICATIONS DISTRIBUTION SYSTEM (Rev. Jun 2011) A. Furnish and install a complete Communications (Telephone/Data) Distribution System

More information

5400 Series Nonmetallic Raceway

5400 Series Nonmetallic Raceway 5400 Series Nonmetallic Raceway Nonmetallic Raceway with Twin Snap Cover System Available Factory Prewired PREWIRED SURGE COMMUNICATIONS FIBER OPTIC CAT5 Wiremold 5400 Series Raceway provides wire and

More information

PREMIUM 5e F/UTP PRODUCTS

PREMIUM 5e F/UTP PRODUCTS Siemon s end-to-end cabling system is guaranteed to provide transmission performance margins in excess of industry standards for category 5e parameters, while featuring excellent EMI resistance. has been

More information

Multi-Media Installation Guide

Multi-Media Installation Guide Multi-Media Installation Guide Coaxial Page 2 Data Plug Page 7 Data Jack Page 10 Telephone Page 13 Splicing Page 15 Cable Types Cable Types Two basic types of cable are used in multimedia installations.

More information

HighBand 25. TrueNet Category 6 Solutions

HighBand 25. TrueNet Category 6 Solutions HighBand 25 TrueNet Category 6 Solutions The highest performing cross-connect system in the world. A unique high-density solution with superior cable management. ADC KRONE s HighBand 25 cross connect solution

More information

blackbox.com/connect The smart choice when price matters most. Need help? Talk to a Black Box cable expert 24/7 at

blackbox.com/connect The smart choice when price matters most. Need help? Talk to a Black Box cable expert 24/7 at blackbox.com/connect The smart choice when price matters most. Need help? Talk to a Black Box cable expert 24/7 at 877-877-2269 The Black Box quality you've come to expect. In stock. Ships today. The smart

More information

Connectivity accessories by Nestor Cables

Connectivity accessories by Nestor Cables Connectivity accessories by Nestor Cables NesCon product family includes essential installation and connection accessories for fibre optic networks, from ODFs to joint closures and terminations. www.nestorcables.com

More information

IP-LINX. Installation Guide

IP-LINX. Installation Guide Installation Guide Installation Guide, 146653-4 Copyright 2017, Telect, Inc. All Rights Reserved Telect and Connecting the Future are registered trademarks of Telect, Inc. 22425 East Appleway Ave. # 11

More information

Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards.

Category 6A UTP cables shall be tested and proved to conform to TIA-568-C.2 standards. 27 08 00 Certification and Commissioning of Communication Systems (Revision date: 7/3/12) 1.0 Purpose A. These guidelines provide requirements for designers to incorporate into bid documents. They are

More information

INFRASTONE BLACKSTONE 10G 6A(U/UTP) Europe, Middle East and Africa regions UNLIMITED USAGE 1

INFRASTONE BLACKSTONE 10G 6A(U/UTP) Europe, Middle East and Africa regions UNLIMITED USAGE 1 INFRASTONE BLACKSTONE 10G 6A(U/UTP) Europe, Middle East and Africa regions UNLIMITED USAGE 1 WWW.INFRASTONE.COM Contents BLACKSTONE CAT6A U/UTP channel performance Introduction BLACKSTONE CAT6A U/UTP channel

More information

OptiTect Premier Local Convergence Cabinet An Evolant Solutions Product

OptiTect Premier Local Convergence Cabinet An Evolant Solutions Product Description The OptiTect Premier Local Convergence Cabinet family provides everything necessary to manage 44, 288 and 432 distribution fibers for an outside plant FTTx application. The OptiTect Premier

More information

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of a centralized

More information

3M Supported Applications Map 100,000 (2005) Single-mode. Fiber. Multimode. Fiber. Copper

3M Supported Applications Map 100,000 (2005) Single-mode. Fiber. Multimode. Fiber. Copper 3M Volition Network Solutions introduces Category 5e (Cat. 5e) copper cabling system to complement its leading fiber optic structured cabling system. Customers can now enjoy a single source of supply and

More information

RCIT Cable Certification Testing Revised 10/2017

RCIT Cable Certification Testing Revised 10/2017 RCIT Testing Revised 10/2017 General Testing Criteria (Applies to all cable certification testing) 1. RCIT reserves the right to be present during any or all cable testing procedures. The Contractor shall

More information

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS Projector, Camera and Veteran s Project

MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS Projector, Camera and Veteran s Project 1.1.0 GENERAL MIDDLESEX COUNTY COLLEGE WIRE AND CABLE NETWORK REQUIREMENTS Projector, Camera and Veteran s Project The purpose of this specification is to establish a requirement for the installation of

More information

3M Fiber Optic Wall Mount Enclosure 8430 Series

3M Fiber Optic Wall Mount Enclosure 8430 Series 3M Fiber Optic Wall Mount Enclosure 8430 Series Installation Instructions January 2014 3 78-0013-9429-1-A Table of Contents 1.0 Description...3 2.0 Parts...4 3.0 Assembly...4 4.0 Mounting the Enclosure...6

More information