1 Status of the LHCb Upgrade CERN-RRB April Introduction The LHCb Upgrade will be installed during the two year Long Shutdown 2 of the LHC (LS2). The upgraded detector will be able to read out all sub-detectors at 40 MHz and to select physics events of interest by means of a pure software trigger at the bunch crossing rate of the LHC. This capability will allow the experiment to collect data with high efficiency at a luminosity of cm 2 s 1. Flavour-physics measurements will be performed with much higher precision than is possible with the current detector, and across a wider range of observables. The flexibility inherent in the new trigger scheme will also allow the experiment to diversify its physics programme into important areas beyond flavour. The Upgrade was proposed in the Letter of Intent [1] in 2011, and its main components and cost-envelope were defined in the Framework TDR [2] one year later. Technical Design Reports (TDRs) have been written for all sub-systems [3 6] and approved by the Reseach Board. Addenda to the Memorandum of Understanding (MoU) were presented to the RRB in April and October 2014, covering the division of resources and responsibilities for Common Project items [7] and sub-system items [8], respectively. In this report a brief update is given on the status of the Upgrade, reiterating the detector choices made in the TDRs and summarising progress since the previous RRB. No new significant risks have been identified, or concerns arisen, in any of the sub-detector or common projects. Information is also given concerning overall project organisation, infrastructure and funding. 2 Tracking system upgrade Over the last six months the Vertex Locator (VELO), Upstream Tracker (UT) and Scintillating Fibre (SciFi) Tracker projects have undergone several Engineering Design Reviews (EDRs) and are now preparing for the construction phase. A summary of recent progress and expectations for the next half year are given for each of the three sub-detectors of the tracking system. 1

2 2.1 Vertex Locator (VELO) VELO sensor prototypes from two candidate suppliers have been evaluated in the testbeam after full, non-uniform irradiation with protons and after full irrradiation with neutrons. All the prototypes satisfy performance requirements in terms of charge-collection efficiency and resolution, and the timewalk behaviour has been characterised. The only cause for concern remains the additional charge collection beyond the pixel matrix in some n-on-p sensors, and possible additional currents drawn on the edges of the thinned n-in-n sensors, both from one supplier. The sensor pre-series orders addressing these issues and adding the rounded corner designs have been placed with both manufacturers. The sensors have been elongated by two pixels to accommodate the larger size of the new TSMC ASICs compared to those from the original foundry. As the HV performance with the new TSMC technology remains unproven, it is considered vital to maintain the n-in-n option, only currently available from one supplier, as a back-up in case sparking is experienced at high voltage. The submission of the VeloPix, the frontend ASIC, has been delayed with respect to the initial plans and is now scheduled for April. All aspects are being verified with the expectation of a fully functioning ASIC after first submission. This will be critical for the module development work during All basic building blocks are ready. A detailed planning for the final steps exists and the submission date is realistic. The VeloPix test setups are in production. For the bare ASIC testing a chipboard design has been submitted and the SPIDR readout development is fully on track. The wafer probing setup is under development. For the DAQ slice test, which will evaluate the signal chain quality, all essential components have been designed and sent for manufacture. This includes the split VeloPix evaluation hybrid ( Velopix hybrid and control hybrid), the vacuum feedthrough evaluation board, and the OPB prototype board, which were submitted following their respective EDRs in November. The final stage of the chain will be the VeloPix specific MiniDAQ system, which has already undergone several successful preliminary tests. The microchannel cooling EDR was held in November and the referee report delivered. The referee report identified no show stoppers and made a number of recommendations to evaluate further and define the performance and technical specifications of the microchannel devices. Endurance and safety tests are underway for critical items in the VELO cooling chain, such as the creep tests recommended in the referee report. The VELO microchannel cooling tender is under preparation and expected to go out in a matter of weeks. The module design has moved to a more narrow foot which eases the assembly. Simulations show that the new design has the required stiffness and also has the consequence of a more balanced and symmetric electrical cabling and layout on both the hybrid and the OPB. Glueing and handling jigs are under construction for the module assembly and are being excercised with full scale 3D printed module mockups. A detailed study has been made of possible gluing patterns which 2

3 provide the necessary strength but avoiding any trapped air pockets. A new half-size RF-foil box prototype with 500 µm thickness (Fig. 1) has been completed using cast aluminium. Whereas the box was at first leaktight, small leaks developed after a 200 degrees bakeout. By using a dye-penetrant method these leaks were traced to a small number of micro-holes in the flat part of the structure, an issue which is believed to be due to the grain sizes in the material, and which will be eliminated with the use of forged aluminium as planned for the first full-size box. The box will be used for etching tests and work is going ahead on the construction of a new 250 µm thick machined box. Figure 1: Half-size prototype of the VELO RF foil box. 2.2 Upstream Tracker (UT) The UT project is progressing well. The transition toward construction, initially planned for the last quarter of 2015, is now underway. The small delay in the start of this phase is due to the time taken to construct two clean rooms, one for stave assembly and metrology, the other for sensor and electronics testing and wire bonding. The latter is now operational and the automatic wire bonder has been used to assemble hybrids with Beetle ASICs, ready for test-beam evaluation with prototype sensors in May Figure 2 shows a silicon sensor wire-bonded to Beetle devices mounted on hybrid circuits. Hamamatsu have completed fabrication of the last batch of prototype type-a sensors, which are needed for the outer region of the UT planes. These sensors are implemented in p-in-n technology, which is expected to be adequate for the irradiation levels expected after the nominal Upgrade integrated luminosity is accumulated. A slight modification of the design will allow further studies of the embedded 3

4 Figure 2: Hamamatsu miniature UT detectors wire-bonded to Beetle ASICs mounted on hybrid circuits to be used in May test beams. The hybridisation work has been done in the bonding laboratory commissioned for instrumented stave assembly. pitch-adapters planned for these sensors. Analysis of the 2015 test beam data indicates that the fan-in pitch-adapter design has charge-collection problems, while the alternative fan-up design performs well in this regard. Miniature detectors featuring the two pitch-adapter design have been irradiated to different levels of fluence, up to twice that expected at the Upgrade. Test beam studies of their performance are planned for early May In addition, full size p-in-n modules will be irradiated at the IRRAD facility at CERN in early May and then tested with beams at the end of May. The findings of the extensive test programme will be scrutinised in a Type A sensor preproduction readiness review (PRR) planned for June Considerable progress has been made in the R&D programme of the SALT chip, which is the ASIC that will be used for UT readout. The first eight channel prototype (SALT8), submitted in February 2015, has been fully characterised. Minor problems have been uncovered, but all the main features tested were consistent with expectations from simulations. Electrostatic discharge (ESD) problems at some input pads prevented the designers from testing some of the ancillary structures fabricated in this submission. Therefore a second eight-channel SALT8b ASIC was designed and submitted for fabrication in November The characterisation of this device is ongoing. In parallel, a first iteration of the full ASIC (SALT128) is currently in an advanced stage of design. This design has been reviewed in the light of the results from the SALT8 tests and will be modified to include the latest ESD protection for the input pads. It will be submitted in May, which represents a slight delay with respect to the previous schedule. This delay will be offset by working in parallel on the design of the printed circuit board that will host SALT128 and provide the necessary infrastructure for the test system. A complete test of an electronics slice is currently being prepared. This slice 4

5 will comprise the silicon sensors wire-bonded to SALT8 ASICs, mounted on flex hybrids, which are connected to the recently acquired prototype flex cables that route signal and power to the near detector electronics. The results of this test will be reviewed in an EDR planned for June In parallel, near-detector electronics boards, which provide data aggregation and the transition to optical signals, are being designed and prototyped. The performance of these boards will also be reviewed in June. Two technologies to implement the SALT hybrids are under consideration. The baseline approach involves a flex circuit glued onto a ceramic substrate (BN) that provides mechanical support, thermal coupling to the cooling system, and electrical insulation. An alternative solution, combining the electrical and mechanical functions, based on an AlN or BN thick film hybrid, is also being pursued. A prototype hybrid circuit to host the SALT8 ASIC is being designed and will be incorporated in the slice test. The hybrid EDR will take place in autumn of this year. The second round of prototype flex cables are currently being instrumented with the adapters necessary to interface with the SALT8 test board and the MINI DAQ based data acquisition system used for the slice test. Figure 3 shows one of these samples. Preliminary tests are very promising. Figure 3: Prototype UT flex cable. Significant progress has been achieved in the mechanical design of the detectors. Construction of the first two bare staves is imminent. In parallel, the assembly procedure of the instrumented staves is being defined and will be validated with a mechanical model. A PRR is planned for June. In addition, developments are ongoing for the CO 2 cooling system. A successful EDR of the cooling plant has taken place. The design of the manifold to distribute the cooling to the various staves is advanced. A recirculating TRACI CO 2 cooling system allows for studies of temperature profiles on mechanical mock-ups. Finally, there have been achievements on the design of the detector enclosure and mounting frame. The partitioning of the space near the boundary between 5

6 inner detector volume and near detector electronics, just outside the detector volume, is being optimised. 2.3 Scintillating-Fibre Tracker (SciFi) The technology and the full detector design of the SciFi system is described in the LHCb Tracker Upgrade TDR [5]. The SciFi will consist of 250 µm thick and 2.5 m long scintillating fibres arranged as hexagonally close-packed six-layer mats of 135 mm width. Eight of these mats will be joined together to form 5 m long and 52 cm wide modules. The fibres will be read out with multi-channel Silicon Photo-multipliers (SiPMs) which have to be cooled down to -40 o C to limit the dark count rate after irradiation. The modules will be arranged in 12 stereo layers. After a market survey for the scintillating fibres an invitation to tender has been sent to two suppliers. A contract with the cheapest supplier has been signed for 11,000 km of fibres. According to the contractual schedule, delivery will start in May 2016 and be completed in January A persisting issue concerning the fibre quality is the uniformity of the fibre diameter. Occasional bumps, where the diameter is significantly larger than the nominal value, are problematic for the mat assembly, as they lead to local defects in the winding pattern. A reliable diameter control procedure has been established allowing fast feedback to the supplier and the winding centres. Moreover different methods of removing or reducing the bumps have been developed and will be introduced in the production process. The serial production of fibre mats and modules is currently being prepared in the four winding centres and the two module assembly centres. All winding centres are equipped with identical winding machines (Fig. 4) and the necessary tools. The first winding-centre (Aachen) will start the fibre mat production in April. A PRR will qualify the production process and quality assurance procedures as well as the readiness of the site. The PRRs of the other three sites (Dortmund, Lausanne and the Kurchatov Institute) will follow soon after. The PRR of the module assembly is foreseen for June. SiPM arrays from two industrial suppliers are under investigation. The devices from one supplier already fulfill the requirements of the project. However, the most recent version, producted in 2015, which benefits from an optimised geometry and a higher photon detection efficiency, shows an unexpectedly large delayed crosstalk, which is currently being studied. The SiPMs from the other supplier exhibit various production problems. Both options will be pursued up to, or soon after the SiPM EDR, which will take place at the end of April. For the readout of the 600k SiPM channels the SciFi group is developing a fast 64-channel ASIC, named the PACIFIC, which provides two-bit pulse-height information for every hit by using three adjustable thresholds. A 64-channel prototype chip (PACIFICv3), with full functionality, has been produced and tested; however several improvements are necessary and are currently being implemented. 6

7 Figure 4: Winding machine for scintillating fibre mats. The submission of PACIFICv4 chip is foreseen for June A first version of the subsequent digital readout boards is also available. The full readout chain, consisting of a PACIFIC carrier board, a cluster-board to find the hits, and the master board, comprising the Slow and Fast Control as well as the optical links, is currently being tested. The EDR of the front-end electronics is also foreseen for the end of April. The so-called Read-Out Box (ROB) is mounted at each end of the fibre module and houses the SiPMs in the cold part of the box ( cold-box ) and the front-end electronics. A prototype cold-box is currently being tested and was successfully operated with the SiPMs maintained at the design temperature of -40 o C. In November 2015, a fibre mat was irradiated at the PS IRRAD facility over its full length, reproducing the expected irradiation profile for the lifetime of the detector. The performance of the irradiated mat has been studied in a test-beam using high energy protons and pions as well as in the laboratory with a beta source. While the test beam measurements reveal a smaller light yield than expected, the laboratory measurements confirmed the photon yield predicted by simulation. The discrepancy between the two measurements is under active investigation. In summary, the SciFi project proceeds according to schedule: mat and module production is about to begin, the development of SiPM and front-end electronics will soon be concluded and the work on the detector s infrastructure is underway. 7

8 3 Track reconstruction The proof-of-concept of the pattern recognition algorithms for the LHCb Upgrade was demonstrated in the VELO and Tracker TDRs [3,5]. In the post-tdr phase the main focus of the tracking software efforts is to implement in detail the geometry, the digitisation and the pattern recognition according to the design choice of the hardware, which is now being finalised. In parallel efforts are ongoing to set up a time- and performance-optimised complete tracking and fitting sequence, which will serve as the basis for studies to be performed in the upcoming computing and software TDR. 3.1 Optimisation of SciFi tracker geometry and timing performance of the tracking algorithms The single-hit inefficiency in the SciFi is the driving parameter of the tracking efficiency and ghost rate of the pattern recognition algorithms. It is mainly determined by geometrical inefficiencies such as gaps between modules ( 1%), gaps in the middle and at the boundaries of each SiPM array ( 2%) and the inefficiency which is introduced by a combination of photon detection and clustering thresholds ( 1%). As a rule of thumb, a single-hit inefficiency of 1% induces a 2-3% tracking inefficiency, depending on the algorithm. In the latest round of production of SiPM arrays the manufacturer optimised the ratio of active to passive area. The corresponding contribution to the single-hit inefficiency went down to below 1%. This improvement helped the performance of all SciFi related algorithms to be raised back to the level quoted in the TDR. Work is ongoing to improve the single-hit and tracking efficiency still further by forming clusters over the boundaries of SiPMs. A detailed photon transport model has been developed and tuned to match the test beam data. Applying this tuned model to the simulation of pp collisions in the LHCb experiment reduces the average photon yield compared to the version which was previously used for performance studies. This change, however, has hardly any impact on the single-hit efficiency. On the contrary, the lower photon yield reduced the number of hits in the event related to spill-over, which had a very beneficial effect on the ghost rate (-20%) and the timing (-30%). As well as improving the realism of the SciFi simulation, much effort is also being invested in the study of potential modifications of the SciFi tracker to improve its performance. Among other ideas a y-segmentation of the inner, most populated modules and additional modules in this region have been investigated. The aim of these potential modifications is to increase the signal-over-noise ratio for true track candidates, and thus to allow cuts to be loosened in the pattern recognition, thereby improving tracking efficiency. It transpires that additional modules do not significantly improve the performance. Introducing y-segmentation appears to be a more promising approach; however the engineering challenges make this solution extremely hard to realise. The small gain of about 2% in tracking efficiency is 8

9 considered insufficient to justify this effort. Forthcoming studies will include an optimisation of the shape of the beam-pipe hole. Detailed studies on the CPU consumption of the tracking algorithms have begun. Already factors of two to three have been achieved in speed, without any loss in tracking performance. Further work is ongoing in this direction in view of the studies required for the computing and software TDR. 4 Particle identification The Particle Identification (PID) system of the upgraded LHCb consists of the RICH, Calorimeter and Muon systems. After a first series of EDRs all the sub systems are now in the phase of preparation for construction. 4.1 RICH system The upgraded RICH system will consist of a re-designed RICH1 detector, an essentially unchanged RICH2, and new photo-sensors with new front-end electronics that can be read out at 40 MHz. The key feature of the new RICH1 is a modification of the optics (and hence also some of the mechanics) in order to spread the image compared to the current detector and thereby reduce the occupancy. This re-design can however be performed within the footprint of the current RICH1, and therefore is compatible with the existing magnetic shielding box and the evolving plans of the VELO and the UT. Simulation indicates that the physics performance of the new RICH system at high luminosity will be similar to that achieved with the existing detector in LHC Runs 1 and 2. The MaPMT is established as the baseline technology for the RICH photon detector, read out by a customized ASIC named CLARO. The MaPMT, CLARO, front-end electronics and system integration have been tested in test-beams and radiation areas. All results to date are satisfactory. The Photo-Detector Assembly, including the photo-sensors, all on-detector electronics and ancillary systems, is common to RICH1 and RICH2. The modularity and mechanical design of the full opto-electronic chain, its supporting mechanics, cooling and power distribution systems have been mostly defined and are undergoing final design and tests. Current studies are focusing on finalising the details of the mechanical concepts of RICH1 and the common Photo-Detector Assembly, with the project entering the phase of detailed engineering design. Successful EDRs for the CLARO, the Front-End Board and the Elementary Cell of the Photo-Detector Assembly were held in October Prototypes of the system, made of several MaPMTs together with the accompanying front-end, digital and acquisition electronics and mechanics (Fig. 5), was evaluated in test beams during both 2014 and These test-beam studies were 9

10 a great success, paving the way towards the important milestones of 2016 and full production of the components. The order for the MaPMTs has been placed and the first devices are arriving. The regional centers for the Quality Assurance are starting to become operational. Figure 5: Left: Prototype of the photo-detector plane of the upgraded RICH used in recent beam tests. Right: prototype where both the 3x3 cm 2 and 6x6 cm 2 are mounted. The large MaPMTs are used in the outer region of RICH Calorimeter system The existing electromagnetic and hadronic calorimeters will remain in place after LS2, but the Scintillating Pad Detector and Preshower will be removed, as they are considered inessential for the most important calorimeter-based physics topics of the upgrade, such as radiative-penguin studies, and are no longer required for the trigger. The gain of the calorimeter PMTs will be reduced by a factor five in order to keep them operational throughout the high-luminosity Upgrade running and the electronics will compensate for this gain reduction. The upgraded detector will send the full data flow to the counting room at 40 MHz. The present earliest-level trigger calculations performed on the Front-End boards will be kept and the result (now an ingredient in the so-called Low Level Trigger) will be sent to the PC farm in order to optimise the software trigger. The upgraded analogue electronics is based on an ASIC called the ICECAL. The ICECAL underwent a successful EDR during Several test beams took place in 2015 at CERN with the current digital board prototype and the ICECAL, using electron beams with energies ranging from 20 to 120 GeV. The performance of the electronics was evaluated in terms of linearity, spill-over, stability of the integrated signal sampling and several other parameters. The results are satisfactory 10

11 and match the design requirements. The radiation tolerance is now under study. A first measurement on a X-ray machine is planned for Q at CERN. Further measurements after exposure to heavy ions will take place soon after, which will involve not only the ASIC but also the ADC candidate for the front-end board (FEB). In parallel to the work on the analogue electronics, the design of the digital part of the FEB is progressing. Several decisions have been taken recently concerning the data format, which have allowed the number of optical links per front-end board to be reduced from five to four. This modification has led to a reduction in the cost of the FEB and also the number of acquisition boards in the counting room. A new prototype is being designed and is expected to be as close as possible to the final version. It will be equipped with the standard GBT-X, GBT-SCA, VTTx and DC DC chips from CERN, and the chosen SEL/SEU and dose-safe FPGA. The schematics of the next FEB prototype have been finalised and the board is expected to be ready in May This new board will be equipped with the ICECAL and tested at CERN in an electron beam during the summer. Figure 6: The new calorimeter HV control mezzanine board equipped with its radiation tolerant FPGA, plugged onto the HV motherboard. The high-voltage, calibration, monitoring and control boards have to be redesigned or modified (for example with the replacement of mezzanines). Prototypes have been designed and produced (Fig. 6), and are now being tested. A new clusterisation scheme has been developed in the reconstruction to reduce the effect of cluster pile-up at Upgrade luminosity. More recently, new energy- and position-dependent corrections have been determined to improve the calorimeter resolution. The corresponding software has been developed and integrated into the standard LHCb event reconstruction so that they can already be tested with the data taken during Run 2. 11

12 The innermost ECAL modules will eventually degrade significantly due to radiation. It is planned to replace them during the LS3 shutdown by spare modules that are already available. 4.3 Muon system Much progress has taken place in the last six months on the Muon system upgrade project. The LNF construction site is producing replacement and spare MWPCs at the foreseen rate, which is one chamber every two weeks. A system using a radioactive source to scan automatically the new MWPCs has now been put into operation, testing one MWPC per week. The PNPI MWPC construction site is now also operational, and four chambers for the M2R4 region have already been built. In addition a second production line for chambers for the M4R2 region is almost ready to go in production. The MWPC production in these two sites is expected to continue during In 2017 chambers will be transported to CERN for the installation of the front-end electronics and final tests with cosmic rays. Figure 7: Layout of the muon system nsync chip. An EDR for all the new readout (nsync, node) and control (nsb, npdm) electronics took place at the end of November This in-depth review allowed the functionalities required in the new ASIC and the boards to be finalised. The nsync ASIC, designed in UMC 130 nm and using a TDC block extensively tested in autumn 2015, was submitted in February (Fig. 7) and is expected to be ready before the summer break. The work on the construction of the node board prototypes, for which the design was finalised after the EDR, will continue in the coming months, with the target of having a first board ready for assembly when the ASIC will be available. The work on the muon system specific TELL40 firmware is continuing. Current simulation indicates that a TELL40 board based on the ARRIA10 FPGA should 12

13 handle 24 optical links at input. A study on possible zero-suppression algorithms is under way to allow the output bandwidth to the CPU to be reduced. It has been demonstrated that the FPGA that will be used (IGLOO2) the new MWPC control (nsb) and pulsing (npdm) boards perform as required. In addition, laboratory tests showed that a prototype full control chain, composed of a MiniDAQ, a Versatile-link Demo Board, an IGLOO2 driver and muon system front-end boards, can be operated in a reliable manner. Work is progressing to improve the shielding in the beampipe region and in front of the muon system. The design of a new M2 plug and of an improved tungsten/lead shielding inside the HCAL is under way, and an EDR is foreseen for May. The PRR for the M2 plug will take place at the same time, allowing the order to be placed during the summer and the shielding to be installed during the extended end-of-year shutdown after the 2016 run. Studies on how to improve the performance of the muon identification algorithms for the upgrade are continuing. New approaches are being tested with full Upgrade simulation and real data collected during Run 1 at high luminosity, and show promising results. These new approaches will already be deployed during Run 2. 5 Data processing Data processing is here defined to encompass the transport of the data from the output of the frond-end (FE) electronics through to the offline reconstruction. It includes data acquisition, trigger and computing. 5.1 Data acquisition The current priority in the domain of readout electronics is to define and optimise the required numbers of the PCIe40 (PCI Express) readout boards. The optimisation criteria are the simplicity of the overall system, the FPGA occupancy and running frequency, as well as the total cost. Studies are ongoing, with a final decision expected in June. The prototypes of the PCIe40 readout board were delivered in mid An extensive campaign of tests were run, which demonstrated the feasibility of a PCI Express board handling a total bandwidth of 100 Gbit/s. Twenty-five copies of the PCIe40 prototype will be produced with the final version of the FPGA Arria10. These boards will be used to equip the MiniDAQ2, which is a PC-server for the testing and validation of the front-end electronics of each sub-detector. The MiniDAQ2 systems will be delivered to the collaboration by the summer of This constitutes a delay of four months with respect to the previous schedule, and is caused by the late availability of the Arria 10. However, a slippage of this duration is still compatible with the timelines of the subdetector projects. 13

14 In the current architecture the front-end electronics and the readout electronics are connected via long distance optical links between the underground area and the surface. A small set of OM3 fibres have been deployed in the PM 85 shaft. Long-term tests have shown that a bit error rate of is achievable with 95% confidence level. These tests use a loop-back between the emitter and the receiver, doubling the optical fibre length. They will be repeated with the nominal fibre length using a front-end board provided by the SciFi subdetector, as well as the GBT transceiver. 5.2 Online The heart of the online system is the event-builder, which assembles the event at a rate of 40 MHz. This system will be based on large bandwidth bi-directional network interconnecting event-builder PC-servers. Software packages have been developed to evaluate the performance of the event building and the transport layers in different configurations and different technologies. Large scale tests have been run at HPC centres. First results are very encouraging with an aggregate traffic of 3.2 Tbit/s having been measured between 128 servers. Recently, a bandwidth of 86 Gbit/s has been achieved on a 12-node cluster using the transport layer Infiniband EDR. In parallel, proposals are being evaluated to distribute the timing and fast commands using a PON network, as well to simplify the regulation of the data flow using a local throttle mechanism. 5.3 Trigger The trigger analyses all collisions and selects those to be written for offline storage. The Upgrade trigger consists of a collection of identical software tasks running on the event-filter farm. The Trigger TDR [6] already laid out an achievable solution for the Upgrade trigger, one that is highly performant and operates within the available timing budget. Many novel aspects proposed for the Upgrade trigger have already been achieved in the Run-2 High-Level Trigger. In 2016, the strategy for the charm physics will be reviewed and the performance of the Upgrade trigger will be re-valuated, taking into account all improvements to the Upgrade detector simulation and reconstruction. Originally foreseen at the beginning of the year, these studies will be postponed to the second half of 2016 since they require the final optimisation of the SciFi detector layout. In parallel, the current High-Level Trigger will be improved since the TURBO stream will become more flexible in terms of event content. This improvement can be considered as a prototype for the Upgrade trigger. 14

15 5.4 Computing Twice a year a workshop is organized to discuss all aspects of LHCb computing, including the requirements of the Upgrade. The latest edition took place in November 2015 in Paris and was devoted entirely to the Upgrade. Several working groups were established to explore requirements and new ideas on the software framework, the event model, the computing hardware, the simulation and the analysis model for the Upgrade. These working groups are documenting their conclusions in the so-called computing roadmap document, a first draft of which was presented to the collaboration in March. The roadmap details the work to be done and the decisions to be taken for the computing TDR, including estimates of the required and available effort. The most important goals of the R&D phase are three demonstrators that are to be completed by the beginning of The first of these is to study a new software framework using a task-based approach. The second is devoted to event models in which objects are immutable and composable. The third is focused on the vectorisation of individual algorithms, taking into account the attributes and capabilities of the hardware platform. Work on others areas such as the analysis model, simulation, and collaborative working, will follow an evolutionary approach in which ideas will already be tested during Run 2 operation. The required level of effort for all activities is around 19 FTEs, of which only half are currently identified. A campaign of recruitment has begun to meet this shortfall. The key upcoming milestones in Upgrade computing are the final version of the roadmap document (Q1 2016), the Software and Computing TDR (Q4 2017), and the finalisation of computing model (Q3 2018). 6 Organisation & oversight of Upgrade activities 6.1 Organisation The Upgrade Planning Group (UPG) meets regularly to review progress. The UPG membership consists of an Upgrade Detector Coordinator, an Upgrade Resources Coordinator, an Upgrade Performance Coordinator and an Upgrade Data Processing Coordinator, as well as the management and a representative of the Physics Coordinator. Detector upgrade activities are organised within the existing Projects, to ensure efficient sharing of resources between operational needs and Upgrade work. The two exceptions are the UT and SciFi systems, where new Projects have been created. 6.2 Milestones A series of important milestones has been achieved in the second half of 2015 including many EDRs. A revised schedule with major milestones for the con- 15

16 struction phase has also been established: it takes into account the new long-term LHC schedule, a preliminary LHCb upgrade installation programme for LS2, and a better and more refined definition of the construction schedule of the subdetectors. All the upgrade projects are now moving towards the production phase, with a set of remaining EDRs planned for 2016 and a series of PRRs, some of which already planned for Q Some milestones (VeloPix ASIC submission, RICH Elementary Cell and CLARO ASIC PRRs) have been delayed by a few months to account for final design optimization before launching mass production. These delays do not cause concern at the moment and plans to mitigate their effects within the current schedule are in place. All projects are working to a timescale that now assumes the start of the LS2 at the end of 2018 and, with this, the beginning of the Upgrade installation. The schedule has also been adjusted to reflect the extended duration of LS2 to two years. Consideration is being given to the possible installation of optical fibres for the data transmission during Run 2 in the extended year-end technical stops. 6.3 Infrastructure The construction of the new assembly hall at the experimental site is progressing (Fig. 8), although a delay of six months has been accumulated. The hall will be completed by early autumn this year. A large semi-clean room will be installed in the existing building at the surface close to the experimental shaft. The floor for this has recently been prepared. Figure 8: The new assembly hall under construction at IP8 in February Construction of the technical gallery is on hold until a decision is made on the final location and housing of the computer farm. The baseline solution is a container-based approach, but other cost-effective solutions are under consideration. A workshop on this subject is scheduled for late April 2016 and the agenda is in preparation. 16

17 Studies of the dismantling of PS/SPD detector and the accompanying lead absorber are progressing well. A procedure for the dismantling of the first muon station (M1) has been almost finalised. The wall that currently holds the M1 chambers will be reused to install the neutron shielding that is required for the SiPMs of the SciFi. The integration of services such as the detector-cooling system has begun. Possible routing of the transfer lines from the cooling plant to the patch panels close to the detector are under study. 7 Funding The funding requirements of the LHCb upgrade project have been defined in detail in Addendum No. 1 to the Memorandum of Understanding (MoU) for Common Projects [7] and in the Addendum No. 2 to the MoU for upgrade of the Sub- Detector Systems [8], which refer to the LHCb Upgrade Framework Technical Design Report (FTDR) [2] and the Technical Design Reports (TDRs) for all upgrade subdetector-systems [3 6]. These documents define in all details the technical design and cost of the upgraded detector, as well as the sharing of responsibilities among the institutes and Funding Agencies in the construction, installation and commissioning of the upgraded sub-systems. The total cost of the LHCb upgrade of 57.2 MCHF is divided into a Common Project component of 15.7 MCHF and a Subdetector System component of 41.5 MCHF. All TDRs have been fully approved by the Research Board and both Addenda have been submitted for signature to the Funding Agencies. The LHCb Upgrade project is now fully underway. Price enquieries have been launched, inviations to tender are ongoing and some major contracts have already been signed. CORE funds are now being committed for a number of sub-detector components and a substantial fraction of the anticipated funds is expected to be spent in 2016 and There is confidence that full funding of the Upgrade project will be available in due time to ensure a complete and timely installation of the LHCb upgraded detector during Long Shutdown 2. References [1] LHCb collaboration, Letter of Intent for the LHCb Upgrade, CERN-LHCC , LHCC-I-018. [2] LHCb collaboration, Framework Technical Design Report for the LHCb Upgrade, CERN-LHCC [3] LHCb collaboration, LHCb VELO Upgrade Technical Design Report, CERN- LHCC

18 [4] LHCb collaboration, LHCb Particle Identification Upgrade Technical Design Report, CERN-LHCC [5] LHCb collaboration, LHCb Tracker Upgrade Technical Design Report, CERN-LHCC [6] LHCb collaboration, LHCb Trigger and Online Technical Design Report, CERN-LHCC [7] LHCb collaboration, Addendum No. 01 to the Memorandum of Understanding for Collaboration in the Construction of the LHCb Detector. The Upgrade of the LHCb Detector: Common Project items, CERN-RRB A, revised April [8] LHCb collaboration, Addendum No. 02 to the Memorandum of Understanding for Collaboration in the Construction of the LHCb Detector. The Upgrade of the LHCb Detector: Sub-Detector Systems, CERN-RRB , October

Status of the LHCb Upgrade

Status of the LHCb Upgrade Status of the LHCb Upgrade CERN-RRB-2016-111 October 2016 1 Introduction The LHCb Upgrade will be installed during the two year Long Shutdown 2 of the LHC (LS2). The upgraded detector will be able to read

More information

A new Scintillating Fibre Tracker for LHCb experiment

A new Scintillating Fibre Tracker for LHCb experiment A new Scintillating Fibre Tracker for LHCb experiment Alexander Malinin, NRC Kurchatov Institute on behalf of the LHCb-SciFi-Collaboration Instrumentation for Colliding Beam Physics BINP, Novosibirsk,

More information

SciFi A Large Scintillating Fibre Tracker for LHCb

SciFi A Large Scintillating Fibre Tracker for LHCb SciFi A Large Scintillating Fibre Tracker for LHCb Roman Greim on behalf of the LHCb-SciFi-Collaboration 14th Topical Seminar on Innovative Particle Radiation Detectors, Siena 5th October 2016 I. Physikalisches

More information

CERN-RRB April 2005 Status of the LHCb Experiment Report to April 2005 RRB By the LHCb Collaboration

CERN-RRB April 2005 Status of the LHCb Experiment Report to April 2005 RRB By the LHCb Collaboration CERN-RRB-2005-034 5 April 2005 Status of the LHCb Experiment Report to April 2005 RRB By the LHCb Collaboration 1. Introduction Construction is advancing well for most of the subsystems (VELO, Outer Tracker,

More information

CMS Upgrade Activities

CMS Upgrade Activities CMS Upgrade Activities G. Eckerlin DESY WA, 1. Feb. 2011 CMS @ LHC CMS Upgrade Phase I CMS Upgrade Phase II Infrastructure Conclusion DESY-WA, 1. Feb. 2011 G. Eckerlin 1 The CMS Experiments at the LHC

More information

The Scintillating Fibre Tracker for the LHCb Upgrade. DESY Joint Instrumentation Seminar

The Scintillating Fibre Tracker for the LHCb Upgrade. DESY Joint Instrumentation Seminar The Scintillating Fibre Tracker for the LHCb Upgrade DESY Joint Instrumentation Seminar Presented by Blake D. Leverington University of Heidelberg, DE on behalf of the LHCb SciFi Tracker group 1/45 Outline

More information

Sensors for the CMS High Granularity Calorimeter

Sensors for the CMS High Granularity Calorimeter Sensors for the CMS High Granularity Calorimeter Andreas Alexander Maier (CERN) on behalf of the CMS Collaboration Wed, March 1, 2017 The CMS HGCAL project ECAL Answer to HL-LHC challenges: Pile-up: up

More information

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Juan Palacios, On behalf of the LHCb VELO group J.P. Palacios, Liverpool Outline LHCb and VELO performance

More information

The Silicon Pixel Detector (SPD) for the ALICE Experiment

The Silicon Pixel Detector (SPD) for the ALICE Experiment The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the SPD Project in the ALICE Experiment INFN and Università Bari, Comenius University Bratislava, INFN and Università

More information

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC Tomas Davidek (Charles University), on behalf of the ATLAS Collaboration Tile Calorimeter Sampling

More information

TORCH a large-area detector for high resolution time-of-flight

TORCH a large-area detector for high resolution time-of-flight TORCH a large-area detector for high resolution time-of-flight Roger Forty (CERN) on behalf of the TORCH collaboration 1. TORCH concept 2. Application in LHCb 3. R&D project 4. Test-beam studies TIPP 2017,

More information

HAPD and Electronics Updates

HAPD and Electronics Updates S. Nishida KEK 3rd Open Meeting for Belle II Collaboration 1 Contents Frontend Electronics Neutron Irradiation News from Hamamtsu 2 144ch HAPD HAPD (Hybrid Avalanche Photo Detector) photon bi alkali photocathode

More information

arxiv: v1 [physics.ins-det] 1 Nov 2015

arxiv: v1 [physics.ins-det] 1 Nov 2015 DPF2015-288 November 3, 2015 The CMS Beam Halo Monitor Detector System arxiv:1511.00264v1 [physics.ins-det] 1 Nov 2015 Kelly Stifter On behalf of the CMS collaboration University of Minnesota, Minneapolis,

More information

The hybrid photon detectors for the LHCb-RICH counters

The hybrid photon detectors for the LHCb-RICH counters 7 th International Conference on Advanced Technology and Particle Physics The hybrid photon detectors for the LHCb-RICH counters Maria Girone, CERN and Imperial College on behalf of the LHCb-RICH group

More information

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration The Alice Pixel Detector R 1 =3.9 cm R 2 =7.6 cm Main Physics Goal Heavy Flavour Physics D 0 K π+ 15 days Pb-Pb data

More information

-Technical Specifications-

-Technical Specifications- Annex I to Contract 108733 NL-Petten: the delivery, installation, warranty and maintenance of one (1) X-ray computed tomography system at the JRC-IET -Technical Specifications- INTRODUCTION In the 7th

More information

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector William Nalti, Ken Suzuki, Stefan-Meyer-Institut, ÖAW on behalf of the PANDA/Barrel-TOF(SciTil) group 12.06.2018, ICASiPM2018 1

More information

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain Lorenzo Cassina - XXIX cycle MiB - Midterm Graduate School Seminar Day Outline Activity on LHCb MaPTM qualification RICH Upgrade

More information

THE ATLAS Inner Detector [2] is designed for precision

THE ATLAS Inner Detector [2] is designed for precision The ATLAS Pixel Detector Fabian Hügging on behalf of the ATLAS Pixel Collaboration [1] arxiv:physics/412138v1 [physics.ins-det] 21 Dec 4 Abstract The ATLAS Pixel Detector is the innermost layer of the

More information

The field cage for a large TPC prototype

The field cage for a large TPC prototype EUDET The field cage for a large TPC prototype T.Behnke, L. Hallermann, P. Schade, R. Diener December 7, 2006 Abstract Within the EUDET Programme, the FLC TPC Group at DESY in collaboration with the Department

More information

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS J.Baudot a, J.Goldstein b, A.Nomerotski c, M.Winter a a IPHC - Université

More information

The CALICE test beam programme

The CALICE test beam programme Journal of Physics: Conference Series The CALICE test beam programme To cite this article: F Salvatore 2009 J. Phys.: Conf. Ser. 160 012064 View the article online for updates and enhancements. Related

More information

The ATLAS Pixel Detector

The ATLAS Pixel Detector The ATLAS Pixel Detector Fabian Hügging arxiv:physics/0412138v2 [physics.ins-det] 5 Aug 5 Abstract The ATLAS Pixel Detector is the innermost layer of the ATLAS tracking system and will contribute significantly

More information

SciFi A large Scintillating Fibre Tracker for LHCb

SciFi A large Scintillating Fibre Tracker for LHCb SciFi A large Scintillating Fibre Tracker for LHCb Thomas Kirn on behalf of the LHCb-SciFi-Collaboration presented at 14 th Vienna Conference on Instrumentation, 16 th February, Vienna *) 18 institutes

More information

Beam test of the QMB6 calibration board and HBU0 prototype

Beam test of the QMB6 calibration board and HBU0 prototype Beam test of the QMB6 calibration board and HBU0 prototype J. Cvach 1, J. Kvasnička 1,2, I. Polák 1, J. Zálešák 1 May 23, 2011 Abstract We report about the performance of the HBU0 board and the optical

More information

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC 1 A L E J A N D R O A L O N S O L U N D U N I V E R S I T Y O N B E H A L F O F T H E A T L A

More information

Front End Electronics

Front End Electronics CLAS12 Ring Imaging Cherenkov (RICH) Detector Mid-term Review Front End Electronics INFN - Ferrara Matteo Turisini 2015 October 13 th Overview Readout requirements Hardware design Electronics boards Integration

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

CGEM-IT project update

CGEM-IT project update BESIII Physics and Software Workshop Beihang University February 20-23, 2014 CGEM-IT project update Gianluigi Cibinetto (INFN Ferrara) on behalf of the CGEM group Outline Introduction Mechanical development

More information

The Status of the ATLAS Inner Detector

The Status of the ATLAS Inner Detector The Status of the ATLAS Inner Detector Introduction Hans-Günther Moser for the ATLAS Collaboration Outline Tracking in ATLAS ATLAS ID Pixel detector Silicon Tracker Transition Radiation Tracker System

More information

High ResolutionCross Strip Anodes for Photon Counting detectors

High ResolutionCross Strip Anodes for Photon Counting detectors High ResolutionCross Strip Anodes for Photon Counting detectors Oswald H.W. Siegmund, Anton S. Tremsin, Robert Abiad, J. Hull and John V. Vallerga Space Sciences Laboratory University of California Berkeley,

More information

Electronics procurements

Electronics procurements Electronics procurements 24 October 2014 Geoff Hall Procurements from CERN There are a wide range of electronics items procured by CERN but we are familiar with only some of them Probably two main categories:

More information

Drift Tubes as Muon Detectors for ILC

Drift Tubes as Muon Detectors for ILC Drift Tubes as Muon Detectors for ILC Dmitri Denisov Fermilab Major specifications for muon detectors D0 muon system tracking detectors Advantages and disadvantages of drift chambers as muon detectors

More information

Front End Electronics

Front End Electronics CLAS12 Ring Imaging Cherenkov (RICH) Detector Mid-term Review Front End Electronics INFN - Ferrara Matteo Turisini 2015 October 13 th Overview Readout requirements Hardware design Electronics boards Integration

More information

DEPFET Active Pixel Sensors for the ILC

DEPFET Active Pixel Sensors for the ILC DEPFET Active Pixel Sensors for the ILC Laci Andricek for the DEPFET Collaboration (www.depfet.org) The DEPFET ILC VTX Project steering chips Switcher thinning technology Simulation sensor development

More information

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Part 1: The TBM and CMS Understanding how the LHC and the CMS detector work as a

More information

arxiv:hep-ex/ v1 27 Nov 2003

arxiv:hep-ex/ v1 27 Nov 2003 arxiv:hep-ex/0311058v1 27 Nov 2003 THE ATLAS TRANSITION RADIATION TRACKER V. A. MITSOU European Laboratory for Particle Physics (CERN), EP Division, CH-1211 Geneva 23, Switzerland E-mail: Vasiliki.Mitsou@cern.ch

More information

An extreme high resolution Timing Counter for the MEG Upgrade

An extreme high resolution Timing Counter for the MEG Upgrade An extreme high resolution Timing Counter for the MEG Upgrade M. De Gerone INFN Genova on behalf of the MEG collaboration 13th Topical Seminar on Innovative Particle and Radiation Detectors Siena, Oct.

More information

A pixel chip for tracking in ALICE and particle identification in LHCb

A pixel chip for tracking in ALICE and particle identification in LHCb A pixel chip for tracking in ALICE and particle identification in LHCb K.Wyllie 1), M.Burns 1), M.Campbell 1), E.Cantatore 1), V.Cencelli 2) R.Dinapoli 3), F.Formenti 1), T.Grassi 1), E.Heijne 1), P.Jarron

More information

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector.

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme, P.Netchaeva, P.Oppizzi, L.Rossi, E.Ruscino, F.Vernocchi Lawrence Berkeley National

More information

A prototype of fine granularity lead-scintillating fiber calorimeter with imaging read-out

A prototype of fine granularity lead-scintillating fiber calorimeter with imaging read-out A prototype of fine granularity lead-scintillating fiber calorimeter with imaging read-out P.Branchini, F.Ceradini, B.Di Micco, A. Passeri INFN Roma Tre and Dipartimento di Fisica Università Roma Tre and

More information

Development of an Abort Gap Monitor for High-Energy Proton Rings *

Development of an Abort Gap Monitor for High-Energy Proton Rings * Development of an Abort Gap Monitor for High-Energy Proton Rings * J.-F. Beche, J. Byrd, S. De Santis, P. Denes, M. Placidi, W. Turner, M. Zolotorev Lawrence Berkeley National Laboratory, Berkeley, USA

More information

Concept and operation of the high resolution gaseous micro-pixel detector Gossip

Concept and operation of the high resolution gaseous micro-pixel detector Gossip Concept and operation of the high resolution gaseous micro-pixel detector Gossip Yevgen Bilevych 1,Victor Blanco Carballo 1, Maarten van Dijk 1, Martin Fransen 1, Harry van der Graaf 1, Fred Hartjes 1,

More information

Review Report of The SACLA Detector Meeting

Review Report of The SACLA Detector Meeting Review Report of The SACLA Detector Meeting The 2 nd Committee Meeting @ SPring-8 Date: Nov. 28-29, 2011 Committee Members: Dr. Peter Denes, LBNL, U.S. (Chair of the Committee) Prof. Yasuo Arai, KEK, Japan.

More information

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration PIXEL2000, June 5-8, 2000 FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy For the ALICE Collaboration CONTENTS: Introduction: Physics Requirements Design Considerations Present development status

More information

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS NOTE 1999/012 The Compact Muon Solenoid Experiment CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland February 23, 1999 Assembly and operation of

More information

LHCb and its electronics. J. Christiansen On behalf of the LHCb collaboration

LHCb and its electronics. J. Christiansen On behalf of the LHCb collaboration LHCb and its electronics J. Christiansen On behalf of the LHCb collaboration Physics background CP violation necessary to explain matter dominance B hadron decays good candidate to study CP violation B

More information

HARDROC, Readout chip of the Digital Hadronic Calorimeter of ILC

HARDROC, Readout chip of the Digital Hadronic Calorimeter of ILC HARDROC, Readout chip of the Digital Hadronic Calorimeter of ILC S. Callier a, F. Dulucq a, C. de La Taille a, G. Martin-Chassard a, N. Seguin-Moreau a a OMEGA/LAL/IN2P3, LAL Université Paris-Sud, Orsay,France

More information

Commissioning and Initial Performance of the Belle II itop PID Subdetector

Commissioning and Initial Performance of the Belle II itop PID Subdetector Commissioning and Initial Performance of the Belle II itop PID Subdetector Gary Varner University of Hawaii TIPP 2017 Beijing Upgrading PID Performance - PID (π/κ) detectors - Inside current calorimeter

More information

SPS BPM system renovation. Roadmap & Milestones

SPS BPM system renovation. Roadmap & Milestones SPS BPM system renovation Roadmap & Milestones Synopsis Introduction and Overview: Andrea Infrastructures Fibres: Simao Cables: Joel Electronics Analogue Front-End: Manfred Digital Front-End: Manoel Back-End:

More information

AIDA Advanced European Infrastructures for Detectors at Accelerators. Milestone Report. Pixel gas read-out progress

AIDA Advanced European Infrastructures for Detectors at Accelerators. Milestone Report. Pixel gas read-out progress AIDA-MS41 AIDA Advanced European Infrastructures for Detectors at Accelerators Milestone Report Pixel gas read-out progress Colas, P. (CEA) et al 11 December 2013 The research leading to these results

More information

Muon Forward Tracker. MFT Collaboration

Muon Forward Tracker. MFT Collaboration Muon Forward Tracker MFT Collaboration QGP France 2013 Introduction Summary of what «physically» MFT looks like: - Silicon detector - Data flow - Mechanical aspects - Power supplies - Cooling - Insertion/Extraction

More information

Report from the 2015 AHCAL beam test at the SPS. Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015

Report from the 2015 AHCAL beam test at the SPS. Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015 Report from the 2015 AHCAL beam test at the SPS Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015 Goals and Preparation > first SPS test beam with 2nd generation electronics and DAQ

More information

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes.

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes. Minutes of the ALICE Technical Board, November 14 th, 2013 ALICE MIN-2013-6 TB-2013 Date 14.11.2013 1. Minutes The draft minutes of the October 2013 TF meeting were approved without any changes. 2. LS1

More information

A Serializer ASIC at 5 Gbps for Detector Front-end Electronics Readout

A Serializer ASIC at 5 Gbps for Detector Front-end Electronics Readout A Serializer ASIC at 5 Gbps for Detector Front-end Electronics Readout Jingbo Ye, on behalf of the ATLAS Liquid Argon Calorimeter Group Department of Physics, Southern Methodist University, Dallas, Texas

More information

LHCb and its electronics.

LHCb and its electronics. LHCb and its electronics. J. Christiansen, CERN On behalf of the LHCb collaboration jorgen.christiansen@cern.ch Abstract The general architecture of the electronics systems in the LHCb experiment is described

More information

CMS Conference Report

CMS Conference Report Available on CMS information server CMS CR 1997/017 CMS Conference Report 22 October 1997 Updated in 30 March 1998 Trigger synchronisation circuits in CMS J. Varela * 1, L. Berger 2, R. Nóbrega 3, A. Pierce

More information

CSC Data Rates, Formats and Calibration Methods

CSC Data Rates, Formats and Calibration Methods CSC Data Rates, Formats and Calibration Methods D. Acosta University of Florida With most information collected from the The Ohio State University PRS March Milestones 1. Determination of calibration methods

More information

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD D. LO PRESTI D. BONANNO, F. LONGHITANO, D. BONGIOVANNI, S. REITO INFN- SEZIONE DI CATANIA D. Lo Presti, NUMEN2015 LNS, 1-2 December 2015 1 OVERVIEW

More information

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration First LHC Beams in ATLAS Peter Krieger University of Toronto On behalf of the ATLAS Collaboration Cutaway View LHC/ATLAS (Graphic) P. Krieger, University of Toronto Aspen Winter Conference, Feb. 2009 2

More information

Mechanical aspects, FEA validation and geometry optimization

Mechanical aspects, FEA validation and geometry optimization RF Fingers for the new ESRF-EBS EBS storage ring The ESRF-EBS storage ring features new vacuum chamber profiles with reduced aperture. RF fingers are a key component to ensure good vacuum conditions and

More information

The TORCH PMT: A close packing, multi-anode, long life MCP-PMT for Cherenkov applications

The TORCH PMT: A close packing, multi-anode, long life MCP-PMT for Cherenkov applications The TORCH PMT: A close packing, multi-anode, long life MCP-PMT for Cherenkov applications James Milnes Tom Conneely 1 page 1 Photek MCP-PMTs Photek currently manufacture the fastest PMTs in the world in

More information

ALICE Muon Trigger upgrade

ALICE Muon Trigger upgrade ALICE Muon Trigger upgrade Context RPC Detector Status Front-End Electronics Upgrade Readout Electronics Upgrade Conclusions and Perspectives Dr Pascal Dupieux, LPC Clermont, QGPF 2013 1 Context The Muon

More information

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors Atlas Pixel Replacement/Upgrade and Measurements on 3D sensors Forskerskole 2007 by E. Bolle erlend.bolle@fys.uio.no Outline Sensors for Atlas pixel b-layer replacement/upgrade UiO activities CERN 3D test

More information

Progress Update FDC Prototype Test Stand Development Upcoming Work

Progress Update FDC Prototype Test Stand Development Upcoming Work Progress Update FDC Prototype Test Stand Development Upcoming Work Progress Update OU GlueX postdoc position filled. Simon Taylor joins our group July 1, 2004 Position funded jointly by Ohio University

More information

Trigger Cost & Schedule

Trigger Cost & Schedule Trigger Cost & Schedule Wesley Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review May 9, 2001 1 Baseline L4 Trigger Costs From April '00 Review -- 5.69 M 3.96 M 1.73 M 2 Calorimeter Trig. Costs

More information

Time Resolution Improvement of an Electromagnetic Calorimeter Based on Lead Tungstate Crystals

Time Resolution Improvement of an Electromagnetic Calorimeter Based on Lead Tungstate Crystals Time Resolution Improvement of an Electromagnetic Calorimeter Based on Lead Tungstate Crystals M. Ippolitov 1 NRC Kurchatov Institute and NRNU MEPhI Kurchatov sq.1, 123182, Moscow, Russian Federation E-mail:

More information

Design, Realization and Test of a DAQ chain for ALICE ITS Experiment. S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi

Design, Realization and Test of a DAQ chain for ALICE ITS Experiment. S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi Design, Realization and Test of a DAQ chain for ALICE ITS Experiment S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi Physics Department, Bologna University, Viale Berti Pichat 6/2 40127 Bologna, Italy

More information

Sharif University of Technology. SoC: Introduction

Sharif University of Technology. SoC: Introduction SoC Design Lecture 1: Introduction Shaahin Hessabi Department of Computer Engineering System-on-Chip System: a set of related parts that act as a whole to achieve a given goal. A system is a set of interacting

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University Development of beam-collision feedback systems for future lepton colliders P.N. Burrows 1 John Adams Institute for Accelerator Science, Oxford University Denys Wilkinson Building, Keble Rd, Oxford, OX1

More information

THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR )

THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR ) THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR ) S. DUSSONI FRONTIER DETECTOR FOR FRONTIER PHYSICS - LA BIODOLA 2009 Fastest

More information

Realization and Test of the Engineering Prototype of the CALICE Tile Hadron Calorimeter

Realization and Test of the Engineering Prototype of the CALICE Tile Hadron Calorimeter Realization and Test of the Engineering Prototype of the CALICE Tile Hadron Calorimeter Mark Terwort on behalf of the CALICE collaboration arxiv:1011.4760v1 [physics.ins-det] 22 Nov 2010 Abstract The CALICE

More information

SLHC- PP EU DELIVERABLE: SLHC-PP v1.0. End of Month 36 (March 2011) 23/03/2011. Integration in full-scale detector modules

SLHC- PP EU DELIVERABLE: SLHC-PP v1.0. End of Month 36 (March 2011) 23/03/2011. Integration in full-scale detector modules SLHC- PP DELIVERABLE REPORT EU DELIVERABLE: 8.1.3 Document identifier: Contractual Date of Delivery to the EC Actual Date of Delivery to the EC End of Month 36 (March 2011) 23/03/2011 Document date: 23/03/2011

More information

Spatial Response of Photon Detectors used in the Focusing DIRC prototype

Spatial Response of Photon Detectors used in the Focusing DIRC prototype Spatial Response of Photon Detectors used in the Focusing DIRC prototype C. Field, T. Hadig, David W.G.S. Leith, G. Mazaheri, B. Ratcliff, J. Schwiening, J. Uher, J. Va vra SLAC 11/26/04 Presented by J.

More information

Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC

Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC Dena Giovinazzo University of California, Santa Cruz Supervisors: Davide Ceresa

More information

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Monolithic Thin Pixel Upgrade Testing Update Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Basic Technology: Standard CMOS CMOS Camera Because of large Capacitance, need

More information

Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC

Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC University of Bristol Brunel University Imperial College London Rutherford Appleton Laboratory Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC 1 Executive Summary... 2 2. Project

More information

Prospect and Plan for IRS3B Readout

Prospect and Plan for IRS3B Readout Prospect and Plan for IRS3B Readout 1. Progress on Key Performance Parameters 2. Understanding limitations during LEPS operation 3. Carrier02 Rev. C (with O-E-M improvements) 4. Pre-production tasks/schedule

More information

Report from the Tracking and Vertexing Group:

Report from the Tracking and Vertexing Group: Report from the Tracking and Vertexing Group: October 10, 2016 Sally Seidel, Petra Merkel, Maurice Garcia- Sciveres Structure of parallel session n Silicon Sensor Fabrication on 8 wafers (Ron Lipton) n

More information

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

Commissioning of the ATLAS Transition Radiation Tracker (TRT) Commissioning of the ATLAS Transition Radiation Tracker (TRT) 11 th Topical Seminar on Innovative Particle and Radiation Detector (IPRD08) 3 October 2008 bocci@fnal.gov On behalf of the ATLAS TRT community

More information

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

An Overview of Beam Diagnostic and Control Systems for AREAL Linac An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic

More information

Local Trigger Electronics for the CMS Drift Tubes Muon Detector

Local Trigger Electronics for the CMS Drift Tubes Muon Detector Amsterdam, 1 October 2003 Local Trigger Electronics for the CMS Drift Tubes Muon Detector Presented by R.Travaglini INFN-Bologna Italy CMS Drift Tubes Muon Detector CMS Barrel: 5 wheels Wheel : Azimuthal

More information

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration Introduction: The Ohio State University high energy physics group consisting of Profs. Gan, Honscheid, Kagan, and

More information

Innovative Rotary Encoders Deliver Durability and Precision without Tradeoffs. By: Jeff Smoot, CUI Inc

Innovative Rotary Encoders Deliver Durability and Precision without Tradeoffs. By: Jeff Smoot, CUI Inc Innovative Rotary Encoders Deliver Durability and Precision without Tradeoffs By: Jeff Smoot, CUI Inc Rotary encoders provide critical information about the position of motor shafts and thus also their

More information

Status of CMS Silicon Strip Tracker

Status of CMS Silicon Strip Tracker 1 Status of CMS Silicon Strip Tracker N. Demaria a on behalf of the CMS Tracker Collaboration a INFN Sez. di Torino, v. P.Giuria 1, I-10125 Torino Italy E-mail: Natale.Demaria@to.infn.it The CMS Silicon

More information

Studies of large dynamic range silicon photomultipliers for the CMS HCAL upgrade

Studies of large dynamic range silicon photomultipliers for the CMS HCAL upgrade Studies of large dynamic range silicon photomultipliers for the CMS HCAL upgrade Yuri Musienko* FNAL(USA) Arjan Heering University of Notre Dame (USA) For the CMS HCAL group *On leave from INR(Moscow)

More information

Diamond detectors in the CMS BCM1F

Diamond detectors in the CMS BCM1F Diamond detectors in the CMS BCM1F DESY (Zeuthen) CARAT 2010 GSI, 13-15 December 2010 On behalf of the DESY BCM and CMS BRM groups 1 Outline: 1. Introduction to the CMS BRM 2. BCM1F: - Back-End Hardware

More information

Status of GEM-based Digital Hadron Calorimetry

Status of GEM-based Digital Hadron Calorimetry Status of GEM-based Digital Hadron Calorimetry Snowmass Meeting August 23, 2005 Andy White (for the GEM-DHCAL group: UTA, U.Washington, Tsinghua U., Changwon National University, KAERI- Radiation Detector

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su Design and prototype tests of the system for the OPERA spectrometers Stefano Dusini INFN sezione di Padova Outline OPERA Detector Inner Tracker Design Mechanical support Gas & HV Production and Quality

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

First evaluation of the prototype 19-modules camera for the Large Size Telescope of the CTA

First evaluation of the prototype 19-modules camera for the Large Size Telescope of the CTA First evaluation of the prototype 19-modules camera for the Large Size Telescope of the CTA Tsutomu Nagayoshi for the CTA-Japan Consortium Saitama Univ, Max-Planck-Institute for Physics 1 Cherenkov Telescope

More information

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2 PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND

More information

Precise Digital Integration of Fast Analogue Signals using a 12-bit Oscilloscope

Precise Digital Integration of Fast Analogue Signals using a 12-bit Oscilloscope EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN BEAMS DEPARTMENT CERN-BE-2014-002 BI Precise Digital Integration of Fast Analogue Signals using a 12-bit Oscilloscope M. Gasior; M. Krupa CERN Geneva/CH

More information

The CMS Detector Status and Prospects

The CMS Detector Status and Prospects The CMS Detector Status and Prospects Jeremiah Mans On behalf of the CMS Collaboration APS April Meeting --- A Compact Muon Soloniod Philosophy: At the core of the CMS detector sits a large superconducting

More information

PITZ Introduction to the Video System

PITZ Introduction to the Video System PITZ Introduction to the Video System Stefan Weiße DESY Zeuthen June 10, 2003 Agenda 1. Introduction to PITZ 2. Why a video system? 3. Schematic structure 4. Client/Server architecture 5. Hardware 6. Software

More information

Perfecting the Package Bare and Overmolded Stacked Dies. Understanding Ultrasonic Technology for Advanced Package Inspection. A Sonix White Paper

Perfecting the Package Bare and Overmolded Stacked Dies. Understanding Ultrasonic Technology for Advanced Package Inspection. A Sonix White Paper Perfecting the Package Bare and Overmolded Stacked Dies Understanding Ultrasonic Technology for Advanced Package Inspection A Sonix White Paper Perfecting the Package Bare and Overmolded Stacked Dies Understanding

More information

Jean-Claude Brient Laboratoire Leprince-Ringuet

Jean-Claude Brient Laboratoire Leprince-Ringuet Jean-Claude Brient Laboratoire Leprince-Ringuet Collaboration between IN2P3 laboratories (LLR LAL LPSC LPNHE Omega) & Japan institutes (University of Kyushu, KEK ) More specific thanks to M.Anduze, V.Boudry,

More information

The Pixel Trigger System for the ALICE experiment

The Pixel Trigger System for the ALICE experiment CERN, European Organization for Nuclear Research E-mail: gianluca.aglieri.rinella@cern.ch The ALICE Silicon Pixel Detector (SPD) data stream includes 1200 digital signals (Fast-OR) promptly asserted on

More information