INTRODUCTION OF COLOUR LIGHT SIGNALS AND NEW SIGNAL BOX AT MAIDSTONE EAST. On SUNDAY, 8th APRIL, 1962

Size: px
Start display at page:

Download "INTRODUCTION OF COLOUR LIGHT SIGNALS AND NEW SIGNAL BOX AT MAIDSTONE EAST. On SUNDAY, 8th APRIL, 1962"

Transcription

1 Signal Instruction No. 21 S.E.D. SOUTHERN REGION-SOUTH EASTERN DIVISION Instructions to all concerned as to INTRODUCTION OF COLOUR LIGHT SIGNALS AND NEW SIGNAL BOX AT MAIDSTONE EAST (in place of certain existing semaphore running signals) and ABOLITION OF EXISTING MAIDSTONE EAST SIGNAL BOX On SUNDAY, 8th APRIL, 1962 Rules 77, 78, 79 and 80 to be observed. Drivers to keep a good look-out for hand signals. Commencing at 11.0 p.m. on Saturday, 7th April. 1962, colour light signals will be brought into use in place of certain existing semaphore running signals operated from Barming. Maidstone East and Bearsted signal boxes. A new signal box known as MAIDSTONE EAST will be provided 48 yards Barming side of the existing signal box which will be removed. The facing connection in the existing Down line leading to the existing Loop line and the trailing connection in the existing Up line leading from the existing Loop line, 9 and 7 yards respectively Bearsted side of the new signal box, which are at present clipped and padlocked in the normal position will be connected to and operated from the new signal box. The facing connection in the existing Up line leading to the existing Loop line, 188 yards Bearsted side of the new signal box which is at present clipped and padlocked in the normal position will be connected to and operated from the new signal box. The trap points in the existing Down and Up lines 158 yards and 68 yards respectively station side of the new signal box which are at present clipped and padlocked out of use will be brought into use, the trap connections each leading to a standard type sand drag. The Down, Up and Loop lines will in future be known as Down Main, Up Main and Reversible lines respectively... Drop off" trap points will be provided in the Reversible line as shown on the enclosed diagram. Full details of the altered permanent way and signalling arrangements are shown on the diagram enclosed with this Instruction.

2 A plate bearing the prefix letters and the number of the signal will be fixed beneath each colour light signal. The pre!fix letters will denote the signal box which operates the signal as under: Prefix letters "EBX" Signal box. Maidstone East The new colour light running signals will consist of three or two aspects as shown on the enclosed diagram.. The lights of the new running signals will be arranged as shown on the enclosed diagram. The new colour light running signals will be fitted with small side lights repeating the aspects exhibited by the signals to assist drivers of trains drawn up close to such signals. Back lights will not be provided in any of these new colour light running signals., The height of the centre of the lowest aspect (Red or Yellow) of these new colour light running signals will vary between 10 feet and 17t feet above rail level. The new colour light running signals will be replaced to danger after the front of a train has passed a distance varying from 15 yards to 627 yards beyond the signal. JUNCTION INDICATORS Junction indicators will be provided to work in conjunction with certain signals as shown on the enclosed diagram and will apply as indicated in Rule 35. clause (e). ROUTE INDICATORS Route indicators will be provided to work in conjunction with certain signals and they will exhibit a letter as indicated on the enclosed diagram according to the route the train is intended to run. TELEPHONES Telephones will be provided at or adjacent to certain signals as indicated on the enclosed diagram. Attention is drawn to the instructions headed "Use of Telephone at automatic. intermediate block or other stop signals" on pages 98 and 99 of the South Eastern Division Sectional Appendix. also to clauses I to 3 of the instructions headed "Telephones at Stop Signals" on page 63 of the General Appendix to the Working Time Tables and books of Rules and Regulations and to t~e instructions headed "Lineside Telephones" appearing as an addition to the South Eastern Division Sectional Appendix (page 95) in Special Notice PjEW 48, SED, CD or WS and subsequent issues. SIGNALLING DURING FOG AND FALLING SNOW Fogsignalmen will NOT be provided at any of the new colour light signals referred to in this Signal Instruction. SUBSIDIARY SIGNALS All subsidiary signals controlled from Maidstone East signal box will be of the position light type. SHUNTING SIGNAL 'Shunting signal EBX.14 will be worked for all running movements controlled by EBX.17118, 19,20 signals in addition to shunting movements. Drivers of trains whose movements have been authorised by these signals are not required to observe the position of this shunting signal. It may however happen in an emergency that this shunting signal has been placed at danger by the signalman nd in such circumstances ii this signal is noticed by a driver he should bring his train to a stand. During shunting operations the position of this shunting signal must be strictly observed. DETONATOR PLACING MACHINES Detonator placing machines will be provided as shown on the enclosed diagram each worked by a separate lever in the signal box. Attention is drawn to the instructions applicable to detonator placing machines appearing on page 67 of the General Appendix to the Working Time Table and books of Rules and Regulations. 2

3 SIGNAL APPLICATIONS BARMING Up Running Signals 14. Up Advanced Starting. 15. Up Starting. 16. Up Home. 17. Up Distant. Down Running Signals MAIDSTONE EAST 17. Goods Sidings (Indicator G) or Dock Siding (Indicator D) Home. 18. Down Bay Home (Indicator B). 19. Down Main Home. 20. Down Reversible Home and Junction Indicator 45 Upper Quadrant to the right. 21. Down Main Starting. 23. Reversible to Down Main Starting. 26. Down Main Advanced Starting. Up Running Signals. 36. Up Main Advanced Starting. 37. Down Bay to Up Main Home (Platform Starting). 39. Reversible to Up Main Inner Home (Station Starting). 41. Up Main Inner Home (Platform Starting). 44. Up Main Calling-on. 45. Up Main Outer Home. 46. Up Main to Reversible Outer Home and Junction-Indicator 45 Upper Quadrant to the right. Shunting Signals I. From Down Siding to Down Main. 3. Back on Down Main or from Down Main to Down Siding. 4. From Up Main to Goods Sidings. Dock Siding. Down Bay. Down Main. Reversible or back on Up Main. 6. From Down Main to Up Main or back on Down Main. 9. From Goods Sidings to Up Main or Down Main. 11. From Dock Siding to Up Main or Down Main. 13. From Down Bay to Down Main. 14. From Down Main to Goods Sidings. Dock Siding. Down Bay or along Down ain or ReversIble. 16. From Reversible"to Down Main. 25. From Down Main to Reversible or back on Down Main. 42. Back on Up Main. Down Running Signal 18. Down Starting. 19. Down Home. 20. Down Distant. BEARSTED 61. Queen Street. E.C.4. T. R. V. BOLLAND, 13th March Line Traffic Manager. (R/Z /30/20)

4 B.R MCCorquodale. London, S.E.-9249

5 ---I --~ BEARSTED No" snown -Thus :- [I[] 90- ~ I ~.JlOID I~I ~ j n[@ acting,- ~ r---u ts t~ --=-_'._"--...-;;;;;.._~_,,_,,(_~(_,=:J_"_,J---..'~ _ /~ HOLLINGBOURNE

6 r- 2~ =+ MAIN -UP ~ IT] ---.~ ~ -~- I ~ ~ HOI..LINGWORTH --HO,-LINGWORTfoI ~-L I I f-- - IGO GROUND FRAME SIO\Ne;, &. Releose W - l ci Up I F.-om Beo red ~ Srarri:1S, 2504 RUNNINli SIGNA~S. 3 ASPECT ~Yellow T\O"-l Al-L RIGHT- PROCEED ~ Y.lbw CAUTION ~Red DANGER STOP lit signal Be prepared to find ne'j(t sisnol 0+ DANGER A"'-lGER

7 E EAST ~ ~ 18 ' r ===:JI\I~: I P:'.~?;,~:,:.5."~:~G", """"".. 'i W~;n~;t Wh;:~~;t ~ 12 I I I I ~I~' "'''''"'"''':~R''S P 21 ~1:: : +--- / 12 II~ OWIo.j'eAYlL;'~t ] t-9b--l f ~"... "",.. """ " "~If':':~,,, 't: to I] 215 ~ Signal Bo" -----'-"~~~ I [---I -,1 '\T SIGNALS ASSOC1AiED WITH RuNNING SIG~AlS. "2 ASPECT 6JWhi~e lights Display;'C"gJ White lishts ~Green ~Yellow PROCEED C.ALlING - OI'J AI..l.. RIG~T' PROCEE;D CAUTION As Fer a.~ lhe line is dear Sec+;on ahead occupied. Be prepared 'to Or- to the ne"t &isn:ll only. ~;nd nellt signa \ ot DA~GER

8 IOG8 MAID5iONE ~A5T PR EFl' '"EBX" LSignal Box ~ I:, - ~EVEF<~ 40 ~'rp 40 _ UP MA-I ~ ~~::~::::::::::: *T _ _.- _.._- P05\,!ON LIGHT SHUNTlllJG SIGNAlS POSITION lighi SIGNALS ASSOCIAtED V' Red light lq White llsht 6J White light 6J Whi ~e lights DANGER STOP PROCEED NORMA~ INDICAilCN PROCEED As For a.s lhe line is clea.r As Fnr as the Line IS clearor ~c the r"lext sisnal only. Or to the ne)(t -:.ign:li only.

9 mt From 8or"m~ - Dowo Ad"oced S,,," BARMING Nos shown 1 Roure 1ndl'cotor SI "Go"' FOR GOOOS "D" FOR DOCK 5 { "8" FOR DOWN I Existin -~t-=:''i'-='~j---, I;\ ~ ~DOWNSIDII -- --==[:.=:::'~(:::~:::~] ~_--2::::=~_~r-ee.Pt 20 DOWN--. ::1 MAIN ~. ~ ~ -UP ~[:::J~ ~_$~~~~'~~l~-i~-@~i~-19-g~l~,q~~~~~~ih- Greeo @'owi $'9"' ~38 - -L-- --2~3'2> -L---- ~D5. ATEO ihus:- ~ ARE II'JDIC.AiED THU5:- n :n~d THUS.:- I I ICATED ihu5 ;-, CATED THUS:- IJIjJ U"-lC.OVERED ~OSI\ION LIe: RT PLUNGER INDICATED T. R.T.S. SIGNALS INOICA'TELJ i'hus :- Red light ~ White ll,9 DANGER STOP

10 SIGNAL IN51TRUCT10N to L 5.E.D. From Borm Down Advon~ BARMING Nos shown WEST MALLING L::::::::] 4[:::::::::] ~ ~--Se-\r.-ac-hn-s; POints I r-s7s - Green L ~- ~38 - -~ ALL DISTANCES IN YARDS. TELEPHONES ARE INDICATED THUS;- ~ DETONATOR PLACr.RS ARE INDICAT~D THU5:- 11 S\Gl'JAL BOXES IN D\CAT~D TH US;- I- I L.\M1T5 GROUND FRAME OF SHUNT INDICATED THUS ;- i!p INDiCATED THUS:- ITDJ UNCOVERED TRAIl'.J READY TO STARt PLUNGER INDICATE.D TR.T.S. BANNER REPEATING SIGNALS INDICATED "THUS :-

Lineside Signal Aspect and Indication Requirements

Lineside Signal Aspect and Indication Requirements Lineside Signal Aspect and Indication Requirements Synopsis This document mandates the appearance of lineside signalling system displays and the information they convey. This document contains one or more

More information

Lineside Signal Aspect Sequences

Lineside Signal Aspect Sequences ailway roup Standard K/T0032 Lineside Signal Aspect Sequences Synopsis This standard defines the sequence in which lineside signal aspects shall be presented to train drivers. This document is the property

More information

Fixed Signals - Rules 1 to 23

Fixed Signals - Rules 1 to 23 Applicability VIC Publication Requirement External Only Document Status Issue/Revision # Effective from 1 07 August 2011 0 04 October 2015 1 01 July 2018 Australian Rail Track Corporation Limited (ARTC)

More information

British Signalling What the driver sees

British Signalling What the driver sees Railway Technical Website Background Paper No. 1 One of a series of papers originally published as pages on RTWP and updated for RTW. Introduction British Signalling What the driver sees by Piers Connor

More information

Responding to Signals and Signs

Responding to Signals and Signs Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 4.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Running Signals ANSG 600. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.

Running Signals ANSG 600. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 3.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

GK/GN0658. Guidance on Lineside Signal Aspect and Indication Requirements. Rail Industry Guidance Note for GK/RT0058

GK/GN0658. Guidance on Lineside Signal Aspect and Indication Requirements. Rail Industry Guidance Note for GK/RT0058 GN This document contains one or more pages which contain colour Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GK/GN0658 Issue

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Fixed Signals Rule Number: 6005 Version 1.0, 31 March 2016 Fixed Signals Rule Number: 6005 Document Control Identification Document title Number Version Date 6005

More information

Sunbury SUNBURY (23 3/4 MILES)

Sunbury SUNBURY (23 3/4 MILES) Sunbury SUNBURY (23 3/4 MILES) Sunbury was the terminus of the first country section of the Victorian Railways to be opened in 1859 and the line was extended to the north two years later. The curious three

More information

2 Layout and Use of Signals

2 Layout and Use of Signals Issued May 2 Layout and Use of Signals 2. General Signals are provided to control the movement of trains and to inform the driver whether it is safe to proceed. Their location is dictated largely by the

More information

Withdrawn Document. Title of Rule Book SECTION N SINGLE LINE WORKING. Page Date Index

Withdrawn Document. Title of Rule Book SECTION N SINGLE LINE WORKING. Page Date Index Uncontrolled Railway When Group Printed Standard Title of Rule Book : GO/RT3000 : Master SECTION N SINGLE LINE WORKING Page Date Index Page No. Latest Issue N.1/N.2 December 2002 N.3/N.4 December 2002

More information

Where was the location of the incident?

Where was the location of the incident? Note: All mention of SPAD in this form refers to provisional SPAD. PART 1 INCIDENT DETAIL 1.1 1.2 What was the date of the incident? (dd/mm/yy) What was the time of the incident? (24 hour clock) 1.3 Where

More information

Lineside Signals, Indicators and Layout of Signals

Lineside Signals, Indicators and Layout of Signals To be part superseded by GKRT0045 Iss 4, GKRT0057 Iss 1 and GKRT0058 Iss 1 published on 06/12/2014 Lineside Signals, Indicators and Layout of Signals Synopsis This document defines the format, presentation

More information

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Transportation Engineering -II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Lecture - 22 Signals part - 1 Dear students, I welcome you back to the lecture

More information

PRIVATE and not for Publication NOTICE No. S.2649 BRITISH RAILWAYS. (WESTERN REGION) (For the use of employees only) Notice to Trainmen, etc.

PRIVATE and not for Publication NOTICE No. S.2649 BRITISH RAILWAYS. (WESTERN REGION) (For the use of employees only) Notice to Trainmen, etc. PRIVATE and not for Publication NOTICE No. S.2649 BRITISH RAILWAYS (WESTERN REGION) (For the use of employees only) Notice to Trainmen, etc. MULTIPLE ASPECT SIGNALLING BRISTOL (Stage 3.C.-Bristol Temple

More information

Lineside Signals, Indicators and Layout of Signals

Lineside Signals, Indicators and Layout of Signals Lineside Signals, Indicators and Layout of Signals Synopsis This document defines the format, presentation and layout of lineside signalling equipment that is used to display movement authority information

More information

Lineside Signal Aspects and Indications

Lineside Signal Aspects and Indications Supersedes Iss 1 (to correct formatting) and supersedes Lineside Signal Aspects and Indications Synopsis This document specifies the appearance of lineside signal aspects and s and the information they

More information

(LONDON MIDLAND REGION) SPECIAL NOTICE 1855 G.

(LONDON MIDLAND REGION) SPECIAL NOTICE 1855 G. PRIVATE and not for Publication BRITISH RAILWAYS (LONDON MIDLAND REGION) SPECIAL NOTICE 1855 G. N01-ICE TO DRIVERS, GUARDS, SIGNALMEN AND OTHERS CONCERNED RESPEC1-ING THE INTRO DUC1-ION OF MULTIPLE ASPECT

More information

The Joys of Life Model Railway Club OPERATING THE RAILWAY. Not To Be Taken Away

The Joys of Life Model Railway Club OPERATING THE RAILWAY. Not To Be Taken Away The Joys of Life Model Railway Club OPERATING THE RAILWAY Not To Be Taken Away Operating the Joys of Life Railway Will High 1. Introduction The Joys of Life Railway is a 600 yard long, 5in gauge ground

More information

Withdrawn Document. SECTION F (Part ii) YOUR DUTIES IF YOU ARE ACTING AS A HANDSIGNALLER

Withdrawn Document. SECTION F (Part ii) YOUR DUTIES IF YOU ARE ACTING AS A HANDSIGNALLER Uncontrolled When Printed SECTION F (Part ii) YOUR DUTIES IF YOU ARE ACTING AS A HANDSIGNALLER Updated to October 1998 (Formatted for CD use) Rule Book No. 13 Page F(ii).1 Uncontrolled When Printed This

More information

Kyneton KYNETON (40 MILES)

Kyneton KYNETON (40 MILES) Kyneton KYNETON (40 MILES) Kyneton was the terminus of the third section; the line was opened to Kyneton in April 1862 and extended to Castlemaine in October 1862. Kyneton had a small goods yard to serve

More information

Ground Frames and Shunters Releases

Ground Frames and Shunters Releases Ground Frames and Shunters Synopsis This document mandates the interface requirements for ground frames and shunters releases that may be operated by railway undertaking personnel. Copyright in the s is

More information

Transportation Engineering - II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee

Transportation Engineering - II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Transportation Engineering - II Dr. Rajat Rastogi Department of Civil Engineering Indian Institute of Technology - Roorkee Lecture 25 Interlocking of Track Dear students, welcome you back to the lecture

More information

Block System Interface Requirements

Block System Interface Requirements Block System Interface Requirements Synopsis This document mandates the requirements for block systems interfaces between signalling infrastructure and railway operations. Copyright in the s is owned by

More information

Track Work Authority ANWT 306. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015.

Track Work Authority ANWT 306. Applicability. Publication Requirement. Document Status NSW SMS. External Only October 2015. Applicability NSW SMS Publication Requirement External Only Document Status Issue/Revision # Effective from 2.0 11 October 2015 Australian Rail Track Corporation Limited (ARTC) Disclaimer This document

More information

Signal Sighting. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Two Date February 1996

Signal Sighting. Withdrawn Document Uncontrolled When Printed. Railway Group Standard. Issue Two Date February 1996 Railway Group Standard Signatures removed from electronic version Submitted by: Philip Wiltshire, Nominated Responsible Manager Approved by: Robin Nelson, Chairman, Train Control and Communications Subject

More information

DOUBLING OF EAST USK BRANCH NEWPORT

DOUBLING OF EAST USK BRANCH NEWPORT Private and not for Publication. Notice No. W.58. BRTSH RALWAYS (WESTE RN REGON.) DOUBLNG OF EAST USK BRANCH NEWPORT. Between the hours of 7.0 a.m. on SUNDAY, 28th SEPTEMBER, 952, and 5.0 p.m. on FRDAY,

More information

BURNLEY GROUP OPERATING PROCEDURES

BURNLEY GROUP OPERATING PROCEDURES The Operating Procedures contained in this document titled Burnley Group Operating Procedures refer to the area bounded by Richmond, Glen Waverley, Alamein, Belgrave & Lilydale. Approval Amendment Record

More information

Fig. 2. Typical Point Lay-out.

Fig. 2. Typical Point Lay-out. route- lever s ig n a l l in g, w in c h e s t e r, g r e a t w e s t e r n r a il w a y. By the Ferreira-Insell Route-Lever Signalling the actuation of one lever simultaneously moves, or holds, all the

More information

Guidance on Lineside Signals, Indicators and Layout of Signals. Rail Industry Guidance Note for GK/RT0045

Guidance on Lineside Signals, Indicators and Layout of Signals. Rail Industry Guidance Note for GK/RT0045 GN Published by Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2012 Rail Safety and Standards Board Limited GK/GN0645 Issue Two: March 2012 Rail Industry Guidance Note for GK/RT0045 Issue

More information

Handbook 8. Handbook 8. IWA, COSS or PC blocking a line. GE/RT8000/HB8 Rule Book

Handbook 8. Handbook 8. IWA, COSS or PC blocking a line. GE/RT8000/HB8 Rule Book GE/RT8000/HB8 Rule Book Handbook 8 IWA, COSS or PC blocking a line Handbook 8 Issue 1 Valid from December 2010 Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY. Contents approved

More information

NETWORK RAIL Scotland. Route SC141. Craigendoran. and. Fort William. (Maintenance) Not to Scale. T.A.P.M.SC

NETWORK RAIL Scotland. Route SC141. Craigendoran. and. Fort William. (Maintenance) Not to Scale. T.A.P.M.SC NETORK RAIL Scotl Route SC141 (Maintenance) T.A..M.SC141.0.0.0.1.3 March 2015 Network Rail / T.A..Ltd. 2008 Contents Legend age 111 T.A..M.SC141.0.0.0.1 June 2007 age 1V T.A..M.SC141.0.0.0.1 June 2007

More information

Uncontrolled When Printed Document comes into force on 05/12/2015 Supersedes GERT8000-HB2 Iss 1 on 05/12/2015

Uncontrolled When Printed Document comes into force on 05/12/2015 Supersedes GERT8000-HB2 Iss 1 on 05/12/2015 GE/RT8000/HB2 Rule Book Uncontrolled When Printed Handbook 2 Instructions for track workers who use emergency protection equipment Handbook 2 Issue 2 September 2015 Comes into force 05 December 2015 This

More information

CR Signals Price List (N Gauge & General) April 2010

CR Signals Price List (N Gauge & General) April 2010 Welcome to CR Signals mail order price list price list and order form. Established in 2004, all of our products have been developed over the years and are hand built using the finest materials and latest

More information

The LONDON MIDLAND and SCOTTISH RAILWAY

The LONDON MIDLAND and SCOTTISH RAILWAY The LONDON MIDLAND and SCOTTISH RAILWAY The DISTANT SIGNAL LMS Society Monologue No 9 L. G. Warburton 1 Contents Chapter 1. Historical. Chapter 2. The Distant signal problem. Chapter 3. The LMS solution.

More information

Azatrax Model Railroad Track Signal Control - Single Track

Azatrax Model Railroad Track Signal Control - Single Track Installation Guide Azatrax Model Railroad Track Signal Control - Single Track TS2 What it is: The TS2 operates one or two trackside block signals (one in each direction) on one track to simulate the block

More information

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS

SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS SIGNALING PRACTICES ON PROTOTYPE AND MODEL RAILROADS Bill Ataras September 30, 2013 PROTOTYPE SIGNALING PRACTICE 1. Many different types of signals A. Block signals B. Interlocking signals C. Whistles

More information

ASB Active Signal Box - CROSSOVER (July 2013)

ASB Active Signal Box - CROSSOVER (July 2013) ASB Active Signal Box - CROSSOVER (July 2013) ASB Crossover is designed to provide secure control of trains at isolated diamond crossovers. It stops train-through-train events, SPADS and blocked signals.

More information

Final Report. Rail inquiry RO Signalling irregularity Wellington Railway Station 3 April 2017

Final Report. Rail inquiry RO Signalling irregularity Wellington Railway Station 3 April 2017 Final report RO-2017-102: Signalling irregularity, Wellington Railway Station, 3 April 2017 The Transport Accident Investigation Commission is an independent Crown entity established to determine the circumstances

More information

The Netherlands. NS signals

The Netherlands. NS signals The Netherlands NS s 5.5. DUTCH RAILWAY SIGNALS The fotos of this chapter on Dutch ling are partly taken from www.nicospilt.com. 5.5.. Signalling SyStem 946 Netherlands rail started light experiments in

More information

Briefing Note Publication

Briefing Note Publication Documents for Block System and for Ground Frames and Shunters Releases New documents Document Document title Issue GK/RT0055 Block System Interface Requirements 1 GK/GN0655 Guidance on Block System Interface

More information

Original BMW Accessory. Installation Instructions.

Original BMW Accessory. Installation Instructions. Original BMW Accessory. Installation Instructions. ipod Interface Retrofit BMW 5 Series (E 60, E 6) BMW 6 Series (E 63, E 64) These installation instructions are only valid for cars without SA 67 (CD changer)

More information

TeSys circuit-breakers

TeSys circuit-breakers Thermal-magnetic motor circuit-breakers type GV2-ME GV2-ME with pushbutton control and screw clamp terminals (1) Standard power ratings Setting Magnetic Reference Weight of -phase motors range tripping

More information

Guidance on Signal Positioning and Visibility

Guidance on Signal Positioning and Visibility Guidance on Signal Positioning and Visibility Synopsis This document provides guidance on the requirements for positioning signals and indicators to ensure adequate viewing and clarity of meaning for drivers.

More information

HUB CATS File Development Documentation

HUB CATS File Development Documentation I. Terminology HUB CATS File Development Documentation Recommended Practices for Computer-Aided Track Signal (CATS) File Development Version 3.0 February 14, 2015 1. Active Module is a module that has

More information

Signal Sighting Standard

Signal Sighting Standard Engineering Standard Signals L1-CHE-STD-004 Signal Sighting Standard Version: 1 Issued: June 2016 Owner: Engineering Approved By: Phil Ellingworth Chief Engineer PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO

More information

RAILWAY INVESTIGATION REPORT R12D0063 UNPROTECTED OVERLAP OF AUTHORITY

RAILWAY INVESTIGATION REPORT R12D0063 UNPROTECTED OVERLAP OF AUTHORITY RAILWAY INVESTIGATION REPORT R12D0063 UNPROTECTED OVERLAP OF AUTHORITY AGENCE MÉTROPOLITAINE DE TRANSPORT TRAINS AMT 94 AND AMT 93 MILE 40.8, ADIRONDACK SUBDIVISION ADIRONDACK JUNCTION MONTRÉAL, QUEBEC

More information

Handbook 8. Issue 6. IWA, COSS or PC blocking a line. GERT8000-HB8 Rule Book. September 2017 Comes into force 02 December 2017

Handbook 8. Issue 6. IWA, COSS or PC blocking a line. GERT8000-HB8 Rule Book. September 2017 Comes into force 02 December 2017 GERT8000-HB8 Rule Book IWA, COSS or PC blocking a line Issue 6 September 2017 Comes into force 02 December 2017 Handbook 8 Uncontrolled when printed Published by: RSSB The authoritative version of this

More information

STANDARD FOR TELECOMMS WIRING AND TERMINATIONS

STANDARD FOR TELECOMMS WIRING AND TERMINATIONS GTlEH H802 Date MR 94 Paae I Part Synopsis This standard defines the Board's policy for the maintenance of Telecomms cable terminations. lthough the standard is centered on maintenance issues its provisions

More information

Dear Railway Modeller,

Dear Railway Modeller, 1721_Betra_21_6915_0101.qxd 27.09.2007 12:15 Uhr Seite 25 6915 TURN-CONTROL Turntable Controller Contents Operating instructions GB Page 1. Safety Warnings and Advice on Use 26 1.2. Components, operational

More information

Original BMW Accessories. Installation Instructions.

Original BMW Accessories. Installation Instructions. Original MW ccessories. Installation Instructions. ipod Interface Retrofit MW 5 Series (E 60, E 6) MW 6 Series (E 63, E 64) These installation instructions are only valid for cars with S 67 (CD changer)

More information

Mitigation measures for tool C - rail infrastructure managers

Mitigation measures for tool C - rail infrastructure managers Mitigation measures for tool C - rail infrastructure managers Mitigation measures for tool C rail infrastructure managers Instructions This tool links to tool C Appendix D SPAD data collection tool C for

More information

POINTS POSITION INDICATOR PPI4

POINTS POSITION INDICATOR PPI4 POINTS POSITION INDICATOR PPI4 Monitors the brief positive operating voltage across points motors when they are switched Lights a corresponding led on a control panel to show the last operation of each

More information

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E.

Installation Manual IPT Installation of skillet systems with 125 A track current. MV a-E. www.wampfler.com Page 1 of 27 Index Page 1 Basics...4 2 Basic understanding of an IPT -system...5 3 General rules regarding metal parts in close proximity...6 3.1 Envelope free of ferromagnetic material...6

More information

Simplified Signaling for Modelers

Simplified Signaling for Modelers Simplified Signaling for Modelers Rule 281 Clear 1 Author: Gary Evans North Central Region, Division 3 garytrain47@frontier.com Revision: May 05, 2014 Handout: NORAC Signal Aspects Sheet 2 Introduction

More information

An Un-Official Guide to Signalling in Rail Simulator Part 1 Semaphore Signals

An Un-Official Guide to Signalling in Rail Simulator Part 1 Semaphore Signals An Un-Official Guide to Signalling in Rail Simulator Part 1 Semaphore Signals By Mark Brinton Issue 2 Extensively re-written from Issue 1 Changes since last version are not shown. Introduction The intention

More information

Route timetable. London Euston - Birmingham - Wolverhampton - Shrewsbury. Stations served:

Route timetable. London Euston - Birmingham - Wolverhampton - Shrewsbury. Stations served: Route timetable London Euston - Birmingham - Wolverhampton - Shrewsbury For Route A trains to Scotland, please see the Route A/F timetable Stations served: Birmingham International Birmingham New Street

More information

PREPAX DELUXE INTERCOM SYSTEMS

PREPAX DELUXE INTERCOM SYSTEMS PREPAX DELUXE INTERCOM SYSTEMS Thank you for investing in a PREPAX Deluxe model intercom system. Kindly make sure that the input voltage specifications are maintained and that no external voltage is applied

More information

Signal Box Diagrams Of The Great Western & Southern Railways: SR Lines In East Dorset Volume 2 By George Pryer

Signal Box Diagrams Of The Great Western & Southern Railways: SR Lines In East Dorset Volume 2 By George Pryer Signal Box Diagrams Of The Great Western & Southern Railways: SR Lines In East Dorset Volume 2 By George Pryer Signal Box Diagrams of the Great Western and - Signal Box Diagrams of the Great Western and

More information

EC5415B. B-Tronic EasyControl. Assembly and Operating Instructions. Wall/hand-held transmitter, 15-channel, bidirectional

EC5415B. B-Tronic EasyControl. Assembly and Operating Instructions. Wall/hand-held transmitter, 15-channel, bidirectional B-Tronic EasyControl EC5415B en Assembly and Operating Instructions Wall/hand-held transmitter, 15-channel, bidirectional Important information for: Fitters / Electricians / Users Please forward accordingly!

More information

Parts and Accessories Installation Instructions

Parts and Accessories Installation Instructions Parts and Accessories Installation Instructions Retrofit kit BMW Traffic Pro BMW Z4 (E 85) Retrofit kit part number: 65 90 0 301 533 65 90 0 153 186 Installation time: The installation time of approx.

More information

Be sure to check the camera is properly functioning, is properly positioned and securely mounted, every time you operate your vehicle.

Be sure to check the camera is properly functioning, is properly positioned and securely mounted, every time you operate your vehicle. Please read all of the installation instructions carefully before installing the product. Improper installation will void manufacturer s warranty. The installation instructions do not apply to all types

More information

Scan-Light Supplement. Fitting instructions and hardware details For Mitsubishi MH105AG and MH216CG scanners

Scan-Light Supplement. Fitting instructions and hardware details For Mitsubishi MH105AG and MH216CG scanners Scan-Light Supplement Fitting instructions and hardware details For Mitsubishi MH105AG and MH216CG scanners Contents Contents Fitting instructions and hardware details... 1 For Mitsubishi MH105AG and MH216CG

More information

Caution. Hanging the Screen:

Caution. Hanging the Screen: Installation Instructions for Laminar and Laminar XL Projection Screens Caution 1. Read Instructions through completely before proceeding; keep them for future reference. Follow these instructions carefully.

More information

NMRA 2013 Peachtree Express Control Panel Editor - B

NMRA 2013 Peachtree Express Control Panel Editor - B NMRA 2013 Peachtree Express Control Panel Editor - B Dick Bronson RR-CirKits, Inc. JMRI Control Panel Editor for Automatic Train Running Using Warrants Items Portal Table The 'Portal Table' is part of

More information

Corporate Identity and Visual Identity Guidelines June 2011

Corporate Identity and Visual Identity Guidelines June 2011 Corporate Identity and Visual Identity Guidelines June 2011 Index A Basic Design Elements A 01 The BenQ Logo A 02 Minimum Size, Minimum Staging Area A 03 Typography A 04 Corporate Colours B B 01 B 02 B

More information

Univox DLS-33TV. Loop amplifier with AutoScart and loop pad/sofa loop. User Guide. Part No Description. Univox DLS-33TV Loop amplifier.

Univox DLS-33TV. Loop amplifier with AutoScart and loop pad/sofa loop. User Guide. Part No Description. Univox DLS-33TV Loop amplifier. Univox DLS-33TV Loop amplifier with AutoScart and loop pad/sofa loop User Guide Univox DLS-33TV Loop amplifier Loop pad Sofa loop Part No Description 203340 Univox DLS-33TV, Loop amplifier with AutoScart,

More information

Scale Track System. 21 Century y Signal System 2-Rail Manual

Scale Track System. 21 Century y Signal System 2-Rail Manual Scale Track System st 21 Century y Signal System 2-Rail Manual TABLE OF CONTENTS Introduction...2-3 Road Signal Board Diagram and Definitions...4-6 Tips for Handling the Circuit Board...6 2-Rail Detector

More information

Signalist SC1. DCC signal controller user manual Covers configuration for UK signals

Signalist SC1. DCC signal controller user manual Covers configuration for UK signals Signalist SC1 DCC signal controller user manual Covers configuration for UK signals 1 Contents Overview... 3 Connections... 3 Ribbon cable connection... 3 DCC track connection... 5 2-aspect signal connections...

More information

Bulletin 190 IEC Modular Starter System

Bulletin 190 IEC Modular Starter System Bulletin 90 Table of Contents Selection Guide Description Page Bulletin 90....................................... Accessories....................................... 7 Specifications.....................................

More information

Chapter 4 Signal Paths

Chapter 4 Signal Paths Chapter 4 Signal Paths The OXF-R3 system can be used to build a wide variety of signal paths with maximum flexibility from a basic default configuration. Creating configurations is simple. Signal paths

More information

Data Sheet. Electronic displays

Data Sheet. Electronic displays Data Pack F Issued November 0 029629 Data Sheet Electronic displays Three types of display are available; each has differences as far as the display appearance, operation and electrical characteristics

More information

Feed-through terminal, 4 mm², Screw connection, Wemid, dark beige, TS 35

Feed-through terminal, 4 mm², Screw connection, Wemid, dark beige, TS 35 General ordering data Order No. 1020100000 Part designation WDU 4 Version EAN 4008190150617 Qty. 100 pc(s). Feed-through terminal,, Screw connection, Wemid, dark beige, TS Product notes Note, ordering

More information

Collator series 300/400, 310B Spare parts list

Collator series 300/400, 310B Spare parts list Collator series 300/400, 30B Spare parts list AUGUST 997 Part # 9049 USER INFORMATION T0703 This Spare part list is devided into one Series 300/400 section, one 30 B section and one Paper feeder section.

More information

Introduction to Layout Control with JMRI/PanelPro. Create a Detailed CTC Machine Model with JMRI/PanelPro

Introduction to Layout Control with JMRI/PanelPro. Create a Detailed CTC Machine Model with JMRI/PanelPro Add Signals to your Layout with JMRI/PanelPro Dick Bronson - R R -C irk its, I n c. Other Clinics in this series: Introduction to Layout Control with JMRI/PanelPro 8:30 PM, Sunday, July 13th Create a Detailed

More information

Margate and Ashford International (via Maidstone East) to London

Margate and Ashford International (via Maidstone East) to London Margate and Ashford International (via Maidstone East) to London 2 28 September 2003 to 17 January 2004 London Victoria London Blackfriars London Waterloo East Elephant & Castle London Charing Cross London

More information

Inserting the batteries. Basic settings of the remote control

Inserting the batteries. Basic settings of the remote control Inserting the batteries Procedure prior to first use or when changing batteries Remove the back plate to expose the battery tray. Insert 2 x AA 1.5V alkaline batteries. Ensure the polarity of the batteries

More information

INSTALLATION INSTRUCTIONS MO023A

INSTALLATION INSTRUCTIONS MO023A INSTALLATION INSTRUCTIONS MO023A Nexans N3S ODF system NEXANS N3S ODF SYSTEM Content Product description Patching frame Splice frame Doors Splice module Patch module Protective cover and label panel Guides

More information

Signalling Cable Equivalent Sizes

Signalling Cable Equivalent Sizes Signalling Cable Equivalent Sizes Signatures removed from electronic version Submitted by... Jim Harper Nominated Responsible Manager Synopsis This Standard Authorises the use of cables to GS/ES 0872 as

More information

Identification - electrical services

Identification - electrical services Identification - electrical services Aesthetic All live phase cable sheathing to be brown coloured and neutral phase cable sheathing to be blue coloured, all labelled L1, L2, L3 & N respectively in accordance

More information

Access Control Keypad for MK-DV, JB-DV

Access Control Keypad for MK-DV, JB-DV #91173 0406 Access Control Keypad for MK-DV, JB-DV - INSTRUCTIONS - The KVI is a surface mount electronic access control keypad for use with Aiphone s MK-DV or JB-DV video door station. Designed with the

More information

Medway Valley Links Bus 149 & 151 times

Medway Valley Links Bus 149 & 151 times Spring 2016 Issue 2, effective 21 February 2016 Medway Valley Links Bus 149 & 151 times Linking Malling with Medway BUS 149 & 151 Code TU-F SD SD NSD Bus Operator N-V N-V N-V N-V N-V N-V N-V N-V N-V N-V

More information

Hotel Lighting. Lua4RC Application VT8300. Local HVAC System (No reheat) Local lighting system SED-WDN-P-5045 SED-DOR-P-5045.

Hotel Lighting. Lua4RC Application VT8300. Local HVAC System (No reheat) Local lighting system SED-WDN-P-5045 SED-DOR-P-5045. Hotel Lighting Lua4RC Application Door Switch SED-WDN-P-5045 SED-DOR-P-5045 VT8300 Local lighting system Local HVAC System (No reheat) 2 Lua4RC Application Hotel Lighting INTRODUCTION This script can be

More information

Omnidirectional TV/FM Antenna

Omnidirectional TV/FM Antenna Omnidirectional TV/FM Antenna For Technical Services, email help@winegard.com or call 1-800-788-4417. DO NOT RETURN ANTENNA TO PLACE OF PURCHASE. DO NOT SNAP THE ANTENNA HEAD AND PEDESTAL TOGETHER PRIOR

More information

Signal Sighting and Position

Signal Sighting and Position Discipline: Engineering (Signalling) Category: Standard Signal Sighting and Position ESC-04-01 Applicability ARTC Network Wide CRIA (NSW CRN) Primary Source PP-165, SC 08 01, SCP 06, SCP 15 Document Status

More information

Digital Clock with Second Circle DA Series

Digital Clock with Second Circle DA Series Digital Clock with Second Circle DA Series State of art technology digital clock intended to be used indoors the clock will find use in many applications, in radio or television studios or as wall clock

More information

signal book Scandinavia decoder die Alleskönner the all-in-one decoder Modellbahnelektronik aus Dresden model railway electronics from Dresden

signal book Scandinavia decoder die Alleskönner the all-in-one decoder Modellbahnelektronik aus Dresden model railway electronics from Dresden Trafo decoder die Alleskönner the all-in-one decoder A0 A A A3 A4 A5 A6 A7 03 Gleis Z-6 decoder Signal Prog A5 A4 A3 A A A0 A9 A8 book Scandinavia Modellbahnelektronik aus Dresden model railway electronics

More information

Hotel Lighting. Lua4RC Application VT8300. Local HVAC System (No reheat) Local lighting system SED-WDN-P-5045 SED-DOR-P-5045.

Hotel Lighting. Lua4RC Application VT8300. Local HVAC System (No reheat) Local lighting system SED-WDN-P-5045 SED-DOR-P-5045. Hotel Lighting Lua4RC Application Door Switch SED-WDN-P-5045 SED-DOR-P-5045 VT8300 Local lighting system Local HVAC System (No reheat) 2 INTRODUCTION This script can be used to control a master lighting

More information

Station-User Guide For Single Line Telephones

Station-User Guide For Single Line Telephones INTRODUCTION Station-User Guide For Single Line Telephones This guide provides instructions on the use of the single-line telephone instruments in the University of Hawaii s SL-1 Telephone System. The

More information

500W ERP SYSTEM CONFIGURATION

500W ERP SYSTEM CONFIGURATION 500W ERP SYSTEM CONFIGURATION INTENDED USE i. The various pieces of equipment in this document are only for use permanently at a predefined location with a license or authorisation from the radio spectrum

More information

Signalling Cable Equivalent Sizes (formerly RT/E/C/11213)

Signalling Cable Equivalent Sizes (formerly RT/E/C/11213) NR/GN/SIG/11213 Ref Date (formerly RT/E/C/11213) This temporary front sheet facilitates change to the new Network Rail Standards referencing nomenclature. The Ref above will be formally allocated to this

More information

PRODUCT INFORMATION. ETHERLINE EC Flex Cat.5e M8

PRODUCT INFORMATION. ETHERLINE EC Flex Cat.5e M8 Industrial Ethernet EC Patchcord M8 Industrial Ethernet Patchcord, EtherCat, Cat.5e, plug M8, PVC, flexible Info For EtherCAT applications Other types are available at www.lappgroup.com/assemblyfinder

More information

Bharat Heavy Electricals Limited HIGH PRESSURE BOILER PLANT, TIRUCHIRAPPALLI CONTROLS AND INSTRUMENTATION/FB

Bharat Heavy Electricals Limited HIGH PRESSURE BOILER PLANT, TIRUCHIRAPPALLI CONTROLS AND INSTRUMENTATION/FB Bharat Heavy Electricals Limited HIGH PRESSURE BOILER PLANT, TIRUCHIRAPPALLI 620 014. CONTROLS AND INSTRUMENTATION/FB DATA SHEET FOR MULTICORE, ARMOURED, CONTROL CABLE Project: Ennore Sez, 2 x 660 MW,

More information

Draft for Public Comment

Draft for Public Comment Draft for Public Comment Form 36 Version 6.1 DPC: 03/302646 DC Head Office 389 Chiswick High Road London W4 4AL Telephone: +44(0)20 8996 9000 Fax: +44(0)20 8996 7001 Date: 27 March 2003 Origin: National

More information

Cable Testing Basic guide to cable testing for newly qualified SMTH staff or trainees.

Cable Testing Basic guide to cable testing for newly qualified SMTH staff or trainees. Cable Testing Basic guide to cable testing for newly qualified SMTH staff or trainees. This is for information only. The SMTH MUST ALWAYS BE FOLLOWED AT ALL TIMES. F. M. Spowart June 2018 v1 Cable Testing

More information

Programmable Room Thermostat With RF

Programmable Room Thermostat With RF Salus RT500RF Manual:89 10/7/10 23:43 Page 1 Programmable Room Thermostat With RF Instruction Manual Model No RT500RF 2 Salus RT500RF Manual:89 10/7/10 23:43 Page 2 PRODUCT COMPLIANCE This product complies

More information

Sequential Logic and Clocked Circuits

Sequential Logic and Clocked Circuits Sequential Logic and Clocked Circuits Clock or Timing Device Input Variables State or Memory Element Combinational Logic Elements From combinational logic, we move on to sequential logic. Sequential logic

More information

User Manual CXE Rev (12) CXX Series. User Manual. Teleste Corporation CXE810. Fibre optic receiver

User Manual CXE Rev (12) CXX Series. User Manual. Teleste Corporation CXE810. Fibre optic receiver 27.3.2012 1(12) CXX Series User Manual Teleste Corporation CXE810 Fibre optic receiver 27.3.2012 2(12) Contents Introduction... 3 Installation... 3 Housing... 3 Powering... 4 Interfaces... 4 Fibre installation...

More information

51109 Köln St. Asaph, Denbigshire LL17OLJ

51109 Köln St. Asaph, Denbigshire LL17OLJ Commissioning the Digital Shaft Copier (DSC) Kollmorgen Steuerungstechnik KOLLMORGEN LIFT CONTROLS Broichstraße 32 Unit 17, St. Asaph Business Park 51109 Köln St. Asaph, Denbigshire LL17OLJ Telefon +49

More information

User Guide UD51. Second encoder small option module for Unidrive. Part Number: Issue Number: 5.

User Guide UD51. Second encoder small option module for Unidrive. Part Number: Issue Number: 5. EF User Guide UD51 Second encoder small option module for Unidrive Part Number: 0460-0084-05 Issue Number: 5 www.controltechniques.com Safety Information The option card and its associated drive are intended

More information