1 An Overview of Commercial Building Retuning Training SRINIVAS KATIPAMULA Big Ten and Friends Mechanical and Energy Conference, October 16, 2012 PNNL-SA-91228

2 Presentation Outline Background on Re-tuning (Existing Building Commissioning) Large Commercial Building Retuning Training Small/Medium-Sized Building Re-tuning Training Concluding Remarks 2

3 Why is Building Retro- Commission Training Important? 3

4 Retro-Commissioning Literature A number of studies have shown that retro-commissioning buildings can lead to significant energy savings between 5 and 30% Cost of retro-commissioning varies between 0.1$/sf to 0.6$/sf Cost savings can range between 0.1$/sf to 0.75$/sf Simple payback ranging from 3 months to 3 years A number of the measures addressed by retrocommissioning relate to our inability to control the building operations 4

5 Why is Retro-Commissioning not Widely Used? There is a perception that retro-commissioning can be expensive It can be expensive, but typically has less than 3 year paybacks There is a perception that measures addressed during retro-commissioning do not persist for a long time (>6 months) It is generally true, only consistent, periodic commissioning will lead to persistence 5

6 What is Re-tuning? A systematic process to identify and correct building operational problems that lead to energy waste Implemented primarily through the building control system at no cost other than the labor required to perform the retuning process Includes small, low-cost repairs, such as replacing faulty sensors Includes identifying other opportunities for improving energy efficiency that require investment Might be thought of as a scaled-down retrocommissioning focused on identifying and correcting operational problems 6

7 Re-tuning can Fill the Gap Building re-tuning training is targeted at building operations staff Once the staff are trained to re-tune buildings, it will address both the cost and the persistence question Because re-tuning is implemented by leveraging information from building automation systems and primarily targets operational problems, cost of implementation is significantly lower than retrocommissioning Because re-tuning costs a fraction of retro-commissioning, it can be periodically done to ensure persistence 7

8 Energy Consumption Life Cycle of Retro-Commissioning/Retuning Typical commercial building behavior over time Periodic Re-tuning Ensures Persistence Continuous Re-tuning Maximizes Persistence Time 8

9 U.S. Department of Energy Building Retuning Training Outreach Building re-tuning training was originally developed as part of a project funded by Washington State ( Extending training outreach beyond WA State ( with U.S. Department of Energy funding Intended for building operations staff, retrocommissioning providers and energy service providers Converted the training into an online interactive training Recently drafted re-tuning training for small/medium-sized building prescriptive approach 9

10 Overview of Large Commercial Building Re-tuning Training 10

11 Large Commercial Building Re-tuning Training Training consists of two parts Classroom training - 6 to 8 hours; limited to 20 to 25 people Field training - 1 to 2 days, depending on the size of the building; limited to 6 to 10 people Intent of the training Provide an in-depth training of the retuning approach Prepare the participating technicians for hands-on field training Provide an opportunity to ask questions and get clarification on any aspect of the re-tuning process 11

12 Six Primary Steps of Large Commercial Building Re-tuning Collecting Initial Building Information: Basic building information Pre-Re-tuning Phase: Trend-data collection and analysis Building Walk Down: Getting to know the building Re-tuning: Identifying and correcting operations problems Post Re-tuning: Reporting re-tuning findings Savings Analysis: Determining and reporting the impacts 12

13 Large Commercial Building Re-tuning- Common Problems Found Occupied schedules longer than they need to be Equipment running during unoccupied periods (e.g. exhaust fans) Discharge-air set points too low Heating/cooling set points too close Static pressure too high Especially during partially occupied periods No resets of either discharge-air temperature set point or discharge-air static pressure set point Economizer problems Lack of resets on distribution loops (both hot and chilled water) 13

14 Purpose of Re-tuning Improve the building s energy efficiency through low-cost and nocost operational improvements (mostly control changes) Identify opportunities to further increase the building s energy efficiency Identify problems requiring physical repair Catch the big energy saving opportunities that may require capital investment 14

15 Building Operations! Most buildings are operated as if it is a peak day every day! Building occupancy changes every hour Driving conditions change every hour weather! So, why do we operate buildings as if it is a design day every day? Easy to implement It is perceived as providing more comfortable environment it is not! Building automation systems are capable of providing intelligent controls to adapt as conditions change, which leads to Energy efficient operations Fewer comfort issues to deal with! October 16,

16 Six Primary Steps of Re-tuning Collecting Initial Building Information: Basic building information Pre-Re-tuning Phase: Trend-data collection and analysis Building Walk Down: Getting to know the building Re-tuning: Identifying and correcting operations problems Post Re-tuning: Reporting re-tuning findings Savings Analysis: Determining and reporting the impacts 16

17 Air handling Unit Points to Monitor & Example Monitoring Plan Air-Handling Unit Monitoring Plan Building Name: ABC Bank Building Re-Tuning Technician Name: John Doe, McDonalds Control Services Building Location: th Ave., Seattle, WA Date: April 3, 2007 Contact Information: (509) ; john.doe@mcs.com Planned Start Date/Time: 5/1/07 TBD Planned Measurement Period (hours, days or weeks) 2 weeks Planned End Date/Time: 5/15/07 TBD Measurement Interval (seconds, minutes, or hours): 30 minutes Floor: 1 Equipment Name: AHU-1 Point Name Measurement Description Planned Start Date/Time Planned End Date/Time Planed Measurement Period (hours, days, or weeks) Measurement Interval (seconds, minutes or hours) Measurement Units OAT1 Outdoor air temperature Degrees F MAT1 Mixed air temperature Degrees F RAT1 Return air temperature Degrees F DAT1 Discharge air temperature Degrees F DATSP1 Discharge air-temperature set point Degrees F PDIST1 Discharge Static Press in. w.c. MADamper1 Mixed air damper position % open Fan1 Fan status on/off Fan Speed1 Fan speed rpm CWV%1 Chilled water valve position % open HWV%1 Hot water valve position % open MODE1 Occupancy mode Occupied/ Unoccupied 17

18 Points to Monitor Guidelines If there are fewer than 6 AHUs in the building, we recommend that all AHUs be trended. If the building is less than 4-stories tall, pick at least one AHU from each floor. If the building is 20-story tall, trend all AHUs if there are few than 6. If there are more than 6 AHUs, trend one AHU on every other floor (maximum of 10 AHUs trended). Our recommendation is not to pick the AHU that is operating the best. We recommend that the AHU be picked randomly for monitoring. Following are the guidelines for trending zone VAV boxes: If there are fewer than 8 zones per floor trend all zones on the floor. For each floor, trend at least 1 zone on each of the four directions (north, south, east and west) and at least 4 zones in core. So, we will need at least 8 VAV boxes trended per floor If the building is less than 4-stories tall, trend 8 zones on every floor. If the building is 20-stories tall, trend all 8 zones on every other floor (maximum of 80 VAV boxes to trend) 18

19 Six Primary Steps of Re-tuning Collecting Initial Building Information: Basic building information Pre-Re-tuning Phase: Trend-data collection and analysis Building Walk Down: Getting to know the building Re-tuning: Identifying and correcting operations problems Post Re-tuning: Reporting re-tuning findings Savings Analysis: Determining and reporting the impacts 19

20 Trend-Data Collection & Analysis: Purpose Detect potential operational problems even before visiting the building Identify problems that require time histories to detect incorrect schedules, no use of setback during unoccupied modes, poor economizer operation, etc. Identify Simultaneous Heating and Cooling Identify poor control loops Identify when support equipment (central plants, etc.) are operating when they should not be or not operating when they should be 20

21 Major Steps in Analysis Using Energy Charting and Metrics (ECAM) Tool Download trend log data files from BAS Format data files for compatibility with the ECAM spreadsheet analysis tool - urces.stm Open data files in ECAM spreadsheet analysis tool and automatically generate graphs Review graphs to identify operational issues Record operational issues for reference during re-tuning 21

22 Six Primary Steps of Re-tuning Collecting Initial Building Information: Basic building information Pre-Re-tuning Phase: Trend-data collection and analysis Building Walk Down: Getting to know the building Re-tuning: Identifying and correcting operations problems Post Re-tuning: Reporting re-tuning findings Savings Analysis: Determining and reporting the impacts 22

23 Building Walk Down: Purpose Get to know the building better Develop a general impression of: Overall building condition Overall building design HVAC system design Collect some basic data on the building systems at a level of detail greater than the initial data collection 23

24 Building Walk Down: Major Steps Review electrical and mechanical prints Walk the outside of the building Walk the inside of the building Walk down the roof Walk down the air-handlers Walk down the plant area Review the DDC system (BAS) front end 24

25 Six Primary Steps of Re-tuning Collecting Initial Building Information: Basic building information Pre-Re-tuning Phase: Trend-data collection and analysis Building Walk Down: Getting to know the building Re-tuning: Identifying and correcting operations problems Post Re-tuning: Reporting re-tuning findings Savings Analysis: Determining and reporting the impacts 25

26 26 Using the knowledge learned from trend-data analysis and building walk down to start the building re-tuning process

27 Occupancy Scheduling Purpose Determine whether night, weekend and holiday set back is being used End-use loads are following occupancy schedules Approach For each major end use, review plots of consumption vs. time or temperature vs. time or status vs. time or static pressure vs. time 27

28 Occupancy Scheduling (continued) Shut off systems whenever possible Night unoccupied schedules Weekend unoccupied schedules Holiday unoccupied schedules Daytime no or low use unoccupied schedules Auditorium, classrooms, conference rooms Includes lighting Includes specialized exhaust Do not restart too early Use a startup schedule based on building needs Do not use fresh air during warm-up except last 30 minutes for flushing building 28 28

29 Occupancy Scheduling (continued) Building electric consumption should show significant energy drop for nights/weekends Signifying set backs are active on all HVAC systems Base load versus peak loads should be at least 50% difference and as much as 80% with aggressive set backs Trended data for zone temperatures should show between 5 o F and 10 o F deviations from set points when set backs are active during non-shoulder months Winter zone temperatures should drop down to between 60 o F and 65 o F and summer zone temperatures should rise to between 80 o F and 85 o F 29

30 Occupancy Scheduling (continued) Enable unoccupied mode and night setback control Shut off units at night and weekend and holiday Turn off heating systems (for reheat only) during summer When reheat system is shut off, room comfort may be maintained by increasing supply air temperature for constant volume units Do not turn heating off too early in the summer to avoid having to turn the system on and off repeatedly Turn off systems during unoccupied hours Slow down systems during unoccupied/lightly-occupied hours 30

31 Examples of Occupancy Scheduling: Bad and Better 31

32 Examples of Occupancy Scheduling: Good 32

33 Examples of Occupancy Scheduling: Good 33

34 Test Your Knowledge

35 Air-Handling Fan Scheduling Damper and Cooling Coil Commands indicate weekend operation Damper and Cooling Coil Valve start action at 7:30 AM and end at 10 PM on Saturday, 11:30 PM on Sunday (15-16 Hours occupy) This air-handling system serves an auditorium What would be your recommendation for a low cost/no cost control operation change? 35

36 Air-Handling Fan Scheduling Discussion Points: Is the schedule for this air-handling system appropriate? For an education institution, is this space likely occupied every weekend? What would be your recommendation for a low cost/no cost control operation change? Correct answer: Reduce or eliminate schedule or provide method to activate occupancy for a 2-4 hour maximum time or both 36

37 Air-Handler Data Analysis: Static Pressure Purpose: Determine whether the static pressure set point is too high or too low Approach: For each air handler, review a plot of the damper positions of all VAV units vs. time Look for situations where: Most dampers are nearly closed during cooling static pressure too high Several VAV boxes on an air handler have dampers fully open static pressure is too low and VAV boxes are not able to meet zone loads starved boxes Dampers are not modulating as conditions change VAV boxes that are not being controlled or not responding to control signals 37

38 Static Pressure Operations: Constant Static Pressure 38

39 Static Pressure Operations: Constant Static Pressure 39

40 Static Pressure Operations: Zone VAV Damper Position vs. Time 40

41 Static Pressure Operations: VAV Damper Position vs. Time 41

42 Static Pressure Operations: VAV Damper Position vs. Time 42

43 Six Primary Steps of Re-tuning Collecting Initial Building Information: Basic building information Pre-Re-tuning Phase: Trend-data collection and analysis Building Walk Down: Getting to know the building Re-tuning: Identifying and correcting operations problems Post Re-tuning: Reporting re-tuning findings Savings Analysis: Determining and reporting the impacts 43

44 Highlights of Re-tuning Every set point adjustment made will have an impact of some sort on the utility meter Can save energy and keep occupants comfortable It takes time to tune a building There are no magic set points that work all the time Always monitor the utility meters (gas & electric) to see what affect you have had Look at the big picture when making adjustments Watch the meter profiles weekly Learn and know the building s personality 44

45 Large Commercial Building Re-tuning e- Learning Adds more reach to instructor-led classroom and field training Available for free Provides learners: A step-by-step walk through of the building re-tuning process Opportunity to practice meaningful re-tuning activities in real-world contexts and situations A variety of downloadable resources (checklists, templates, example plans, etc.) to use on the job 45

46 Large Commercial Building Re-tuning: Learn by Doing Work within a virtual, 3D commercial building Collect and analyze building prints and trend data Perform a virtual building walk down Interact with building occupants Work through a variety of interactive scenarios designed to target specific re-tuning issues throughout the building 46

47 Large Commercial Building Re-tuning Training Resources 10 re-tuning guides, each addressing an area of re-tuning Short course or training module How to use ECAM and interpret graphs generated by ECAM Working on another short course How to setup trends in a building automation system 47

48 Overview of Small/Medium-Sized Commercial Building Re-tuning Training 48

49 Small/Medium-Sized Building Re-tuning Training: Introduction The purpose of this training is to train students/technicians on how to make small/medium-sized buildings more efficient leading to energy savings and reduced operating cost The knowledge and skills learned through the training will be highly valued by organizations and companies seeking to improve the performance of small/medium-sized buildings It will also prepare the participating students/technicians for hands-on field training It will also provide an opportunity for students/technicians to ask questions and get clarification on any aspect of the re-tuning process 49

50 Small/Medium-Sized Commercial Building: Scope Small-sized Buildings: Defined as 5,000 sf or less No building automation system Medium-sized Buildings: Defined as greater than 5,000 and up to 50,000 sf No building automation system Focus is on low-cost and no-cost ideas and methods for saving energy A prescriptive approach to identify and correct building operational problems that lead to energy waste May include identifying other opportunities for improving energy efficiency that require investment 50

51 Small-Sized Commercial Building Characteristics Buildings less than 5,000 sf Percent of total number of commercial buildings 54% Percent of total commercial building square footage 22% Percent of total commercial building energy use 21% Even a 10% reduction in HVAC and lighting energy consumption will lead to 6 kbtu/sf/year or 60 mbtu/yr for a small commercial building of 10,000 sf Refrigeration, 11.72, 14% Consumption Breakdown in kbtu/sf/year and % of Total Computer Use, 1.77, 2% Office Equipment, 1.1, 1% Cooking, 5.59, 7% Water Heating, 6.08, 7% Miscellaneous, 6.2, 7% Lighting, 15.32, 18% Heating, 27.7, 32% Cooling, 6.51, 8% Ventilation, 3.53, 4% 51

52 Medium-Sized Commercial Building Characteristics Buildings greater than 5,000 sf and up to 50,000 sf Percent of total number of commercial buildings 3% Percent of total commercial building square footage 6% Percent of total commercial building energy use 5% Even a 10% reduction in HVAC and lighting energy consumption will lead to 5.5 kbtu/sf/year or 165 mbtu/yr for a medium-sized commercial building that is 30,000 sf in size Consumption Breakdown in kbtu/sf/year and % of Total Computer Use, 1.92, 3% Office Equipment, 0.64, 1% Refrigeration, 5.54, 8% Cooking, 1.45, 2% Lighting, 16.6, 23% Water Heating, 6.82, 9% Miscellaneous, 7.45, 10% Heating, 19.09, 26% Ventilation, 4.8, 7% Cooling, 8.1, 11% 52

53 Small/Medium-Sized Building Re-tuning Training: Major Focus Areas Building Envelope Heating, Ventilation and Air Conditioning Systems and Controls Packaged air conditioners and heat pumps Gas furnaces Air distribution system Lighting and Lighting Controls Domestic Hot Water/Process Hot Water Office Equipment/Process Equipment Internal Conditions Meter Profile 53

54 Small/Medium-Sized Building Re-tuning: Definition and Scope Building re-tuning is a systematic process to identify and correct operational problems that lead to energy waste Although the original building re-tuning process developed for large commercial buildings leveraged data from building automation system to identify operational problems, the process for small/medium-sized buildings will be prescriptive and will not rely on detailed monitored data Because small/medium-sized buildings will mostly have packaged units for heating and cooling with simple air distribution, and are controlled by a zone thermostat, many of the recommendations for efficiency improvements will be prescriptive Some of the topics covered in this building re-tuning training are often covered in training associated with energy auditing and retrocommissioning for small/medium-sized commercial buildings 54

55 Small/Medium-Sized Building Re-tuning Training: Approach Because most small/medium-sized commercial buildings will not have a building automation system, the training will be prescriptive It will use a four step approach Initial data collection phase: Collection of information about the building Investigation phase: Building walk down to identify and characterize the building operations Implementation phase: Application of prescriptive re-tuning measures Documentation phase: Reporting of measures implemented and calculation of energy saving 55

56 Targeted Building Types There is a lot of diversity in small/medium-sized commercial buildings However, some building types are somewhat homogenous office, education, retail (strip mall, enclosed mall, retail other than mall), outpatient health care, religious worship and service (other than food or retail) They make up about 62% of all small/mediumsized commercial buildings (<50,000 sf) The remainder of the building types include food sales, food services, and refrigerated and non-refrigerated warehouses These are different from the first group So, re-tuning training will be focused on the first group of building types 56

57 Small/Medium-Sized Building Re-tuning Training: Intended Audience Onsite employees (custodial staff) responsible for day-to-day building operations, Offsite contractors (retro-commissioning agents, service providers or control vendors) hired to improve a building s energy efficiency, People interested in entering this field, including college students and military veterans, and People currently involved in weatherization work 57

58 Lessons Learned from Large Commercial Building Re-tuning Training 58

59 Issues for Successful Application of Large Commercial Building Re-tuning Important to make adjustments during the re-tuning process. Do not defer implementation until later Building operations staff need to know that they have the authority to implement minor operational changes without risk of reprisal Building operations staff need to have confidence in the process. To develop confidence, operators can make small incremental changes over time and observe the responses of occupants When re-tuning measures are implemented, the energy consumption information should be reviewed so feedback can be provided to building managers on the success 59

60 Key Lessons Learned Many commercial buildings have array of operational problems Trained building operations staff can re-tune buildings, if empowered Building re-tuning can yield energy savings between 5% and 20% through implementation of no-cost and low-cost measures But, the human factor is a real issue in realizing re-tuning benefits in practice In the long run, automation is key to persistence of optimal building operation 60

61 Online Re-tuning Resources All classroom re-tuning training material, including train-the-trainer instructors manual Energy Charting and Metric tool, a semi-automated Microsoft Excel -based trend data analysis tool, including user guides and sample data Guides to re-tuning measures Community College Education Curriculum 61

62 Questions?

HVAC Controls Upgrade FPT: Scheduling, Override & Night Setback; End to End ( )

HVAC Controls Upgrade FPT: Scheduling, Override & Night Setback; End to End ( ) REQUIRED SEQUENCES CONTROLS/FEATURES: Indicate that the specific feature is installed and record the date it was verified to work correctly. Indicate NA if not required by grant. Installed? Date Tested

More information

Retrocommissioning (RCx) Siebel Center for Computer Science. Damon E. McFall EIT, LEED AP

Retrocommissioning (RCx) Siebel Center for Computer Science. Damon E. McFall EIT, LEED AP Retrocommissioning (RCx) Siebel Center for Computer Science Damon E. McFall EIT, LEED AP Presentation Goal Truthfully present known facts and demonstrate the fundamental need for verifying design, components,

More information

ComfortChoice Touch Thermostat. Designed for ZigBee R Wireless Technology USER GUIDE

ComfortChoice Touch Thermostat. Designed for ZigBee R Wireless Technology USER GUIDE ComfortChoice Touch Thermostat Designed for ZigBee R Wireless Technology USER GUIDE TABLE OF CONTENTS PAGE WELCOME... 8,9 THE TOUCH SCREEN... 10,11 Home - Inactive... 10 Home - Active... 11 PHYSICAL BUTTONS...

More information

All the energy of your home, in an App!

All the energy of your home, in an App! All the energy of your home, in an App! The smart home system for managing wireless thermostats energy meters smart sockets Rialto, simplicity with total comfort Simple installation Simple configuration

More information

1600 Series. Impingement Technology

1600 Series. Impingement Technology Overview Background Oven with Impingement Technology Implementing Quest Energy Management System Background to the project Project Details(Functionality, Schematic, Signal Scenarios) Results Time/Cost

More information

THE MODERN HVAC SYSTEM. J. Michael Carson P.E. Senior Mechanical Engineer Purdue University

THE MODERN HVAC SYSTEM. J. Michael Carson P.E. Senior Mechanical Engineer Purdue University THE MODERN HVAC SYSTEM J. Michael Carson P.E. Senior Mechanical Engineer Purdue University Btu Ton Heat Gain & Heat Loss Air Handling Unit Fan Air Distribution Preheat Coil Cooling Coil Reheat Coil Double

More information

Ambiflex MF620 USER GUIDE

Ambiflex MF620 USER GUIDE Ambiflex MF620 USER GUIDE 1 st August 2001 AMBIFLEX MF620 - USER GUIDE CONTENTS Page No MF620 Overview 2 MF620 Connection Details 3 Technical Specification 4 Standby Display 6 User Facilities 7 Status

More information

User Guide Stand-Alone Metering for OptiPlant

User Guide Stand-Alone Metering for OptiPlant User Guide Stand-Alone Metering for OptiPlant BAS-SVU030A-GB Table of Contents Introduction...4 General Features...5 User Interface...6 Top display area... 6 Bottom display area... 6 Main display area...

More information

Comfort System T-32-P Universal Thermostat. Operation Manual

Comfort System T-32-P Universal Thermostat. Operation Manual TM Comfort System T-32-P Universal Thermostat TM O Operation Manual Your new Comfort System T-32-P Universal Thermostat has been built using the highest quality components and design currently available.

More information

73% Contents. of companies have yet to make any concrete investments in the Internet of Things. 1. Foreword 4. Key findings 5

73% Contents. of companies have yet to make any concrete investments in the Internet of Things. 1. Foreword 4. Key findings 5 2 CEO Briefing 2015 CEO Briefing 2015 3 Contents Foreword 4 Key findings 5 A disruptive environment 7 A gap between aspiration and investment 9 The short-term efficiency agenda 10 Conclusion 11 73% of

More information

User interface. Abbreviations / Meanings

User interface. Abbreviations / Meanings RG66012649 User interface Contents Page Abbreviations / Meanings Abbreviations / meanings... 2 Button Identification... 3 On-screen Indicators... 4 Quick Start... 5 Setting the time and day... 5 Changing

More information

Informational Panel: Current Trends and Future of NetZero Building

Informational Panel: Current Trends and Future of NetZero Building Informational Panel: Current Trends and Future of NetZero Building Panelists: Kiere DeGrandchamp President, High Performance Homes Ellen Larson Vaughan Policy Director, High Performance Green Buildings

More information

Barco Smart Laser - High performance cinema projection

Barco Smart Laser - High performance cinema projection DATE AUTHOR 7/12/2017 Goran Stojmenovik Sr. Product Manager Laser Projection goran.stojmenovik@barco.com whitepaper Barco Smart Laser - High performance cinema projection Better image, operational simplicity

More information

Reciprocating Machine Protection

Reciprocating Machine Protection Reciprocating Machine Protection Why You Should Be Monitoring the Needle Instead of the Haystack By: John Kovach, President, Riotech Instruments Ltd LLP Frank Fifer, Director of Operations, Peerless Dynamics,

More information

SINGLE ZONE CLIMATE ZONING SYSTEM. Technical Manual. Polyaire Pty Ltd

SINGLE ZONE CLIMATE ZONING SYSTEM. Technical Manual. Polyaire Pty Ltd SINGLE ZONE CLIMATE ZONING SYSTEM Technical Manual Polyaire Pty Ltd 11-13 White Road GEPPS CROSS South Australia, 5094 Tel: (08) 8349 8466 Fax: (08) 8349 8446 www.polyaire.com.au CONTENTS Features 1 Application

More information

"CHOOSING A STATIC MIXER"

CHOOSING A STATIC MIXER "HOW TO CHOOSE A STATIC MIXER TO PROPERLY MIX A 2-COMPONENT ADHESIVE" BY David W. Kirsch Choosing a static mixer requires more than reading a sales catalog and selecting a part number. Adhesive manufacturers

More information

Ford AMS Test Bench Operating Instructions

Ford AMS Test Bench Operating Instructions THE FORD METER BOX COMPANY, INC. ISO 9001:2008 10002505 AMS Test Bench 09/2013 Ford AMS Test Bench Operating Instructions The Ford Meter Box Co., Inc. 775 Manchester Avenue, P.O. Box 443, Wabash, Indiana,

More information

Smart Buildings - Integrating PoE with the IoT

Smart Buildings - Integrating PoE with the IoT Smart Buildings: Integrating PoE with the lot Smart Buildings - Integrating PoE with the IoT Eric Haugaard Cree Lighting This session is eligible for 1 Contact Hour. For these hours to appear on your certificate,

More information

Operation Guide 6022 ENGLISH

Operation Guide 6022 ENGLISH Operation Guide 6022 Control Panel Reset TEMP UP SET CLOCK PROG2 TIME SET Heat/Cool Mode Switch Fan Switch Target Temp TIME SLOT Time EPA PROGRAM COPY HOLD REVIEW FILTER TEMP DOWN Battery Compartment Statement

More information

LED driver architectures determine SSL Flicker,

LED driver architectures determine SSL Flicker, LED driver architectures determine SSL Flicker, By: MELUX CONTROL GEARS P.LTD. Replacing traditional incandescent and fluorescent lights with more efficient, and longerlasting LED-based solid-state lighting

More information

Ford AMS Test Bench Operating Instructions

Ford AMS Test Bench Operating Instructions AMS Test Bench 09/2013 Ford AMS Test Bench Operating Instructions The Ford Meter Box Co., Inc. 775 Manchester Avenue, P.O. Box 443, Wabash, Indiana, USA 46992-0443 Telephone: 260-563-3171 FAX: 800-826-3487

More information

Building Your DLP Strategy & Process. Whitepaper

Building Your DLP Strategy & Process. Whitepaper Building Your DLP Strategy & Process Whitepaper Contents Introduction 3 DLP Planning: Organize Your Project for Success 3 DLP Planning: Clarify User Profiles 4 DLP Implementation: Phases of a Successful

More information

Operations. BCU Operator Display BMTW-SVU02C-EN

Operations. BCU Operator Display BMTW-SVU02C-EN Operations BCU Operator Display BMTW-SVU02C-EN Operations BCU Operator Display Tracer Summit BMTW-SVU02C-EN June 2006 BCU Operator Display Operations This guide and the information in it are the property

More information

Power Consumption Trends in Digital TVs produced since 2003

Power Consumption Trends in Digital TVs produced since 2003 Power Consumption Trends in Digital TVs produced since 2003 Prepared by Darrell J. King And Ratcharit Ponoum TIAX LLC 35 Hartwell Avenue Lexington, MA 02421 TIAX Reference No. D0543 for Consumer Electronics

More information

Full Disclosure Monitoring

Full Disclosure Monitoring Full Disclosure Monitoring Power Quality Application Note Full Disclosure monitoring is the ability to measure all aspects of power quality, on every voltage cycle, and record them in appropriate detail

More information

SWITCHED INFINITY: SUPPORTING AN INFINITE HD LINEUP WITH SDV

SWITCHED INFINITY: SUPPORTING AN INFINITE HD LINEUP WITH SDV SWITCHED INFINITY: SUPPORTING AN INFINITE HD LINEUP WITH SDV First Presented at the SCTE Cable-Tec Expo 2010 John Civiletto, Executive Director of Platform Architecture. Cox Communications Ludovic Milin,

More information

Analysis of Background Illuminance Levels During Television Viewing

Analysis of Background Illuminance Levels During Television Viewing Analysis of Background Illuminance Levels During Television Viewing December 211 BY Christopher Wold The Collaborative Labeling and Appliance Standards Program (CLASP) This report has been produced for

More information

ORM0022 EHPC210 Universal Controller Operation Manual Revision 1. EHPC210 Universal Controller. Operation Manual

ORM0022 EHPC210 Universal Controller Operation Manual Revision 1. EHPC210 Universal Controller. Operation Manual ORM0022 EHPC210 Universal Controller Operation Manual Revision 1 EHPC210 Universal Controller Operation Manual Associated Documentation... 4 Electrical Interface... 4 Power Supply... 4 Solenoid Outputs...

More information

Index. - Registration assistant of momit Home 1 - Start of session/registration 2 - Registration of devices. - momit Home App 1.

Index. - Registration assistant of momit Home 1 - Start of session/registration 2 - Registration of devices. - momit Home App 1. Index - Registration assistant of momit Home 1 - Start of session/registration 2 - Registration of devices - momit Home App 1. Start 2. Device 2.1 Control panel a. State of operation b. Temperature b1.

More information

Student resource files

Student resource files Chapter 4: Actuated Controller Timing Processes CHAPTR 4: ACTUATD CONTROLLR TIMING PROCSSS This chapter includes information that you will need to prepare for, conduct, and assess each of the seven activities

More information

Live Sound System Specification

Live Sound System Specification Unit 26: Live Sound System Specification Learning hours: 60 NQF level 4: BTEC Higher National H1 Description of unit This unit deals with the design and specification of sound systems for a range of performance

More information

WHY SWITCH TO A SYSTEM?

WHY SWITCH TO A SYSTEM? WHY SWITCH? WHY SWITCH TO A SYSTEM? It s just a case of when, not if, LED completely replaces HID A Rin stadium lighting. EThere s no time Nbetter to make the jump, A S and you don t want to be left in

More information

All real signals have scale factor 10. Integer, Index and Logic has always scale factor 1.

All real signals have scale factor 10. Integer, Index and Logic has always scale factor 1. STRA communication The types of the signals (types in the list below): 1 = Coil Status Register ( function = 1, 5 and 15) - 0x 2 = Discrete Input ( function = 2) - 1x 3 = Holding Register ( function =

More information

Image Acquisition Technology

Image Acquisition Technology Image Choosing the Right Image Acquisition Technology A Machine Vision White Paper 1 Today, machine vision is used to ensure the quality of everything from tiny computer chips to massive space vehicles.

More information

Mitsubishi Electric Air Conditioning Network System Integrated centralized control software TG-2000A Operation Manual (Management)

Mitsubishi Electric Air Conditioning Network System Integrated centralized control software TG-2000A Operation Manual (Management) Mitsubishi Electric Air Conditioning Network System Integrated centralized control software TG-2000A Operation Manual (Management) Contents 1. Safety Precautions...1 2. Precautions Before Starting Use...3

More information

Room thermostat Instructions for Use. For the user. Instructions for Use. geotherm

Room thermostat Instructions for Use. For the user. Instructions for Use. geotherm Room thermostat Instructions for Use For the user Instructions for Use geotherm GB table of contents HOW TO USE YOUR APPLIANCE 1 Appliance use...2 1.1 Overall view... 2 1.2 Display... 2 1.3 Main screen...

More information

In this Issue: AMS News Letter. John Deere s new Display Shearer Equipment s 2017 Test Plot Information on the 17-1 Software update

In this Issue: AMS News Letter. John Deere s new Display Shearer Equipment s 2017 Test Plot Information on the 17-1 Software update AMS News Letter Shearer Equipment Quarterly AMS News Summer 2017 Inside this issue: New John Deere Gen 4, 4640 Display 2 JDLink Reminders 4 5 2017 Test Plot Overview 17-1 Software Update Information 7

More information

Compatibility mode. rev. 0.1, 10/09/2015. Compatibility mode Sx tool manual 1

Compatibility mode. rev. 0.1, 10/09/2015. Compatibility mode Sx tool manual 1 Compatibility mode rev. 0.1, 10/09/2015 1 Index 1 COMPATIBILITY MODE FOR DUPLINE... 4 1.1 How to enable the Dupline compatibility in the Sx tool... 5 1.2 How to manage the Dupline network in a Sx2WEB24

More information

Owner's Manual. TOUCH SCREEN CONTROLLER for Air Conditioning Control System. Model BMS-CT5120UL. English

Owner's Manual. TOUCH SCREEN CONTROLLER for Air Conditioning Control System. Model BMS-CT5120UL. English TOUCH SCREEN CONTROLLER for Air Conditioning Control System Model BMS-CT5120UL English Contents 1 Precautions for safety.................................................. 5 2 Main functions........................................................

More information

Installation Operation Maintenance

Installation Operation Maintenance Installation Operation Maintenance Rooftop Energy Recovery Module for TKD / TKH / WKD / WKH YKD / YKH / DKD / DKH # 125-155-175-200 250 265-290-340 # 275-300-350-400-500-600 April 2011 RT-SVX42B-E4 General

More information

CLASSROOM ACOUSTICS OF MCNEESE STATE UNIVER- SITY

CLASSROOM ACOUSTICS OF MCNEESE STATE UNIVER- SITY CLASSROOM ACOUSTICS OF MCNEESE STATE UNIVER- SITY Aash Chaudhary and Zhuang Li McNeese State University, Department of Chemical, Civil, and Mechanical Engineering, Lake Charles, LA, USA email: zli@mcneese.edu

More information

STADIUMS THE ULTIMATE GUIDE TO STADIUM LIGHTING

STADIUMS THE ULTIMATE GUIDE TO STADIUM LIGHTING STADIUMS THE WHAT S INSIDE WHAT S INSIDE INTRODUCING THE LUMADAPT 24 3 THE LUMADAPT SYSTEM 5 WHY SWITCH TO A SYSTEM? 7 UNIQUE BENEFITS 10 ABOUT EPHESUS 19 CONTACT 21 2 IN T RO DUC ING LUMA DA PT INTRODUCING

More information

Submittal. Downflow Two Stage Condensing Gas Fired Furnace 120,000 BTUH S9V2D120D5-SUB-1-EN. March 2016 S9V2D120D5PSAA TAG:

Submittal. Downflow Two Stage Condensing Gas Fired Furnace 120,000 BTUH S9V2D120D5-SUB-1-EN. March 2016 S9V2D120D5PSAA TAG: Submittal Downflow Two Stage Condensing Gas Fired Furnace 120,000 BTUH Downflow Only S9V2D120D5PSAA Note: Graphics in this document are for representation only. Actual model may differ in appearance. SAFETY

More information

ZoneTouch V2 Zone Control System User Manual

ZoneTouch V2 Zone Control System User Manual ZoneTouch V2 Zone Control System User Manual www.polyaire.com.au 2014 Polyaire Pty Ltd II ZONEMASTER ZONETOUCH V2 ZONE CONTROL SYSTEM - User Manual TABLE OF CONTENTS 1) Features 2 2) Wall Controller Layout

More information

Hitachi Kokusai Electric Comark LLC

Hitachi Kokusai Electric Comark LLC Hitachi Kokusai Electric Comark LLC TRANSMIT TER OF THE FUTURE Solid State. Broadband. Affordable. The future has arrived. With rapid changes in solid state RF device technologies and design techniques,

More information

Features. Specifications. Finish. Notes

Features. Specifications. Finish. Notes Spec-00732 BPH FX ( McLean Electronics Cooling Sealed Enclosure Cooling McLean Electronics Cooling: Sealed Enclosure Cooling SPECTRACOOL Narrow Indoor/Outdoor N43 11000 BTU/Hr. 3223 Watt N36 / BTU/Hr.

More information

PoE: Adding Power to (IoT)

PoE: Adding Power to (IoT) Sponsored by: PoE: Adding Power to (IoT) Sponsored by: December 20th, 2018 1 Today s Speakers Sponsored by: Steve Bell Senior Analyst - IoT Heavy Reading Mohammad Shahid Khan Chief Manager (PLM & AE),

More information

MICROFOCUS X-RAY SOURCE PROJECT*

MICROFOCUS X-RAY SOURCE PROJECT* MICROFOCUS X-RAY SOURCE PROJECT* Dan Mancuso, CHESS, Cornell University, NY, USA ABSTRACT At the Cornell High Energy Synchrotron Source (CHESS), scientists in all fields and from all over the world utilize

More information

USING MATLAB CODE FOR RADAR SIGNAL PROCESSING. EEC 134B Winter 2016 Amanda Williams Team Hertz

USING MATLAB CODE FOR RADAR SIGNAL PROCESSING. EEC 134B Winter 2016 Amanda Williams Team Hertz USING MATLAB CODE FOR RADAR SIGNAL PROCESSING EEC 134B Winter 2016 Amanda Williams 997387195 Team Hertz CONTENTS: I. Introduction II. Note Concerning Sources III. Requirements for Correct Functionality

More information

PRESS FOR SUCCESS. Meeting the Document Make-Ready Challenge

PRESS FOR SUCCESS. Meeting the Document Make-Ready Challenge PRESS FOR SUCCESS Meeting the Document Make-Ready Challenge MEETING THE DOCUMENT MAKE-READY CHALLENGE PAGE DESIGN AND LAYOUT TEXT EDITS PDF FILE GENERATION COLOR CORRECTION COMBINING DOCUMENTS IMPOSITION

More information

Comverge PowerPortal In-Home Display (IHD) User Guide for Members of New Hampshire Electric Cooperative

Comverge PowerPortal In-Home Display (IHD) User Guide for Members of New Hampshire Electric Cooperative Comverge PowerPortal In-Home Display (IHD) User Guide for Members of New Hampshire Electric Cooperative Table of Contents Table of Contents About the Comverge PowerPortal In-Home Display (IHD)... 2 Safety

More information

T-Series Indoor/Outdoor Air Conditioners. Keeps its cool during peak heat loads and hot weather. Product Overview. T-Series A/C

T-Series Indoor/Outdoor Air Conditioners. Keeps its cool during peak heat loads and hot weather. Product Overview. T-Series A/C : Product Overview Keeps its cool during peak heat loads and hot weather A/C Indoor/Outdoor Air Conditioners Chapter Contents PRODUCT OVERVIEW T15 Model 800 BTU...43 Indoor/Outdoor Air Conditioners...42

More information

Smart Home. The beginning of a smarter home. Ambi Kodak LaMetric Netatmo Tend

Smart Home. The beginning of a smarter home. Ambi Kodak LaMetric Netatmo Tend Smart Home The beginning of a smarter home Ambi Kodak LaMetric Netatmo Tend Personalized Comfort - Made Easy With AI The world s First AI Enabled Smart Air Conditioner Controller - But what is AI? Nowadays,

More information

Topic: Instructional David G. Thomas December 23, 2015

Topic: Instructional David G. Thomas December 23, 2015 Procedure to Setup a 3ɸ Linear Motor This is a guide to configure a 3ɸ linear motor using either analog or digital encoder feedback with an Elmo Gold Line drive. Topic: Instructional David G. Thomas December

More information

Electronic solutions for the smart home. mobile App control of heating / electrical appliances / electrical power consumption

Electronic solutions for the smart home. mobile App control of heating / electrical appliances / electrical power consumption Electronic solutions for the smart home mobile App control of heating / electrical appliances / electrical power consumption Rialto Smart Home Simple Expandable Made in Italy The bridge to comfort and

More information

The use of an available Color Sensor for Burn-In of LED Products

The use of an available Color Sensor for Burn-In of LED Products As originally published in the IPC APEX EXPO Conference Proceedings. The use of an available Color Sensor for Burn-In of LED Products Tom Melly Ph.D. Feasa Enterprises Ltd., Limerick, Ireland Abstract

More information

Eagle Business Software

Eagle Business Software Rental Table of Contents Introduction... 1 Technical Support... 1 Overview... 2 Getting Started... 5 Inventory Folders for Rental Items... 5 Rental Service Folders... 5 Equipment Inventory Folders...

More information

SCS318. User Instructions. SCS318 comprising of SCS317 7 Day Wireless Programmable Room Thermostat and SSR303 Receiver

SCS318. User Instructions. SCS318 comprising of SCS317 7 Day Wireless Programmable Room Thermostat and SSR303 Receiver SCS318 User Instructions SCS318 comprising of SCS317 7 Day Wireless Programmable Room Thermostat and SSR303 Receiver Programmable room thermostats are widely recognised as one of the best ways in which

More information

N BTU/Hr Watt. N /8000 BTU/Hr. 1758/2344 Watt. N BTU/Hr Watt. Air Conditioners

N BTU/Hr Watt. N /8000 BTU/Hr. 1758/2344 Watt. N BTU/Hr Watt. Air Conditioners Spec-00732 F Sealed Enclosure Air Conditioners Sealed Enclosure Air Conditioners SPECTRACOOL Narrow Indoor/Outdoor N43 11000 BTU/Hr. 3223 Watt INDUSTRY STANDARDS N36 / BTU/Hr. / Watt N28 BTU/Hr. Watt UL/cUL

More information

COMFORT COMFORT CALL OWNER S MANUAL CALL SYSTEM P/N P BASE STATION & RF WIRELESS MODULE. Complete Control from TOTALINE

COMFORT COMFORT CALL OWNER S MANUAL CALL SYSTEM P/N P BASE STATION & RF WIRELESS MODULE. Complete Control from TOTALINE OWNER S MANUAL COMFORT CALL SYSTEM P/N P374-0433 COMFORT BASE STATION & RF WIRELESS MODULE CALL TOTALINE REMOTE THERMOSTAT ACCESS Compatible with thermostat models: P374-700, P374-800, P374-900, P374-2700,

More information

Digital Video Engineering Professional Certification Competencies

Digital Video Engineering Professional Certification Competencies Digital Video Engineering Professional Certification Competencies I. Engineering Management and Professionalism A. Demonstrate effective problem solving techniques B. Describe processes for ensuring realistic

More information

DESIGN AND DEVELOPMENT OF E-SAVING METER TO PREVENT THE WASTAGE OF ELECTRICITY

DESIGN AND DEVELOPMENT OF E-SAVING METER TO PREVENT THE WASTAGE OF ELECTRICITY DESIGN AND DEVELOPMENT OF E-SAVING METER TO PREVENT THE WASTAGE OF ELECTRICITY 1 RAKESH TIGADI, 2 NIKITA P, 3 SAGAR UMLOTI, 4 SHIVARAJ DODDAMALLAPPANAVAR, 5 VIVEK HOSAMANI, 6 VISHNUPANTH HUDDEDAR, 7 VIVEKANANDAYYA

More information

Implementation of LED Roadway Lighting

Implementation of LED Roadway Lighting Implementation of LED Roadway Lighting Ken Taillon, Principal Investigator Short Elliot Hendrickson, Inc. (SEH ) May 2016 Research Project Final Report 2016-17 To request this document in an alternative

More information

Upflow/ Horizontal Left/Right, Downflow Two Stage Condensing Gas Fired Furnace

Upflow/ Horizontal Left/Right, Downflow Two Stage Condensing Gas Fired Furnace Product Data Upflow/ Horizontal Left/Right, Downflow Two Condensing Gas Fired Furnace Upflow, Convertible to Horizontal Right or Horizontal Left S9V2B040U3PSAA S9V2B060U3PSAA S9V2B060U4PSAA S9V2B080U3PSAA

More information

Intelligent compressor solutions. EFC, EFCe Systems Electronic Frequency Control EFC. EFCe

Intelligent compressor solutions. EFC, EFCe Systems Electronic Frequency Control EFC. EFCe EFC, EFCe Systems Electronic Frequency Control Continuously variable speed control using frequency converter technology With the EFC and EFCe system Bock offers the most efficient means of adapting the

More information

Chapter 2. Analysis of ICT Industrial Trends in the IoT Era. Part 1

Chapter 2. Analysis of ICT Industrial Trends in the IoT Era. Part 1 Chapter 2 Analysis of ICT Industrial Trends in the IoT Era This chapter organizes the overall structure of the ICT industry, given IoT progress, and provides quantitative verifications of each market s

More information

E X P E R I M E N T 1

E X P E R I M E N T 1 E X P E R I M E N T 1 Getting to Know Data Studio Produced by the Physics Staff at Collin College Copyright Collin College Physics Department. All Rights Reserved. University Physics, Exp 1: Getting to

More information

MOBILE DEFENDERS : QUALITY GUIDE FEBRUARY 2019 MOBILE DEFENDERS QUALITY GUIDE. Shenzhen, China: Our second home.

MOBILE DEFENDERS : QUALITY GUIDE FEBRUARY 2019 MOBILE DEFENDERS QUALITY GUIDE. Shenzhen, China: Our second home. MOBILE DEFENDERS : QUALITY GUIDE FEBRUARY 2019 MOBILE DEFENDERS QUALITY GUIDE Shenzhen, China: Our second home. MOBILE DEFENDERS : QUALITY GUIDE FEBRUARY 2019 INTRODUCTION At Mobile Defenders, we realize

More information

Digital Logic Design: An Overview & Number Systems

Digital Logic Design: An Overview & Number Systems Digital Logic Design: An Overview & Number Systems Analogue versus Digital Most of the quantities in nature that can be measured are continuous. Examples include Intensity of light during the day: The

More information

Sonic's Third Quarter Results Reflect Current Challenges

Sonic's Third Quarter Results Reflect Current Challenges Sonic's Third Quarter Results Reflect Current Challenges Sales Improve Steadily after Slow March, and Development Initiatives Maintain Strong Momentum Partner Drive-in Operations Slip OKLAHOMA CITY, Jun

More information

Tracer AdaptiView Display

Tracer AdaptiView Display Operations Guide Tracer AdaptiView Display for Gear-Driven Water-Cooled CenTraVac (CVGF) Chillers X39641144-010 March 2009 CTV-SVU02A-EN Copyright 2009 Trane All rights reserved This document and the information

More information

N43 N36 N28. Sealed Enclosure Cooling Air Conditioners

N43 N36 N28. Sealed Enclosure Cooling Air Conditioners SPECTRACOOL NARROW INDOOR/OUTDOOR N43 N36 N28 11000 BTU/Hr. / BTU/Hr. BTU/Hr. 3223 Watt / Watt Watt INDUSTRY STANDARDS UL/cUL Listed; Type 12, 3R, 4; 4X optional; File No. SA6453 CE IP 56 Internal Loop

More information

The above chart is used in ISO method to determine the alarm and trip limit for rotating machines equipped with rolling element bearings.

The above chart is used in ISO method to determine the alarm and trip limit for rotating machines equipped with rolling element bearings. In vibration analysis (with accelerometers) of rotating machines with rolling element bearing, the process industries are interested to know the failure of the machine well in advance to plan the spare

More information

Section C Recorders. DPR mm Digital Strip Chart Recorder

Section C Recorders. DPR mm Digital Strip Chart Recorder 91-00-01-01 Section C Recorders Contents Product Type Literature No. Overview 40-00-02-02 LeaderLine PC Software 51-52-03-16 SCF Software Configuration Tool 51-52-03-26 SDA Software Data Analysis Tool

More information

Laughter Yoga International

Laughter Yoga International Laughter Yoga International LAUGHTER YOGA CORPORATE SEMINARS Based on Dr. Kataria s worldwide experience of conducting corporate seminars, we bring you these training sessions and workshops designed to

More information

A Collaborative Future in HiVol to Sell and Install

A Collaborative Future in HiVol to Sell and Install A Collaborative Future in HiVol to Sell and Install Session Flow, Goal & Presenters Goal: Provide tips about effective collaboration among the trades in a wide variety of functional areas including marketing,

More information

ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE

ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE ENGINEERING COMMITTEE Energy Management Subcommittee SCTE STANDARD SCTE 237 2017 Implementation Steps for Adaptive Power Systems Interface Specification (APSIS ) NOTICE The Society of Cable Telecommunications

More information

Preface 11 Key Concept 1: Know your machine from a programmer s viewpoint 17

Preface 11 Key Concept 1: Know your machine from a programmer s viewpoint 17 Table of contents Preface 11 Prerequisites 11 Basic machining practice experience 11 Math 12 Motivation 12 Controls covered 12 What about conversational controls? 13 Controls other than Fanuc 13 Limitations

More information

CS101 Final term solved paper Question No: 1 ( Marks: 1 ) - Please choose one ---------- was known as mill in Analytical engine. Memory Processor Monitor Mouse Ref: An arithmetical unit (the "mill") would

More information

engineering guide TVS Parallel Flow, Fan-Powered, 50/60 Hz VAV Terminals

engineering guide TVS Parallel Flow, Fan-Powered, 50/60 Hz VAV Terminals engineering guide TVS Parallel Flow, Fan-Powered, 50/60 Hz VAV Terminals FORM 133-EG6.1 (209) TABLE OF CONTENTS Parallel Fan-Powered, 50/60 Hz VAV Terminals Features and Benefits.......................

More information

Electronic Roll Feed (ERF) Registration System

Electronic Roll Feed (ERF) Registration System 3 Electronic Roll Feed (ERF) Registration System Information Folder 9.6 May 2014 Replaces IF 9.6 dated February 2013 Safety Blanking Die Guard: Fabricated guards enclose the blanking die to prevent accidental

More information

Tipping the balancetotal Cost of Ownership

Tipping the balancetotal Cost of Ownership Tipping the balancetotal Cost of Ownership White Paper www.pro.sony.eu/dcinema Total Cost of Ownership (TCO) analysis is an invaluable technique for financial comparison of different solutions and technologies

More information

Compressed Air Management Systems SIGMA AIR MANAGER Pressure flexibility Switching losses Control losses next.

Compressed Air Management Systems SIGMA AIR MANAGER Pressure flexibility Switching losses Control losses next. Compressed Air Management Systems SIGMA AIR MANAGER Pressure flexibility Switching losses Control losses next.generation Sigma Air Manager Integrated performance for maximum energy savings An orchestra

More information

Four steps to IoT success

Four steps to IoT success Introduction Businesses are using the Internet of Things (IoT) to connect the unconnected. By taking all their electro-mechanical assets and applying a digital layer a layer enabled by the Internet of

More information

Line Information System (LIS) Reference and Training Manual Rev /01/12 Making information accessible, visible, understandable, and actionable.

Line Information System (LIS) Reference and Training Manual Rev /01/12 Making information accessible, visible, understandable, and actionable. Line Information System (LIS) Reference and Training Manual Rev 2.0 10/01/12 Making information accessible, visible, understandable, and actionable. 1 LIS General Features: LIS isn t proprietary; CCR owns

More information

Familiar Metric Management - The Effort-Time Tradeoff: It s in the Data

Familiar Metric Management - The Effort-Time Tradeoff: It s in the Data Familiar Metric Management - The Effort-Time Tradeoff: It s in the Data Lawrence H. Putnam Ware Myers Watch me make this baby jump, Ol Leadfoot said, as the light on the boulevard turned green. He pressed

More information

A QUALITY IMPROVEMENT PROCESS IN, HEMLOCK DRYING

A QUALITY IMPROVEMENT PROCESS IN, HEMLOCK DRYING A QUALITY IMPROVEMENT PROCESS IN, HEMLOCK DRYING Neil Odegard Weyerhaeuser Corporation Snoqualmie, Washington The first thing I'd like to say is this; I'm not here to tell you what to do, or how and when

More information

Printed Documentation

Printed Documentation Printed Documentation Table of Contents INTRODUCTION... 1 Technical Support... 1 Overview... 2 GETTING STARTED... 3 Inventory Folders for Rental Items... 3 Rental Service Folders... 4 Equipment Inventory

More information

Table of Contents. iii

Table of Contents. iii Rental Table of Contents Introduction... 1 Technical Support... 1 Overview... 2 Getting Started... 3 Inventory Folders for Rental Items... 3 Rental Service Folders... 3 Equipment Inventory Folders...

More information

013-RD

013-RD Engineering Note Topic: Product Affected: JAZ-PX Lamp Module Jaz Date Issued: 08/27/2010 Description The Jaz PX lamp is a pulsed, short arc xenon lamp for UV-VIS applications such as absorbance, bioreflectance,

More information

MTL Software. Overview

MTL Software. Overview MTL Software Overview MTL Windows Control software requires a 2350 controller and together - offer a highly integrated solution to the needs of mechanical tensile, compression and fatigue testing. MTL

More information

PanelView 1400e CRT Maintenance

PanelView 1400e CRT Maintenance Release Note PanelView 1400e CRT Maintenance Maximizing the life of your PanelView 1400e, CRT Terminals To maximize the life of a CRT, the following is strongly recommended: Adjust the external brightness

More information

Click Here To Start Demo

Click Here To Start Demo Click Here To Start Demo AirLogix Demo Title Screen AirLogix Interactive Demonstrator Version 3.0 Copyright 2005 by Case Engineering inc This is intended as a working active demonstration only. Every attempt

More information

OJ Air Pressure. full-range pressure and ventilation control FLOOR HEATING HYDRONIC HVAC CONTROLS & POWER FLOOR HEATING ELECTRIC

OJ Air Pressure. full-range pressure and ventilation control FLOOR HEATING HYDRONIC HVAC CONTROLS & POWER FLOOR HEATING ELECTRIC full-range pressure and ventilation control HVAC CONTROLS & POWER FLOOR HEATING ELECTRIC OJ Air Pressure FLOOR HEATING HYDRONIC VENTILATION CONTROLLERS AND PRESSURE TRANSMITTERS application specific solutions

More information

Off Site Maintenance Goes Mobile Electronic Cellular Time Switch

Off Site Maintenance Goes Mobile Electronic Cellular Time Switch Off Site Maintenance Goes Mobile Electronic Cellular Time Switch Load Monitoring Light Controls Remote Control Monthly Reports Talking To Your Technology Take control of your locations from anywhere! The

More information

BTA SERVICE OFFERINGS

BTA SERVICE OFFERINGS BTA SERVICE OFFERINGS NEW SYSTEM WARRANTY PLATINUM WHITE GLOVE SERVICE STANDARD SERVICE COST Free $749.94/quarter Labor & Materials PLAN OBJECTIVE Worry-free Worry-free All Labor On-Demand Labor for service

More information

Low Power VLSI Circuits and Systems Prof. Ajit Pal Department of Computer Science and Engineering Indian Institute of Technology, Kharagpur

Low Power VLSI Circuits and Systems Prof. Ajit Pal Department of Computer Science and Engineering Indian Institute of Technology, Kharagpur Low Power VLSI Circuits and Systems Prof. Ajit Pal Department of Computer Science and Engineering Indian Institute of Technology, Kharagpur Lecture No. # 29 Minimizing Switched Capacitance-III. (Refer

More information

Rental Information For Campus Clients

Rental Information For Campus Clients Rental Information For Campus Clients 2018-2019 SCU Presents fosters opportunities on the Santa Clara University campus to teach students, engage audiences, and promote understanding through the performing

More information

World Class Converting Xpanded Productivity Platform Xpanded Capabilities State-of-the-Art Ergonomics

World Class Converting Xpanded Productivity Platform Xpanded Capabilities State-of-the-Art Ergonomics World Class Converting Xpanded Productivity Platform Xpanded Capabilities State-of-the-Art Ergonomics MULTI-PROCESS CAPABILITIES GENUINE PLATFORM SERVO PRESS When Mark Andy set out to offer one of the

More information

EDL8 Race Dash Manual Engine Management Systems

EDL8 Race Dash Manual Engine Management Systems Engine Management Systems EDL8 Race Dash Manual Engine Management Systems Page 1 EDL8 Race Dash Page 2 EMS Computers Pty Ltd Unit 9 / 171 Power St Glendenning NSW, 2761 Australia Phone.: +612 9675 1414

More information