1 Revolutionizing the Transfer Die Industry for Maximum Production. STM Manufacturing, Inc.

2 Design/Build Case Study 7 station, 2-out, Support Member (servo press, servo transfer) Problems: Previous home-line runoff issues during initial setup: difficulty positioning transfer fingers, additional finger and bar clearances needed to hard tooling, press tied up during troubleshooting process, delays entering production, and loss of revenue for stamper and build shop.

3 Design/Build Case Study 7 station, 2-out, Support Member (servo press, servo transfer) Problems: Previous home-line runoff issues during initial setup: difficulty positioning transfer fingers, additional finger and bar clearances needed to hard tooling, press tied up during troubleshooting process, delays entering production, and loss of revenue for stamper and build shop. Solution: Transfer Simulation completed on die design before die is built, CAR Report communicates crash and clearance issues to designer so die design can be corrected, die is built and then shipped to stamper with setup instructions and transfer timing curves to enter production without issues

4 Design/Build Case Study 7 station, 2-out, Support Member (servo press, servo transfer) Problems: Previous home-line runoff issues during initial setup: difficulty positioning transfer fingers, additional finger and bar clearances needed to hard tooling, press tied up during troubleshooting process, delays entering production, and loss of revenue for stamper and build shop. Solution: Transfer Simulation completed on die design before die is built, CAR Report communicates crash and clearance issues to designer so die design can be corrected, die is built and then shipped to stamper with setup instructions and transfer timing curves to enter production without issues Results: No issues setting up die for Home-line runoff and production. Provided transfer timing and servo ram timing curves provide a high SPM rate. Increased revenue for stamper and build shop.

5 Design/Build Case Study 7 station, 2-out, Support Member (servo press, servo transfer) Problems: Previous home-line runoff issues during initial setup: difficulty positioning transfer fingers, additional finger and bar clearances needed to hard tooling, press tied up during troubleshooting process, delays entering production, and loss of revenue for stamper and build shop. Solution: Transfer Simulation completed on die design before die is built, CAR Report communicates crash and clearance issues to designer so die design can be corrected, die is built and then shipped to stamper with setup instructions and transfer timing curves to enter production without issues. Results: No issues setting up die for Home-line runoff and production. Provided transfer timing and servo ram timing curves provide a high SPM rate. Increased revenue for stamper and build shop. Since using T-Sim Solutions Transfer Simulation, our run-offs go a lot smoother. We address transfer interferences right up front in the design. We feel confident that when we send our tooling to our customers, it can runoff without transfer fingers crashing. Steve Lameyer STM Manufacturing, Inc.

6 Revolutionizing the Transfer Die Industry for Maximum Production. Matcor Matsu

7 Design/Build Case Study - Automotive Bracket, 2-out, mechanical press, servo transfer. Problems - Trouble positioning fingers, inadequate finger clearance, long initial setup time, back and forth shipping to add finger and bar clearances, difficulty achieving required SPM. Customer relationships strained, unexpected die build costs, delayed die delivery, press tied up during troubleshooting process, loss of revenue for everyone involved.

8 Design/Build Case Study - Automotive Bracket, 2-out, mechanical press, servo transfer. Input - Import 3-D design and Smart Press Template, enter bar locations and transfer specs.

9 Design/Build Case Study - Automotive Bracket, 2-out, mechanical press, servo transfer. Function - Auto Optimization finds the bottlenecks that limit achievable SPM. Example A: Gripper vs. die heel delays clamp in motion and timing.

10 Design/Build Case Study - Automotive Bracket, 2-out, mechanical press, servo transfer. Function - Auto Optimization finds the bottlenecks that limit achievable SPM. Example B: Gripper vs. aerial cam delays clamp out motion and timing.

11 Design/Build Case Study - Automotive Bracket, 2-out, mechanical press, servo transfer. Function - Auto Clearance & Clash Detection find all die errors to correct. Example A: Open gripper jaw clashes with lower die shoe and nitro. Output - C.A.R. Total errors found: 17 (6 clash, 11 clear.)

12 Design/Build Case Study - Automotive Bracket, 2-out, mechanical press, servo transfer. Function - Auto Clearance & Clash Detection find all die errors to correct. Example B: Cam punch clashes with stripper pad when die is in the open position. Output - C.A.R. Total errors found: 17 (6 clash, 11 clear.)

13 Design/Build Case Study - Automotive Bracket, 2-out, mechanical press, servo transfer. Function - Auto Optimization determines best transfer timing for HIGHEST SPM. Example: with enhanced panel control turned ON, 16 SPM using the transfer timing curves as shown. Output - Press Setup Report with all timing curves, Full Videos, press setup sheets

14 Design/Build Case Study - Automotive Bracket, 2-out, mechanical press, servo transfer. Results - Die ships one time to stamper with no re-machining required. - Initial press setup and home-line runoff are done in one shift. - Press operator has transfer timing curves for HIGHEST SPM. - Die enters production on time and panels transfer smoothly. Bottom line SUCCESSFUL HOMELINE RUNOFF HIGHEST POSSIBLE SPM RATE

15 Design/Build Case Study - Automotive Bracket, 2-out, mechanical press, servo transfer. Quote - "We've had fewer problems and frustrations with home-line runoff on projects run through your Transfer Simulation. What typically took a few days of press time is now done in a single shift. Our production rates have increased significantly. Mr. Andrew Szczepanski - Matcor-Matsu Bottom line SUCCESSFUL HOMELINE RUNOFF HIGHEST POSSIBLE SPM RATE

16 Revolutionizing the Transfer Die Industry for Maximum Production. L & W Engineering Holland, MI

17 Design/Build Case Study 6 station (2) out Bk Body Plr Inr Upr Problems: Difficulty getting new dies set up and running production, excessive time spent positioning fingers for best panel control, inadequate finger clearance requiring additional machining, setup personnel have to create timing curves in the press rather than running production.

18 Design/Build Case Study 6 station (2) out Bk Body Plr Inr Upr Problems: Difficulty getting new dies set up and running production, excessive time spent positioning fingers for best panel control, inadequate finger clearance requiring additional machining, setup personnel have to create timing curves in the press rather than running production. Solution: New die design ran through T-SIM to find bottlenecks and all crash and clearance issues. Auto-Optimization is used to create best timing curves for smooth panel control and highest possible SPM rate. Setup sheets showing exact finger positions are provided to setup personnel.

19 Design/Build Case Study 6 station (2) out Bk Body Plr Inr Upr Problems: Difficulty getting new dies set up and running production, excessive time spent positioning fingers for best panel control, inadequate finger clearance requiring additional machining, setup personnel have to create timing curves in the press rather than running production. Solution: New die design ran through T-SIM to find bottlenecks and all crash and clearance issues. Auto-Optimization is used to create best timing curves for smooth panel control and highest possible SPM rate. Setup sheets showing exact finger positions are provided to setup personnel. Results: Die enters production within four hours of start of setup (plant record). Die immediately achieves desired SPM rate, and as speed is ramped up press is maxed-out at 18 SPM. Panel movement is very smooth and controlled with no issues. Designer, Builder, Stamper are very satisfied. On our first project the die entered production in record time and with a high SPM rate. We are very happy with the results. - L&W

20 Design/Build Case Study 6 station (2) out Bk Body Plr Inr Upr Videos: Die within 4 hours of start of setup in the press:

21 Revolutionizing the Transfer Die Industry for Maximum Production. ODM Tool & Mfg. Co.

22 Design/Build Case Study Gullwing Bracket LH/RH Problems: Die in production with a low 13 SPM production rate. Excessive bar shake while panels are being lifted and pitched down to the next station causing panel control issues and sensor faults.

23 Design/Build Case Study Gullwing Bracket LH/RH Problems: Die in production with a low 13 SPM production rate. Excessive bar shake while panels are being lifted and pitched down to the next station causing panel control issues and sensor faults. Solution: Run through T-SIM to automatically find bottlenecks that hamper production. Auto-Optimize clamp, lift, & pitch motions for smoother panel movement, better part control, and increased SPM rate.

24 Design/Build Case Study Gullwing Bracket LH/RH Problems: Die in production with a low 13 SPM production rate. Excessive bar shake while panels are being lifted and pitched down to the next station causing panel control issues and sensor faults. Solution: Run through T-SIM to automatically find bottlenecks that hamper production. Auto-Optimize clamp, lift, & pitch motions for smoother panel movement, better part control, and increased SPM rate. Results: Bar shake significantly improved, better panel control with fewer sensor faults, and production rate increased by 23% (13 to 16 spm). *Adding trim station lift = 24 spm.

25 Design/Build Case Study Gullwing Bracket LH/RH Problems: Die in production with a low 13 SPM production rate. Excessive bar shake while panels are being lifted and pitched down to the next station causing panel control issues and sensor faults. Solution: Run through T-SIM to automatically find bottlenecks that hamper production. Auto-Optimize clamp, lift, & pitch motions for smoother panel movement, better part control, and increased SPM rate. Results: Bar shake significantly improved, better panel control with fewer sensor faults, and production rate increased by 23% (13 to 16 spm). *Adding trim station lift = 24 spm. We did not think the dies could be improved, but T-SIM made it possible to improve the SPM rate and make the die run smoother. - ODM

26 Revolutionizing the Transfer Die Industry for Maximum Production. Johnson Controls / Adient (Battle Creek)

27 Design/Build Case Study 15 station (2) out seat side member Problems: Project was only able to run at the min 15 spm press speed and transfer bars were shaking significantly during the clamp in and out strokes putting excessive strain on the finger tooling and bars. Frequent shut-downs from die crashes and sensor faults from panels out of position. Video showing problems in production (click or copy/paste):

28 Design/Build Case Study 15 station (2) out seat side member Solution: Reduce the G-Force in clamp motions to minimize the shake on the bars, Optimize the transfer to increase overlaps while maintaining min choke point clearances.

29 Design/Build Case Study 15 station (2) out seat side member Solution: Reduce the G-Force in clamp motions to minimize the shake on the bars, Optimize the transfer to increase overlaps while maintaining min choke point clearances. Results: Bar shake was eliminated, SPM was increased by 20% (from 15 to 18 spm) with no physical changes to the tooling. Video after T-SIM improvements (click or copy/paste):

30 Revolutionizing the Transfer Die Industry for Maximum Production. Dostel Makina

31 Design/Build Case Study 8 station 1-out Cross Member (mechanical press, servo transfer) Problems: Low production rate (10spm) parts were stamping at cost (no profit)

32 Design/Build Case Study 8 station 1-out Cross Member (mechanical press, servo transfer) Problems: Low production rate (10spm) parts were stamping at cost (no profit) Solution: Setup and simulated tooling with current settings, analyzed existing forces during part movement, and optimized settings to 18spm with minor tool modifications.

33 Design/Build Case Study 8 station 1-out Cross Member (mechanical press, servo transfer) Problems: Low production rate (10spm) parts were stamping at cost (no profit) Solution: Setup and simulated tooling with current settings, analyzed existing forces during part movement, and optimized settings to 18spm with minor tool modifications. Results: Increased production rate to 18spm (80% increase). Parts now stamping with above average profit margin. More press time available (increased capacity)

34 Design/Build Case Study 8 station 1-out Cross Member (mechanical press, servo transfer) Problems: Low production rate (10spm) parts were stamping at cost (no profit) Solution: Setup and simulated tooling with current settings, analyzed existing forces during part movement, and optimized settings to 18spm with minor tool modifications. Results: Increased production rate to 18spm (80% increase). Parts now stamping with above average profit margin. More press time available (increased capacity) "We like how simple T-Sim Solutions makes it for us to get valuable simulation results with step-by-step corrective action reports, and realistic video simulations. On our first project with T-Sim we gained 8 SPM! We went from 10 to 18 SPM, that's an 80% increase! - Can Yucel Dostel Makina

35 Revolutionizing the Transfer Die Industry for Maximum Production.

36 Design/Build Case Study First time user setting up and running T-Sim 4.0 (initial (2) projects) Purpose: To determine the amount of training required to efficiently run T-Sim software Key Points: Installed T-Sim 4.0 Full version on-site at GTD (V5 R22) Setup Login and Password to Online training tutorials and videos Spent (2-3) hrs. installing and giving a general overview of the software User Profile: Name: Nate Akin Company: Greenville Tool & Die Experience: 20 years in the trade with shop floor and design experience. Nate is proficient in using CATIA V5 but has had no training or experience on T-Sim products prior to this study.

37 Results (1 st Sim): (6) Station Transfer (Total time to complete = 3-4 days) Initial project setup time (including watching training videos) = 1.5 days Initial simulation (using pre-set transfer 20spm) ran and report completed in less than 1day Optimization of tool and re-check simulation ran. Key areas were identified in tooling where minor modifications would resulting in a 20% increase in production(24spm) = 3-4 hrs. It s easy to learn and use. Anybody can do it. I learn better watching the videos, versus having someone telling me or trying to read it. I thought the videos were very helpful. Nate Akin Greenville Tool & Die

38 Results (2 nd Sim): (6) Station Transfer (Total time to complete = 2-3 days) Initial project setup time = 1 day Optimization of tool finding key areas where minor modifications would improve production rate was completed and initial simulation was run = less than 1 Day Report Summary reviewed and Corrective Action Report completed = 1 Day I didn t realize how many more SPM you could get out of a transfer by optimizing it. Taking out small transfer bottlenecks make a big difference on your SPM. Nate Akin Greenville Tool & Die

39 Summary of Results: Completed (2) full transfer simulation with a re-run on one of them in less than 7 working days. No prior training or experience using T-Sim 4.0 before starting these projects Used on-line documentation and video tutorials to learn the software Even with 20 years experience in the trade, he recognized the value of running transfer simulations on these projects and better understands the importance of designing for production not just to make a good part.

Copyright 2008 Society of Manufacturing Engineers. FUNDAMENTALS OF TOOL DESIGN Progressive Die Design

Copyright 2008 Society of Manufacturing Engineers. FUNDAMENTALS OF TOOL DESIGN Progressive Die Design FUNDAMENTALS OF TOOL DESIGN Progressive Die Design SCENE 1. PD06A, tape FTD29, 09:14:22:00-09:14:48:00 pan, progressive die operation PROGRESSIVE DIES PERFORM A SERIES OF FUNDAMENTAL CUTTING AND FORMING

More information

PSC300 Operation Manual

PSC300 Operation Manual PSC300 Operation Manual Version 9.10 General information Prior to any attempt to operate this Columbia PSC 300, operator should read and understand the complete operation of the cubing system. It is very

More information

PRESS FOR SUCCESS. Meeting the Document Make-Ready Challenge

PRESS FOR SUCCESS. Meeting the Document Make-Ready Challenge PRESS FOR SUCCESS Meeting the Document Make-Ready Challenge MEETING THE DOCUMENT MAKE-READY CHALLENGE PAGE DESIGN AND LAYOUT TEXT EDITS PDF FILE GENERATION COLOR CORRECTION COMBINING DOCUMENTS IMPOSITION

More information

8 Problems High-Mix Discrete Manufacturers Have That They Don t See As Problems

8 Problems High-Mix Discrete Manufacturers Have That They Don t See As Problems 8 Problems High-Mix Discrete Manufacturers Have That They Don t See As Problems It s human nature. We get used to doing things a certain way, to the point we assume it s the way they have to be done. (How

More information

MAXIMUM PRODUCTIVITY DUE TO SHORTEST CONVERSION TIMES

MAXIMUM PRODUCTIVITY DUE TO SHORTEST CONVERSION TIMES EN crimp module MAXIMUM PRODUCTIVITY DUE TO SHORTEST CONVERSION TIMES The C1370 and C1340 crimp modules guarantee the shortest changeover times on the latest fully automatic wire processing machines from

More information

Leer Ice Vending Machines

Leer Ice Vending Machines Leer Ice Vending Machines Guide for Owners & Operators How to get the most out of your new ice vending merchandiser S Contents Key Contacts - who they all are and what they do (Page 2-3) q Your Distributor

More information

Operation/Users Manual

Operation/Users Manual Operation/Users Manual 48-1-21 Please forward any suggestions or errors to: jillas@daumar.es 6- OPERATION MANUAL FOR MACHINE 48 VERSION 48-1-21 This document is made up of the following sections: COMPULSORY

More information

Impact of Servo Press Motion on Hole Flanging of High Strength Steels (submitted to SAE Sept. 2016)

Impact of Servo Press Motion on Hole Flanging of High Strength Steels (submitted to SAE Sept. 2016) Impact of Servo Press Motion on Hole Flanging of High Strength Steels (submitted to SAE Sept. 2016) By Pedro Stemler (1), Anoop Samant (2), Dennis Hofmann (1), Taylan Altan (1) (1) Center for Precision

More information

THE RELATIONSHIP OF BURR HEIGHT AND BLANKING FORCE WITH CLEARANCE IN THE BLANKING PROCESS OF AA5754 ALUMINIUM ALLOY

THE RELATIONSHIP OF BURR HEIGHT AND BLANKING FORCE WITH CLEARANCE IN THE BLANKING PROCESS OF AA5754 ALUMINIUM ALLOY Onur Çavuşoğlu Hakan Gürün DOI: 10.21278/TOF.41105 ISSN 1333-1124 eissn 1849-1391 THE RELATIONSHIP OF BURR HEIGHT AND BLANKING FORCE WITH CLEARANCE IN THE BLANKING PROCESS OF AA5754 ALUMINIUM ALLOY Summary

More information

Processes for the Intersection

Processes for the Intersection 7 Timing Processes for the Intersection In Chapter 6, you studied the operation of one intersection approach and determined the value of the vehicle extension time that would extend the green for as long

More information

Ocean Today Kiosk: Final Summary Report

Ocean Today Kiosk: Final Summary Report Ocean Today Kiosk: Final Summary Report Office of Policy & Analysis Smithsonian Institution August 24, 2010 Preface I am grateful for the teamwork, support and patience demonstrated by the following staff

More information

Perfect Binder BQ-480 BQ-480. Perfect Binder. New level of automation brings efficient, high quality production.

Perfect Binder BQ-480 BQ-480. Perfect Binder. New level of automation brings efficient, high quality production. BQ-480 Perfect Binder New level of automation brings efficient, high quality production. New level of automation brings more efficient and higher quality production. Features 1. Higher Level of Automation

More information

KODAK Video Monitor CFH-V10

KODAK Video Monitor CFH-V10 Quick Start Guide CAUTION RISK OF ELECTRIC SHOCK DO NOT OPEN CAUTION TO REDUCE THE RISK OF ELECTRIC SHOCK, DO NOT REMOVE COVER (OR BACK). NO USER SERVICEABLE PARTS INSIDE, REFER SERVICING TO QUALIFIED

More information

Bookletmaking. Versatile. Flexible. Efficient. Making printings alive. NAGEL Foldnak Compact Line with Robo-Feeder and Collection Bridge

Bookletmaking. Versatile. Flexible. Efficient. Making printings alive. NAGEL Foldnak Compact Line with Robo-Feeder and Collection Bridge Bookletmaking Versatile. Flexible. Efficient. NAGEL Foldnak Compact Line with Robo-Feeder and Collection Bridge NAGEL Bookletmaking Line with S8 collator, Tray, Foldnak 100, Trimmer 100 and SP 100 Making

More information

Bookletmaking. Versatile. Flexible. Efficient. We create a professional impression. Nagel Foldnak Compact

Bookletmaking. Versatile. Flexible. Efficient. We create a professional impression. Nagel Foldnak Compact Bookletmaking Versatile. Flexible. Efficient. Nagel Foldnak Compact Nagel bookletmaking line with S8 collator, tray, Foldnak 100, Trimmer 100 and SP + We create a professional impression 2 NAGEL Foldnak

More information

MTL Software. Overview

MTL Software. Overview MTL Software Overview MTL Windows Control software requires a 2350 controller and together - offer a highly integrated solution to the needs of mechanical tensile, compression and fatigue testing. MTL

More information

ISRA VISION PARSYTEC Tissue World Milano 2017

ISRA VISION PARSYTEC Tissue World Milano 2017 1 Improve runability in production & converting by Tissue Inspection System and Web Break Monitoring System TISSUE 2 Total Machine Efficiency Improvement (TME) Reducing defects on the tissue machine with

More information

SETUP TIME REDUCTION FOR CNC HOBBING MACHINE IMPLEMENTING SMED AND DESIGN OF SPLIT FIXTURE

SETUP TIME REDUCTION FOR CNC HOBBING MACHINE IMPLEMENTING SMED AND DESIGN OF SPLIT FIXTURE SETUP TIME REDUCTION FOR CNC HOBBING MACHINE IMPLEMENTING SMED AND DESIGN OF SPLIT FIXTURE 1 KARAN SHARMA, 2 NAIK NITHESH, 3 ARUN PRABHU, 4 GEORGE VARGHESE 1,2,3,4 Dept. of Mechanical and Mfg. Engg, Manipal

More information

A Novel Study on Data Rate by the Video Transmission for Teleoperated Road Vehicles

A Novel Study on Data Rate by the Video Transmission for Teleoperated Road Vehicles A Novel Study on Data Rate by the Video Transmission for Teleoperated Road Vehicles Tito Tang, Frederic Chucholowski, Min Yan and Prof. Dr. Markus Lienkamp 9th International Conference on Intelligent Unmanned

More information

Customized electronic part transport in the press shop siemens.com/metalforming

Customized electronic part transport in the press shop siemens.com/metalforming Press handling solutions Customized electronic part transport in the press shop siemens.com/metalforming Your handling. Your press. Your solution. Cost-effective workpiece transport is essential for presses.

More information

Installation and Tuning Manual DAC 7000 DAC 2X

Installation and Tuning Manual DAC 7000 DAC 2X Installation and Tuning Manual DAC 7000 DAC 2X DISCLAIMER While every effort has been made to ensure the accuracy of this document, Wayne s, Inc. nor its dealers assumes any responsibility for omissions

More information

Milestone Solution Partner IT Infrastructure Components Certification Report

Milestone Solution Partner IT Infrastructure Components Certification Report Milestone Solution Partner IT Infrastructure Components Certification Report Infortrend Technologies 5000 Series NVR 12-15-2015 Table of Contents Executive Summary:... 4 Introduction... 4 Certified Products...

More information

Troubleshooting EMI in Embedded Designs White Paper

Troubleshooting EMI in Embedded Designs White Paper Troubleshooting EMI in Embedded Designs White Paper Abstract Today, engineers need reliable information fast, and to ensure compliance with regulations for electromagnetic compatibility in the most economical

More information

Processor time 9 Used memory 9. Lost video frames 11 Storage buffer 11 Received rate 11

Processor time 9 Used memory 9. Lost video frames 11 Storage buffer 11 Received rate 11 Processor time 9 Used memory 9 Lost video frames 11 Storage buffer 11 Received rate 11 2 3 After you ve completed the installation and configuration, run AXIS Installation Verifier from the main menu icon

More information

A leading global media studio achieves their longtime goal: seamless digital operations

A leading global media studio achieves their longtime goal: seamless digital operations A leading global media studio achieves their longtime goal: seamless digital operations RadicalMedia is a multi-disciplinary company that crafts notably moving content such as feature films, television,

More information

ACCESSORIES MANUAL PART NUMBER: TNP500. Universal Tilt N Plug Interconnect Box USER'S GUIDE

ACCESSORIES MANUAL PART NUMBER: TNP500. Universal Tilt N Plug Interconnect Box USER'S GUIDE MANUAL PART NUMBER: 400-0091-003 TNP500 Universal Tilt N Plug Interconnect Box USER'S GUIDE INTRODUCTION Your purchase of the TNP100 Tilt N Plug Interconnect Box is greatly appreciated. We are sure you

More information

Advanced Techniques for Spurious Measurements with R&S FSW-K50 White Paper

Advanced Techniques for Spurious Measurements with R&S FSW-K50 White Paper Advanced Techniques for Spurious Measurements with R&S FSW-K50 White Paper Products: ı ı R&S FSW R&S FSW-K50 Spurious emission search with spectrum analyzers is one of the most demanding measurements in

More information

Satellite Services and Interference: The current situation. ITU International Satellite Communication Symposium Geneva, June 2016

Satellite Services and Interference: The current situation. ITU International Satellite Communication Symposium Geneva, June 2016 1 Satellite Services and Interference: The current situation ITU International Satellite Communication Symposium Geneva, 13-14 June 2016 Ruben D. Marentes Director, RF Operations Center 2 Current impact

More information

Dancer control slims down while gaining functionality

Dancer control slims down while gaining functionality Dancer control slims down while gaining functionality Delta Servo drives with onboard control plus integrated HMI eliminate the need for a PLC on a film handling module. When Company X decided to build

More information

One view. Total control. Barco OpSpace

One view. Total control. Barco OpSpace One view. Total control Barco OpSpace One view. Total control Today, operators can either access only one portion of the required information, or they have to physically switch between different work stations

More information

Transporting NV Standardized Testing from the Lab to the Production Environment

Transporting NV Standardized Testing from the Lab to the Production Environment 2009-01-2158 Transporting NV Standardized Testing from the Lab to the Production Environment G. Pietila and P. Goodes Sound Answers Copyright 2009 SAE International ABSTRACT NVH labs at Tier 1 and Tier

More information

ACCESSORIES MANUAL PART NUMBER: PRODUCT REVISION: 1 TNP100. Tilt N Plug Interconnect Box USER'S GUIDE

ACCESSORIES MANUAL PART NUMBER: PRODUCT REVISION: 1 TNP100. Tilt N Plug Interconnect Box USER'S GUIDE MANUAL PART NUMBER: 400-0091-001 PRODUCT REVISION: 1 TNP100 Tilt N Plug Interconnect Box USER'S GUIDE INTRODUCTION Your purchase of the TNP100 Tilt N Plug Interconnect Box is greatly appreciated. We are

More information

Tube filling machines

Tube filling machines Tube filling machines TFS 80-1 www.oystar-group.com Tube filling machine technology gaining your confidence With Oystar IWK you have a most competent partner at your side for solving complex issues and

More information

LED EVENEMENT 2013

LED EVENEMENT 2013 www.osram-os.com LED EVENEMENT 2013 AGENDA 1. Identify the Nature of the Potential Faillure 2. Why do we need to bin LEDs? 3. Colour binning @ OSRAM Opto Semiconductors 4. Mixing of LEDs the Brilliant

More information

CHRISTIE LX1500 PROJECTOR MANUAL EPUB

CHRISTIE LX1500 PROJECTOR MANUAL EPUB 18 November, 2017 CHRISTIE LX1500 PROJECTOR MANUAL EPUB Document Filetype: PDF 330.95 KB 0 CHRISTIE LX1500 PROJECTOR MANUAL EPUB We guarantee the lowest price & free ground shipping on all Christie LX1500

More information

IRISPen Air 7. Quick User Guide. (ios - ipad)

IRISPen Air 7. Quick User Guide. (ios - ipad) IRISPen Air 7 Quick User Guide (ios - ipad) This Quick User Guide helps you get started with the IRISPen TM Air 7. Please read this guide before operating this scanner and its software. All information

More information

In-Line or 75 Ohm In-Line

In-Line or 75 Ohm In-Line or 5 Ohm 1dB Adjustable Gain 800/1900 Smart Technology Contents: Quick Install Overview.... 2 Installation Diagram.... Understanding the Lights... 9 Warnings and Recommendations....11 Appearance of device

More information

Ecoline S series. Precision solutions for quality production. Innovations for a better world.

Ecoline S series. Precision solutions for quality production. Innovations for a better world. Ecoline S series. Precision solutions for quality production. Innovations for a better world. Precision solutions for quality production. Die casting with confidence. The Ecoline S is a series of cold-chamber

More information

TP HDMI OVER ANYWIRE TRANSMITTER

TP HDMI OVER ANYWIRE TRANSMITTER HDMI OVER ANYWIRE TRANSMITTER Welcome! Everyone at Altinex greatly appreciates your purchase of the TP315-101. We are confident that you will find it to be reliable and simple to use. If you need support,

More information

AltiumLive 2017: Effective Methods for Advanced Routing

AltiumLive 2017: Effective Methods for Advanced Routing AltiumLive 2017: Effective Methods for Advanced Routing Charles Pfeil Senior Product Manager Dave Cousineau Sr. Field Applications Engineer Charles Pfeil Senior Product Manager Over 50 years of experience

More information

VJ 6040 UHF Chip Antenna for Mobile Devices

VJ 6040 UHF Chip Antenna for Mobile Devices End of Life Last Available Purchase Date: 2-Aug-217 VJ 64 UHF Chip Antenna for Mobile Devices VJ 64 The company s products are covered by one or more of the following: WO5262 (A1), US2833 (A1), US283575

More information

SINCE User Manual 7 DAY PROGRAMMABLE DIGITAL TIMER MODEL PS-100. The best solutions for automation and protection.

SINCE User Manual 7 DAY PROGRAMMABLE DIGITAL TIMER MODEL PS-100. The best solutions for automation and protection. SINCE 1973 User Manual 7 DAY PROGRAMMABLE DIGITAL TIMER MODEL PS-100 The best solutions for automation and protection www.nassarelectronics.com Description The PS-100 is a 7 day programmable digital timer

More information

45LM Series Modules. Features. Specifications. Plug-in Logic and Display Modules for Q45 Series Photoelectric Sensors

45LM Series Modules. Features. Specifications. Plug-in Logic and Display Modules for Q45 Series Photoelectric Sensors Plug-in Logic and Display Modules for Q45 Series Photoelectric Sensors Three plug-in modules are available: Features Model 45LM58 45LM58D 45LMD Functions Selectable output timing Selectable output timing,

More information

2/28/2018. Optimizing Cone Crusher Performance Jeff Gray. Three Focus Areas

2/28/2018. Optimizing Cone Crusher Performance Jeff Gray. Three Focus Areas Optimizing Cone Crusher Performance Jeff Gray Three Focus Areas Part 1: Compiling application data Part 2: Cone Installation characteristics Part 3: Symptoms and solutions 1 Part 1: Compile Application

More information

Industrial Automation Technology

Industrial Automation Technology Industrial Automation Technology Low-Cost Machine Design using Application Specific Automation Innovations Innovation Stage at Pack Expo 2017 Presenter: Bill Faber, Director Marketing Date: Sept 26 th,

More information

Achieve Challenging Targets in Propylene Yield using Ultra System Fractionation Trays

Achieve Challenging Targets in Propylene Yield using Ultra System Fractionation Trays Achieve Challenging Targets in Propylene Yield using Ultra System Fractionation Trays Peter Wilkinson, Shell Global Solutions International BV, Amsterdam, NL Waldo DeVilliers, Shell Global Solutions Inc,

More information

Pre-processing of revolution speed data in ArtemiS SUITE 1

Pre-processing of revolution speed data in ArtemiS SUITE 1 03/18 in ArtemiS SUITE 1 Introduction 1 TTL logic 2 Sources of error in pulse data acquisition 3 Processing of trigger signals 5 Revolution speed acquisition with complex pulse patterns 7 Introduction

More information

FLAT DISPLAY TECHNOLOGY

FLAT DISPLAY TECHNOLOGY 15.0 Open Frame Monitor Model Number: LOF1506xx This product is RoHS compliant SPEC No.: SAS-1008002 Version: 0.0 Issue Date: September 6, 2010 1. Introduction: 1.1 About the Product The LOF1506xx 15.0

More information

HDMI to VGA Converter

HDMI to VGA Converter 0 HDMI to VGA Converter User s Guide Welcome! We greatly appreciate your purchase of the HDMI to VGA Converter. We are sure you will find it reliable and simple to use. Superior performance for the right

More information

Installation & User Manual For. Styluscom. Wired Video Intercom System. Models StylusAB, StylusABK, StylusAS Manual Version 1.

Installation & User Manual For. Styluscom. Wired Video Intercom System. Models StylusAB, StylusABK, StylusAS Manual Version 1. Installation & User Manual For Styluscom Wired Video Intercom System Models StylusAB, StylusABK, StylusAS Manual Version 1 P a g e 1 Contents Overview of system.pg 3 Site Survey.Pg 3 SIM card.pg 3 Power.Pg

More information

DSIM-GI Installation Guide Revision P

DSIM-GI Installation Guide Revision P Installation Guide Revision P 1. Quick Start Instructions for Single Pilot AGC Operatation 1. With the ADU jumper in Auto position, turn ADU pot to MIN amplifier output level. Then place the ADU jumper

More information

Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and

Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and Copyright is owned by the Author of the thesis. Permission is given for a copy to be downloaded by an individual for the purpose of research and private study only. The thesis may not be reproduced elsewhere

More information

Event recording (or logging) with a Fluke 287/289 Digital Multimeter

Event recording (or logging) with a Fluke 287/289 Digital Multimeter Event recording (or logging) with a Fluke 287/289 Digital Multimeter Application Note One of the major features of the Fluke 280 Series digital multimeters (DMM) with TrendCapture is their ability to record

More information

Comparing Ethernet and SerDes in ADAS Applications

Comparing Ethernet and SerDes in ADAS Applications Single-pair Ethernet is currently being deployed in automobiles over unshielded twisted pair (UTP) cable. Ethernet shows great promise as an in-vehicle networking technology for the connected car due to

More information

Saddle-stitching System StitchLiner5500

Saddle-stitching System StitchLiner5500 Saddle-stitching System StitchLiner5500 Combining the efficiency and ease of operation of flat sheet collating with the productivity, versatility and quality of a saddle-stitching system. The StitchLiner5500

More information

EAN-Performance and Latency

EAN-Performance and Latency EAN-Performance and Latency PN: EAN-Performance-and-Latency 6/4/2018 SightLine Applications, Inc. Contact: Web: sightlineapplications.com Sales: sales@sightlineapplications.com Support: support@sightlineapplications.com

More information

Installing a Turntable and Operating it Under AI Control

Installing a Turntable and Operating it Under AI Control Installing a Turntable and Operating it Under AI Control Turntables can be found on many railroads, from the smallest to the largest, and their ability to turn locomotives in a relatively small space makes

More information

Low Profile Digital HDTV Over-the-Air Antenna CONTENTS

Low Profile Digital HDTV Over-the-Air Antenna CONTENTS Low Profile Digital HDTV Over-the-Air Antenna Owner s Manual Roof Thickness: 1 to 4-1/2 Roof Thickness: 4-1/2 to 8 (when installed with KING extension #21850) OA8400 White OA8401 Black CONTENTS OPERATION

More information

ENGR 3030: Sound Demonstration Project. December 8, 2006 Western Michigan University. Steven Eick, Paul Fiero, and Andrew Sigler

ENGR 3030: Sound Demonstration Project. December 8, 2006 Western Michigan University. Steven Eick, Paul Fiero, and Andrew Sigler ENGR 00: Sound Demonstration Project December 8, 2006 Western Michigan University Steven Eick, Paul Fiero, and Andrew Sigler Introduction The goal of our project was to demonstrate the effects of sound

More information

Displays Open Frame Monitor Model Number: AND-TFT-150Bxx

Displays Open Frame Monitor Model Number: AND-TFT-150Bxx Displays 15.0 Open Frame Monitor Model Number: AND-TFT-150Bxx The AND-TFT-150Bxx 15.0 Open Frame Monitor series are rugged, high performance Industrial LCD Monitors, designed for commercial and industrial

More information

Aerial Cable Installation Best Practices

Aerial Cable Installation Best Practices Aerial Cable Installation Best Practices Panduit Corp. 2007 BEST PRACTICES Table of Contents 1.0 General... 3 2.0 Introduction... 3 3.0 Precautions... 4 4.0 Pre-survey... 5 5.0 Materials and Equipment...

More information

Aqua Turf International, Inc.

Aqua Turf International, Inc. Satellite Versus Decoder Control System During the irrigation design process a decision must be made whether to chose a satellite or decoder style control system. The decision must be made soon after the

More information

NV Series PA Modification for Improved Performance in FM+HD and HD Modes

NV Series PA Modification for Improved Performance in FM+HD and HD Modes NV Series PA Modification for Improved Performance in FM+HD and HD Modes IS10001 Issue 0.3... 02 March 2010 Nautel Limited 10089 Peggy's Cove Road, Hackett's Cove, NS, Canada B3Z 3J4 T.877 6 nautel (628835)

More information

Automatic Transfer Switch Control PLC Operator s Manual

Automatic Transfer Switch Control PLC Operator s Manual MTS Power Products MIAMI FL 33142 ATS-22AG Automatic Transfer Switch Control PLC Operator s Manual Dedicated Single Phase Transfer Switch ATS-22AG Automatic Transfer Switch INTRODUCTION 1.1 Preliminary

More information

Auto classification and simulation of mask defects using SEM and CAD images

Auto classification and simulation of mask defects using SEM and CAD images Auto classification and simulation of mask defects using SEM and CAD images Tung Yaw Kang, Hsin Chang Lee Taiwan Semiconductor Manufacturing Company, Ltd. 25, Li Hsin Road, Hsinchu Science Park, Hsinchu

More information

SonarWiz Layback - Cable-Out Tutorial

SonarWiz Layback - Cable-Out Tutorial SonarWiz Layback - Cable-Out Tutorial Revision 6.0,4/30/2015 Chesapeake Technology, Inc. email: support@chesapeaketech.com Main Web site: http://www.chesapeaketech.com Support Web site: http://www.chestech-support.com

More information

Torsional vibration analysis in ArtemiS SUITE 1

Torsional vibration analysis in ArtemiS SUITE 1 02/18 in ArtemiS SUITE 1 Introduction 1 Revolution speed information as a separate analog channel 1 Revolution speed information as a digital pulse channel 2 Proceeding and general notes 3 Application

More information

2.810 Manufacturing Processes and Systems Quiz #2. November 15, minutes

2.810 Manufacturing Processes and Systems Quiz #2. November 15, minutes 2.810 Manufacturing Processes and Systems Quiz #2 November 15, 2017 90 minutes Open book, open notes, calculators, computers with internet off. Please present your work clearly and state all assumptions.

More information

introduction Serenga: a new approach to emergency lighting Why choose Serenga?

introduction Serenga: a new approach to emergency lighting Why choose Serenga? introduction Serenga: a new approach to emergency lighting Serenga is a modular LED based emergency lighting system, combining a versatile range of exit signs with high specification downlighters to provide

More information

Calibrating attenuators using the 9640A RF Reference

Calibrating attenuators using the 9640A RF Reference Calibrating attenuators using the 9640A RF Reference Application Note The precision, continuously variable attenuator within the 9640A can be used as a reference in the calibration of other attenuators,

More information

MICROFOCUS X-RAY SOURCE PROJECT*

MICROFOCUS X-RAY SOURCE PROJECT* MICROFOCUS X-RAY SOURCE PROJECT* Dan Mancuso, CHESS, Cornell University, NY, USA ABSTRACT At the Cornell High Energy Synchrotron Source (CHESS), scientists in all fields and from all over the world utilize

More information

NOTICE: This document is for use only at UNSW. No copies can be made of this document without the permission of the authors.

NOTICE: This document is for use only at UNSW. No copies can be made of this document without the permission of the authors. Brüel & Kjær Pulse Primer University of New South Wales School of Mechanical and Manufacturing Engineering September 2005 Prepared by Michael Skeen and Geoff Lucas NOTICE: This document is for use only

More information

PNP300 & PNP350 POP N PLUG SLIM INTERCONNECT BOX USER S GUIDE

PNP300 & PNP350 POP N PLUG SLIM INTERCONNECT BOX USER S GUIDE The is shown above. MANUAL PART NUMBER: 400-0114-004 & PNP350 POP N PLUG SLIM INTERCONNECT BOX USER S GUIDE TABLE OF CONTENTS Page PRECAUTIONS / SAFETY WARNINGS... 2 GENERAL...2 HANDLING...2 CLEANING...2

More information

Mastering Phase Noise Measurements (Part 3)

Mastering Phase Noise Measurements (Part 3) Mastering Phase Noise Measurements (Part 3) Application Note Whether you are new to phase noise or have been measuring phase noise for years it is important to get a good understanding of the basics and

More information

Brilliant indoor display solutions. Now ready for a close-up.

Brilliant indoor display solutions. Now ready for a close-up. Video Wall Solution Brilliant indoor display solutions. Now ready for a close-up. High-Density Surface Mount Diode (SMD) Indoor LED displays have revolutionized large-scale video communications, delivering

More information

Informatics Enlightened Station 1 Sunflower

Informatics Enlightened Station 1 Sunflower Efficient Sunbathing For a sunflower, it is essential for survival to gather as much sunlight as possible. That is the reason why sunflowers slowly turn towards the brightest spot in the sky. Fig. 1: Sunflowers

More information

DLG Programming on the Futaba 12FG

DLG Programming on the Futaba 12FG DLG Programming on the Futaba 12FG This is a guide for programming the Futaba 12FG transmitter for use with a Discus Launched Glider (DLG). It serves two purposes: It serves as a dummies guide for those

More information

Digital Terrestrial Alignment & Installation Meter

Digital Terrestrial Alignment & Installation Meter Digital Terrestrial Alignment & Installation Meter Instruction Booklet Version 3 - February 2005 www.horizonhge.com Thank you for choosing our latest and most innovative terrestrial meter. It has been

More information

TIMECLOCK ENROLLMENT GUIDE (5000 SERIES)

TIMECLOCK ENROLLMENT GUIDE (5000 SERIES) TIMECLOCK ENROLLMENT GUIDE (5000 SERIES) Abstract This document describes in detail the Process of enrolling employees in a 5000 series time clock 8/1/2014 2014 SmartLinx Solutions, LLC. Contents Overview...

More information

TP HDMI OVER ANYWIRE RECEIVER (DC)

TP HDMI OVER ANYWIRE RECEIVER (DC) HDMI OVER ANYWIRE RECEIVER (DC) Welcome! Everyone at Altinex greatly appreciates your purchase of the TP315 106. We are confident that you will find it to be reliable and simple to use. If you need support,

More information

Period #: 2. Make sure that you re computer s volume is set at a reasonable level. Test using the keys at the top of the keyboard

Period #: 2. Make sure that you re computer s volume is set at a reasonable level. Test using the keys at the top of the keyboard CAPA DK-12 Activity: page 1 of 7 Student s Name: Period #: Instructor: Ray Migneco Introduction In this activity you will learn about the factors that determine why a musical instrument sounds a certain

More information

6 3 0 N M, S I N G L E M O D E F U S E D F I B E R O P T I C C OUPLERS / TA P S

6 3 0 N M, S I N G L E M O D E F U S E D F I B E R O P T I C C OUPLERS / TA P S 6 3 0 N M, S I N G L E M O D E F U S E D F I B E R O P T I C C OUPLERS / TA P S Narrowband and Wideband Couplers for 630 nm Available with 50:50, 75:25, 90:10, or 99:1 Terminated with 2.0 mm Narrow Key

More information

Analog Performance-based Self-Test Approaches for Mixed-Signal Circuits

Analog Performance-based Self-Test Approaches for Mixed-Signal Circuits Analog Performance-based Self-Test Approaches for Mixed-Signal Circuits Tutorial, September 1, 2015 Byoungho Kim, Ph.D. Division of Electrical Engineering Hanyang University Outline State of the Art for

More information

T-470 Weekly Timer PM-20II Premelt Tank (18 litter) Key Features Features Color Touchscreen Milling Lever Nipping Height Adjustment

T-470 Weekly Timer PM-20II Premelt Tank (18 litter) Key Features Features Color Touchscreen Milling Lever Nipping Height Adjustment or The Horizon Fully Automated, -Clamp Perfect Binder features an interchangeable glue tank for both and adhesives. Features Fully automated set-up through the intuitive icon based LCD touchscreen. Customer

More information

PNP300 / PNP300UN / PNP350

PNP300 / PNP300UN / PNP350 DOCUMENT NUMBER 400-0114-003 / UN / PNP350 Pop N Plug Slim INTERCONNECT BOX USER'S GUIDE TABLE OF CONTENTS Page PRECAUTIONS / SAFETY WARNINGS...2 GENERAL...2 INSTALLATION...2 CLEANING...2 ABOUT YOUR /300UN/350...3

More information

Instructions Manual

Instructions Manual 15 19 22 26 32 42 46 55 65 Instructions Manual Table of Contents Safety Guidelines Safety Guidelines 3 Package Contents 4 Ports and Connectors 5 Technical Specifications 6 Installation Guidelines 7 Installation

More information

CITOCUT Plasma inverter cutting range

CITOCUT Plasma inverter cutting range CITOCUT Plasma inverter cutting range Sword edge cutting www.oerlikon-welding.com The plasma expert advanced plasma cutting powerful all metals performance portable solutions inverter plasma gouging maintenance

More information

GE Fanuc Automation. Series 0i C CNC Family. The Best Value CNC with GE Fanuc Reliability

GE Fanuc Automation. Series 0i C CNC Family. The Best Value CNC with GE Fanuc Reliability GE Fanuc Automation Series 0i C CNC Family The Best Value CNC with GE Fanuc Reliability The Series 0i CNC Controller Family The new Series 0i CNC is the proud successor to the Series 0, the world s most

More information

Modular screen printing system from 2 6 colours

Modular screen printing system from 2 6 colours THIEME 5000 multicolour line Modular screen printing system from 2 6 colours THIEME 5000 multicolour line Details of the THIEME 5000 multicolour line Modular profile chassis construction Grippers and Gripper

More information

An outstanding introduction to Concert Artist quality.

An outstanding introduction to Concert Artist quality. CA48 An outstanding introduction to Concert Artist quality. Kawai has been crafting musical instruments for 90 years, maintaining traditional processes while embracing the latest technical innovations.

More information

HyPrecision Waterjet. The world's most profitable waterjets

HyPrecision Waterjet. The world's most profitable waterjets HyPrecision Waterjet The world's most profitable waterjets Dollars Make more money every inch of the way 60k versus 60k decrease your total cost of ownership by approximately 20% How profitable are your

More information

Using the BHM binaural head microphone

Using the BHM binaural head microphone 11/17 Using the binaural head microphone Introduction 1 Recording with a binaural head microphone 2 Equalization of a recording 2 Individual equalization curves 5 Using the equalization curves 5 Post-processing

More information

Crimp & Cleave Termination Instructions for SEL ST Connectors

Crimp & Cleave Termination Instructions for SEL ST Connectors Your Optical Fiber Solutions Partner Crimp & Cleave Termination Instructions for SEL ST Connectors For Use With: ST Termination Kit (SEL, Part Number BT05402-01) 200 µm HCS Fiber-Optic Cable ST Crimp &

More information

CREATE NEW VALUE. High Speed Multi Tester for Blu-ray TM (BD-R, RE and ROM)

CREATE NEW VALUE. High Speed Multi Tester for Blu-ray TM (BD-R, RE and ROM) High Speed Multi Tester for Blu-ray TM (BD-R, RE and ROM) Contents About PULSTEC BD (SL/DL), (TL/QL) New measurement items for (i-mlse, R-SER ) Write strategy Adjustment based on Specifications Write and

More information

Rapid-Air. Operating Instructions. C-T-L w/ 100D Series Servo Feed Control Ver. C. s/n & Later

Rapid-Air. Operating Instructions. C-T-L w/ 100D Series Servo Feed Control Ver. C. s/n & Later Rapid-Air Operating Instructions C-T-L w/ 100D Series Servo Feed Control Ver. C s/n 133095 & Later 4601 Kishwaukee Street, Rockford, IL 61109 815.397.2578 www.rapidair.com Thank you for purchasing a Rapid-Air

More information

What is a Visual Presenter? Flexible operation, ready in seconds. Perfect images. Progressive Scan vs. PAL/ NTSC Video

What is a Visual Presenter? Flexible operation, ready in seconds. Perfect images. Progressive Scan vs. PAL/ NTSC Video Visual Presenter and your presentation comes alive! The new standard for: Presentations Meetings and seminars Classroom & education Product presentations Video conferencing Medical care Courtrooms & Legal

More information

COMPLETE TISSUE PRODUCTION IMPROVEMENT SYSTEM

COMPLETE TISSUE PRODUCTION IMPROVEMENT SYSTEM COMPLETE TISSUE PRODUCTION IMPROVEMENT SYSTEM Improving Tissue & Converting Machine Efficiency by detecting Defects, reducing Web Breaks and creating Value Don t miss what you can t see! Reduce web breaks

More information

TRF STEP-DOWN TRANSFORMER USER MANUAL

TRF STEP-DOWN TRANSFORMER USER MANUAL TRF STEP-DOWN TRANSFORMER USER MANUA www.ventilation-system.com 2013 ! WARNING The present operation manual consisting of the technical details, operating instructions and technical specification applies

More information

Solutions to Embedded System Design Challenges Part II

Solutions to Embedded System Design Challenges Part II Solutions to Embedded System Design Challenges Part II Time-Saving Tips to Improve Productivity In Embedded System Design, Validation and Debug Hi, my name is Mike Juliana. Welcome to today s elearning.

More information

TABLE OF CONTENTS. 1) Introduction 2. 2) Unpacking the Ares 2. 3) Installing the Ares in your system 3. 4) Setting the Operational Parameters 4

TABLE OF CONTENTS. 1) Introduction 2. 2) Unpacking the Ares 2. 3) Installing the Ares in your system 3. 4) Setting the Operational Parameters 4 TABLE OF CONTENTS 1) Introduction 2 2) Unpacking the Ares 2 3) Installing the Ares in your system 3 4) Setting the Operational Parameters 4 5) High Output MM/MC Cartridge Setup 6 6) Medium Output Cartridge