|
|
- Claud Hopkins
- 5 years ago
- Views:
Transcription
1
2
3
4
5
6
7
8
9
10
11 EXISTING/DEMOLITION MECHANICAL PLAN DRAWING KEYED NOTES: 1065 S. MAIN ST. BLDG D STE. A LAS CRUCES, NM (575) FAX (575) rbm@rbm.cc PROJECT NO.: 12121L CAD DWG FILE: DRAWN BY: CHECKED BY: SHEET TITLE: EXISTING/ DEMOLITION MECHANICAL PLAN SHEET NO: MD-101 MARK DATE ISSUE: 10/24/2014 DESCRIPTION 2014 NMSU WOMENS SWIM TEAM LOCKER ROOM RENOVATION for: NEW MEXICO STATE UNIVERSITY PO BOX 30001, MSC 3545 LAS CRUCES, NEW MEXICO N. Alameda P.O. Box 146 Las Cruces, NM p f
12 MECHANICAL SYMBOL LEGEND NEW MEXICO "ONE CALL SYSTEM" IT'S THE LAW HVAC LOAD CALCULATION PLUMBING GENERAL NOTES: DOCUMENT GENERAL NOTES: HVAC GENERAL NOTES: OUTSIDE AIR CALCULATIONS 1065 S. MAIN ST. BLDG D STE. A LAS CRUCES, NM (575) FAX (575) rbm@rbm.cc PROJECT NO.: 12121L CAD DWG FILE: DRAWN BY: CHECKED BY: SHEET TITLE: MECHANICAL GENERAL SHEET NO: M-001 MARK DATE ISSUE: 10/24/2014 DESCRIPTION 2014 NMSU WOMENS SWIM TEAM LOCKER ROOM RENOVATION for: NEW MEXICO STATE UNIVERSITY PO BOX 30001, MSC 3545 LAS CRUCES, NEW MEXICO N. Alameda P.O. Box 146 Las Cruces, NM p f
13 DUCTLESS-MULTI HEAT PUMP SCHEDULE OUTDOOR CONDENSING UNIT SCHEDULE INDOOR EVAPORATOR UNIT SCHEDULE PLUMBING FIXTURE SCHEDULE SERVICE TYPE MINIMUM PIPE MATERIAL SCHEDULE LOCATION MATERIAL REQUIRED COMMENTS PIPE MATERIAL SUBSTITUTION NOTES: INSULATION REQUIREMENTS: 1065 S. MAIN ST. BLDG D STE. A LAS CRUCES, NM (575) FAX (575) rbm@rbm.cc PROJECT NO.: 12121L CAD DWG FILE: DRAWN BY: CHECKED BY: SHEET TITLE: MECHANICAL SCHEDULES SHEET NO: M-002 MARK DATE ISSUE: 10/24/2014 DESCRIPTION 2014 NMSU WOMENS SWIM TEAM LOCKER ROOM RENOVATION for: NEW MEXICO STATE UNIVERSITY PO BOX 30001, MSC 3545 LAS CRUCES, NEW MEXICO N. Alameda P.O. Box 146 Las Cruces, NM p f
14 OFFICE H101A LOUNGE H101B OFFICE H101C STOR. H101D WET STR. H101G RR H101E SHOWER H101F LOCKER RM. H101 EX. LOCKER ROOM 109 SHOWER 109A HC RR 109B LAV. 109C NEW WORK MECHANICAL PLAN - HVAC RR 109D DRAWING KEYED NOTES: 1065 S. MAIN ST. BLDG D STE. A LAS CRUCES, NM (575) FAX (575) rbm@rbm.cc PROJECT NO.: 12121L CAD DWG FILE: DRAWN BY: CHECKED BY: SHEET TITLE: NEW WORK MECHANICAL PLAN - HVAC SHEET NO: M-101 MARK DATE ISSUE: 10/24/2014 DESCRIPTION 2014 NMSU WOMENS SWIM TEAM LOCKER ROOM RENOVATION for: NEW MEXICO STATE UNIVERSITY PO BOX 30001, MSC 3545 LAS CRUCES, NEW MEXICO N. Alameda P.O. Box 146 Las Cruces, NM p f
15 OFFICE H101A LOUNGE H101B OFFICE H101C STOR. H101D WET STR. H101G RR H101E SHOWER H101F LOCKER RM. H101 EX. LOCKER ROOM 109 SHOWER 109A HC RR 109B LAV. 109C RR 109D NEW WORK MECHANICAL PLAN - PLUMBING DRAWING KEYED NOTES: 1065 S. MAIN ST. BLDG D STE. A LAS CRUCES, NM (575) FAX (575) rbm@rbm.cc PROJECT NO.: 12121L CAD DWG FILE: DRAWN BY: CHECKED BY: SHEET TITLE: NEW WORK MECHANICAL PLAN - PLUMBING SHEET NO: M-102 MARK DATE ISSUE: 10/24/2014 DESCRIPTION 2014 NMSU WOMENS SWIM TEAM LOCKER ROOM RENOVATION for: NEW MEXICO STATE UNIVERSITY PO BOX 30001, MSC 3545 LAS CRUCES, NEW MEXICO N. Alameda P.O. Box 146 Las Cruces, NM p f
16 ELECTRICAL SYMBOL LEGEND GENERAL NOTES: LIGHT FIXTURE WIRING DEVICES HEIGHTS NOTED ARE TO CENTER LINE FROM FLOOR. FIRE ALARM SYSTEMS HEIGHTS NOTED ARE TO CENTER LINE FROM FLOOR. CONDUIT, RACEWAYS, AND WIRING COMMUNICATION SYSTEMS HEIGHTS NOTED ARE TO CENTER LINE FROM FLOOR. 201 N. Alameda P.O. Box 146 Las Cruces, NM p f EQUIPMENT MISCELLANEOUS TYPICAL DLM WIRING DIAGRAM DATA / OUTLET BOX DETAIL LOAD SUMMARY CALC.: STATE OF NM NOTES: 2014 NMSU WOMENS SWIM TEAM LOCKER ROOM RENOVATION for: NEW MEXICO STATE UNIVERSITY PO BOX 30001, MSC 3545 LAS CRUCES, NEW MEXICO NO WORK THIS AREA NO WORK THIS AREA DESCRIPTION SHORT CIRCUIT CALC. DEVICE CEILING SUPPORT DETAIL KEYED NOTES: PROJECT NO.: MARK DATE ISSUE: 10/24/ L NO WORK THIS AREA CAD DWG FILE: DRAWN BY: CHECKED BY: BACK-TO-BACK OUTLET DETAIL NO WORK THIS AREA ELECTRICAL OVERALL BLDG. PLAN 1065 S. MAIN ST. BLDG D STE. A LAS CRUCES, NM (575) FAX (575) rbm@rbm.cc SHEET TITLE: ELECTRICAL NOTES, DETAILS AND OVERALL PLAN SHEET NO: E-001
17 ELECTRICAL EXISTING/DEMOLITION PLAN GENERAL DEMO NOTES: KEYED NOTES 1065 S. MAIN ST. BLDG D STE. A LAS CRUCES, NM (575) FAX (575) rbm@rbm.cc PROJECT NO.: 12121L CAD DWG FILE: DRAWN BY: CHECKED BY: SHEET TITLE: ELECTRICAL EXIST / DEMO PLAN SHEET NO: ED-101 MARK DATE ISSUE: 10/24/2014 DESCRIPTION 2014 NMSU WOMENS SWIM TEAM LOCKER ROOM RENOVATION for: NEW MEXICO STATE UNIVERSITY PO BOX 30001, MSC 3545 LAS CRUCES, NEW MEXICO N. Alameda P.O. Box 146 Las Cruces, NM p f
18 GENERAL NOTES: OFFICE H101A LOCKER RM. H101 LOUNGE H101B 201 N. Alameda P.O. Box 146 Las Cruces, NM p f WET STR. H101G KEYED NOTES: OFFICE H101A SHOWER H101F SHOWER LOUNGE H101B OFFICE H101C STOR. H101D LOCKER RM. WET STR. H101G H101 RR H101E SHOWER H101F SHOWER 109A EX. LOCKER ROOM 109 HC RR LAV. RR 109B 109C 109D NEW WORK LIGHTING PLAN OFFICE H101C RR H101E NEW WORK POWER PLAN NEW WORK HVAC POWER PLAN NEW WORK SPECIAL SYSTEMS PLAN 2014 NMSU WOMENS SWIM TEAM LOCKER ROOM RENOVATION for: NEW MEXICO STATE UNIVERSITY MARK DATE ISSUE: 10/24/2014 PO BOX 30001, MSC 3545 LAS CRUCES, NEW MEXICO DESCRIPTION PROJECT NO.: 12121L CAD DWG FILE: DRAWN BY: CHECKED BY: SHEET TITLE: ELECTRICAL NEW WORK PLANS 1065 S. MAIN ST. BLDG D STE. A LAS CRUCES, NM (575) FAX (575) rbm@rbm.cc SHEET NO: E-101
New Mexico State University Gerald Thomas Hall Room 322 Renovation
NOT FOR 940 College Dr. Las Cruces, N.M.88003 NewRepublic New Mexico State University Gerald Thomas Hall Room 322 Renovation NewRepublic COLLEGE DR. PROJECT LOCATION NOT FOR Las Cruces, N.M.88003 S. ESPINA
More informationSAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM
SAQCC FIRE D&GS TRAINING SUB COMMITTEE COURSE CURRICULUM COURSE ORIGINATOR Cabling and Conduit K Norgate DATE 23rd August 2013 Amendment 1 5th October 2013 Technical changes - Issued Amendment 2 6th October
More informationBENSON POLYTECHNIC H.S. MPC #8 / JANUARY 5, 2017
BENSON POLYTECHNIC H.S. MPC #8 / JANUARY 5, 2017 AGENDA / 6:00-6:15 Introductions 5 min MPC and Design Team Introductions 5 min Project Update - Portland Public Schools + + Tasks since last MPC + + Budget
More informationELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE
ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE E0.01 FIRST FLOOR DEMOLITION E1.01 10 E2 11 12 12 G2 14 15 D1 D2 17 18 18 19 1 2 3 4 19 21 1 3 2 4 5 1 3 2 4 5 7 6 7 A2 E1 C2 A2 H1 H2 A1 E1 E2 6 8 A1 11 C1
More informationIndyGo Facility Upgrades Project 35671EE
SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Identification for raceways. 2. Identification of power and control cables. 3. Identification for
More informationCenter For The Arts Towson, Maryland
Electrical Depth Introduction For the Electrical portion of this report, several panelboards on the Third Floor were analyzed and examined to combine and move loads to reduce the number of panelboards.
More informationBILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School
BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street
More informationMinimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)
PART 1: GENERAL 1.01 Telecommunications Engineer Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) B. Registered Communications Distribution Designer
More informationQueens College Technology Enhanced Classroom (TEC) Specifications 9/2008
Queens College Technology Enhanced Classroom (TEC) Specifications 9/2008 Instructor s Station - All Technology Enhanced Classrooms (TEC) must include an appropriately placed instructor station. It must
More informationEVAPORATIVE COOLER. ...Simple Effective Inexpensive to operate Economical. MODEL EC2.5 EC to CFM Nominal Airflow
...Simple Effective Inexpensive to operate Economical The Saudi Factory for Air Conditioning Units No air cooled condenser needed No chiller or cooling tower needed No major control center No refrigerant
More informationTarget Interface / Construction Compliance Inspection Checklist
A. Targets Quantities meet DD, applicable TC -, and CEHNC Design Guide 0-- (Standard is single UTOs and Double UTOs) B. Roads-Service, Lanes Adequate access is provided to the and AAR D. Testing Results-provided
More informationMeeting Room Packages
Meeting Room Packages AUDIOVISUAL PRICE GUIDE Encore makes it simple to choose the meeting package(s) that best suit your business demands. Most packages will accommodate any meeting from 10 up to 80 attendees.
More informationGPON EDFA with WDM for IP(OLT) Wavelengths Multiple Optical Outputs
ED5219LGT Series GPON EDFA with WDM for IP(OLT) Wavelengths Multiple Optical Outputs The ACI ED5219LGT series is a high-power multi-ports EDFA optical booster with gain spectrum bandwidth from 1545 to
More informationELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.
ELECTRICAL SAFETY INSPECTION REPORT MTM Garments Ltd. 15934/16004, Chanpara, Medical Road, Uttarkhan, Dhaka, Bangladesh. Factory List MTM Garments Ltd. Inspected by: Hemlal Dahal Report Generated by: Hemlal
More informationELECTRICAL SAFETY INSPECTION REPORT.
ELECTRICAL SAFETY INSPECTION REPORT., Plot no: 72 & 82, DEPZ, Ganakbari, Savar, Dhaka, Bangladesh. Factory List: 1.Experience Clothing Company Ltd. Inspected on March 31, 2014 SUMMARY Experience Clothing
More informationClick Here To Start Demo
Click Here To Start Demo AirLogix Demo Title Screen AirLogix Interactive Demonstrator Version 3.0 Copyright 2005 by Case Engineering inc This is intended as a working active demonstration only. Every attempt
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationPower and Control T YPE BY RAVI GANATR November/December IAEI NEWS
Power and Control 26 1999 November/December IAEI NEWS T YPE BY RAVI GANATR This article discusses how the requirements in both the installation code and the product standard are utilized to manufacture
More informationWall-/Pipe-Mount Level Indicator
Data Sheet SS/_4 Wall-/Pipe-Mount Level Indicator High visibility 5-digit LED display clear multi-functional indication Analog and 2-relay outputs as standard high, low, latch and rate alarms, plus isolated
More informationDESIGN STANDARD FOR AUDIOVISUAL SYSTEMS
DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS General: The SCC is intent on moving to 21 st century unified communications and data systems, consistent with industry standards and best practices as they evolve.
More informationPLU-TV & AT&T CATV CLASSROOM/OFFICE BUILDING EQUIPMENT LISTS & DIAGRAMS CLT CATV.doc CENTER FOR LEARNING & TECHNOLOGY (CLT)
Page 1 08-21-01 PLU-TV & AT&T CATV CLASSROOM/OFFICE BUILDING EQUIPMENT LISTS & DIAGRAMS CLT CATV.doc CENTER FOR LEARNING & TECHNOLOGY (CLT) The following is a list of equipment needed to cable and provide
More informationEXHIBIT BASIS OF DESIGN REPORT. Space Type: Space Usage: Approx. 2,000 BTU each. Off-center of room to match side screen.
AV Basis of Design Illinois Project #: Space : Date of Creation: Latest Revision: General Information Space : Space Usage: Other Notes: Project Name: Room s Presentation Room Room Numbers 1 System AV Presentation
More informationEducation Service Center
Education Service Center Detailed Evaluation of building condition: The Educational Services Building provides office space for district administrative personnel and a meeting room for the Board of School
More information8 Ports. 16 Ports. ED5219LGT Series. CATV Single Channel EDFA 1310nm Forward Optical Transmitter
8 Ports 16 Ports CATV Single Channel EDFA 1310nm Forward Optical Transmitter The ACI ED5219LGT series is a high-power multi-ports EDFA optical booster with gain spectrum bandwidth from 1545 to 1563 nm
More informationEXHIBIT BASIS OF DESIGN REPORT. Space Type: Space Usage: Off-center of room to match side screen. Location
AV Basis of Design Illinois Project #: Space Location: Date of Creation: Latest Revision: General Information Space Type: Space Usage: Other Notes: Project Name: Room Types Presentation Room Room Numbers
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More informationThe Chan-L-Wire Pro Series Lighting Distribution
Lighting Distribution System Offers Maximum Flexibility The Chan-L-Wire Pro Series Lighting Distribution System offers maximum flexibility while saving up to 40% in labor installation costs. The system
More information3700 O'Donnell Street Baltimore, Maryland USA Tel Fax Owner IPIC ENTERTAINMENT 3300 Airport Road, Suit
SERVICE ELEVATOR NEW ESCALATOR PASSENGER ELEVATOR NO. REVISION PROJECT # DRAWN CHECKED ISSUED ENLARGED SITE PLAN ENLARGED SITE PLAN /8" = '-0" 0 4' 8' 6' 0.0 08/5/0 5:8 PM edak E:\ IPic Mizner Park\ADA
More informationDESIGN STANDARD FOR AUDIOVISUAL SYSTEMS
DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS General: Solano Community College (SCC) is intent on moving to 21 st century unified communications and data systems, consistent with industry standards and best
More informationCLT17620AVControlRoom-RA.doc Page 1 CENTER FOR LEARNING AND TECHNOLOGY - A/V PRODUCTION ROOM 104 CLT PROD ROOM.doc
CLT17620AVControlRoom-RA.doc Page 1 CENTER FOR LEARNING AND TECHNOLOGY - A/V PRODUCTION ROOM 104 CLT PROD ROOM.doc The general consensus of the occupants of the CLT is that the following rooms be equiped
More informationA Collaborative Future in HiVol to Sell and Install
A Collaborative Future in HiVol to Sell and Install Session Flow, Goal & Presenters Goal: Provide tips about effective collaboration among the trades in a wide variety of functional areas including marketing,
More informationR OPTEVA 868 THROUGH THE WALL ATM. 305mm (12") MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL
OPTEVA 868 THROUGH THE WALL ATM WITH 40mm ( 6") CEN III AND CEN IV SAFE L0 CALL -800--600 0 (6") REQUIRED FOR WALLS EXCEEDING 0mm (2") CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS
More informationChurch Layout Medium Advanced
Specifier Product Information Church Layout Medium Advanced System Summary This summary is intended to explain, in general terms, some of the possible uses and reasons for having the recommended equipment
More informationR OPTEVA 868 THROUGH THE WALL ATM. 305mm (12") MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL
OPTEVA 868 THROUGH THE WALL ATM WITH mm ( 2") CEN-L SAFE L00 CALL -800-999-600 22 (9 6") REQUIRED FOR WALLS EXCEEDING 0mm (2") CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND
More informationFor reference, here is a shop drawing of how feed through lugs is shown by a manufacturer:
Minimum Needed I would need the ability in revit to treat three panel families as one three section panelboard, more specifically: Add a parameter or row in the panel schedule for feed through lugs (FTL)
More informationM BTU/Hr Watts. Finish. Options
Spec-00607 CPH FX ( Protective Cooling Air Conditioners Indoor Air Conditioners M13 1000 BTU/Hr. 293 Watt M17 1800 BTU/Hr. 527 Watt Industry Standards Maintains U/cUL Type 12 rating when properly installed
More informationInformation Technology Services DESIGN AND INSTALLATION STANDARDS
Requirements and Guidelines for: New Construction, Renovations, Upgrades, and Retrofits. Revised: June 5, 2015 VIU ITS Network Services 2 TABLE OF CONTENTS 0 GENERAL... 5 1 FIBER OPTIC CABLING... 5 1.1
More informationStand Alone Serenity, Light, Sound, Rain Head
Installation Manual For Tutorials and Troubleshooting visit www.thermasol.com/solutions SASC-XX, SAST-XX, SASMR-XX, SAST-XX Stand Alone Serenity, Light, Sound, Rain Head OVER 55 YEARS OF STEAM SHOWER INNOVATION
More informationAT&T January, 2012 Revised December, 2018 TABLE OF CONTENTS SECTION 1--INTRODUCTION...1-1
SECTION 1--INTRODUCTION...1-1 1. General...1-1 1.1. Introduction...1-1 1.2. Purpose...1-2 1.3. Application...1-2 1.4. Definitions...1-3 1.5. General Requirements...1-3 1.6. Proprietary Information...1-5
More informationUltra Quiet Series Electric Air Handler
Residential & Light Commercial HVAC Ultra Quiet Series Electric Air Handler 1 1 2 thru 5 Tons 208/230 Volt, 1-Phase, 60 Hz The Fedders multi-position air handlers, when matched with our air conditioners
More informationPre-Installation Manual. Sync. November 2017 /
Pre-Installation Manual Sync November 2017 / 10-095400-091 Sync Pre-Installation Manual November 2017 by Brunswick Bowling Products. All rights reserved. Manual Part No. 10-095400-091 Notice: If available,
More informationDMP 343. Industrial Pressure Transmitter. Without Media Isolation. accuracy according to IEC 60770: 0,35 % FSO. Nominal pressure
DMP 4 Industrial Pressure Transmitter Without Media Isolation accuracy according to IEC 60770: 0,5 % FSO Nominal pressure from 0... 0 mbar up to 0... 000 mbar Product characteristics excellent linearity
More informationELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE
ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE E0.01 FIRST FLOOR DEMOLITION E1.01 10 E2 11 12 12 G2 14 15 D1 D2 17 18 18 19 1 2 3 4 19 21 1 3 2 4 5 1 3 2 4 5 7 6 7 A2 E1 C2 A2 H1 H2 A1 E1 E2 6 8 A1 11 C1
More informationOPTEVA 828 LOBBY ATM FRONT LOAD PLAN VIEW FRONT ELEVATION SIDE ELEVATION
L0 CALL -800--600 OPTEVA 88 LOBBY ATM FRONT LOAD WITH 0mm ( 6") CEN III AND CEN IV SAFE CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND INFORMATION. PLEASE SEE PLANNING AND
More informationFireCAD Training Guide v
Link to video describing this 0-0 https://youtu.be/o4uycqhersy Short Demo of FireCAD software Features 0-1-1 https://youtu.be/ny0x0r4bfny FireCAD Overview 0-1-2 https://youtu.be/yhb4wsdaoom AutoCAD Command
More informationDS 400 P. Intelligent Electronic Pressure Switch in Hygienic Stainless Steel Ball Housing. on hygienic process connections
Intelligent Electronic Pressure Switch in Hygienic Stainless Steel Ball Housing Description The electronic pressure switch is the successful combination of hygienic process connections with flush welded
More informationElectrical Depth CAL IT 2. Brian Smith. Introduction
Electrical Depth Introduction The University of California, San Diego Cal IT 2 Building was electrically designed for a lot of future growth. With my changes in the lighting system and control zones, a
More informationTEXAS LOTTERY COMMISSION REQUEST FOR PROPOSALS FOR DRAWING STUDIO AND PRODUCTION SERVICES # RESPONSES TO PROPOSERS QUESTIONS
TEXAS LOTTERY COMMISSION REQUEST FOR PROPOSALS FOR DRAWING STUDIO AND PRODUCTION SERVICES #362-14-0003 RESPONSES TO PROPOSERS QUESTIONS January 28, 2014 REQUEST FOR PROPOSALS FOR DRAWING STUDIO AND PRODUCTION
More informationEnvironmental Technology, Inc.
Models LCD 1H and LCD 3H Snow Switch Installation and Operation Manual We manage heat Environmental Technology, Inc. 1850 N Sheridan Street South Bend, Indiana 46628 (574) 233-1202 or (800) 234-4239 FAX
More informationOT 100/ /700 P5
OT 100/120 277/700 P5 OPTOTRONIC Outdoor Constant current LED drivers Areas of application _ Street and urban lighting _ Industry _ Suitable for luminaires of protection class I Product benefits _ High
More informationWCHE BTU/Hr Watts
Spec-00754 B Sealed Enclosure Heat Exchangers Sealed Enclosure Heat Exchangers CLIMAGUARD Air-to-Water Indoor WCHE01 2968 BTU/Hr. 870 Watts WCHE04/WCHE06 7506/10577 BTU/Hr. 2200/3100 Watts WCHE14 22861
More informationCHALICE PENDANT LED DOWNLIGHT 70 Watt LED
CHALICE PENDANT LED DOWNLIGHT 70 Watt LED The Chalice 70 pendant LED downlight follows the Altman Lighting tradition of lighting quality. Designed specifically for the demands of theaters, churches and
More informationFLUID VIEW 12V LED TAPE LIGHT
DRY LOCATION FLUID VIEW 12V LED TAPE LIGHT Medium brightness Available in 8+ CRI 16.4 ft. maximum run UL Listed & R/C SAM Manual Suitable for closet use 5-Year limited warranty SUITABLE FOR CLOSET USE
More information- special pressure ranges - variety of electrical and mechanical. Characteristics. - other versions on request
DMP Industrial Pressure Transmitter for Low Pressure piezoresistive stainless steel sensor O p t i o n : f l u s h v e r s i o n accuracy: 0.75 %, 0.5 %, 0.0 %, 0.05 % FSO BFSL (0.5 %, 0.5 %, 0. %, 0.
More informationAudio/Visual for Lower Level and Board Room A2.0 Projector:
Audio/Visual for Lower Level and Board Room A2.0 Projector: A2.1 Projector must meet or exceed the following specifications: A2.1.1 3LCD imaging engine capable of native WXGA (1024x768) resolution. A2.1.2
More informationFinal Exam. Time: 3pm-5pm, Thursday, May 5. Location : E100 Vet. Med. This information can also be found on our course schedule page
Final Exam A common final exam time is scheduled d for all sections of Physics 231 Time: 3pm-5pm, Thursday, May 5. Location : E100 Vet. Med. This information can also be found on our course schedule page
More informationXR47-24 Models 24 W/ F (43 W/ C)
Heat Exchangers CLIMAGUARD Air-to-Air Indoor XR20 Models 4 W/ F (7 W/ C) XR29-08 Models 8 W/ F (14 W/ C) XR29-18 Models 18 W/ F (2 W/ C) XR47-24 Models 24 W/ F (4 W/ C) XR47-5 Models 5 W/ F (6 W/ C) XR60-55
More informationEC7000, EC7004 and EC7005 Single Channel Electronic Time Controls
http://waterheatertimer.org/paragon-timers-and-manuals.html#ec Replacement timer http://waterheatertimer.org/intermatic-et-series-timers-and-manuals.html#et1700 EC7000, EC7004 and EC7005 Single Channel
More informationMartin W. Kappel Theater TECHNICAL INFORMATION Revision D February 25, 2013
Martin W. Kappel Theater TECHNICAL INFORMATION Revision D February 25, 2013 27 West Main Street Norwich, NY 13815 www.chenangoarts.org 607-336-2787 Table of Contents AUDITORIUM... 2 STAGE... 2 RIGGING...
More informationBIRTHDAY PARTIES. at the Shoreview Community Center
BIRTHDAY PARTIES at the Shoreview Community Center Have your next party at the Tropics Indoor Waterpark! Our party spaces accommodate groups large and small and allow you to bring your own food and cake.
More informationP1000P1/P1100E1 50Hz
- P1000P1/P1100E1 50Hz #FGWILSON_GENSET_IMAGE Output Ratings Voltage, Frequency Prime Standby 400V, 50 Hz 480V, 60 Hz kva 1000 1100 kw 800 880 kva kw Ratings at 0.8 power factor. Please refer to the output
More informationIntelligent compressor solutions. EFC, EFCe Systems Electronic Frequency Control EFC. EFCe
EFC, EFCe Systems Electronic Frequency Control Continuously variable speed control using frequency converter technology With the EFC and EFCe system Bock offers the most efficient means of adapting the
More informationP800P1/P900E1. Output Ratings. Dimensions and Weights. Prime Rating
#DEALER_LOGO P800P1/P900E1 #FGWILSON_GENSET_IMAGE Output Ratings Voltage, Frequency Prime Standby 400/230V, 50 Hz 480/277V, 60 Hz kva 800 900 kw 640 720 kva 844 938 kw 675.2 750.4 Ratings at 0.8 power
More informationTECH SHEET AND INFORMATION (Updated )
TECH SHEET AND INFORMATION (Updated 13-03-2018) TYPE OF PRODUCTION: TYPE OF VENUE: RUNNING TIME: MAXIMUM AUDIENCE: CAST AND CREW: Young audience Theatre, auditorium 55 minutes 350 spectators 4 performers
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT A PLUS INDUSTRIES LIMITED. Plot-28, Milk Vita Rd., Section-07, Mirpur, Dhaka Factory List: 1. A Plus Industries Ltd. Inspected by: Yoon Report Generated by: Nezar Inspected
More informationP1350P1/P1500E1 50Hz
- P1350P1/P1500E1 50Hz #FGWILSON_GENSET_IMAGE Output Ratings Voltage, Frequency Prime Standby 400V, 50 Hz 480V, 60 Hz kva 1350 1500 kw 1080 1200 kva kw Ratings at 0.8 power factor. Please refer to the
More informationGENESIS Indoor Air Conditioners
PH FX ( Product Overview : Indoor Air Conditioners M28 Model M52 460 Volt 3-Phase Model M17 Model 74 74 Product Overview : The specifier s choice for cooling industrial process controls Indoor Air Conditioners
More informationACADEMIC SUCCESS CENTER THE COLLEGE AT BROCKPORT STATE UNIVERSITY OF NEW YORK PROJECT NO
SECTION 270536 - CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationDMP 339. Pressure Transmitter. with G ¼" flush diaphragm. Pressure Transmitter. Industrial. accuracy according to IEC 60770: 0.
DMP 9 Industrial Pressure Transmitter with G ¼" flush diaphragm accuracy according to IEC 60770: 0.5 % FSO Industrial Pressure Transmitter DMP 9 Nominal pressure from 0... 60 bar up to 0... 600 bar Output
More informationDefining and Labeling Circuits and Electrical Phasing in PLS-CADD
610 N. Whitney Way, Suite 160 Madison, WI 53705 Phone: 608.238.2171 Fax: 608.238.9241 Email:info@powline.com URL: http://www.powline.com Defining and Labeling Circuits and Electrical Phasing in PLS-CADD
More informationHenkel Installation Handbook LINEGUARD 2001
Henkel Installation Handbook LINEGUARD 2001 HENKEL ITALIA S.r.l. Microprocessor instruments Henkel Installation Handbook Lineguard 2001 Page 2 Summary 1. The Microprocessor Instruments... 4 1.1. Norms
More informationSoftware Package WW 9038 for the Sound Intensity Analysing System Type 3360 or the Digital Frequency Analyzer Type 2131
Software Package WW 9038 for the Sound Intensity Analysing System Type 3360 or the Digital Frequency Analyzer Type 2131 BO 0065-11 Software Package WW 9038 for the Sound Intensity Analysing System Type
More informationAPPENDIX O RECOMMENDED GUIDELINES FOR AUDIO/VISUAL TECHNOLOGIES (AV TECHNOLOGY) TABLE OF CONTENTS E. CATV... 8 F. SECURITY SYSTEM...
RECOMMENDED GUIDELINES FOR AUDIO/VISUAL TECHNOLOGIES (AV TECHNOLOGY) TABLE OF CONTENTS A. GENERAL REQUIREMENTS... 2 B. MECHANICAL SYSTEM... 2 C. ACOUSTICAL SYSTEM... 3 D. ELECTRICAL SYSTEM... 6 E. CATV...
More informationWelcome to the AccessibilityOnline Webinar Series. Listening to the Webinar
Welcome to the AccessibilityOnline Webinar Series A collaborative program between the ADA National Network and the U.S. Access Board The Session is Scheduled to begin at 2:30pm Eastern Time We will be
More informationWelcome to the AccessibilityOnline Webinar Series. Listening to the Webinar. Listening to the Webinar, continued
Welcome to the AccessibilityOnline Webinar Series A collaborative program between the ADA National Network and the U.S. Access Board The Session is Scheduled to begin at 2:30pm Eastern Time We will be
More informationComplete Part Number = MIL 72A or E Followed by Suffix Code and Voltage. Example: MIL 72A STuZ-24
GRASSLIN - MIL 72 SERIES (24-Hour, 7-Day) 24-HOUR TIME CONTROL SYNCHRONOUS WITHOUT OVERRIDE WITH 3-WAY OVERRIDE QUARTZ 7-DAY CARRY-OVER**With 3-Way Override Time based control of lighting, ventilating,
More informationWCHE BTU/Hr Watts
763.576.3200 SPEC-01037 A763.422.2211 COOLING SEALED ENCLOSURE COOLING HEAT EXCHANGERS Sealed Enclosure Cooling Heat Exchangers CLIMAGUARD AIR-TO-WATER INDOOR HEAT EXCHANGERS WCHE01 2968 BTU/Hr. 870 Watts
More informationWRIGHT AUDITORIUM TECHNICAL INFORMATION. 1. Contact Information. 2. General Information
WRIGHT AUDITORIUM TECHNICAL INFORMATION 1. Contact Information 2. General Information 3. Dimensional Information House Goods House Accessories Dressing Rooms (Description) 4. Lighting Information Lighting
More informationPre-Installation Manual. Sync. February 2016 /
Pre-Installation Manual Sync February 2016 / 10-095400-091 Sync Pre-Installation Manual February 2016 by Brunswick Bowling Products. All rights reserved. Manual Part No. 10-095400-091 Notice: If available,
More informationELECTRICAL SERVICE ORDER FORM
ELECTRICAL SERVICE ORDER FORM Deadline In order to receive advance rates, orders must be received with payment in full, a minimum of 14 days prior to the first move in date. Orders received after that
More information45 mm : all channels. Output indicator Yellow LED System status indicator Light source Infrared (880 nm) Opening angle +/ 4 Emission angle +/ 5
SPACEGUARD SERIES Description 1-12 metre sensing range 16 to 56 parallel scanning beams Active height of 0 mm to 2520 mm Detector length of 1928 mm to 2648 mm 3 different channel placement models Cable
More informationHYDROLUME LED STRIP LIGHT
DRY/WET LOCTION UV RESISTNT SLTWTER RESISTNT SUMERSILE DIMMLE 24V DC LED STRIP LIGHT SPECIFICTION SHEET Medium brightness Waterproof, submersible - IP68 Saltwater, chlorine, and UV resistant UL Listed
More informationY WA TIONS UNDER VA RENO
RENOVATIONS UNDERWAY NEW OUTDOOR PATIOS & COMMON AREA RENOVATIONS ADDRESS PROJECT SIZE RENTAL RATE 10935, 10945, & 10955 Vista Sorrento Parkway 217,715 RSF $3.85 + Electric FEATURES Exciting lobby and
More informationPURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date Request Doc # April 15, see text below
PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do
More informationVenue Specifications. Telephone: 0221/ Fax: 0221/
Venue Specifications Telephone: 0221/9679-0 Fax: 0221/9679-900 www.e-werk-cologne.com Important Information Venue mailing address E-Werk Köln Schanzenstrasse 37 51063 Köln www.e-werk-cologne.com info@e-werk-cologne.com
More informationTORK MODEL DWZ100A 1 CHANNEL DIGITAL TIME SWITCH
TORK MODEL DWZ100A 1 CHANNEL DIGITAL TIME SWITCH INSTALLATION & OPERATION CAPABILITIES 365 Day Advance Single Holiday Scheduling. ON and OFF set points: Total # - 99 per week Minimum setting - 1 minute
More informationPRODUCT INFORMATION NYY-J, NYY-O
Fixed installation, direct burial; PVC cable with different application areas, VDE, PVC-Starkstromkabel acc. HD 603 / VDE 0276-603, direct burial and building installation, fixed installation with various
More informationGardner Liquid Color Standards Instruction Manual
Gardner Liquid Color Standards Instruction Manual 027A005-03 Rev A Gardner Liquid Color Standards This set of eighteen liquid-filled tubes is an instrument used for the quick visual evaluation of the colors
More informationMHB BTU/Hr Watt
763.576.3200 Spec-00613 J763.422.2211 Sealed Enclosure Cooling Air Conditioners Sealed Enclosure Cooling Air Conditioners GENESIS Top-Mount Indoor HB16 8000 BTU/Hr. 2051 Watt MHB11 2200-4000 BTU/Hr. 645-1172
More informationSITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018
DATE: 04/03/2018 TO: The Contractor FROM: System Protection & Control Projects 20413 SUBJECT: Technical Specifications for Center Park APSTF Project PROJECT OVERVIEW This is a general specification that
More informationNO A BYLAW OF THE CITY OF VICTORIA. The purpose of this Bylaw is to revise the fees for use of recreation facilities.
NO. 14-065 A BYLAW OF THE CITY OF VICTORIA The purpose of this Bylaw is to revise the fees for use of recreation facilities. Under its statutory powers, including section 194 of the Community Charter,
More informationMulti-DC Power Distribution Box
Multi-DC Power Distribution Box LDG Electronics 1445 Parran Road, PO Box 48 St. Leonard MD 20685-2903 USA Phone: 410-586-2177 Fax: 410-586-8475 ldg@ldgelectronics.com www.ldgelectronics.com Multi-DC Power
More informationERALY & Associés. 4 Rue Georges Besse Bâtiment i FONTENAY-LE-FLEURY, France.
ERALY & Associés 4 Rue Georges Besse Bâtiment i 78330 FONTENAY-LE-FLEURY, France Email : contact@eraly.com Located near Versailles on the outskirts of Paris, we are specialized in the field of elemental
More informationMarch 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/
Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu March 4 th, 2013
More informationCHALICE PENDANT LED DOWNLIGHT 150 Watt LED
CHALICE PENDANT LED DOWNLIGHT 150 Watt LED The Chalice 150 LED pendant downlight follows the Altman Lighting tradition of lighting quality. Designed specifically for the demands of theaters, churches and
More informationRoom Recommendations for the Cisco TelePresence System 3210
CHAPTER 2 Room Recommendations for the Cisco TelePresence System 3210 Revised: February 20, 2012, This chapter provides you with general room recommendations for the Cisco TelePresence System 3210 (CTS
More informationThree Phase - General Purpose. THREE PHASE: 3 kva - 9 kva Epoxy Encapsulated Series 76 ISO-Shield
26 THREE PHASE: 3-9 Epoxy Encapsulated Series 76 ISO-Shield Features UL Listed, File E3210. CSA Certified, File LR 560. Electrostatic shield between primary and secondary windings provides cleaner output
More informationRIDER C: TECHNICAL RIDER TO CONTRACT
RIOULT Technical Rider 2011 2012 Standard Technical Rider, p. 1 of 9 RIDER C: TECHNICAL RIDER TO CONTRACT THIS TECHNICAL RIDER SHALL BE USED IN TANDEM WITH ADDENDUMS, BASED ON THE REPERTORY PRESENTED.
More informationSoliTherm. Control Cabinet Air Conditioning....wegweisend innovativ
SoliTherm Control Cabinet Air Conditioning...wegweisend innovativ Table of Content Page ComPact cooling unit series 06 ComPact cooling units 07-15 SlimLine cooling unit series 16 SlimLine cooling units
More informationNitrogen Oxide Trace Level Analyzer (NOy) Minimum Specifications
Nitrogen Oxide Trace Level Analyzer (NOy) Minimum Specifications 1) General instrument specifications: a) Electronic temperature and pressure transducers capable of being turned off and on while the instrument
More information