1 Office of Traffic Operations Signal Design eference Packet ev5 07/15/2016 Contents The purpose of this packet is to provide guidance on designing and reviewing traffic signal plans. The format, legends, TEM tables/charts, page layouts, and sample details presented shall be used and followed as shown. Additionally, auto table/cadig shall be used to fill in all tables. Failure to provide in such format may result in submittals not being approved. eferences for Traffic Signal Design Projects Detailed Design eview Submission Stages Signal Design/eview Checklist Traffic Signal Plan o Traffic Signal eneral Notes o Plan View o Plan Details o Coordination Plan o Subsummary Calculation Tables o Calculation Spreadsheets Notes to the Designer o Clearance Intervals o Conduit Sizing o Mast Arm Pole Height o Mast Arm Design No o Two Arm Design No Typical Signal Head Placements Design files and spreadsheets are available for download and use on the Office of Traffic Operations website: SignalDesigneferencePacket.aspx Page 1 of 27

2 EFEENCES FO TAFFIC SINAL DESIN POJECTS ODOT Signals Documents and Publications Office of Traffic Operations Handbook* Traffic Authorized Products List (TAP)* ODOT Qualified Products List (QPL) Traffic Academy Ohio Manual of Uniform Traffic Control Devices (OMUTCD) 2012 Ed. Part 4, Highway Traffic Signals Part 5, Traffic Control Devices for LowVolume oads Part 6, Temporary Traffic Control (corrected page numbers for Chapters 6H and 6I 1/31/12) Part 7, Traffic Control for School Areas Part 8, Traffic Control for ailroad and Light ail Transit rade Crossings Part 9, Traffic Control for Bicycle Facilities Traffic Engineering Manual (TEM) Part 4 Signals Part 12 Zones and Traffic Engineering Studies Part 13 Intelligent Transportation Systems (Fiber Optics) Sign Designs and Markings Manual (SDMM) Construction & Material Specifications* 632 Traffic Signal Equipment 633 Traffic Signal Controllers 732 Traffic Signal Material 733 Traffic Signal Controller Material Supplements 1063 Signal Construction Personnel equirements (631, 632, 633) 1076 Conflict Monitors for Use with Model 2070 Controllers/Cabinets Supplemental Specifications 800 evisions to CMS 819 ailroad Preemption Interface 804 Fiber Optic Cable and Components 903 PS Clock Assembly 805 PS Clock Assembly 904 Fiber Optic Cable and Components 809 ITS Devices and Components 906 Spread Spectrum adio 815 Spread Spectrum adio 907 Video Detection System 816 Video Detection System 919 ailroad Preemption Interface Standard Construction Drawings Highway Lighting (HL) HL10.11 HL10.12 HL30.11 HL30.21 HL30.22 HL60.11 Standard Construction Drawings Maintaining Traffic (MT) MT96.26 MT Standard Construction Drawings Traffic Control (TC) TC21.20 TC22.10 TC22.20 TC41.20 TC42.20 TC81.10 TC81.21 TC82.10 TC83.10 TC83.20 TC84.20 TC84.21 TC85.10 TC85.20 TC85.21 TC85.22 TC86.10 Traffic Signal Plan Insert Sheets (PIS) Protective Coating of Overhead Sign Support Sections Controller Cabinet enerator Power Panel Battery Backup System (BBS) enerator Power Panel Prepare to Stop When Flashing (PTSWF) Sign Installation Sepac and ASC/3 Input File Information for 332 and 336 Cabinets Typical Pole Entrance Fitting Aerial Cable Placement Methods Cable Storage Details I Cable Storage Details II Miscellaneous Fiber Optic Details Typical Loose Tube Cable Installation Cable Construction adio Interconnect Details Uninterruptible Power Supply (UPS) and Controller Cabinet Foundation Uninterruptible Power Supply (UPS) Foundation etrofit Breakaway Transformer Base Connector Design Diamond Interchange 3Phase Operation Diamond Interchange 4Phase Operation Traffic Standard Drawings (Available upon request to the Office of Traffic Operations) Strain Pole and Mast Arm Camera Mount Location & Design Manual Volume 1 oadway Design Location & Design Manual Volume 2 Drainage Design Location & Design Manual Volume 3 Highway Plans *Note: efer to the most current version. Page 2 of 27

3 DETAILED DESIN/EVIEW SUBMISSION STAES SCOPE Is consultant prequalified for basic and/or signal system design? Were the plans reviewed, submitted and stamped by the prequalified individual? Developer Signal Agreement (Completed and Accepted) Village Signal Permit (Documentation and Approvals) Does the project involve any if the following: Emergency Vehicle Preemption ail oad Coordination/Preemption Coordinated with ail Commission PTZ Cameras HAWK Signals STAE 1 Title Sheet Plan and Profile Sheets Signal Warrants Signal Pole Locations Conceptual Maintenance of Traffic evised Systems Engineering Analysis for Intelligent Transportation Systems (ITS) Projects (TEM 13013) Proprietary Item Approval(s) Coordination with Utilities (If poles are to be used for interconnect) Determine type of detection (radar, video, loops) STAE 2 Title Sheet Maintenance of Traffic Sequence of Operations evised Systems Engineering Analysis for Intelligent Transportation Systems (ITS) Projects (TEM 13013) Signal Plan Sheets Base plan drawn to scale of 1:20 including: oadway base lines Underground and overhead utilities Overhead power lines should include their voltage Check stop bar locations with WB62 turning template Traffic signal pole locations and skew angles, if required Identify reference numbers for all poles Signal head locations and direction; Identify the following: Signal heads having turn arrow lenses Louvers or special optically programmed features Signal head sizes eference numbers for all signal heads Signal controller location and orientation Detector Locations adar detection chart Traffic signal detector chart (Form 4964) Underground conduit and pull boxes Overhead sign locations, whether on signal spans, mast arms, or located on separate supports Check cross sections for placement of poles/cabinets (in a ditch, with a steep slope, etc.) Legend for symbols used Pavement marking pertinent to the signal operation Signal phasing diagram, method of addressing yellow trap (where applicable) or field hookup chart (see Forms and 49620) and signal timing (see Forms 4963 and 4965 for typical signal timing charts) Handicap ramp locations ightofway lines Corporation lines Any existing features to be incorporated into the new signal. Location of Power Service Any decision to reuse equipment must be based on a field check of the structural integrity and condition of the devices and agreement with the maintaining agency. Other physical features within the intersection and sidewalk area which may conflict with traffic flow, pedestrian flow, or sight distance Synchro files Design Calculations (use ODOT spreadsheets) Clearance Intervals Pedestrian ellow All ed Conduit Sizing Pole loading calculations/swiss/mast Arm (TEM) Mast arm attachment height calculations ITS Plan Sheets Fiber Optic Cable Cost Estimate STAE 3 Systems Engineering Analysis for Intelligent Transportation Systems (ITS) Projects (TEM 13013) Signal Plan Sheets eneral Notes Estimated quantities Special details Pole orientation chart Wiring diagram; Shall indicate the following: Type of cable Number of conductors connecting each signal head, pedestrian head, detector, push button, etc. Coordination timing (Shall be in seconds) Timing summary (coordination) ailroad preemption Interconnection Cost Estimate Page 3 of 27

4 SINAL DESIN/EVIEW CHECKLIST SUPPLEMENTAL SPECS Number Title 800 evisions to the 2013 Construction and Material Specifications [Date 8 weeks before letting] 804 Fiber Optic Cable and Components 805 PS (lobal Positioning System) Clock Assembly [Project w/ alternative to time base coord] 809 Intelligent Transportation System (ITS) Devices and Components 815 Spread Spectrum adio (Serial adios) 816 Video Detection System 819 ailroad Preemption Interface 903 PS (lobal Positioning System) Clock Assembly [For use on all projects using SS 805] 904 Fiber Optic Cable and Components 906 Spread Spectrum adio 907 Video Detection System 919 ailroad Preemption Interface STANDAD CONSTUCTION DAWINS (TPICAL) Number Title HL10.11 Light Pole Styles HL10.12 Light Pole Details HL30.11 Pull Box Details I HL30.21 oadway Conduit Details I HL30.22 oadway Conduit Details II HL60.11 Pole Wiring I MT96.26 Typical Wiring Diagram for One Signal Head and One Detector MT New Signal Activation TC21.20 Foundations TC22.10 Miscellaneous Overhead Sign Support Details TC22.20 Sign Attachment Assemblies TC41.20 ielding Post TC42.20 Typical Flat Sheet Sign Placement TC81.10 Strain Pole Details TC81.21 Single Arm Overhead Signal Support TC82.10 Vehicle Detector Installation Details TC83.10 Pole Mountings for Controllers and Power Service TC83.20 Cabinet Foundations and Pedestals TC84.20 Messenger Wire Details I TC84.21 Messenger Wire Details II TC85.10 Pole Mountings for Signal Heads TC85.20 Overhead Signal Attachment Mast Arm TC85.21 Signal Tether Attachment TC85.22 Overhead Signal Attachments, Span Wire TC86.10 ailroad Preemption Interface Panel PLAN INSET SHEETS Number Title Protective Coating of Overhead Sign Support Sections Controller Cabinet enerator Power Panel Battery Backup System (BBS) enerator Power Panel Prepare to Stop When Flashing (PTSWF) Sign Installation Sepac and ASC/3 Input File Information for 332 and 336 Cabinets Typical Pole Entrance Fitting Aerial Cable Placement Methods Cable Storage Details I Cable Storage Details II Miscellaneous Fiber Optic Details Typical Loose Tube Cable Installation Cable Construction adio Interconnect Details Uninterruptible Power Supply (UPS) and Controller Cabinet Foundation Uninterruptible Power Supply (UPS) Foundation etrofit Breakaway Transformer Base Connector Design Diamond Interchange 3Phase Operation Diamond Interchange 4Phase Operation TAFFIC STANDAD DAWINS Number Title TBD Strain Pole and Mast Arm Camera Mount FHWA POPIETA EQUIPMENT APPOVALS (FO ODOT USE ONL) Type Title Cellular Modem Sierra Wireless 3 Airlink aven X Cellular Modem Sierra Wireless 4 Airlink X440 Detector Wavetronix Matrix (Model SS225) Detector Wavetronix Smartsensor Advance (Model SS200E) Page 4 of 27

5 SINAL DESIN/EVIEW CHECKLIST TEM ENEAL NOTES (TPICAL) Number Name 4422 Power Supply for Traffic Signals 4423* Signal Activation emoval of Traffic Signal Installation Interconnect Cable, Misc.: (by Size), with Support Messenger, As Per Plan Loop Detector Units, by Type, As Per Plan 4427 Detection Maintenance 4428* Work Inspection Loop Detector LeadIn Cable, Direct Burial Combination Signal Support, Type TC81.21 and Sign Support, TC (with Light Pole Extension) , Combination Strain Pole, Type TC81.10 and Sign Support. TC (with Light Pole Extension) Strain Pole and Pedestal Foundation Elevations Vehicular Signal Head, LED, Black, (By Type), With Backplate, As Per Plan Covering of Vehicular Signal Head 44215* uarantee Alternate Bid Item Pedestrian Signal Head (LED), (Countdown), Type D2, As Per Plan elamp Existing Signal Section with LED Module, By Lens Type, As Per Plan Controller Unit, Type 2070E with SEPAC Software, with Cabinet, (By Type), As Per Plan Controller Unit, Type TS2/A2, with Cabinet, Type TS2, As Per Plan Preemption Preemption eceiving Unit Preemption Detector Cable Preempt Phase Selector Preempt Confirmation Light, LED Pull Box, 24 X 35 X Pole Entrance Fitting 44232* rounding and Bonding Underdrains for Pullboxes Uninterruptible Power Supply (UPS), Battery eplacement Uninterruptible Power Supply (USP), 1000 Watt, As Per Plan Signal Support Foundation Signal Support, Mechanical Damper for TC81.21 Mast Arm (reater Than 59 in Length), As Per Plan Signal Support, (By Type), As Per Plan Signalization, Misc.: Unlash and elash Messenger Wire Advance adar Detection StopBar adar Detection eneral Electrical equirements for SolarPowered Devices 64242* Maintenance of Traffic Signal/Flasher Installation SPECIALT NOTES Number OTO OTO TEM FOMS AND FIUES Number Name Signal Operation Changed 633 Communications, As Per Plan Name Traffic Signal Controller Timing Chart for Actuated Signals Traffic Signal Detector Chart adar Detection Chart Coordination Timing Chart Field Wiring HookUp Chart Vehicular/Ped Volume Chart Plan Details for Strain Poles Plan Details for Signal Supports Arm Lengths Plan Details for Signal Supports Mast Arm Orientation Wiring Diagram Phasing Diagram DESINE NOTES: FO OTO NOTES, PLEASE CONTACT THE OFFICE OF TAFFIC OPEATIONS. AS PE PLAN NOTES AND ITEMS AE USED WHEN MODIFICATIONS AE MADE TO THE BASE ITEM/STANDAD NOTE. TPICAL EXTENSION NUMBES AE 1 HIHE THAN THE OIINAL ITEM. CHECK CONSTUCTION ITEM MASTE FO EXACT NUMBES. * Designates EQUIED Signal Notes Page 5 of 27

6 SINAL DESIN/EVIEW CHECKLIST PA ITEMS (TPICAL) Item Ext. Unit Description SQ FT Curb amp EACH Connection, Fused Pull Apart EACH Connection, Unfused Permanent 625 VAIES EACH Bracket Arm, XX', As Per Plan 625 VAIES FT No. XX AW 600 Volt Distribution Cable 625 VAIES FT No. XX AW Pole And Bracket Cable FT Conduit, 2", FT Conduit, 3", FT Conduit, 4", FT Conduit, Jacked Or Drilled, (Specify Size) EACH Luminaire, Conventional, 250w HPS, 120 Volt, As Per Plan FT Trench EACH Pull Box, , 18" EACH Pull Box, , 24" EACH round od 632 VAIES EACH Vehicular Signal Head, (LED), Black, XSection, 12" Lens, 1Way, Polycarbonate With Backplate, As Per Plan EACH Pedestrian Signal Head (LED), (Countdown), Type D2, As Per Plan EACH Covering Of Vehicular Signal Head EACH Covering Of Pedestrian Signal Head EACH Pedestrian Pushbutton, As Per Plan EACH Detector Loop 632 VAIES FT Signal Cable, X Conductor, No. X AW EACH Signal Support Foundation EACH Pedestal Foundation FT Loop Detector LeadIn Cable 632 VAIES FT Power Cable, X Conductor, No. X AW 632 VAIES FT Service Cable, X Conductor, No. X AW EACH Power Service, As Per Plan 632 VAIES EACH Signal Support, Type TC81.21, Design XX, As Per Plan 632 VAIES EACH Combination Signal Support, Type TC81.21, Design XX, As Per Plan EACH Signal Support, Mechanical Damper For Tc81.21 Mast Arm (reater Than 59 In Length) 632 VAIES EACH Strain Pole, Type TC81.10, Design XX 632 VAIES EACH Combination Strain Pole, Type TC81.10, Design XX, As Per Plan 632 VAIES EACH Pedestal, X', Transformer Base EACH emoval Of Traffic Signal Installation, As Per Plan EACH Controller Unit, Type TS2/A2, With Cabinet, Type TS2, As Per Plan EACH Controller Unit, Type TS2/A2, With Cabinet, Type TS EACH Controller Unit, Type 2070E, With Cabinet, Type 332, As Per Plan PA ITEMS (TPICAL) EACH Controller Unit, Type 2070E, With Cabinet, Type 336, As Per Plan EACH Cabinet Foundation EACH Controller Work Pad EACH Communications, As Per Plan EACH Flasher Controller EACH Uninterruptible Power Supply (UPS), 1000 Watt, As Per Plan FT Fiber Optic Cable, 18 Fiber FT Fiber Optic Cable, 24 Cable FT Fiber Optic Cable, 48 Cable FT Fiber Optic Cable, Armored, 18 Fiber FT Fiber Optic Cable, Armored, 24 Fiber FT Fiber Optic Cable, Armored, 36 Fiber FT Fiber Optic Cable, Armored, 48 Fiber EACH Fiber Optic Patch Cord, 2 Fiber EACH Termination Panel, 12 Fiber EACH Termination Panel, 24 Fiber EACH Termination Panel, 36 Fiber EACH Termination Panel, 48 Fiber EACH Splice Enclosure EACH lobal Positioning System Clock Assembly EACH Closed Loop Arterial Traffic Signal System EACH Centrally Controlled Arterial Traffic Signal System EACH Highway ail/traffic Signal PreEmption EACH Traffic Signal System With Emergency Vehicle PreEmption EACH Traffic Signal System With Transit Priority EACH Adaptive Traffic Signal Control System EACH SideFired adar Detector EACH Advance adar Detection EACH StopBar adar Detection EACH StopBar And Advance adar Detection EACH Spread Spectrum adio Note: Pay Items listed are TPICAL. o to the ODOT Item Master for complete list. DESINE NOTE: PLANS THAT INCLUDE FIBE OPTIC CABLE SHALL BE SUBMITTED TO OTO ITS SECTION FO EVIEW Page 6 of 27

7 TPICAL SINAL NOTES (TEM 442 & 642): SPECIALT SINAL NOTES: CALCULATED CHECKED 4422 POWE SUPPL FO TAFFIC SINALS COVEIN OF VEHICULA SINAL HEAD 44232* OUNDIN AND BONDIN OTO SINAL OPEATION CHANED 4423* SINAL ACTIVATION 44215* UAANTEE UNDEDAINS FO PULLBOXES OTO 633 COMMUNICATIONS, AS PE PLAN EMOVAL OF TAFFIC SINAL INSTALLATION 632 INTECONNECT CABLE, MISC.: (B SIZE), WITH SUPPOT MESSENE, AS PE PLAN 632 LOOP DETECTO UNITS, B TPE, AS PE PLAN ALTENATE BID ITEM 632 PEDESTIAN SINAL HEAD (LED), (COUNTDOWN), TPE D2, AS PE PLAN 632 ELAMP EXISTIN SINAL SECTION WITH LED MODULE, B LENS TPE, AS PE PLAN UNINTEUPTIBLE POWE SUPPL (UPS), BATTE EPLACEMENT 633 UNINTEUPTIBLE POWE SUPPL (UPS), 1000 WATT, AS PE PLAN 632 SINAL SUPPOT FOUNDATION * DESINATES EQUIED SINAL NOTES T:\CO\Adm in\docum ents\signal Design eference Packet\ev 5_071516\01_Traffic Control eneral Notes 01.dgn Sheet 9/27/2016 1:23:22 PM sm arik * DETECTION MAINTENANCE WOK INSPECTION 632 LOOP DETECTO LEADIN CABLE, DIECT BUIAL 632 COMBINATION SINAL SUPPOT, TPE TC81.21 AND SIN SUPPOT, TC(WITH LIHT POLE EXTENSION) 632 COMBINATION STAIN POLE, TPE TC81.10 AND SIN SUPPOT, TC(WITH LIHT POLE EXTENSION) STAIN POLE AND PEDESTAL FOUNDATION ELEVATIONS 632 VEHICULA SINAL HEAD, LED, BLACK, (B TPE), WITH BACKPLATE, AS PE PLAN CONTOLLE UNIT, TPE 2070E WITH SEPAC SOFTWAE, WITH CABINET, (B TPE), AS PE PLAN CONTOLLE UNIT, TPE TS2/A2, WITH CABINET, TPE TS2, AS PE PLAN 633 PEEMPTION 633 PEEMPTION ECEIVIN UNIT 633 PEEMPTION DETECTO CABLE 633 PEEMPT PHASE SELECTO 633 PEEMPT CONFIMATION LIHT, LED PULL BOX, 24" X 35" X 26" 632 POLE ENTANCE FITTIN * 632 SINAL SUPPOT, MECHANICAL DAMPE FO TC81.21, MAST AM (EATE THAN 59' IN LENTH), AS PE PLAN 632 SINAL SUPPOT, (B TPE), AS PE PLAN 632 SINALIZATION, MISC.: UNLASH AND ELASH MESSENE WIE 809 ADVANCE ADA DETECTION 809 STOPBA ADA DETECTION ENEAL ELECTICAL EQUIEMENTS FO SOLA POWEED DEVICES MAINTENANCE OF TAFFIC SINAL/FLASHE INSTALLATION DESINE NOTE: AN SPECIALT, NEWL CEATED, O MODIFIED NOTES FOM THOSE LISTED IN THE TEM SHALL BE EVIEWED, ACCEPTED, AND/O POVIDED B THE OFFICE OF TAFFIC OPEATIONS. Page 7 of 27 TA FFIC SI NA L ENEA L NO TES

8 CALCULATED CHECKED MODEL 332 CABINET DETAIL (TP.) DESINE NOTE: CAN BE MODIFIED AS NEEDED TO MATCH DISTICT PEFEENCES. UPS FOUNDATION DETAIL UPS WOK PAD DETAIL T:\CO\Adm in\docum ents\signal Design eference Packet\ev 4_011516\02_Traffic Control eneral Notes 02.dgn 13JAN2016 1:45PM sm arik 8" CABINET ISE 4" CONCETE EX. CABINET FOUNDATION NOTES: 1) THE SIZE OF THE UPS FOUNDATION MA VA BASED ON THE CABINET SIZE POVIDED. 2) UPS FOUNDATION ELEVATION SHOULD MATCH CABINET FOUNDATION ELEVATION. 3) THE UPS CABINET SHALL BE MOUNTED FLUSH UP AAINST THE SINAL CABINET AND SEALED. 4) CONDUIT AND WIIN FOM THE SINAL CABINET TO THE UPS SHALL BE INSTALLED THOUH THE CABINET ISE. ELEVATION SIDE VIEW OUND LINE 36" TS2 SIZE 6/7 CABINET DETAIL (TP.) CABINET FOUNDATION DETAIL ELEVATION 12" CABINET SIDE VIEW ISE 4" CONCETE OUND LINE 36" CABINET FOUNDATION FONT 36" SIDE UPS EA 32" VA. VA. 96" 30" 36" NOM. 30" 36" 32" NOM. 42" FONT 24" PB SIDE UPS EA PLAN VIEW CABINET & WOK PAD DETAIL 36" 69" TS2 UPS CABINET SIZE 6/7 DOO HINES PLAN VIEW 36" 36" DOO HINES SEPAATE BID ITEMS: TA FFIC SI NA L ENEA L NO TES 633 CABINET ISE 633 CONTOLLE WOK PAD, AS PE PLAN 633 CABINET FOUNDATION, AS PE PLAN 633 UNINTEUPTIBLE POWE SUPPL (UPS) 633 CONTOLLE UNIT, TPE, WITH CABINET, TPE Page 8 of 27

9 PEDESTIAN SINS SINAL HEADS N STAT COSSIN Watch For Vehicles DON'T STAT Finish Crossing FLASHIN If Started TIME EMAININ TIME To Finish Crossing STEAD DON'T COSS PUSH BUTTON TO COSS 103E9 # LEFT AOWS # IHT AOWS 9318 # EACH USE COSSWALK 93BP18 # LEFT AOWS # IHT AOWS ITEMS EQUIED IN PLAN VIEW 20 SCALE CHECK STOP BA LOCATIONS WITH WB62 TUNIN TEMPLATE DETECTOS/DETECTION ZONES LABEL DETECTOS B ASSOCIATED PHASE (D2A, D2B, D6A, D6B, ETC.) 5 PEDESTIAN HEADS (LED, COUNTDOWN, TPE D2) 2A, 2B, 6A, 6B 1, 5 4A, 8A 0 20 CALCULATED HOIZONTAL SCALE IN FEET CHECKED LABEL DETECTO ZONES B TPE AND ASSOCIATED PHASE ( LDZ2A, LDZ2B, LDZ6, ETC. FO LOOPS, DZ2A FO ADA, AND VDZ2A FO VIDEO) ALL MOVEMENTS SHALL BE ACTUATED T:\CO\Adm in\docum ents\signal Design eference Packet\ev 5_071516\03_Traffic Signal Plan 01.dgn Sheet 9/27/2016 2:33:52 PM sm arik PULLBOX TABLE PULL BOX STATION SIDE OFFSET SIZE (IN.) # SINAL HEADS WITH COECT PLACEMENT (SEE SAMPLE SINAL HEAD PLACEMENTS PE OTO DAWIN) LABELED B ASSOCIATED PHASE: 2A, 2B, 4A, 4B, 6A, ETC. SPECIF TPE: 12" LED WITH BACKPLATE SPECIF VISO TPE: CUTAWA O OPEN BOTTOM TUNNEL SPECIF COLO: BLACK O ELLOW PEDESTIAN FACILITIES (ADA COMPLIANT) PEDESTAL/PUSHBUTTON CONFIUATION LABEL PEDESTAL SUPPOTS AS PS# NUMBE WITH THE NW CONE = 1, SW=2, NE=3, SE=4. FO CONFIUATIONS WITH ONL 2 O 3 SUPPOT POLES, NUMBE ACCODINL FOLLOWIN THE SAME ODE (EX. IF NW CONE IS MISSIN, SW=1) CUB AMPS (NOTE: COSSWALKS CANNOT SHAE AMPS) SINAL SUPPOTS LABELED AS SP# NUMBE STAIN POLES ACCODIN TO SWISS OUTPUT DIAAM. FO MAST AMS, NUMBE WITH THE NW CONE = 1, SW=2, NE=3, SE=4. FO CONFIUATIONS WITH ONL 2 O 3 SUPPOT POLES, NUMBE ACCODINL FOLLOWIN THE SAME ODE. LOCATED WITH THE FOLLOWIN CONSIDEATIONS: WITHIN THE /W EMOVED FOM LOCATION OF DITCHES O DAINAE AEAS OUTSIDE THE L&D MANUAL'S CLEA ZONE EQUIEMENTS PEDESTIAN PUSHBUTTON ACCESS AND PEDESTIAN SINAL VIEWIN ANLE UNDEOUND OBSTUCTIONS OVEHEAD OBSTUCTIONS (NOTE: THE UTILIT COMPANIES EQUIE DIFFEENT CLEAANCES BETWEEN THE POLE AND THEI POWE LINES BASED ON THE VOLTAE LEVELS CAIED ON THE OVEHEAD LINES.) AE NEW SUPPOTS LOCATED AT LEAST 5 FEET FOM EXISTIN SUPPOTS TO BE EMOVED? EXISTIN & POPOSED W LOCATION OF POWE SEVICE IDENTIFIED CONDUITS & PULLBOXES INCLUDE SIZE, LENTH, AND NUMBE & TPE OF CONDUCTOS WITHIN SHOULD HAVE SEPAATE FO LIHTIN CICUITS PLAN VIEW DESINE NOTES: SELECT APPOPIATE SINAL HEAD(S) PE PLAN DESIN EMOVE UNUSED CONFIUATIONS FOM PLAN SHEET 4B, 8B LEEND TAFFIC SINAL, 3 UNIT HEAD, 12" TAFFIC SINAL, 3 UNIT HEAT, 12" WITH AOWS TAFFIC SINAL, 4 O 5 UNIT HEAD, 12" SINAL SUPPOT POLE PEDESTIAN SINAL PEDESTIAN PUSH BUTTON PEDESTAL SUPPOT LUMINAIE, CONVENTIONAL CONTOLLE CABINET AND WOK PAD (332) CONTOLLE CABINET AND WOK PAD (TS2) TAFFIC PULL BOX VIDEO DETECTION CAMEA DILEMMA ZONE ADA DETECTION UNIT STOP BA ADA DETECTION UNIT PTZ CAMEA ETHENET ADIO DETECTO LOOP DETECTION ZONE DETECTO COUNT POP D S EXIST D S Page 9 of 27 TA FFIC SI NA L PLA N &

10 SINAL TIMIN CHAT (TEM FOM 4963) PHASIN DIAAM (TPICAL) DESINE NOTE: LABEL ALL PHASES B DIECTION, PEDS AND OVELAP CALCULATED CHECKED INTESECTION: MAINTAININ AENC: 2 & 5 + OLA LEEND 4 & 7 + OLB STAT UP DUAL ENT: PHASES: EST IN ED: IN 1 IN 2 OLA VEHICLE STAT IN: TIME FO FLASH O ALL ED: FIST PHASE(S): OVELAP A B C D 05 PEMITTED PEDESTIAN OLB COLO DISPLAED: PHASES 02 INTEVAL O FEATUE CONTOLLE MOVEMENT NO. INTESECTION MOVEMENT (PHASE) & 5 + OLA 2 & 6 (ECALL) 3 & 7 + OLB 4 & 8 T:\CO\Adm in\docum ents\signal Design eference Packet\ev 4_011516\04_Traffic Signal Plan Details 01.dgn 13JAN2016 2:18PM sm arik DIECTION MINIMUM EEN (INITIAL) (SEC.) OLA 07 ADDED INITIAL *(SEC./ACTUATION) MAXIMUM INITIAL (SEC.) 05 PED B 06 OLB PASSAE TIME (PESET AP) (SEC.) 02 PED A TIME BEFOE EDUCTION *(SEC.) 01 MINIMUM AP *(SEC.) TIME TO EDUCE *(SEC.) 1 & & 8 MAXIMUM EEN I (SEC.) MAXIMUM EEN II (SEC.) ELLOW CHANE (SEC.) ALL ED CLEAANCE (SEC.) 06 WALK (SEC.) DESINE NOTE: PEDESTIAN CLEAANCE (SEC.) MAXIMUM (ON/OFF) 01 MAINLINE PHASES = 2 & 6 ECALL MINIMUM (ON/OFF) PEDESTIAN (ON/OFF) MEMO (ON/OFF) *VOLUME DENSIT CONTOLS NOTES: ALL MOVEMENTS SHALL BE ACTUATED. THE PIMA THU MOVEMENT SHOULD HAVE MIN ECALL ACTIVE TO EST IN EEN. FO POTECTED/PEMISSIVE PHASES, IMPLEMENT CALL OMITS TO AVOID ELLOW BALL TAP. ENABLE 3 & 7 DETECTO SWITCHIN TO ALLOW 3 & 7 TO EXTEND 4 & 8 WHEN ALLOCATED EEN TIME FO LEFT TUN PHASES AE EXHAUSTED. ENABLE DETECTO SWITCHIN TO EXTEND 4 & 8 WITH 3 & 7 LOOPS ONCE LEFT TUN PHASES AE EXHAUSTED. COUNTDOWN PEDESTIAN SINALS SHALL O TO ZEO ON ELLOW PE OMUTCD FIUE 4E2. ADA DETECTION UNITS FO DILEMMA ZONE DETECTION SHALL PLACE A CONSTANT CALL TO THE CONTOLLE WHEN VEHICLES TAVEL TIMES TO THE STOP BA AE BETWEEN 2.5 AND 6 SECONDS. SPEED TIE SHALL BE SET FO VEHICLES TAVELIN 35 MPH AND EATE. ADA SHALL HAVE QUEUE DETECTION CONFIUED AND A ZONE PLACED AT FEET FOM STOP BA FO SLOW MOVIN VEHICLE EXTENSIONS. SPEED TIE SHALL BE SET AT 135 MPH. ALL DETECTO DELAS SHALL BE PLACED IN THE CONTOLLE. DESINE NOTES: POWEHEAD STOP BA ADD EXTENSION/SECOND CA EC SECOND CA TAFFIC SINAL DETECTO CHAT (TEM FOM 4964) ADA DETECTION CHAT (TEM FOM 4964) LOOP DESINATION LOOP CONFIUATION** SIZE (FT.) PULSE O PESENCE DELA (SEC.) EXTENSION (SEC.) CONNECT TO DETECTO UNIT (UNITCHANNEL) ASSOCIATED CONTOLLE PHASE TEMINAL NO.* * FO 332/336 CABINET ** CONFIUATIONS: POWEHEAD (P), QUADUPOLE (Q), ANULA DESIN DETECTO (ADD), O ECTANULA (); PE TC PED C PED D DETECTION ZONE MOVEMENT PULSE O PESENCE ASSOCIATED PHASE DELA IN CONTOLLE (SEC) DELA INHIBIT PHASE PUPOSE DETECTION ZONE LENTH (FT) NOTE: DILEMMA ZONE SPEED THESHOLD >30 MPH 08 Page 10 of 27 TA FFIC SI NA L PLA N DETAILS &

11 DESINE NOTE: 5 SECTION HEADS MUST BE CENTEED ON ELLOW BACKET AM, AS PE PLAN PE HL X DILEMMA ZONE ADA DETECTION TPICAL PLACEMENT CALCULATED CHECKED T:\CO\Adm in\docum ents\signal Design eference Packet\ev 5_071516\05_Traffic Signal Plan Details 02 Mast Arm.dgn Sheet 9/27/2016 2:40:46 PM sm arik IID MOUNTED SINAL HEADS EFLECTIVE BACKPLATE DILEMMA ZONE ADA DETECTION TPICAL PLACEMENT DESINE NOTE: ADD PEDESTAL INFOMATION TO TABLE IF APPLICABLE SUPPOT NO. STATION OFFSET SINAL HEADS SHALL BE LEVEL WITHIN 6" OF ONE ANOTHE ELEV. (A) CITICAL PAVEMENT ELEVATION L 17' MIN TO 19' MAX CLEAANCE L1 D1 SINAL SUPPOT ELEVATION (TPICAL) L2 L3 STOP BA ADA DETECTION TPICAL PLACEMENT ON MAST AM D2 ELEV. (B) TOP OF FOUNDATION 5 1.5' TP. AM HEIHT POLE HEIHT 10' POLE EXTENSION PE TC22.10 STOP BA ADA DETECTION TPICAL PLACEMENT ON SUPPOT POLE 3.5' TP. WITH POLE EXTENSION SUPPLEMENTAL SINAL HEADS SHALL BE MOUNTED AS PE TC85.10 ON THE SUPPOT POLE MAST AM TABLE (TEM FIUE & 38) PEDESTIAN SINAL HEADS, PUSH BUTTONS, AND ASSOCIATED SINS SHALL BE MOUNTED AS PE SCD TC85.10 ON THE SUPPOT POLE. TOP OF SINAL SUPPOT AND PEDESTAL FOUNDATIONS SHALL BE LEVEL WITH THE SIDEWALK ELEVATION WHEE ADA LANDINS AE ADJACENT; ELSEWHEE, FOUNDATIONS SHALL BE 2" (` 1") ABOVE ADE PE TC21.20 LEFT OF IHT OF MAST AM (INDEX) MAJO STEET OIENTATION ANLES MAST AM OIENTATION ANLE POLE OIENTATION ELEVATION SINAL SUPPOT DETAILS OIENTATION ANLES FOM MAST AM A B DESIN TPE DESIN NO. POLE HEIHT AM HEIHT L L1 L2 L3 D1 D2 X MAST AM OIENTATION ANLE INCEASIN STATIONIN MAST AM (INDEX) OIENTATION FT FT FT FT FT FT FT FT FT DE DE DE DE DE DE DE DE DE MAST AM A ANLE MAST AM B ANLE PEDESTIAN SINAL PEDESTIAN BUTTON POWE SEVICE CONTOLLE BACKET AM HANDHOLE ANLES CABLE ENTANCE 12" FOM TOP Page 11 of 27 TA FFIC SI NA L PLA N DETAILS &

12 PLAN DETAILS FO STAIN POLES (TEM FIUE 49836) CALCULATED CHECKED T:\CO\Adm in\docum ents\signal Design eference Packet\ev 5_071516\05_Traffic Signal Plan Details 02 Span W ire.dgn Sheet 9/27/2016 2:44:59 PM sm arik *SEE TEM SECTION 4418 INDEX LINE ANLE MAJO STEET IHT OF HANDHOLE ANLES ITEM POLE NOTES: ALL ANLES AE MEASUED CLOCKWISE. THE INDEX LINE OES THOUH THE CENTE OF THE HANDHOLE. POLE DIAAM ANLES HANDHOLE ITEM POLE INCEASIN STATIONS INDEX LINE ANLE SUPPLEMENTAL SINAL HEADS SHALL BE MOUNTED AS PE TC85.10 ON THE SUPPOT POLE. 6C ANLES (DE.) FOM INDEX LINE EFEENCE SHEET NO.* STATION & OFFSET* POLE NO. DESIN NO. POLE HEIHT (FT.) FOUNDATION ELEV.* SPAN WIE ATTACHED HEIHT* CABLE ENTANCE DISTANCE FOM TOP (IN.) INDEX LINE ANLE (DE.) PEDESTIAN SINALS PEDESTIAN PUSH BUTTONS CONTOLLE POWE SEVICE CABLE ENTANCE LUMINAIE BACKET INTECONNECT POLE SPLICE BOX 2" CAPPED FT. FT. DE. FT. FT. FT. FT. DE. 2B 2A 5 FT. DESINE NOTE: ADD PEDESTAL INFOMATION TO TABLE IF APPLICABLE PEDESTIAN SINAL HEADS, PUSH BUTTONS, AND ASSOCIATED SINS SHALL BE MOUNTED AS PE TC85.10 ON THE SUPPOT POLE. PLAN VIEW FO TPICAL SPANWIE (BOX) DETAIL FT. FT. FT. 8A 8B NOTES: 17' MIN TO 19' MAX CLEAANCE PE TC85.22 TETHEED PE TC A 1B 6A 6B 4B 4A FT. FT. NOTE: TOP OF SINAL SUPPOT AND PEDESTAL FOUNDATIONS SHALL BE LEVEL WITH THE SIDEWALK ELEVATION WHEE ADA LANDINS AE ADJACENT; ELSEWHEE, FOUNDATIONS SHALL BE 2" (` 1") ABOVE ADE PE TC21.20 DE. FT. FT. FT. FT. FT. DE. FT. FT. 2C Page 12 of 27 TA FFIC SI NA L PLA N DETAILS &

13 WIIN DIAAM (TPICAL) FIELD WIIN HOOKUP CHAT (TEM FOM 49616) CALCULATED CHECKED L2D LIC FIELD SINAL HEAD INDICATION TEMINAL FLASH FIELD SINAL HEAD INDICATION TEMINAL FLASH L2C LIC L2B LIC L2A LIC 5C DESINE NOTE: T:\CO\Adm in\docum ents\signal Design eference Packet\ev 4_011516\06_Traffic Signal Plan Details 03.dgn 13JAN2016 2:23PM sm arik S D P8A 5C P6B 5C P4B 5C P6A C 4C 3 8A 8B 6B 2A 6A 2B 4B 4A 7 8C P8B P2A P4A P2B L6D L6C L6B L6A NOTES: FO LOCATIONS WITH LEFT TUN LANES UN FO POTENTIAL PT/PM LT PHASE IF INITIAL DESIN IS FO PEMITTED ONL. OVELAPS SHALL BE WIED TO THE APPOPIATE LOAD SWITCHES AS PE THE FIELD HOOKUP CHAT AND CONFIUED IN THE CONTOLLE SOFTWAE PE THE SINAL TIMIN CHAT. S D C C C 5C 5C 5C 5C LIC LIC LIC LIC INT CONTOLLE CABINET UPS UNINTEUPTIBLE POWE SUPPL PC D S SP 2 N10 DS PC MB PC SP 1 PC N10 PE PE N10 DS N4 N4 COLO SEQUENCE CHAT NO LONE EQUIED O ACCEPTED. SP SC 4 N4 PE N10 SP 3 PE 5 SECTION VEHICULA SINAL HEAD, 1WA 3 SECTION VEHICULA SINAL HEAD, 1WA LIC 3 SECTION VEHICULA SINAL HEAD, L TUN AOWS 1WA PEDESTIAN SINAL HEAD 5C PEDESTIAN PUSH BUTTON DILEMMA ZONE ADA DETECTION UNIT C STOP BA ADA DETECTION UNIT VC VIDEO DETECTION CAMEA INT PTZ CAMEA PE ETHENET ADIO LEEND LUMINAIE, CONVENTIONAL, 150 WATT, HPS, 120 VOLT, AS PE PLAN 2/C NO. XX AW (LEADIN CABLE) VEHICLE LOOP DETECTO SINAL CABLE, 5 CONDUCTO, NO. XX AW SINAL CABLE, 7 CONDUCTO, NO. XX AW ADA DETECTION CABLE VIDEO CAMEA CABLE INTECONNECT CABLE PHOTOELECTIC CELL POWE SOUCE SC PC SP 1 MB NX NXX DS FC UPS SEVICE CABLE, 3 CONDUCTO, NO. X AW POWE CABLE, 2 CONDUCTO, NO. X AW SINAL SUPPOT POLE NO. METE BASE NO. X AW DISTIBUTION CABLE NO. XX AW POLE & BACKET CABLE DUAL LIHTIN/SINAL DISCONNECT SWITCH FLASHE CABINET PEDESTIAN MOVEMENTS OVELAPS LS = LOAD SWITCH * SEE TEM FOM FO COMPLETED SAMPLE OF THIS CHAT. UNINTEUPTIBLE POWE SUPPL CABLE Page 13 of 27 TA FFIC SI NA L PLA N DETAILS &

14 COODINATION TIMIN CHAT (TEM FOM 4965) COIDO LAOUT CALCULATED CHECKED SPLITS (++A) IN SECONDS PHASE DIECTION PLAN NO. INTESECTION 1 CCLE LENTH (SEC) OFFSET 1 (SEC) OFFSET 2 (SEC) INTESECTION 5* N INTESECTION 1 INTESECTION 2 INTESECTION 4 FT. X T:\CO\Adm in\docum ents\signal Design eference Packet\ev 5_071516\07_Traffic Signal Coordination Plan 01.dgn Sheet 9/27/2016 2:56:17 PM sm arik SPLITS (++A) IN SECONDS CCLE OFFSET 1 OFFSET 2 PHASE LENTH (SEC) (SEC) DIECTION (SEC) PLAN NO. INTESECTION 2 SPLITS (++A) IN SECONDS CCLE OFFSET 1 OFFSET 2 PHASE LENTH (SEC) (SEC) DIECTION (SEC) PLAN NO. INTESECTION 3* SPLITS (++A) IN SECONDS CCLE OFFSET 1 OFFSET 2 PHASE LENTH (SEC) (SEC) DIECTION (SEC) PLAN NO. INTESECTION 4 SPLITS (++A) IN SECONDS CCLE OFFSET 1 OFFSET 2 PHASE LENTH (SEC) (SEC) DIECTION (SEC) Cycle PLAN NO. Length (Sec) SPLITS (++A) IN SECONDS CCLE OFFSET 1 OFFSET 2 PHASE LENTH (SEC) (SEC) DIECTION (SEC) PLAN NO. INTESECTION 6 MAIN OAD X FT. X FT. X FT. # MASTE INTESECTION * CIT/COUNT MAINTAINED NOTES: COODINATION TIMIN PLANS OFFSETS AE MEASUED FOM EFEENCE PHASE(S) NUMBEED "END OF EEN/BEINNIN OF ELLOW." «1+ 2 = «5+ 6 AND «3+ 4 = «7+ 8 DESINE NOTES: BE SUE TO CLAIF AT A MINIMUM MONFI & SATSUN PLANS. (ECOMMEND LABELIN AM PEAK, MID DA, PM PEAK, OFF PEAK, ETC.) HOUS AE IVEN IN MILITA TIME. SPLIT TIMES AND OFFSETS IVEN IN % AE NOT ACCEPTED FT. X INTESECTION 3# INTESECTION 6* DA(S) OF WEEK PLAN NAME HOUS CCLE/SPLIT/OFFSET CCLE LENTH (SEC) MASTE INTESECTION OFFSET EFEENCE IS ALWAS EQUAL TO ZEO. Page 14 of 27 TA FFIC SI NA L C O O DINA TIO N PLA N

15 VEHICULA/PED VOLUME CHAT (TEM FOM 49618) COUNT INFOMATION CALCULATED CHECKED VEHICULA/PED PEAK HOUL VOLUME PHASE 1 2 2/PED 3 4 4/PED 5 6 6/PED 7 8 8/PED MONTH/EA: DA OF WEEK: DIECTION TIME PEIOD(S): PLAN NO. INTESECTION 1 TOTAL NUMBE OF HOUS: METHOD OF OBTAININ COUNTS: TPE OF COUNT: VEHICULA/PED PEAK HOUL VOLUME T:\CO\Adm in\docum ents\signal Design eference Packet\ev 4_011516\08_Traffic Signal Volum e Counts 01.dgn 13JAN2016 2:12PM sm arik PHASE 1 2 2/PED 3 4 4/PED 5 6 6/PED 7 8 8/PED DIECTION PLAN NO. INTESECTION 2 VEHICULA/PED PEAK HOUL VOLUME PHASE 1 2 2/PED 3 4 4/PED 5 6 6/PED 7 8 8/PED DIECTION PLAN NO. INTESECTION 3* VEHICULA/PED PEAK HOUL VOLUME PHASE 1 2 2/PED 3 4 4/PED 5 6 6/PED 7 8 8/PED DIECTION PLAN NO. INTESECTION 4 VEHICULA/PED PEAK HOUL VOLUME PHASE 1 2 2/PED 3 4 4/PED 5 6 6/PED 7 8 8/PED DIECTION PLAN NO. INTESECTION 5 VEHICULA/PED PEAK HOUL VOLUME PHASE 1 2 2/PED 3 4 4/PED 5 6 6/PED 7 8 8/PED DIECTION PLAN NO. INTESECTION 6 NOTES: VOLUMES AE PE HOU COESPONDIN TIMIN PLANS SHOWN ON COODINATION TIMIN CHATS DESINE NOTES: VEHICULA VOLUMES INCLUDE PASSENE, A COMMECIAL, AND B & C COMMECIAL COUNTS OLDE THAN THEE (3) EAS MA ONL BE USED WITH APPOVAL FOM THE OFFICE OF TAFFIC OPEATIONS. Page 15 of 27 TA FFIC SI NA L V O LU M E C O UNTS

16 T:\CO\Adm in\docum ents\signal Design eference Packet\ev 4_011516\09_Traffic Signal Subsum m ary 01.dgn 13JAN2016 2:14PM sm arik SHEET NO. DESINE NOTE: LOCATION ALL ITEMS SHALL BE LISTED UNLESS PAID FO IN TAFFIC SINAL NOTES. TOTALS CAIED TO ENEAL SUMMA Page 16 of 27 CALCULATED TA FFIC SI NA L SUBSUM M A CHECKED

17 CALCULATION SPEADSHEETS NOTES TO THE DESINE ENEAL Calculation spreadsheets are required for plan review. Please include with submission(s). The spreadsheets are set up with a limited number of cells/rows. If more space is required, please create and save additional files to meet your needs. CLEAANCE INTEVALS rade is measured from the stop bar to 200 behind the stop bar. For LT movement, use speed of 25 mph. +A interval shall not exceed 7 sec unless prior approval is given. All phase pairs shall have the same +A times. Lagging lefts shall have +A times equal to the mainline through phase. CONDUIT SIZIN Include grounding conductor in wire count for lighting circuits of notation with ground. MAST AM Submissions with span wire supports shall use SWISS output for calculation. If mast arm design calcs exceed standard designs, signs should be removed from support arms and moved to support pole uprights, or a separate structure. If design still exceeds standard, consider using TC Calculations should be checked against cross sections. Be sure to take into consideration critical pavement elevations under signal heads and the crown/slope of the roadway. For mast arms less than or equal to 48 in length, assume a 0 o rise. For mast arms greater than 48 in length, assume a 0.5 o rise. For nonstandard/specialty mast arms, check with the manufacturer for appropriate rise. It is up to the designer to determine whether the assumed is applicable. Foundations shall be level with the sidewalk when adjacent to ADA landings, otherwise, the top of foundation should be 2 (± 1 ) above ground level. Typical height from mast arm to top of pole without extension is 1.5, with extension is 3.5 of pole + 10 extension. 5 section heads must be centered on yellow due to rigid mounting bracket. All signals in the intersection shall be centered on the same color for consistency. Area of signal heads found using TEM Table For dimensions of standard signs, please reference the Sign Designs and Markings Manual. For total mast arm length, add 3 length beyond the center of the furthest signal, or 1 beyond the edge of the furthest sign. Design numbers shall be determined using TEM sections 4403 and Page 17 of 27

18 PID/POJECT: INTESECTION EV. DATE TAFFIC SINAL PEDESTIAN FACTOS CALCULATED FINAL CLEAANCE OMUTCD 4E.0612 OMUTCD 4E fps CHECKS (OMUTCD 4E.0614) FINAL PED TIMIN ASSOCIATED PHASE DIECTION PECEPTION/EACTIO N TIME (1s TP) APPOACH SPEED APPOACH SPEED DECELEATION ATE (10 sq. fps TP) WIDTH OF INTESECTION LENTH OF VEHICLE (20 ft TP) t V V a W L g A TOTAL APPOACH ADE ELLOW ALL ED + A ELLOW (36s TP) ALL ED A (16s TP) + A PED MOVEMENT ASSOCIATED PHASE COSSWALK LENTH PUSHBUTTON POVIDED DISTANCE TO PUSHBUTTON TOTAL L P WALK INTEVAL (47s TP) CALCULATED PED CLEAANCE = 3.5 fps WALK TIME PED CHANE INTEVAL (FDW) = 3.5 fps WALK TIME 3 sec BUFFE (L+P)/(3 fps) (NOTE: P=6 IF NO PUSHBUTTON) X WALK + PED CHANE INTEVALS IS >=X? ADDITIONAL WALK INTEVAL EQUIED FINAL WALK INTEVAL FINAL PED CHANE INTEVAL (FDW) SEC MPH FPS SQ. FPS FT FT % SEC SEC SEC SEC SEC SEC FT FT SEC SEC SEC SEC SEC SEC SEC SEC CLEAANCE INTEVALS Page 18 of 27

19 PID/POJECT: INTESECTION EV. DATE CONDUIT CABLE AND WIE FOM TO UN LENTH SIZE/NOMINAL DIAMETE INSIDE DIAMETE C 0.25C a [A] INSIDE AEA 25% INSIDE AEA CABLE USE SPECIFICATION O MATEIAL NO. OF CONDUCTOS AW NO. CABLES O WIES* COSS SECTION AEA COMBINED COSS SECTION AEA IS [A] LESS THAN 0.25C? FINAL CONDUIT NOMINAL DIAMETE FT. IN. IN. SQ. IN. SQ. IN. SQ. IN. SQ. IN. IN. * NOTE: INCLUDE OUNDIN CONDUCTO IN WIE COUNT FO LIHTIN CICUITS OF NOTATION "WITH OUND." CONDUIT SIZIN Page 19 of 27

20 PID/POJECT: INTESECTION EV. DATE MIN CLEAANCE FOM PAVEMENT TO BOTTOM OF SINAL HEAD MAX CLEAANCE FOM PAVEMENT TO BOTTOM OF SINAL HEAD FOUNDATION ELEVATION AT OUND LEVEL DISTANCE FOM OUND TO FOUNDATION ELEVATION B TOP OF FOUNDATION ISE ANLE WITH HOIZONTAL AM TIP SINAL HEADS CENTEED ON WHICH COLO? SINAL NO. DISTANCE FOM BOTTOM OF SINAL HEAD TO CENTE OF MAST AM (TEM 4976) SINAL HEAD DISTANCE FOM SUPPOT POLE ELEVATION A PAVEMENT ELEVATION UNDE SINAL HEAD O SIN MINIMUM HEIHT (FOUNDATION TO MAST AM) MAXIMUM HEIHT (FOUNDATION TO MAST AM) MINIMUM ALLOWABLE HEIHT (FOUNDATION TO MAST AM) MAXIMUM ALLOWABLE HEIHT (FOUNDATION TO MAST AM) FINAL ATTACHMENT AM HEIHT (FOUNDATION TO MAST AM) DOES MAST AM HAVE POLE EXTENSION? HEIHT FOM MAST AM TO TOP OF POLE SUESTED POLE HEIHT POLE HEIHT WITH EXTENSION FT FT FT IN FT DEEE FT FT FT FT FT FT FT FT FT FT FT SINAL HEAD TPE (12 IN. SECTIONS WITH BACKPLATES) SUPPOT NO. AM MAST AM HEIHT Page 20 of 27

21 PID/POJECT: INTESECTION EV. DATE SUPPOT NO. AM NUMBE OF LUMINAIES O BACKET AMS LUMINAIE/ BACKET AM LENTH SINAL O SIN? SINAL/ SIN ATTACHMENT DISTANCE FOM SUPPOT POLE SINAL HEAD TPE (12 IN. LENS) SIN SIZE L TOTAL MAST AM LENTH NO. FT NO. FT IN SQ. FT. FT L1 L2 L3 L4 L5 L6 L7 L8 L1 L2 L3 L4 L5 L6 L7 L8 L1 L2 L3 L4 L5 L6 L7 L8 L1 L2 L3 L4 L5 L6 L7 L8 AEA ATTACHMENT LENTH * AEA DAMPE EQUIED? K AEA MOMENT DESIN FACTO DESIN NO. MAST AM DESIN NO. Page 21 of 27

22 PID/POJECT: INTESECTION EV. DATE SUPPOT NO. AM DESIN NO. POLE SIZE EQ. POLE DESINATION 2 AM DESIN NO. Page 22 of 27

23 ODOT Typical Signal Head Placements 3 UNIT SINAL HEAD 3 UNIT POTECTED LEFT TUN SINAL HEAD 5 UNIT POTECTED/PEMISSIVE LEFT TUN SINAL HEAD 5 UNIT SINAL HEAD FO IHT TUN OVELAPS NOTES A MINIMUM OF TWO THOUH SINAL FACES IS ALWAS EQUIED FO THE PIMA MOVEMENT. THE EQUIED SINAL FACES FO THOUH TAFFIC ON AN APPOACH SHALL BE LOCATED NOT LESS THAN 8 FEET APAT MEASUED HOIZONTALL PEPENDICULA TO THE APPOACH BETWEEN CENTES OF THE SINAL FACES. IF A POTECTEDPEMITTED LEFTTUN MODE IS USED WITH SHAED SINAL FACE [IT] SHALL BE LOCATED OVE THE POJECTION OF THE CHANNELIZIN LANE LINE BETWEEN THE LEFTTUN AND THOUH LANES. AN PIMA SINAL FACE FO AN EXCLUSIVE TUN LANE SHOULD BE LOCATED OVE THE CENTE OF EACH EXCLUSIVE TUN LANE. IT SHALL NOT BE POSITIONED AN FUTHE TO THE IHT OF THE EXTENSION OF THE IHTHAND EDE OF THE EXCLUSIVE TUN LANE O AN FUTHE TO THE LEFT THAN THE EXTENSION OF THE LEFTHAND EDE OF THE EXCLUSIVE TUN LANE. FO APPOACHES OF 45 MPH O EATE, WITH TWO O MOE THOUH LANES, POVIDE ONE SINAL FACE PE THOUH LANE. (SEE TABLE 4D1 OF OMUTCD) FO APPOACHES OF 45 MPH O EATE, WITH TWO O MOE TOTAL APPOACH LANES, ADD A SUPPLEMENTAL SINAL HEAD. SINAL FACES MOUNTED AT THE SIDE OF THE OADWA WITH CUBS AT LESS THAN 15 FEET FOM THE BOTTOM OF THE HOUSIN O ATTACHMENTS SHALL HAVE A HOIZONTAL OFFSET OF NOT LESS THAN 2 FEET FOM THE FACE OF VETICAL CUB O EDE OF SHOULDE IF NO CUB. NEA SIDED, SUPPOT POLE MOUNTED, SUPPLEMENTAL HEADS SHOULD BE CONSIDEED WHEN TUCK VOLUMES AE EATE THAN 20%, O IF SIHT DISTANCE IS LIMITED. * See 2012 OMUTCD Section 4D.10 for additional layouts Page 23 of 27

24 ODOT Typical Signal Head Placements 3 UNIT SINAL HEAD 3 UNIT POTECTED LEFT TUN SINAL HEAD 5 UNIT POTECTED/PEMISSIVE LEFT TUN SINAL HEAD 5 UNIT SINAL HEAD FO IHT TUN OVELAPS 2' inside center line Over edge line Center over channelizing line Over edgeline 2' inside center line Center over lane line * Spacing could vary depending on lane width, 8' minimum. * * Spacing could vary depending on lane width, 8' minimum. 3 or 5 unit head * Spacing could vary depending on lane width, 8' minimum. * 3 or 5 unit head 2' 2' Single Lane Approach Protected/permissive left, thru/right or Unprotected left, thru/right Thru/left, protected/permissive right (overlap) or Thru/left, permissive right Center head over approach lane 2' right of lane line Over edgeline Center heads over approach lanes 2' left of lane line Over center line Center head over approach lane * Spacing could vary depending on lane width, 8' minimum. * 2' Protected only left, thru/right Two Lane Approach Notes: Signal head configuration may vary depending on preference. Per OMUTCD 4D.11, a minimum of two primary signal faces shall be provided for the signalized turning movement that is considered to be the major movement from the approach. 2' 2 Lane T Intersection/amp * * Spacing could vary depending on lane width, 8' minimum. * See 2012 OMUTCD Section 4D.10 for additional layouts Page 24 of 27

25 ODOT Typical Signal Head Placements 3 UNIT SINAL HEAD 3 UNIT POTECTED LEFT TUN SINAL HEAD 5 UNIT POTECTED/PEMISSIVE LEFT TUN SINAL HEAD 5 UNIT SINAL HEAD FO IHT TUN OVELAPS Center heads over approach lanes Center over channelizing lines Center heads over approach lanes 5 unit w/lt & T Arrows 3 or 5 unit head 3 or 5 unit head 3 Lane T Intersection Protected/permissive left, thru, right turn lane, or Unprotected left, thru, right turn lane Protected only left, thru, right turn lane Center head over approach lane 2' right of channelizing line Center over channelizing line Center over channelizing lines Center over lane lines Center heads over approach lanes 3 or 5 unit head 2' Protected only left, thru, right turn lane (w/ overlap) Protected/permissive left, thru, thru/right, or Unprotected left, thru, thru/right Protected only left, thru, thru/right * See 2012 OMUTCD Section 4D.10 for additional layouts Page 25 of 27

26 ODOT Typical Signal Head Placements 3 UNIT SINAL HEAD 3 UNIT POTECTED LEFT TUN SINAL HEAD 5 UNIT POTECTED/PEMISSIVE LEFT TUN SINAL HEAD 5 UNIT SINAL HEAD FO IHT TUN OVELAPS Center heads over approach lanes 2' right of lane line Over edgeline Over center line 2'* left of lane/ channelizing line Center heads over approach lanes Center over channelizing line Center over lane line Center over channelizing line * Spacing could vary depending on lane width, 8' minimum. * * * Spacing could vary depending on lane width, 8' minimum. 3 or 5 unit head 3 or 5 unit head 2' 2' Dual left, thru/right Thru/Left, Double ight Protected/permissive left, 2 thru, right turn lane, or Unprotected left, 2 thru, right turn lane Center heads over approach lanes Center head over approach lane 3'* left of lane line * * Center over channelizing line * Distance between heads shall be consistent; 8' minimum. Center heads over approach lanes 3'* Protected only left, 2 thru, right turn lane Protected only left, 2 thru, right turn lane (w/ overlap) Dual left, thru, thru/right * See 2012 OMUTCD Section 4D.10 for additional layouts Page 26 of 27

27 ODOT Typical Signal Head Placements 3 UNIT SINAL HEAD 3 UNIT POTECTED LEFT TUN SINAL HEAD 5 UNIT POTECTED/PEMISSIVE LEFT TUN SINAL HEAD 5 UNIT SINAL HEAD FO IHT TUN OVELAPS Center heads over approach lanes Dual left, 2 thru, right turn lane Center heads over approach lanes 3' left of lane line Center over cahnnelizing line * * * Distance between heads shall be consistent. 3' Dual left, 2 thru, right turn lane (w/ overlap) * See 2012 OMUTCD Section 4D.10 for additional layouts Page 27 of 27

Office of Traffic Operations Signal Design Reference Packet

Office of Traffic Operations Signal Design Reference Packet Office of Traffic Operations Signal Design Reference Packet Rev-2 04/17/2015 Contents The purpose of this packet is to provide guidance on designing and reviewing traffic signal plans. The format, legends,

More information

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA TABLE OF CONTENTS Section Title Page 5901 GENERAL... 2 5902 DESIGN CRITERIA... 2 5902.1 Codes and Standards... 2 5902.2 Signal

More information

Flagger Control for Resurfacing or Moving Operation. One-Lane Two-Way Operation

Flagger Control for Resurfacing or Moving Operation. One-Lane Two-Way Operation Flagger Control for esurfacing or Moving Operation 5 DEVICE MINIMUM WOK AEA SET 1 SET SET 3 SET 4 ACTIVE INACTIVE ACTIVE INACTIVE SIGN SETS 1 AND 3 AE ACTIVE AND (I.E., SIGNS FACE ONCOMING TAFFIC). SIGN

More information

Flagger Control for Resurfacing or Moving Operation. One-Lane Two-Way Operation

Flagger Control for Resurfacing or Moving Operation. One-Lane Two-Way Operation Flagger Control for esurfacing or Moving Operation 5 5 WOK AEA 5 5 DEVICE MINIMUM SET 1 SET SET THIS SET OF SIGNS IS PLACED WITH SIGN LEGEND TUNED AWAY FOM BOTH DIECTIONS OF TAFFIC UNTIL ESUFACING OPEATIONS

More information

(2'-6") OUTLINE OF REQUIRED CLEAR SERVICE AREA

(2'-6) OUTLINE OF REQUIRED CLEAR SERVICE AREA VACUUM AI TUBE 2GX 494 CUSTOME DETAILS DIMENSIONS IN MILLIMETES L64 "ALL DIMENSIONS AND DESIGN CITEIA POJECTION PAGE OF 7 46 ('- TAFFIC FLOW CALL -8-999-6 (2") MIN. 8 2") ( DUAL CALL/SEND INTEFACE FEATUE

More information

TRAFFIC SIGNAL DESIGN GUIDELINES

TRAFFIC SIGNAL DESIGN GUIDELINES TRAFFIC SIGNAL DESIGN GUIDELINES January, 2006 INDEX PLAN APPROVAL PROCESS 1 1. Designer Prequalification 1 2. Items Available from the County 1 3. Plan Submittals 1 4. Final Submittal 1 5. Checklist for

More information

400 TRAFFIC SIGNALS Traffic Engineering Manual

400 TRAFFIC SIGNALS Traffic Engineering Manual TABLE OF CONTENTS Part 4 - SIGNALS 400 GENERAL... 4-9 400-1 Introduction... 4-9 400-2 Construction Projects... 4-9 400-3 Force Account (ODOT Operations) Work... 4-9 401 TRAFFIC CONTROL SIGNALS - GENERAL...

More information

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING

CHAPTER 14 WIRING SIGNALS AND LIGHTING FIELD GUIDE Wiring Requirements WIRING WIRING CHAPTER 14 WIRING The installation of all wiring, including electrical cables and conductors, must conform to the National Electrical Code (NEC). The Code represents the minimum required standard.

More information

CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 620 APRIL 2017 CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT TABLE OF CONTENTS 620.01 SCOPE 620.02 REFERENCES 620.03 DEFINITIONS 620.04

More information

C2 Vectors C3 Interactions transfer momentum. General Physics GP7-Vectors (Ch 4) 1

C2 Vectors C3 Interactions transfer momentum. General Physics GP7-Vectors (Ch 4) 1 C2 Vectos C3 Inteactions tansfe momentum Geneal Phsics GP7-Vectos (Ch 4) 1 Solutions to HW When ou homewok is gaded and etuned, solutions will be available. Download PobViewe 1.4 www.phsics.pomona.edu/siideas/sicp.html

More information

September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS SPECIFICATION NO C ADDENDUM NO. 2

September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS SPECIFICATION NO C ADDENDUM NO. 2 Department of Public Works Transportation Division September 28, 2018 CITY OF BERKELEY JOHN MUIR SCHOOL CROSSING IMPROVEMENTS ADDENDUM NO. 2 Dear Bidder: The following amendments are hereby made to the

More information

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/

March 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/ Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu March 4 th, 2013

More information

Special Provision Fiber Optic Cable Section 643. The Contractor shall install fiber optic cable in conduit where shown on the plan sheets.

Special Provision Fiber Optic Cable Section 643. The Contractor shall install fiber optic cable in conduit where shown on the plan sheets. Special Provision Fiber Optic Cable Section 643 The Contractor shall install fiber optic cable in conduit where shown on the plan sheets. ATRC Fiber Optic Specifications: To ensure compatibility and proper

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 872 LIGHT EMITTING DIODE TRAFFIC SIGNAL LAMP UNITS JULY 19, 2002

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 872 LIGHT EMITTING DIODE TRAFFIC SIGNAL LAMP UNITS JULY 19, 2002 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 872 LIGHT EMITTING DIODE TRAFFIC SIGNAL LAMP UNITS JULY 19, 02 872.01 Description 872.02 Prequalification 872.03 Material Requirements

More information

Work Type Definition and Submittal Requirements. Work Type Definition: Traffic Signal Design

Work Type Definition and Submittal Requirements. Work Type Definition: Traffic Signal Design The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements, identifies the requirements a firm must meet to become pre-qualified

More information

TEO Signal Committee Meeting Minutes Meeting Date: 05/19/2009 Waters Edge Conference Rm 176 Meeting Time: 9:00am - Noon

TEO Signal Committee Meeting Minutes Meeting Date: 05/19/2009 Waters Edge Conference Rm 176 Meeting Time: 9:00am - Noon TEO Signal Committee Meeting Minutes Meeting Date: 05/19/2009 Waters Edge Conference Rm 176 Meeting Time: 9:00am - Noon Meeting Attendees: Kile Holm Sue Zarling Curt Krohn Mike Schroeder Tim Bangsund Jeff

More information

7/8" BOR LENGTH - 1-3/4 IN MOR LENGTH MOR LENGTH PER SUBMISSION. Example of continuous row

7/8 BOR LENGTH - 1-3/4 IN MOR LENGTH MOR LENGTH PER SUBMISSION. Example of continuous row AMELUX Lin1.5 Mini Direct/Indirect LED (emote Driver) SHEET #: 689-0654 (1 of 7) SPEC. SHEET EFEENCE: WANING - ISK OF FIE AND ELECTICAL SHOCK. FIXTUE MUST BE INSTALLED BY A QUALIFIED ELECTICIAN ONLY. FIXTUE

More information

SPECIAL SPECIFICATION 6911 Fiber Optic Video Data Transmission Equipment

SPECIAL SPECIFICATION 6911 Fiber Optic Video Data Transmission Equipment 2004 Specifications CSJ 3256-02-079 & 3256-03-082 SPECIAL SPECIFICATION 6911 Fiber Optic Video Data Transmission Equipment 1. Description. Furnish and install Fiber Optic Video Data Transmission Equipment

More information

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures.

U-verse Outside Plant Cabinets AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. U-verse Outside Plant s U-verse Outside Plant (OSP) Certifications AT&T certifies that Lightspeed cabinets, wiring and equipment have been inspected for and are compliant to the following industry standards:

More information

SPECIAL SPECIFICATION 1291 Fiber Optic Video Data Transmission Equipment

SPECIAL SPECIFICATION 1291 Fiber Optic Video Data Transmission Equipment 1993 Specifications CSJ 0500-01-117 SPECIAL SPECIFICATION 1291 Fiber Optic Video Data Transmission Equipment 1. Description. This Item shall govern for the furnishing and installation of Fiber Optic Video

More information

IndyGo Facility Upgrades Project 35671EE

IndyGo Facility Upgrades Project 35671EE SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Identification for raceways. 2. Identification of power and control cables. 3. Identification for

More information

SIGNAL CONTROLLER PEER-TO-PEER COMMUNICATIONS

SIGNAL CONTROLLER PEER-TO-PEER COMMUNICATIONS SIGNAL CONTROLLER PEER-TO-PEER COMMUNICATIONS Using advanced controller features to improve operations Matt Luker, P.E., PTOE Utah Department of Transportation WHY PEER-TO-PEER 2 3 The Problem We re Trying

More information

SPECIAL SPECIFICATION 8540 Telecommunication Cable

SPECIAL SPECIFICATION 8540 Telecommunication Cable 2004 Specifications CSJ 0914-00-307 & CSJ 0914-25-003 SPECIAL SPECIFICATION 8540 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing,

More information

SPECIAL SPECIFICATION 6559 Telecommunication Cable

SPECIAL SPECIFICATION 6559 Telecommunication Cable 2004 Specifications CSJ 0015-09-147, etc. SPECIAL SPECIFICATION 6559 Telecommunication Cable 1. Description. This specification governs the materials, installation, termination, splicing, testing, training,

More information

OptiTect Premier Local Convergence Cabinet An Evolant Solutions Product

OptiTect Premier Local Convergence Cabinet An Evolant Solutions Product Description The OptiTect Premier Local Convergence Cabinet family provides everything necessary to manage 44, 288 and 432 distribution fibers for an outside plant FTTx application. The OptiTect Premier

More information

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR October 19, 2018 Construction Documents PART 1 - GENERAL 1.1 SUMMARY SECTION 271500 COMMUNICATIONS HORIZONTAL CABLING A. Section Includes: 1. UTP cabling. 2. Telecommunications outlet/connectors. 3. Cabling system identification products. 1.2

More information

SECTION FIVE COBB COUNTY TRAFFIC SIGNAL SPECIFICATIONS

SECTION FIVE COBB COUNTY TRAFFIC SIGNAL SPECIFICATIONS SECTION FIVE COBB COUNTY TRAFFIC SIGNAL SPECIFICATIONS COBB COUNTY DOT TRAFFIC SIGNAL SPECIFICATIONS OCTOBER 2017 Table of Contents Section 647 Traffic Signal Installation 4 Section 687 Signal Timing 35

More information

SPECIAL SPECIFICATION 6735 Video Optical Transceiver

SPECIAL SPECIFICATION 6735 Video Optical Transceiver 2004 Specifications CSJ 0924-06-244 SPECIAL SPECIFICATION 6735 Video Optical Transceiver 1. Description. This Item governs the furnishing and installation of Video optical transceiver (VOTR) in field location(s)

More information

Version Capital public radio. Brand, Logo and Style Guide

Version Capital public radio. Brand, Logo and Style Guide Vesion 2.0 12.3.2014 Capital public adio Band, Logo and Style Guide T A C K E T T + B A R B A R I A Oveview Ask anyone in the Sacamento egion what they think of Capital Public Radio and thei esponses will

More information

Reno A & E, 4655 Aircenter Circle, Reno, NV (775)

Reno A & E, 4655 Aircenter Circle, Reno, NV (775) Product: MMU-1600 Title: Monitoring Flashing Yellow Arrow Left Turns Release Date: February 06, 2009 Scope: All Reno A&E Monitors. The following Reno A&E monitors now support Flashing Yellow Arrow (FYA)

More information

LED control gear Compact dimming. Uconverter LCAI 2x38 W 0500 K013 one4all ECO series. Ordering data

LED control gear Compact dimming. Uconverter LCAI 2x38 W 0500 K013 one4all ECO series. Ordering data Product description Dimmable built-in for LED Constant current (with 2 adjustable output channels) Designed for outdoor and street luminaire Output power 2 x 38 W Suitable for mains voltage peaks (burst/surge)

More information

MMU2-16LE FYA Overview

MMU2-16LE FYA Overview 2016 MMU2-16LE FYA Overview The history of the Flashing Yellow Arrow (FYA), how it came about and what you need to know to program an intersection for the feature. March 15, 2016 MMU2-16LE FYA Overview

More information

Installation Instructions

Installation Instructions SuperBus 2000 Concord 4 GSM Module 466-2262A October 2006 Copyright 2006, GE Security Inc. Introduction This is the GE SuperBus 2000 Concord 4 GSM Module Installation Instructions for part number 600-1053.

More information

multi-function meters

multi-function meters multi-function meters eclipse 2 eclipse 7 installation and operating manual 1 GENERAL DESCRIPTION 2 INSTALLATION 3 WIRING INFORMATION 4 2 ECLIPSE 2 METERS 2.1 PROGRAMMING THE METER 5 2.2 INFORMATION 6

More information

NEXT/RADIUS Shelf Mount CCU

NEXT/RADIUS Shelf Mount CCU 2018 NEXT/RADIUS Shelf Mount CCU The Next / Radius shelf mount CCU is open for orders and is available to ship mid September. CCU information on pages 3 and 7. September 11, 2018 VantageRadius Radar technology

More information

Student resource files

Student resource files Chapter 4: Actuated Controller Timing Processes CHAPTR 4: ACTUATD CONTROLLR TIMING PROCSSS This chapter includes information that you will need to prepare for, conduct, and assess each of the seven activities

More information

SPECIAL SPECIFICATION 8311 LED Countdown Pedestrian Signal Module

SPECIAL SPECIFICATION 8311 LED Countdown Pedestrian Signal Module 2004 Specifications CSJ 0542-06-041, Etc. SPECIAL SPECIFICATION 8311 LED Countdown Pedestrian Signal Module 1. Description. Furnish and install LED Walking Person and Hand icon pedestrian signal modules

More information

EM1. Transmissive Optical Encoder Module Page 1 of 8. Description. Features

EM1. Transmissive Optical Encoder Module Page 1 of 8. Description. Features Description Page 1 of 8 The EM1 is a transmissive optical encoder module. This module is designed to detect rotary or linear position when used together with a codewheel or linear strip. The EM1 consists

More information

Special Specification 6293 Adaptive Traffic Signal Control System

Special Specification 6293 Adaptive Traffic Signal Control System Special Specification Adaptive Traffic Signal Control System 1. DESCRIPTION 2. MATERIALS Furnish, install, relocate, or remove adaptive traffic signal control (ATSC) system software and equipment at locations

More information

SATELLITE TV OPERATION / TECHNICAL MANUAL. Eagle II Controller

SATELLITE TV OPERATION / TECHNICAL MANUAL. Eagle II Controller SATELLITE TV OPERATION / TECHNICAL MANUAL Eagle II Controller 10 May 2018 2 Index Warnings... 4 Mount Definitions... 5 Controller Views... 6 Configuration and Software Versions... 8 Menus and Operations...

More information

LED Driver Linear / area fixed output

LED Driver Linear / area fixed output Driver LC 10W 350mA fixc lp SNC2 ESSENCE series Product description Fixed output built-in LED Driver Constant current LED Driver Output current 350 ma Max. output power 10.2 W Up to 80 % efficiency For

More information

SPECIAL SPECIFICATION 1987 Single Mode Fiber Optic Video Transmission Equipment

SPECIAL SPECIFICATION 1987 Single Mode Fiber Optic Video Transmission Equipment 1993 Specifications CSJ 0027-12-086, etc. SPECIAL SPECIFICATION 1987 Single Mode Fiber Optic Video Transmission Equipment 1. Description. This Item shall govern for the furnishing and installation of color

More information

DLP200M 2 Relay Module for Heating and Cooling Plants

DLP200M 2 Relay Module for Heating and Cooling Plants Product Sheet TH6.24 Thermostat Type DLP200M DLP200M 2 Relay Module for Heating and Cooling Plants The DLP 200 M is a relay module for activation of loads (namely thermal actuators or circulators) in wireless

More information

Special Specification 6083 Video Imaging and Radar Vehicle Detection System

Special Specification 6083 Video Imaging and Radar Vehicle Detection System Special Specification Video Imaging and Radar Vehicle Detection System 1. DESCRIPTION This specification sets forth the minimum requirements for a system that detects vehicles on a roadway using a multi-sensor

More information

TruePlate Structural Plate

TruePlate Structural Plate TruePlate Structural Plate Galvanized Steel and Aluminum Alloy Sizes, Shapes and Height of Cover Tables TrueNorthSteel.com info@truenorthsteel.com 866-82-511 TruePlate Structural Plate Many drainage and

More information

Traffic Signal Timing Maintenance. Division of Traffic Control Services. Organization. Division of Traffic Control Systems

Traffic Signal Timing Maintenance. Division of Traffic Control Services. Organization. Division of Traffic Control Systems Traffic Signal Timing Maintenance Division of Traffic Control Systems Division of Traffic Control Services Tasked with: Assisting the District Traffic Systems Engineers with retiming coordinated signals

More information

INSTRUCTION MANUAL. MODEL Downconverter

INSTRUCTION MANUAL. MODEL Downconverter INSTUCTION MANUAL MODEL 2016-123 Downconverter Data, drawings, and other material contained herein are proprietary to Cross Technologies, Inc., but may be reproduced or duplicated without the prior permission

More information

1995 Metric CSJ SPECIAL SPECIFICATION ITEM 6031 SINGLE MODE FIBER OPTIC VIDEO TRANSMISSION EQUIPMENT

1995 Metric CSJ SPECIAL SPECIFICATION ITEM 6031 SINGLE MODE FIBER OPTIC VIDEO TRANSMISSION EQUIPMENT 1995 Metric CSJ 0508-01-258 SPECIAL SPECIFICATION ITEM 6031 SINGLE MODE FIBER OPTIC VIDEO TRANSMISSION EQUIPMENT 1.0 Description This Item shall govern for the furnishing and installation of color Single

More information

Radio receiver EXL. 4-channel / up to 1000 memory locations. Mounting and operating instructions for qualified electricians

Radio receiver EXL. 4-channel / up to 1000 memory locations. Mounting and operating instructions for qualified electricians Radio receiver EXL 4-channel / up to 1000 memory locations Mounting and operating instructions for qualified electricians Please keep these instructions so that you have them available if you have any

More information

Processes for the Intersection

Processes for the Intersection 7 Timing Processes for the Intersection In Chapter 6, you studied the operation of one intersection approach and determined the value of the vehicle extension time that would extend the green for as long

More information

Operating instructions

Operating instructions 108183 2017-05-17 Page 1 0359 Operating instructions TPPL-EX series Hazardous environments luminaires Please read the instructions carefully before starting any works! Content: 1. Safety instructions 2.

More information

Primex Wireless, Inc. July, Wells Street Lake Geneva, WI

Primex Wireless, Inc. July, Wells Street Lake Geneva, WI Division 0 0 0 0 Primex Wireless, Inc. July, 00 Wells Street Lake Geneva, WI 00--0 www.primexwireless.com Product Guide Specification Specifier Note: This product specification is written according to

More information

MILITARY SPECIFICATION SHEET

MILITARY SPECIFICATION SHEET INCH POUND MIL-S-22885/100A 16 May 2003 SUPERSEDING MIL-S-22885/100 (USAF) 27 August 1982 MILITARY SPECIFICATION SHEET SWITCH, PUSH BUTTON, ILLUMINATED, 4-LAMP, SPDT AND DPDT, 7.5 AMPERES, SILVER CONTACTS,

More information

INSTALLATION INSTRUCTIONS FOR

INSTALLATION INSTRUCTIONS FOR INSTALLATION INSTRUCTIONS FOR MODEL 2240LED www.sportablescoreboards.com 1 Table of Contents 8 X 7 INDOOR SCOREBOARD... 3 THE SCOREBOARD SYSTEM SHOULD INCLUDE THE FOLLOWING PARTS:... 3 INSTRUCTIONS FOR

More information

Cable Installation Tips

Cable Installation Tips Cable Installation Tips Campus Network Design & Operations Workshop These materials are licensed under the Creative Commons Attribution-NonCommercial 4.0 International license (http://creativecommons.org/licenses/by-nc/4.0/)

More information

VISSIM TUTORIALS This document includes tutorials that provide help in using VISSIM to accomplish the six tasks listed in the table below.

VISSIM TUTORIALS This document includes tutorials that provide help in using VISSIM to accomplish the six tasks listed in the table below. VISSIM TUTORIALS This document includes tutorials that provide help in using VISSIM to accomplish the six tasks listed in the table below. Number Title Page Number 1 Adding actuated signal control to an

More information

SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION

SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION 683 SECTION 683 VIDEO OPTICAL TRANSCEIVER WITH BI-DIRECTIONAL DATA CHANNEL DESCRIPTION 683.01.01 GENERAL A. The Contractor shall furnish the designated quantity of Video Optical Transceiver (VOTR) pairs

More information

Aerial Cable Installation Best Practices

Aerial Cable Installation Best Practices Aerial Cable Installation Best Practices Panduit Corp. 2007 BEST PRACTICES Table of Contents 1.0 General... 3 2.0 Introduction... 3 3.0 Precautions... 4 4.0 Pre-survey... 5 5.0 Materials and Equipment...

More information

JAMAR TRAX RD Detector Package Power Requirements Installation Setting Up The Unit

JAMAR TRAX RD Detector Package Power Requirements Installation Setting Up The Unit JAMAR TRAX RD The TRAX RD is an automatic traffic recorder designed and built by JAMAR Technologies, Inc. Since the unit is a Raw Data unit, it records a time stamp of every sensor hit that occurs during

More information

SECTION 7 -- CROSS-CONNECT SYSTEMS

SECTION 7 -- CROSS-CONNECT SYSTEMS DETAIL ENGINEERING REQUIREMENTS AT&T March, 2016 Section 7, ATT-TP-76400 Revised NA SECTION 7 -- CROSS-CONNECT SYSTEMS CONTENTS PAGE 1. GENERAL... 7-2 1.1. Introduction... 7-2 1.2. Cable Holes... 7-2 1.3.

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD, applicable TC -, and CEHNC Design Guide 0-- (Standard is single UTOs and Double UTOs) B. Roads-Service, Lanes Adequate access is provided to the and AAR D. Testing Results-provided

More information

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation

All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation All Dielectric Self Supporting (ADSS) Fiber Optic Cable Installation Underground Installation M P - 1012 Issue #3 March 2011 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES The practices contained

More information

SATELLITE TV OPERATION / TECHNICAL MANUAL. Eagle II Controller

SATELLITE TV OPERATION / TECHNICAL MANUAL. Eagle II Controller SATELLITE TV OPERATION / TECHNICAL MANUAL Eagle II Controller 8 Nov 2017 2 Index Warnings... 4 Mount Definitions... 5 Controller Views... 6 Configuration and Software Versions... 8 Menus and Operations...

More information

DSIM-GI Installation Guide Revision P

DSIM-GI Installation Guide Revision P Installation Guide Revision P 1. Quick Start Instructions for Single Pilot AGC Operatation 1. With the ADU jumper in Auto position, turn ADU pot to MIN amplifier output level. Then place the ADU jumper

More information

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street

More information

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel

SPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel 1993 Specifications CSJ 0924-06-223 SPECIAL SPECIFICATION 1160 8:1 Video (De) Mux with Data Channel 1. Description. This Item shall govern for furnishing and installing an 8 channel digital multiplexed

More information

210E - 210ECL ECL ECL

210E - 210ECL ECL ECL 210E - 210ECL - 2010ECL - 2018ECL RMS Signal Monitor Operations Manual THIS MANUAL CONTAINS TECHNICAL INFORMATION FOR THE FOLLOWING SERIES OF MODEL 210/2010/2018 SIGNAL MONITORS, PCB Issue G: 210E, 210ECL,

More information

NW Neutral White 4000K, 70 min. CRI. 70LA LEDs, 350mA. 85LA LEDs, 350mA. CW Cool White 5700K, 70 min. CRI. 105LA LEDs, 530mA

NW Neutral White 4000K, 70 min. CRI. 70LA LEDs, 350mA. 85LA LEDs, 350mA. CW Cool White 5700K, 70 min. CRI. 105LA LEDs, 530mA Project: Site & Area Location: Cat.No: Type: Gullwing LED Qty: Notes: Small, GL13 Philips Gardco Gullwing LED GL13 area luminaires combine LED performance excellence and advanced Gardco LED thermal management

More information

SPECIAL SPECIFICATION 2344 TMC Support Equipment

SPECIAL SPECIFICATION 2344 TMC Support Equipment 2004 Specifications CSJ 0912-00-488 SPECIAL SPECIFICATION 2344 TMC Support Equipment 1. Description. Furnish Traffic Management Center (TMC) support equipment in the City of Missouri City TMC location

More information

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components

Telecommunciations Infrastructure Project September 20, A. Broadband radio frequency active and passive components PART 1 - GENERAL 1.1 SECTION INCLUDES A. Broadband radio frequency active and passive components B. Broadband optical active and passive components C. Coaxial cable and connectors D. Support and termination

More information

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GENERAL

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 26 0553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)

Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) 1. Splicing specifications are provided by Mediacom, but due to resplice conditions, many locations become

More information

ADDENDUM NO. 6 PORT OF NOME SECURITY CAMERA PROJECT RFP

ADDENDUM NO. 6 PORT OF NOME SECURITY CAMERA PROJECT RFP P.O. Box 281 o Nome, Alaska 99762 ADDENDUM NO. 6 DATE: May 22, 2017 TO: Proposers FROM: Joy Baker, Project Manager RE: PORT OF NOME SECURITY CAMERA PROJECT RFP NOTES TO PROPOSERS: The Proposal submittal

More information

Public Works Division Lighting District Fiber Optic Specifications April 2009

Public Works Division Lighting District Fiber Optic Specifications April 2009 Public Works Division Lighting District Fiber Optic Specifications April 2009 7000 Florida Street Punta Gorda, Florida 33950 Tele: 941.575.3600 Fax : 941.637.9265 www.charlottecountyfl.com/publicworks

More information

Cable Installation Tips

Cable Installation Tips Cable Installation Tips Campus Network Design & Operations Workshop These materials are licensed under the Creative Commons Attribution-NonCommercial 4.0 International license (http://creativecommons.org/licenses/by-nc/4.0/)

More information

TOKISTAR. TokiLux TOKISTAR LIGHTING

TOKISTAR. TokiLux TOKISTAR LIGHTING TOKISTAR TokiLux TOKISTAR LIGHTING TokiLux Systems T okilux is a compact high-performance LED luminaire for use as an indirect light source within tight architectural details and a variety of casework

More information

Guide to Interpretation of Traffic Signal Timing Reports Produced by the Miami-Dade County (MDC) Advanced Traffic Management System (ATMS)

Guide to Interpretation of Traffic Signal Timing Reports Produced by the Miami-Dade County (MDC) Advanced Traffic Management System (ATMS) Guide to Interpretation of Traffic Signal Timing Reports Produced by the Miami-Dade County (MDC) Advanced Traffic Management System (ATMS) Miami-Dade county s Traffic Signals and Signs Division started

More information

YHT-33 QUICK-CONNECT GUIDE

YHT-33 QUICK-CONNECT GUIDE YHT-33 QUICK-CONNECT GUIDE INTODUCTION Yamaha developed the YHT-33 A/V Home Theater package to turn your home into a theater. In addition to enhancing the sound of a video source, like your TV, DVD, or

More information

DIGITAL SWITCHERS 2100 SERIES

DIGITAL SWITCHERS 2100 SERIES DIGITAL SWITCHERS 00 SERIES HIGH PERFORMANCE DIGITAL ROUTING OPERATORS MANUAL Includes Module and Frame Information for: AUDIO DAS- DAS-88 DAS-66 VIDEO DVS- DVS-8 DVS-6 DVM-66 DVS-66 SIGMA ELECTRONICS,

More information

ACTIVE IF SPLITTER/COMBINER UHP-IFS

ACTIVE IF SPLITTER/COMBINER UHP-IFS ACTIVE IF SPLITTER/COMBINER UHP-IFS GENERAL DESCRIPTION AND INSTALLATION GUIDE DOCUMENT RELEASE 2 [UHP.IFS.2.EN] JUNE 2016 CONTENT Acronyms and Abbreviations... 4 Introduction... 5 Required level of qualification...

More information

Site Information. Delivery Requirements. If yes, what is the dock height? Is the customer site tractor/trailer accessible? Yes No

Site Information. Delivery Requirements. If yes, what is the dock height? Is the customer site tractor/trailer accessible? Yes No Customer Name: SITE SURVEY Site Information Vario-Print 6XX0 PLUS Family Includes: The Ultra+, MICR+, and TP+ (the MICR+ & TP+ include Print Guards) REVISED Aug. 2014 Department: Floor: Room/Suite: Address:

More information

Old Business. TEO Signal Committee Meeting Minutes Waters Edge Conf. Room C September 16, 2004

Old Business. TEO Signal Committee Meeting Minutes Waters Edge Conf. Room C September 16, 2004 Attendees: Jerry Kotzenmacher Ray Star Mike Wolf Marlin Reinardy Kevin Schwartz Greg Gruber Roger Sowder Mike Gerbenski Jim Deans Tom Dumont Kile Holm Ben Osemenam Old Business TEO Signal Committee Meeting

More information

PC-250. SMD Taped Parts Counter Operator s Manual. ISO 9001:2008 Certified. V-TEK, Incorporated 751 Summit Avenue Mankato, MN USA

PC-250. SMD Taped Parts Counter Operator s Manual. ISO 9001:2008 Certified. V-TEK, Incorporated 751 Summit Avenue Mankato, MN USA PC-250 SMD Taped Parts Counter Operator s Manual ISO 9001:2008 Certified V-TEK, Incorporated 751 Summit Avenue Mankato, MN 56001 USA (P) 507-387-2039 (F) 507-387-2257 www.vtekusa.com Dear Customer: All

More information

TC Mbps - 622Mbps FIBER OPTIC MODE CONVERTER/REPEATER (Rev A0.1) User's Manual

TC Mbps - 622Mbps FIBER OPTIC MODE CONVERTER/REPEATER (Rev A0.1) User's Manual TC3004 50Mbps - 622Mbps FIBER OPTIC MODE CONVERTER/REPEATER (Rev A0.1) MODEL: S/N: DATE: Notice! Although every effort has been made to insure that this manual is current and accurate as of date of publication,

More information

SECTION COMMUNICATIONS HORIZONTAL CABLING

SECTION COMMUNICATIONS HORIZONTAL CABLING SECTION 271500 COMMUNICATIONS HORIZONTAL CABLING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. UTP cabling. 2. Telecommunications outlet/connectors including patch panels. 3. Cabling identification

More information

MonitorKey Operation Manual: content/uploads/ MonitorKey Operation Manual.pdf

MonitorKey Operation Manual:   content/uploads/ MonitorKey Operation Manual.pdf Additional Resources: MonitorKey Operation Manual: www.editraffic.com/wp content/uploads/888 1212 001 MonitorKey Operation Manual.pdf CMUip 2212 Operation Manual: www.editraffic.com/wp content/uploads/888

More information

DAAB DB409 INSTRUCTION MANUAL FOR THE VFD-EL FREQUENCY CONVERTER. For the DAAB EP104 automatic control system with software version 4.

DAAB DB409 INSTRUCTION MANUAL FOR THE VFD-EL FREQUENCY CONVERTER. For the DAAB EP104 automatic control system with software version 4. DAAB DB409 INSTRUCTION MANUAL FOR THE VFD-EL FREQUENCY CONVERTER For the DAAB EP104 automatic control system with software version 4.07 Revision: 12 FAAC Nordic AB BOX 125, SE-284 22 PERSTORP SWEDEN, +46

More information

Sentinel I24 Digital Input and Output Configuration

Sentinel I24 Digital Input and Output Configuration Application Bulletin: #155 Date: October 19, 2007 Sentinel I24 Digital Input and Output Configuration The Sentinel I24 can communicate with external hardware using digital inputs and outputs. There are

More information

just add your TV and video source YHT-18 1ST DRAFT QUICK-CONNECT GUIDE

just add your TV and video source YHT-18 1ST DRAFT QUICK-CONNECT GUIDE just add your TV and video source 1ST DAFT YHT-18 QUICK-CONNECT GUIDE INTODUCTION Yamaha developed the YHT-18 A/V Home Theater package to turn your home into a theater. In addition to enhancing the sound

More information

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS SECTION 27 51 23 SPEC WRITER NOTES: 1. Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Contact Department of Veterans

More information

YHT-34 QUICK-CONNECT GUIDE

YHT-34 QUICK-CONNECT GUIDE 1ST DAFT YHT-34 QUICK-CONNECT GUIDE INTODUCTION Yamaha developed the YHT-34 A/V Home Theater package to turn your home into a theater. In addition to enhancing the sound of a video source, like your TV,,

More information

Structural Plate Design Guide. 5 th Edition MULTI-PLATE. Aluminum Structural Plate. Aluminum Box Culvert SUPER-SPAN SUPER-PLATE.

Structural Plate Design Guide. 5 th Edition MULTI-PLATE. Aluminum Structural Plate. Aluminum Box Culvert SUPER-SPAN SUPER-PLATE. ENGINEERED SOLUTIONS Structural Plate Design Guide 5 th Edition MULTI-PLATE Aluminum Structural Plate SUPER-SPAN SUPER-PLATE BridgeCor Table of Contents Steel and Aluminum Structural Plate design guide.

More information

Automated Local Loop Test System

Automated Local Loop Test System INSTRUMENTS Automated Local Loop Test System Comprehensive Local Loop Testing for Voice, Data, Fax and Internet Services Two-way Testing of Copper, Wireless, and Hybrid-Fiber Coax Local Loops A whole new

More information

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS

DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS General: The SCC is intent on moving to 21 st century unified communications and data systems, consistent with industry standards and best practices as they evolve.

More information

I N S T R U C T I O N D A T A

I N S T R U C T I O N D A T A I N S T R U C T I O N D A T A RFL (C37.94) Fiber Service Unit Single Mode 108015-1 RS-449 108015-2 V.35 108015-3 G.703 108015-4 X.21 108015-5 E1 Multimode 107460-1 RS-449 107460-2 V.35 107460-3 G.703 107460-4

More information

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment.

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment. Film-Tech The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment. These manuals are designed to facilitate the exchange of information related to cinema

More information

Artisan Technology Group is your source for quality new and certified-used/pre-owned equipment

Artisan Technology Group is your source for quality new and certified-used/pre-owned equipment Artisan Technology Group is your source for quality new and certified-used/pre-owned equipment FAST SHIPPING AND DELIVEY TENS OF THOUSANDS OF IN-STOCK ITEMS EQUIPMENT DEMOS HUNDEDS OF MANUFACTUES SUPPOTED

More information

2178-L/S Series Fiber Optic Splice Case with Gasket

2178-L/S Series Fiber Optic Splice Case with Gasket 2178-L/S Series Fiber Optic Splice Case with Gasket Instructions for: 2178-S Splice Case 2178-LS Splice Case 2178-LL Splice Case 2181-LS Cable Addition Kit May 1997 34-7041-9949-5-A 1 Table of Contents

More information

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD

INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD 1 INSTALLATION INSTRUCTIONS MODEL VSBX-236 LED 3 X 8 INDOOR SCOREBOARD NOTE TO INSTALLERS: PLEASE RETURN THIS MANUAL TO THE INDIVIDUAL IN CHARGE OF THE SCOREBOARD UPON COMPLETION OF INSTALLATION. The scoreboard

More information