CERN-LHCC Addendum ATLAS TDR 19 4 May 2012 A T L A S. Insertable B-Layer. Technical Design Report TDR

Size: px
Start display at page:

Download "CERN-LHCC Addendum ATLAS TDR 19 4 May 2012 A T L A S. Insertable B-Layer. Technical Design Report TDR"

Transcription

1 CERN-LHCC Addendum ATLAS TDR 19 4 May 2012 A T L A S Insertable B-Layer Technical Design Report TDR

2 IBL TDR Addendum ATLAS Project Document No: Institute Document No. Created: 17/03/2012 Page: 1 of xx ATL-SYS-XX-XXX Modified: IBL TDR Addendum Abstract This document is an addendum of the ATLAS IBL TDR of September This document focuses on the Mixed Scenario where staves are populated in the centre with two-chip planar sensor modules and with single-chip 3D sensors at the two extremities. We also describe the diamond beam monitor that uses the diamond sensors originally developed for the IBL. Prepared by: IBL Management Board + D. Ferrere, C. Gemme, W. Trischuk. Checked by: Approved by: G. Darbo, H. Pernegger, M. Nessi, B. Di Girolamo Distribution List ATLAS IBL Collaboration for comments

3 ATLAS Project Document No: Page: 2 of 13 History of Changes Rev. No. Date Pages Description of changes 1 17/03/2012 All First Draft /04/2012 All, Sec.2.4 Overall editing. Added section /05/2012 Sec. 2.3, 3 Added section 2.3 and /05/2012 All Improvement from W. Trischuk.

4 ATLAS Project Document No: Page: 3 of 13 Table of Contents 1 INTRODUCTION Sensor Qualification and Production Status MIXED SENSOR SCENARIO Module Layout Stave Layout Module Loading on Stave Electrical services DIAMOND BEAM MONITOR (DBM) REFERENCES... 13

5 ATLAS Project Document No: Page: 4 of 13 1 INTRODUCTION At the time the IBL TDR [1] was submitted in September 2010, the sensor technology was not decided. Three technologies were considered for the IBL: planar sensors (n-on-n and n-on-p), 3D sensors (with active or slim edge) and diamond sensors. A program of extensive testing of detector assemblies irradiated to IBL fluence of 5x10 15 n eq /cm 2 and 250 Mrad was carried out through the Spring of Results were presented to a sensor technology review in July The review panel recommendation was to investigate a mixed scenario, in which the 3D technology populates the highest eta region of the IBL where the tracking could take advantage of the electrode orientation to give a better z-resolution after heavy irradiation. The implications of the IBL mixed scenario are presented in section 2 of this Addendum document with emphasis on how this affects the module, stave and services design. The Diamond Beam Monitor (DBM) [5] is presented in section 3, which is a spin-off from the IBL technology with prototype assemblies of FE-I4 and diamond sensors. The DBM is a detector that is constructed by the IBL collaboration and will only be installed, if the existing ATLAS Pixel detector is brought to the surface in 2013 to replace the Service Quarter Panels (nsqp project Error! Reference source not found.). 1.1 Sensor Qualification and Production Status Between the end of 2010 and early 2011, the plans for construction of the IBL were substantially modified by two events: the change in the LHC long shutdown planning (necessary to install the IBL) and the very good results of the FE-I4A frontend chip. The latter raised confidence that only minor changes would be needed for the production version of this chip. The LHC shutdown to install the IBL, assumed in the IBL TDR, was for the end of The decision of LHC (Chamonix 2011) to have a long shutdown in 2013/14 offered ATLAS the serious possibility to install the IBL two years earlier. From all the sensor technologies under study for IBL the two that were more advanced and at asufficiently mature stage for possible production were: planar n-in-n and double sided 3D sensors. It was therefore decided to restrict the qualification to these two technologies and develop FE-I4 modules from these two to be fully qualified in test beam studies and at full IBL radiation dose. To fulfil this sped up schedule it was decided, in January 2011, to launch a pre-production of planar sensors from CiS i and of double sided 3D sensors from CNM ii and FBK iii. A further idea behind these production runs was to already have between 30% and 50% of the sensors available by the time of the qualification deadline and sensor review. The path chosen to streamline the sensor prototyping and decision, the success of version A of the FE-I4 with minor needs for modification together with the high production yield, also streamlined the production of the FE-I4B by making engineering and production in an single run. Together these saved over one year in the IBL schedule. Further optimization and reduction of the originally generous contingency in the schedule gained the needed time to be ready for the phase 0 LHC shutdown in 2013/14. Figure 1 compares the IBL TDR schedule with the present schedule for the major detector items. The FE-I4B and sensor production were almost completed as of March 31 st 2013, meeting the new schedule for these critical items. Task Name Start End Days FE-I4B Design FE-I4B Production Slim edge planar sensor production Slim edge 3D sensor production Bump-bonding production Module assembly Bare stave production & QA Module loading, testing and QA Schedule v3 (ready for installation in 2015) Ready for installation ( ) Schedue v5.3a (ready for installation in 2013) Ready for installation ( ) Figure 1: Comparison between the IBL TDR schedule (version v.3) and the version prepared for the IBL installation in the 2013/14 LHC shutdown. The comparison is made for the major production items going into the detector. i CiS: Forschungsinstitut fur Mikrosensorik und Photovoltaik GmbH, Konrad-Zuse-Strasse 14, Erfurt, Germany ii CNM: Centro Nacional de Microelectronica (CNM-IMB-CSIC), Campus Universidad Autonoma de Barcelona, Bellaterra (Barcelona), Spain. See iii FBK: Fondazione Bruno Kessler (FBK), Via Sommarive 18, Povo di Trento, Italy. See

6 ATLAS Project Document No: Page: 5 of 13 The recommendation from the sensor review panel, in July 2011, were that both sensor technologies fulfilled the IBL requirements, and that there was an opportunity to populate the forward region with 3D where the tracking could take advantage of the electrode orientation to give a better z-resolution after heavy irradiation. The IBL collaboration, following that recommendation from the review panel, decided to complete the production of planar and 3D sensors and endorsed the proposal to build enough modules for a mixed IBL sensor scenario where 25% of 3D modules populate the forward and backward part of each stave. The production of planar sensors will also allow coverage of 100% of IBL in case that is needed. The fractions of planar and 3D sensors that can be put in the IBL are quantized by the granularity of the high voltage services, which individually bias a group of four FE-I4 equivalent area of sensors (i.e. 4 FE-I4 out of 32 in a stave). Preserving backward/forward symmetry of the IBL restricts to multiples of 25% the fraction of planar/3d that can populate each stave. Table 1 and Table 2 show a summary of the planar and 3D sensor production as of the 31 st of March There are enough sensors from both technologies to fulfil the mixed scenario, considering the expected overall yield for the module production and stave loading. Batch # Total Received wafers Good DC sensors Yield 86.3 % 86.4 % 89.9 % 87.5 % 91.2 % 94.3 % 89.1% Table 1: Status of two-chip planar sensor production at the end of March The IBL in the 75% of planar scenario has 168 sensors. Status Produced Wafers Selected Wafers Yield selected on Good sensors FBK-A10 Completed % 58 FBK-A11 Completed % 14 FBK-A12 Completed % 63 FBK-A13 In proc. (backup batch) - - CNM-1 Completed % 86 CNM-2 Completed % 85 CNM-3 In proc Total % 306 Table 2: Status of planar single-chip 3D sensor production at the end of March The IBL, in the 25% of 3D scenario, has 112 sensors. In addition to the sensor qualification and production, thin modules have been developed with both sensor technologies, making single and double-chip assemblies. The prototyping was carried out with 100 µm and 150 µm thin FE-I4A chips. For the aggressive IBL installation plan, it was decided to use the 150 µm thickness to be on the safe side to avoid unexpected yields issues. Table 3 summarizes the production of thin modules. Several such modules have been dressed with the flex hybrids and are ready to be installed on stave 0.

7 ATLAS Project Document No: Page: 6 of 13 FE-I4 Planar (200µm) 3D (230µm) Total Thickness Single Chip Double Chip Single Chip FE-I4 100 µm µm Total Table 3. Modules bump-bonded at IZM iv with thin FE-I4A chips to qualify the stave assembly procedure. 2 Mixed Sensor Scenario This section describes the main changes from the IBL TDR design to execute the mixed sensor scenario. The impact of the mixed sensor scenario on the IBL construction is on the following items: Module design. Stave layout. Module loading on stave. Electrical services. 2.1 Module Design. The IBL module outlines for two-chip modules and one-chip modules are geometrically compatible; the physical size of two single-chip 3D sensor assemblies is the same width as a single planar two-chip module. The differences in rφ between the two sensor technologies are compatible with the overall IBL envelopes. In Table 4 are listed the geometric parameters for the sensors used in the IBL mixed scenario. Bare module assemblies are dressed by gluing a flex hybrid circuit on the sensor side; there are two circuits, one for singlechip 3D assembly and another for the planar double-chip assembly. Such circuits are shown in Figure 2. They are mechanically different, but electrically very similar once the test pigtail is cut. Having two flex-circuits eases the assembly procedure, but does not change the electrical connections, which will basically remain separate for each of the two FE-I4 chips in the double-chip version. In the case of the double-chip module flex, there are two separate wire-bonding fields that bring the signals from the stave flex wings together. The connection step, once the modules are on the stave, is the same for two single and one double module. In this way the stave flex connections are compatible for either single or double chip modules. Structure Planar 3D Gap b/w modules 205 µm 205 µm Sensor thickness 200 µm 230 µm Module width (along z) µm µm Bias tab / guard-ring extension (in rφ) 630 µm µm Table 4: Main geometrical parameters of the IBL sensor used for planar and 3D sensor modules. A few special precautions have been used in the design of the module flex: The back of the flex (which is glued on the module) uses a 25µm thick polyimide film based coverlay v which is rated to stand 100V/µm to hold the 1000V needed by the planar modules once they have received their full integrated radiation dose. It was sensible to do the same for the 3D modules, even if it is planned to have between 160 and 180 V as the maximum operation voltage. The extra radiation length is very small. iv Fraunhofer IZM-Berlin, Gustav-Meyer-Allee 25, Berlin v SF302C polyimide film from Shengyi (

8 ATLAS Project Document No: Page: 7 of 13 The high voltage capacitors are encapsulated using an isolating resin. The prime candidate is a Polyurethane resin (PUR) vi that was used for the ATLAS SCT. Figure 2: Module Flex Hybrid for single chip (left) and double chip module (right). The flexes come with a pigtail and a test connector, which is cut away before loading on stave. The stave flex wing is glued on the module flex and then connections are provided by wire bonding. The double chip flex is electrically equivalent to two single chip ones. The clock and data signals, which are individual lines on the stave flex, are routed separately on the double module flex to the input of each FE-I4. Each line is terminated with a 160Ω resistance. This is acceptable as the two stubs only 4 cm long and the frequency of the signals are 40/20 MHz for the clock/data. Single-chip modules use the same routing topology on two separated flexes. The two FE-I4 chips on a single module are differentiated by having their ID addresses connected to a pull-up wire-bond connected to VDD.. For the double-chip module, the additional wire-bond is used for only one of the two chips. When the single-chip modules are mounted on a stave, the wire-bond of one of the two chips making a logical module will have the ID address wire-bond removed. The module flexes are produced with a surrounding frame having precision holes for positioning pins in the mounting jigs. When the pigtail is cut, the frames are removed and the modules can then picked up by vacuum tools. This is done at the last moment, before loading to the stave. All tooling and jigs for assembling the modules are made such as to be compatible with both designs. The module testing is done using the USBPix readout system. Two USBPix systems are connected in master/slave configuration to a double-module using the test connector and an adapter card. Both single and double-chip modules use the same adapter cards; double modules use an additional pin for the extra signal on the test connector. 2.2 Stave Layout The mixed sensor scenario stave layout is shown in Figure 3. The 3D sensors populate the 2 extremities. The area covered with planar and 3D sensors is, respectively, 75 % (equivalent to 24 FE-I4 chips) and 25 % (equivalent to 4+4 FE-I4 chips). The modules have a fixed gap of 205 µm. The planar and 3D modules differ slightly in thickness: from 200 µm to 230 µm; and in rφ where the 3D modules are 700 µm wider. The 3D design is compliant for the double and single sided design (active edge), having the second one the high voltage connection being made on the same side as the bump-bonding. For this compliant reason the sensor extends beyond the FE-I4. Figure 4 shows a cross-section of the stave, (top) at the position of a planar double-chip module and (bottom) at the position of a 3D single-chip module. vi VU 4453 from Peters (

9 ATLAS Project Document No: Page: 8 of 13 Figure 3: Stave layout for the mixed sensor scenario. 3D sensor modules populate the two stave extremities. The gaps betweenneighbouring modules is fixed at mm. Figure 4: Stave cross sections at the position of a planar module (top) and a 3D module (bottom). 2.3 Module Loading on Stave The module loading integrates the stave and stave-flex together with the planar and 3D detector modules while targeting for the highest quality in term of working pixel and modules and the long term reliability. The 16 procedural steps, followed by the module loading and QA sites are: 1. The reception of the completed stave with the stave-flex. This is part of the QA to validate that the stave with the glued stave-flex has a conformal geometry after it has been thermally cycled 10 times from -40 C to +40 C. 2. The reception tests of modules. Detector modules qualified at the assembly sites pass visual inspection and basic electrical readout tests at loading site, before the module-flex test pigtail is cut to load them on the stave. 3. A Guillotine tool cuts the module pigtail. The next operation consists in the removing the wire bonds from the pads that will be re-used to connect the stave-flex wings. These same pads were previously used to electrically connect the module test pigtail before loading the module to the stave (see Figure 2). 4. The modules are loaded on the first half of the stave (Figure 5). Six planar and four 3D modules are positioned using precise mechanical references (dowel pins). Module placement accuracy is based on the sensor dicing accuracy, which is +/- 10 microns. The gap between modules of 205 µm (see Figure 3) is fixed by polyimidecoated shims that have a thickness of 190 µm. 5. The modules are loaded on the second half stave with the same positioning technique.

10 ATLAS Project Document No: Page: 9 of The 32 flex-wings that are retracted during loading are then released and glued on the module flex with Araldite 2011 (epoxy glue) (see Figure 5). 7. Once the wings are glued, the electrical interconnection between the module-flex and the stave-flex (wings) is done by wire-bonding. Multiple wire-bonds are used for redundancy. The connections bring out FE-I4 power and I/O LVDS signals, sensor bias and connections to NTC temperature sensors placed on the module-flexes. Test wire-bonds are then pulled to control the quality of the wire-bonding process. 8. The loaded stave is electrically connected through an adapter card to the readout system and cooled by a CO 2 system. This step qualifies the stave in near real operating conditions. Reworking is done in case as needed before shipping to CERN for integration into the IBL. 9. The module positions are surveyed with respect to stave references. 10. The complete stave is thermally cycled. Ten thermal cycles from -40 C to +40 C are foreseen in the QC procedure. Assembly weaknesses and infant mortality are detected and corrected in this way. 11. The survey is repeated and the results are compared with those from step 9. If displacements or distortions are seen, rework will be considered. Such positions are recorded and will be used for initial alignment of the detector modules in the IBL. Figure 5: Tooling to load modules on stave. On the right side are visible four 3D single-chip modules, while another six double-chip planar modules are shown toward the centre of the stave. Modules are positioned with respect to the cut edge of the sensors. In the 200µm gap between modules a PEEK spacer is inserted to electrically isolate neighbouring sensors. Bottom left illustration shows a planar module loaded with ~40g. The bottom right illustration shows the wing to module flex gluing operation with a jig defining the wing shape during the polymerization.

11 ATLAS Project Document No: Page: 10 of A complete functional test with cooling and readout is performed. This test checks integrity and full functionality of all the modules. Bump integrity can be checked with pixel noise measurements. Pixels that have lower noise with sensor bias and that have no difference with bias on/off have high probability to be disconnected from the sensor. 13. Adherence to the IBL envelope is verified. This is particularly critical with respect the neighboring IBL staves where the minimum distance is as small as 0.8 mm. Stave-flex wings will be the subjects of the highest attention. 14. The last operations on the stave are to add an insulation spacer in the gap between module groups sharing the same sensor bias and a spacer protecting wire-bonds from mechanical damage from touching another stave during integration in IBL. 15. The stave is finally transported to CERN SR1 surface building for extensive QA test: burn-in, source scan and cosmic tests. Each stave, before loading with modules, is mounted onto a handling frame support jig (see Figure 6). The stave stays on the handling frame for all of its life, until it is integrated as a long (7 m) object (stave + internal services) around the beampipe in the IBL. This minimizes mechanical stress in handling staves. The handling frame is made of carbon fibre reinforced plastic (CFRP). Its CTE is about zero and very close to that of the stave. In this way thermal excursions during the thermal cycles do not affect the stave with mechanical stress. Module thermal contact to the stave is guaranteed by thermal grease, which has been qualified for IBL radiation requirements. Two drops of araldite are added to mechanically stabilize the module attachment to stave. The loading tools consist of almost 80 mechanical parts that are linked to the cradles for the various operations. A few of them are specific to the module geometry like: the grease mask, the alignment ruler and guides, the loading weight. The basic tooling set is therefore compatible for a scenario with different fractions of 3D and planar sensor modules: 25/75 mixed scenario or, in case is needed, full planar scenario. Figure 6: CFRP Handling Frame holding a real stave with mechanical fixation at the two end-blocks and at the middle of the stave (mounted as integrated around the beam pipe). One handling frame is dedicated per loaded stave for all loading, QA and integration operations. 2.4 Electrical services Electrical services have been designed maintaining compatibility between planar and 3D sensors. In particular the high voltage maximum rating of all the components is designed for 1000 V, needed to bias the planar sensors when they reach their full radiation dose. The modularity in the sensor bias voltage was decided as best compromise between having every single sensor tile controlled individually and the constraints from service routing. This modularity was defined in the IBL TDR being a sensor area equivalent to four FE-I4 chips. This is maintained in the mixed scenario. The planar and 3D sensors will see

12 ATLAS Project Document No: Page: 11 of 13 quite different operating voltages before and after irradiation. For this reason they need to be connected to separate HV supplies. This constraint, together with the modularity in the sensor power distribution, requires a minimum modularity of four FE-I4 chips equivalent in area for each sensor flavour. The additional backward-forward symmetry in the stave limits to multiples of 25% (8 out of 32 FE-I4 chip area per stave) the coverage with either of the technologies. The 25% (3D) / 75% (planar) scenario will use two bias lines for the 3D and six lines for the planar sensors in each stave. For the 3D it is planned to use sensors from both CNM and FBK. They are similar in operational voltage, but for optimal control of the operational settings each HV channel will be connected to only one of the 3D sensor flavours. The bias current requirement for the HV power supply is defined by the sensor leakage current after the integrated dose at the operation temperature. From measurements made during the sensor qualification phase it is found that the planar and 3D sensor have similar currents, between 300 and 400 µa for the area of a single FE-I4 chip at -15ºC and after a dose of 5x10 15 n eq /cm 2 [2]. The difference in the range of operating voltages between planar and 3D suggests the selection of different models of HV power supplies. The two models of power supplies from iseg vii : Mod. EHS F205n_R51: V outnom = 500 V / I outnom = 10 ma per channel Mod. EHS F210n_R51: V outnom = 1000 V / I outnom = 10 ma per channel is an optimal solution to fulfil the sensor requirements. The exisiting ATLAS pixel detector uses HV power supply from the same series. This will simplify the control and monitor software in the experiment. 3 Diamond Beam Monitor (DBM) Beam monitoring, luminosity measurement and tracking in ATLAS, in the future, must continue to operate in radiation environments at least an order of magnitude harsher than experienced by the current detectors. It is observed that, as the environment becomes harsher, detectors lacking fine spatial or timing granularity are challenged to separate of signal from background. To remedy this problem, detectors close to the interaction region are becoming ever more highly spatially segmented. We propose to add the Diamond Beam Monitor (DBM) [5] to ATLAS, which is a spatially segmented upgrade to complement the timing granularity of the existing Beam Crossing Monitor (BCM). Chemical Vapour Deposition (CVD) diamond has a number of properties that make it an attractive alternative for highenergy physics detector applications. Its large band-gap (5.5 ev) and large displacement energy (42 ev/atom) make it a material that is inherently radiation tolerant with very low leakage currents and high thermal conductivity. ATLAS already uses this material in its highly time-segmented (sub-ns) BCM that provides stable luminosity measurements and detailed background characterisations in both during stables beams and while the LHC machine is setting up for collisions. Figure 7: CAD view of the DBM telescopes inside the new Service Quarter Panels (nsqp) Error! Reference source not found.. Left: An isometric view of the four telescopes, with their type-0 cables (orange) and PP0 patch panels (green) mounted on the innermost nsqp cruciform. Right: Details of the DBM cooling channel (blue) and it s connection to the from SQP cooling channel (red) between the quarter panel (brown) that will be in place when the DBM telescopes are mounted in July The DBM capitalises on R&D undertaken for the diamond bid to be the IBL sensor. We produced 20 single-chip FE-I4 modules with diamond sensors in When the IBL insertion schedule was advanced to 2013 it was not possible to produce the more than 500 diamond sensors in time to meet the IBL schedule. Instead, we propose to install 24, single-chip IBL modules, with diamond sensors in the forward region of ATLAS, at r = 65 mm from the beam line and z ~ 1m, at rapidities from 3.0 to 3.4. Figure 7 shows two views of the DBM telescopes (on one side of ATLAS the full system has similar arrangements on both sides of ATLAS). Each telescope consists of three single-chip sensors, spread over a 10 cm lever arm. Parametric tracking simulations show this arrangement gives impact parameter resolution of better than 1 mm vii iseg GmbH, Bautzner Landstr. 23, D Radeberg / OT Rossendorf

13 ATLAS Project Document No: Page: 12 of 13 for tracks from the interaction point (IP) and allowing us to distinguish them from charged particles originating in the up/down-stream collimators. Even for µ = 40 (µ is the mean events number per bunch-crossing) we expect an average of 4 tracks per telescope from the IP. Initial pattern recognition studies show that the DBM modules will have the granularity to un-ambiguously reconstruct 10 or more tracks per telescope arm with low fake-rates. We are implementing a full GEANT model of the DBM in the ALTAS/IBL/Pixel simulation and will continue performance studies for proton collisions, detector albedo/afterglow and representative beam loss and beam-gas background samples, in the coming months. Conversely for µ = 40 we expect to acquire 10,000 tracks per bunch-crossing over a period of one minute, allowing a 1% precision on the bunch-by-bunch luminosity on a time-scale comparable to the basic ATLAS luminosity block. This should not only preserve the precision of the current BCM luminosity measurements, as the LHC rates continue to increase, but also make it more robust as we get to higher doses with correspondingly higher albedo and background rates. Beyond the DBM patch-panel 0 (the green quarter-circle boards in Figure 7) the signals are bundled into cables that are identical to the IBL half-staves. These, in turn, will feed standard IBL type-2 services and IBL RODs. The DBM event fragments will appear as two additional IBL half-stave. The DBM channels will have twelve FE-I4 chips worth of data instead of the sixteen in a real IBL half-stave. The DBM modules will be powered with standard IBL low-voltage (LV) and high-voltage (HV) power supply modules controlled through the standard pixel/ibl control and monitoring system. The only DBM-specific piece of the readout we are developing is an LVDS hit-bus chip that will allow us to accumulate telescope track multiplicities independent of the ATLAS data acquisition system, as a monitor of backgrounds and luminosity even when ATLAS is not taking data. We have assembled and tested ten DBM modules and are working with IZM to finalise the metallisation and bumpbonding procedures. We have studied the performance of four modules in test beams at CERN and DESY and are learning how to calibrate the charge gain for the FE-I4 chip and set the single-channel thresholds to optimise the hit efficiencies for our diamond devices. Over the last year, we have been actively working with a second diamond sensor supplier to complement our erstwhile single source of diamond sensor material. We have received four sensors from this new company that show comparable, or better, signal sizes and have placed an order for ten additional DBM sensors from this new vendor. We expect delivery of these ten additional sensors in July Finally, we have done extensive thermal and mechanical modelling of the support structure design to ensure that the DBM will be thermally neutral in ATLAS. We are beginning the process of manufacturing the mechanical parts to arrive at CERN by the end of Table 5 provides details of the remaining DBM construction and installation milestones. More details can be found in [5]. DBM Milestones Date Testbeam results from Module 0 June 1, 2012 Sensors 1-20 at IZM for module production July 1, 2012 Modules 1-15 ready for Q/A September 1, 2012 Sensors at IZM for module production November 1, 2012 Support Mechanics ready at CERN December 1, 2012 Modules ready for Q/A January 1, 2013 DBM telescopes 1-5 ready for mounting May 1, 2013 DBM telescopes 6-9 ready for mounting June 15, 2013 Mount DBM telescopes in nsqp July 1, 2013 Table 5: Milestones for DBM construction, assembly, testing and installation in ATLAS nsqp.

14 ATLAS Project Document No: Page: 13 of 13 4 References [1] ATLAS Collaboration, ATLAS Insertable B-Layer Technical Design Report, ATLAS TDR 19, CERN/LHCC , 15 September [2] IBL Collaboration, Prototype ATLAS IBL Modules using the FE-I4A Front-End Readout Chip, to be published on JINST. [3] R. Klingenberg, D. Muenstermann and T. Wittig, Sensor Specifications and Acceptance Criteria for Planar Pixel Sensors of the IBL at ATLAS, ATL-IP-QA-0030, [4] C. Da Via, M. Boscardin, G. Pellegrini, G-F. Dalla Betta, Technical Specifications and Acceptance Criteria for the 3D Sensors of the ATLAS IBL, ATU-SYS-QC-0004, [5] H. Kagan, M. Mikuž and W. Trischuk, ATLAS Diamond Beam Monitor (DBM), ATL-IP-ES-0187, [6] Share Point Site of the ATLAS Pixel Service Quarter Panel Reproduction,

CERN-LHCC Addendum ATLAS TDR 19 4 May 2012 A T L A S. Insertable B-Layer. Technical Design Report TDR

CERN-LHCC Addendum ATLAS TDR 19 4 May 2012 A T L A S. Insertable B-Layer. Technical Design Report TDR CERN-LHCC-2010-013 Addendum ATLAS TDR 19 4 May 2012 A T L A S Insertable B-Layer Technical Design Report TDR IBL TDR Addendum ATLAS Project Document No: Institute Document No. Created: 17/03/2012 Page:

More information

The Silicon Pixel Detector (SPD) for the ALICE Experiment

The Silicon Pixel Detector (SPD) for the ALICE Experiment The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the SPD Project in the ALICE Experiment INFN and Università Bari, Comenius University Bratislava, INFN and Università

More information

THE ATLAS Inner Detector [2] is designed for precision

THE ATLAS Inner Detector [2] is designed for precision The ATLAS Pixel Detector Fabian Hügging on behalf of the ATLAS Pixel Collaboration [1] arxiv:physics/412138v1 [physics.ins-det] 21 Dec 4 Abstract The ATLAS Pixel Detector is the innermost layer of the

More information

The ATLAS Pixel Detector

The ATLAS Pixel Detector The ATLAS Pixel Detector Fabian Hügging arxiv:physics/0412138v2 [physics.ins-det] 5 Aug 5 Abstract The ATLAS Pixel Detector is the innermost layer of the ATLAS tracking system and will contribute significantly

More information

The Status of the ATLAS Inner Detector

The Status of the ATLAS Inner Detector The Status of the ATLAS Inner Detector Introduction Hans-Günther Moser for the ATLAS Collaboration Outline Tracking in ATLAS ATLAS ID Pixel detector Silicon Tracker Transition Radiation Tracker System

More information

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration

The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration The Alice Silicon Pixel Detector (SPD) Peter Chochula for the Alice Pixel Collaboration The Alice Pixel Detector R 1 =3.9 cm R 2 =7.6 cm Main Physics Goal Heavy Flavour Physics D 0 K π+ 15 days Pb-Pb data

More information

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector.

Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme, P.Netchaeva, P.Oppizzi, L.Rossi, E.Ruscino, F.Vernocchi Lawrence Berkeley National

More information

CMS Upgrade Activities

CMS Upgrade Activities CMS Upgrade Activities G. Eckerlin DESY WA, 1. Feb. 2011 CMS @ LHC CMS Upgrade Phase I CMS Upgrade Phase II Infrastructure Conclusion DESY-WA, 1. Feb. 2011 G. Eckerlin 1 The CMS Experiments at the LHC

More information

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC 1 A L E J A N D R O A L O N S O L U N D U N I V E R S I T Y O N B E H A L F O F T H E A T L A

More information

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS J.Baudot a, J.Goldstein b, A.Nomerotski c, M.Winter a a IPHC - Université

More information

DEPFET Active Pixel Sensors for the ILC

DEPFET Active Pixel Sensors for the ILC DEPFET Active Pixel Sensors for the ILC Laci Andricek for the DEPFET Collaboration (www.depfet.org) The DEPFET ILC VTX Project steering chips Switcher thinning technology Simulation sensor development

More information

The hybrid photon detectors for the LHCb-RICH counters

The hybrid photon detectors for the LHCb-RICH counters 7 th International Conference on Advanced Technology and Particle Physics The hybrid photon detectors for the LHCb-RICH counters Maria Girone, CERN and Imperial College on behalf of the LHCb-RICH group

More information

Concept and operation of the high resolution gaseous micro-pixel detector Gossip

Concept and operation of the high resolution gaseous micro-pixel detector Gossip Concept and operation of the high resolution gaseous micro-pixel detector Gossip Yevgen Bilevych 1,Victor Blanco Carballo 1, Maarten van Dijk 1, Martin Fransen 1, Harry van der Graaf 1, Fred Hartjes 1,

More information

A pixel chip for tracking in ALICE and particle identification in LHCb

A pixel chip for tracking in ALICE and particle identification in LHCb A pixel chip for tracking in ALICE and particle identification in LHCb K.Wyllie 1), M.Burns 1), M.Campbell 1), E.Cantatore 1), V.Cencelli 2) R.Dinapoli 3), F.Formenti 1), T.Grassi 1), E.Heijne 1), P.Jarron

More information

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors Atlas Pixel Replacement/Upgrade and Measurements on 3D sensors Forskerskole 2007 by E. Bolle erlend.bolle@fys.uio.no Outline Sensors for Atlas pixel b-layer replacement/upgrade UiO activities CERN 3D test

More information

SciFi A Large Scintillating Fibre Tracker for LHCb

SciFi A Large Scintillating Fibre Tracker for LHCb SciFi A Large Scintillating Fibre Tracker for LHCb Roman Greim on behalf of the LHCb-SciFi-Collaboration 14th Topical Seminar on Innovative Particle Radiation Detectors, Siena 5th October 2016 I. Physikalisches

More information

A new Scintillating Fibre Tracker for LHCb experiment

A new Scintillating Fibre Tracker for LHCb experiment A new Scintillating Fibre Tracker for LHCb experiment Alexander Malinin, NRC Kurchatov Institute on behalf of the LHCb-SciFi-Collaboration Instrumentation for Colliding Beam Physics BINP, Novosibirsk,

More information

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration PIXEL2000, June 5-8, 2000 FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy For the ALICE Collaboration CONTENTS: Introduction: Physics Requirements Design Considerations Present development status

More information

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector William Nalti, Ken Suzuki, Stefan-Meyer-Institut, ÖAW on behalf of the PANDA/Barrel-TOF(SciTil) group 12.06.2018, ICASiPM2018 1

More information

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS NOTE 1999/012 The Compact Muon Solenoid Experiment CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland February 23, 1999 Assembly and operation of

More information

TORCH a large-area detector for high resolution time-of-flight

TORCH a large-area detector for high resolution time-of-flight TORCH a large-area detector for high resolution time-of-flight Roger Forty (CERN) on behalf of the TORCH collaboration 1. TORCH concept 2. Application in LHCb 3. R&D project 4. Test-beam studies TIPP 2017,

More information

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Juan Palacios, On behalf of the LHCb VELO group J.P. Palacios, Liverpool Outline LHCb and VELO performance

More information

G. Pittá(*), S. Braccini TERA Foundation, Novara, Italy (*) Corresponding author.

G. Pittá(*), S. Braccini TERA Foundation, Novara, Italy (*) Corresponding author. Frascati Physics Series Vol. VVVVVV (xxxx), pp. 000-000 XX Conference Location, Date-start - Date-end, Year MATRIX: AN INNOVATIVE PIXEL IONIZATION CHAMBER FOR ON-LINE BEAM MONITORING IN HADRONTHERAPY G.

More information

Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC

Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC Dena Giovinazzo University of California, Santa Cruz Supervisors: Davide Ceresa

More information

FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration PIXEL2000, June 5-8, 2000 FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy For the ALICE Collaboration JUNE 5-8,2000 PIXEL2000 1 CONTENTS: Introduction: Physics Requirements Design Considerations

More information

ATLAS IBL Pixel Module Electrical Tests Description

ATLAS IBL Pixel Module Electrical Tests Description ATLAS IBL Pixel Module Electrical Tests ATLAS Project Document No: Institute Document No. Created: 10/05/2012 Page: 1 of 41 1221585 Modified: 06/01/2013 ATLAS IBL Pixel Module Electrical Tests Description

More information

Status of CMS Silicon Strip Tracker

Status of CMS Silicon Strip Tracker 1 Status of CMS Silicon Strip Tracker N. Demaria a on behalf of the CMS Tracker Collaboration a INFN Sez. di Torino, v. P.Giuria 1, I-10125 Torino Italy E-mail: Natale.Demaria@to.infn.it The CMS Silicon

More information

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC Tomas Davidek (Charles University), on behalf of the ATLAS Collaboration Tile Calorimeter Sampling

More information

arxiv:hep-ex/ v1 27 Nov 2003

arxiv:hep-ex/ v1 27 Nov 2003 arxiv:hep-ex/0311058v1 27 Nov 2003 THE ATLAS TRANSITION RADIATION TRACKER V. A. MITSOU European Laboratory for Particle Physics (CERN), EP Division, CH-1211 Geneva 23, Switzerland E-mail: Vasiliki.Mitsou@cern.ch

More information

The ATLAS Pixel Chip FEI in 0.25µm Technology

The ATLAS Pixel Chip FEI in 0.25µm Technology The ATLAS Pixel Chip FEI in 0.25µm Technology Peter Fischer, Universität Bonn (for Ivan Peric) for the ATLAS pixel collaboration The ATLAS Pixel Chip FEI Short Introduction to ATLAS Pixel mechanics, modules

More information

ATLAS Group LPNHE. ATLAS upgrade activities. Biennale du LPNHE Tirrenia (Pise)

ATLAS Group LPNHE. ATLAS upgrade activities. Biennale du LPNHE Tirrenia (Pise) ATLAS Group LPNHE ATLAS upgrade activities Biennale du LPNHE Tirrenia (Pise) 4-7/10/2016 The ATLAS roadmap in the LHC upgrade TDR strips TDR pixels ITk construction Phase 2 Run2 LS2 Run3 LS3 100fb-1 300fb-1

More information

SLHC tracker upgrade: challenges and strategies in ATLAS

SLHC tracker upgrade: challenges and strategies in ATLAS SLHC tracker upgrade: challenges and strategies in ATLAS 1 Rutherford Appleton Laboratory, STFC, Harwell Science and Innovation Campus, Didcot, OX11 0QX, UK E-mail: m.m.weber@rl.ac.uk The Large Hadron

More information

Sensors for the CMS High Granularity Calorimeter

Sensors for the CMS High Granularity Calorimeter Sensors for the CMS High Granularity Calorimeter Andreas Alexander Maier (CERN) on behalf of the CMS Collaboration Wed, March 1, 2017 The CMS HGCAL project ECAL Answer to HL-LHC challenges: Pile-up: up

More information

The ATLAS Beam Conditions and Beam Loss Monitors

The ATLAS Beam Conditions and Beam Loss Monitors RD09 9th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors The ATLAS Beam Conditions and Beam Loss Monitors Boštjan Maček J. Stefan Institute, Ljubljana

More information

GaAs MMIC Triple Balanced Mixer

GaAs MMIC Triple Balanced Mixer Page 1 The is a passive MMIC triple balanced mixer. It features a broadband IF port that spans from 2 to 20 GHz, and has excellent spurious suppression. GaAs MMIC technology improves upon the previous

More information

GaAs MMIC Double Balanced Mixer

GaAs MMIC Double Balanced Mixer Page 1 The is a passive double balanced MMIC mixer. It features excellent conversion loss, superior isolations and spurious performance across a broad bandwidth, in a highly miniaturized form factor. Accurate,

More information

SLHC- PP EU DELIVERABLE: SLHC-PP v1.0. End of Month 36 (March 2011) 23/03/2011. Integration in full-scale detector modules

SLHC- PP EU DELIVERABLE: SLHC-PP v1.0. End of Month 36 (March 2011) 23/03/2011. Integration in full-scale detector modules SLHC- PP DELIVERABLE REPORT EU DELIVERABLE: 8.1.3 Document identifier: Contractual Date of Delivery to the EC Actual Date of Delivery to the EC End of Month 36 (March 2011) 23/03/2011 Document date: 23/03/2011

More information

CGEM-IT project update

CGEM-IT project update BESIII Physics and Software Workshop Beihang University February 20-23, 2014 CGEM-IT project update Gianluigi Cibinetto (INFN Ferrara) on behalf of the CGEM group Outline Introduction Mechanical development

More information

1. Publishable summary

1. Publishable summary 1. Publishable summary 1.1. Project objectives. The target of the project is to develop a highly reliable high brightness conformable low cost scalable display for demanding applications such as their

More information

arxiv: v1 [physics.ins-det] 1 Nov 2015

arxiv: v1 [physics.ins-det] 1 Nov 2015 DPF2015-288 November 3, 2015 The CMS Beam Halo Monitor Detector System arxiv:1511.00264v1 [physics.ins-det] 1 Nov 2015 Kelly Stifter On behalf of the CMS collaboration University of Minnesota, Minneapolis,

More information

GaAs DOUBLE-BALANCED MIXER

GaAs DOUBLE-BALANCED MIXER MM1-124S The MM1-124S is a passive double balanced MMIC mixer. It features excellent conversion loss, superior isolations and spurious performance across a broad bandwidth, in a highly miniaturized form

More information

GaAs DOUBLE-BALANCED MIXER

GaAs DOUBLE-BALANCED MIXER MM1-3H The MM1-3H is a passive double balanced MMIC mixer. It features excellent conversion loss, superior isolations and spurious performance across a broad bandwidth, in a highly miniaturized form factor.

More information

GaAs DOUBLE-BALANCED MIXER

GaAs DOUBLE-BALANCED MIXER MM1-185H The MM1-185H is a passive double balanced MMIC mixer. It features excellent conversion loss, superior isolations and spurious performance across a broad bandwidth, in a highly miniaturized form

More information

R&D on high performance RPC for the ATLAS Phase-II upgrade

R&D on high performance RPC for the ATLAS Phase-II upgrade R&D on high performance RPC for the ATLAS Phase-II upgrade Yongjie Sun State Key Laboratory of Particle detection and electronics Department of Modern Physics, USTC outline ATLAS Phase-II Muon Spectrometer

More information

The field cage for a large TPC prototype

The field cage for a large TPC prototype EUDET The field cage for a large TPC prototype T.Behnke, L. Hallermann, P. Schade, R. Diener December 7, 2006 Abstract Within the EUDET Programme, the FLC TPC Group at DESY in collaboration with the Department

More information

GaAs MMIC Double Balanced Mixer

GaAs MMIC Double Balanced Mixer Page 1 The is a passive double balanced MMIC mixer. It features excellent conversion loss, superior isolations and spurious performance across a broad bandwidth, in a highly miniaturized form factor. Low

More information

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su Design and prototype tests of the system for the OPERA spectrometers Stefano Dusini INFN sezione di Padova Outline OPERA Detector Inner Tracker Design Mechanical support Gas & HV Production and Quality

More information

GaAs MMIC Double Balanced Mixer

GaAs MMIC Double Balanced Mixer Page 1 The is a passive double balanced MMIC mixer. It features excellent conversion loss, superior isolations and spurious performance across a broad bandwidth, in a highly miniaturized form factor. Low

More information

Review of the CMS muon detector system

Review of the CMS muon detector system 1 Review of the CMS muon detector system E. Torassa a a INFN sez. di Padova, Via Marzolo 8, 35131 Padova, Italy The muon detector system of CMS consists of 3 sub detectors, the barrel drift tube chambers

More information

Parameter Input Output Min Typ Max Diode Option (GHz) (GHz) Input drive level (dbm)

Parameter Input Output Min Typ Max Diode Option (GHz) (GHz) Input drive level (dbm) MMD3H The MMD3H is a passive double balanced MMIC doubler covering 1 to 3 GHz on the output. It features excellent conversion loss, superior isolations and harmonic suppressions across a broad bandwidth,

More information

GaAs DOUBLE-BALANCED MIXER

GaAs DOUBLE-BALANCED MIXER The MM1-312S is a high linearity passive double balanced MMIC mixer. The S diode offers superior 1 db compression, two tone intermodulation performance, and spurious suppression to other GaAs MMIC mixers.

More information

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

Commissioning of the ATLAS Transition Radiation Tracker (TRT) Commissioning of the ATLAS Transition Radiation Tracker (TRT) 11 th Topical Seminar on Innovative Particle and Radiation Detector (IPRD08) 3 October 2008 bocci@fnal.gov On behalf of the ATLAS TRT community

More information

Front End Electronics

Front End Electronics CLAS12 Ring Imaging Cherenkov (RICH) Detector Mid-term Review Front End Electronics INFN - Ferrara Matteo Turisini 2015 October 13 th Overview Readout requirements Hardware design Electronics boards Integration

More information

The Time-of-Flight Detector for the ALICE experiment

The Time-of-Flight Detector for the ALICE experiment ALICE-PUB-- The Time-of-Flight Detector for the ALICE experiment M.C.S. Williams for the ALICE collaboration EP Division, CERN, Geneva, Switzerland Abstract The Multigap Resistive Plate Chamber (MRPC)

More information

Local Trigger Electronics for the CMS Drift Tubes Muon Detector

Local Trigger Electronics for the CMS Drift Tubes Muon Detector Amsterdam, 1 October 2003 Local Trigger Electronics for the CMS Drift Tubes Muon Detector Presented by R.Travaglini INFN-Bologna Italy CMS Drift Tubes Muon Detector CMS Barrel: 5 wheels Wheel : Azimuthal

More information

TRT Software Activities

TRT Software Activities TRT Software Activities - 08/14/2009 SPLASH EVENT IN THE TRT I will mainly focus on the activities where the Duke group is more directly involved 1 TRT SW Offline Duke Group heavily involved in several

More information

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Part 1: The TBM and CMS Understanding how the LHC and the CMS detector work as a

More information

VLSI Chip Design Project TSEK06

VLSI Chip Design Project TSEK06 VLSI Chip Design Project TSEK06 Project Description and Requirement Specification Version 1.1 Project: High Speed Serial Link Transceiver Project number: 4 Project Group: Name Project members Telephone

More information

Quick Report on Silicon G-APDs (a.k.a. Si-PM) studies. XIV SuperB General Meeting LNF - Frascati

Quick Report on Silicon G-APDs (a.k.a. Si-PM) studies. XIV SuperB General Meeting LNF - Frascati Quick Report on Silicon G-APDs (a.k.a. Si-PM) studies XIV SuperB General Meeting LNF - Frascati Report of the work done in Padova Dal Corso F., E.F., Simi G., Stroili R. University & INFN Padova Outline

More information

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration First LHC Beams in ATLAS Peter Krieger University of Toronto On behalf of the ATLAS Collaboration Cutaway View LHC/ATLAS (Graphic) P. Krieger, University of Toronto Aspen Winter Conference, Feb. 2009 2

More information

The Readout Architecture of the ATLAS Pixel System

The Readout Architecture of the ATLAS Pixel System The Readout Architecture of the ATLAS Pixel System Roberto Beccherle / INFN - Genova E-mail: Roberto.Beccherle@ge.infn.it Copy of This Talk: http://www.ge.infn.it/atlas/electronics/home.html R. Beccherle

More information

In-process inspection: Inspector technology and concept

In-process inspection: Inspector technology and concept Inspector In-process inspection: Inspector technology and concept Need to inspect a part during production or the final result? The Inspector system provides a quick and efficient method to interface a

More information

Optimizing BNC PCB Footprint Designs for Digital Video Equipment

Optimizing BNC PCB Footprint Designs for Digital Video Equipment Optimizing BNC PCB Footprint Designs for Digital Video Equipment By Tsun-kit Chin Applications Engineer, Member of Technical Staff National Semiconductor Corp. Introduction An increasing number of video

More information

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD D. LO PRESTI D. BONANNO, F. LONGHITANO, D. BONGIOVANNI, S. REITO INFN- SEZIONE DI CATANIA D. Lo Presti, NUMEN2015 LNS, 1-2 December 2015 1 OVERVIEW

More information

Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards

Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards Highly Accelerated Stress Screening of the Atlas Liquid Argon Calorimeter Front End Boards K. Benslama, G. Brooijmans, C.-Y. Chi, D. Dannheim, I. Katsanos, J. Parsons, S. Simion Nevis Labs, Columbia University

More information

Diamond detectors in the CMS BCM1F

Diamond detectors in the CMS BCM1F Diamond detectors in the CMS BCM1F DESY (Zeuthen) CARAT 2010 GSI, 13-15 December 2010 On behalf of the DESY BCM and CMS BRM groups 1 Outline: 1. Introduction to the CMS BRM 2. BCM1F: - Back-End Hardware

More information

P ixel Detector Module using MC M-D Technology for the B -layer of the AT LAS P ixel Detector

P ixel Detector Module using MC M-D Technology for the B -layer of the AT LAS P ixel Detector P ixel Detector Module using MC M-D Technology for the B -layer of the AT LAS P ixel Detector DETECTOR CHIP Pixel 2000 Workshop O. Bäsken K.H.Becks P.Gerlach Ch. Grah O.Ehrmann M.Töpper J.Wolf Christian

More information

Avoiding False Pass or False Fail

Avoiding False Pass or False Fail Avoiding False Pass or False Fail By Michael Smith, Teradyne, October 2012 There is an expectation from consumers that today s electronic products will just work and that electronic manufacturers have

More information

RX40_V1_0 Measurement Report F.Faccio

RX40_V1_0 Measurement Report F.Faccio RX40_V1_0 Measurement Report F.Faccio This document follows the previous report An 80Mbit/s Optical Receiver for the CMS digital optical link, dating back to January 2000 and concerning the first prototype

More information

Innovative Fast Timing Design

Innovative Fast Timing Design Innovative Fast Timing Design Solution through Simultaneous Processing of Logic Synthesis and Placement A new design methodology is now available that offers the advantages of enhanced logical design efficiency

More information

TRT Alignment. John Alison Aart Heijboer Joel Heinrich Joe Kroll. Outline: What we're trying to do. How we're doing it. Results. Plans for the future.

TRT Alignment. John Alison Aart Heijboer Joel Heinrich Joe Kroll. Outline: What we're trying to do. How we're doing it. Results. Plans for the future. Outline: What we're trying to do. How we're doing it. Results. Plans for the future. TRT Alignment John Alison Aart Heijboer Joel Heinrich Joe Kroll 1 Why is alignment a problem? Detector positions used

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

TGL2210-SM_EVB GHz 100 Watt VPIN Limiter. Product Overview. Key Features. Applications. Functional Block Diagram. Ordering Information

TGL2210-SM_EVB GHz 100 Watt VPIN Limiter. Product Overview. Key Features. Applications. Functional Block Diagram. Ordering Information .5 6 GHz Watt VPIN Limiter Product Overview The Qorvo is a high-power receive protection circuit (limiter) operating from.5-6ghz. Capable of withstanding up to W incident power levels, the allows < dbm

More information

Electronics procurements

Electronics procurements Electronics procurements 24 October 2014 Geoff Hall Procurements from CERN There are a wide range of electronics items procured by CERN but we are familiar with only some of them Probably two main categories:

More information

A Serializer ASIC at 5 Gbps for Detector Front-end Electronics Readout

A Serializer ASIC at 5 Gbps for Detector Front-end Electronics Readout A Serializer ASIC at 5 Gbps for Detector Front-end Electronics Readout Jingbo Ye, on behalf of the ATLAS Liquid Argon Calorimeter Group Department of Physics, Southern Methodist University, Dallas, Texas

More information

How to overcome/avoid High Frequency Effects on Debug Interfaces Trace Port Design Guidelines

How to overcome/avoid High Frequency Effects on Debug Interfaces Trace Port Design Guidelines How to overcome/avoid High Frequency Effects on Debug Interfaces Trace Port Design Guidelines An On-Chip Debugger/Analyzer (OCD) like isystem s ic5000 (Figure 1) acts as a link to the target hardware by

More information

Rome group activity since last meeting (4)

Rome group activity since last meeting (4) OLYMPUS Collaboration DESY 30/August/2010 Rome group activity since last meeting (4) DESY 30/August/2010 Olympus Collaboration meeting Salvatore Frullani / INFN-Rome Sanità Group 1 GEM electronics: Outline

More information

The Readout Architecture of the ATLAS Pixel System. 2 The ATLAS Pixel Detector System

The Readout Architecture of the ATLAS Pixel System. 2 The ATLAS Pixel Detector System The Readout Architecture of the ATLAS Pixel System Roberto Beccherle, on behalf of the ATLAS Pixel Collaboration Istituto Nazionale di Fisica Nucleare, Sez. di Genova Via Dodecaneso 33, I-646 Genova, ITALY

More information

Muon Forward Tracker. MFT Collaboration

Muon Forward Tracker. MFT Collaboration Muon Forward Tracker MFT Collaboration QGP France 2013 Introduction Summary of what «physically» MFT looks like: - Silicon detector - Data flow - Mechanical aspects - Power supplies - Cooling - Insertion/Extraction

More information

Precision measurements of beam current, position and phase for an e+e- linear collider

Precision measurements of beam current, position and phase for an e+e- linear collider Precision measurements of beam current, position and phase for an e+e- linear collider R. Corsini on behalf of H. Braun, M. Gasior, S. Livesley, P. Odier, J. Sladen, L. Soby INTRODUCTION Commissioning

More information

Mechanical aspects, FEA validation and geometry optimization

Mechanical aspects, FEA validation and geometry optimization RF Fingers for the new ESRF-EBS EBS storage ring The ESRF-EBS storage ring features new vacuum chamber profiles with reduced aperture. RF fingers are a key component to ensure good vacuum conditions and

More information

CMS Tracker Optical Control Link Specification. Part 1: System

CMS Tracker Optical Control Link Specification. Part 1: System CMS Tracker Optical Control Link Specification Part 1: System Version 1.2, 7th March, 2003. CERN EP/CME Preliminary 1. INTRODUCTION...2 1.1. GENERAL SYSTEM DESCRIPTION...2 1.2. DOCUMENT STRUCTURE AND CONVENTION...3

More information

Front End Electronics

Front End Electronics CLAS12 Ring Imaging Cherenkov (RICH) Detector Mid-term Review Front End Electronics INFN - Ferrara Matteo Turisini 2015 October 13 th Overview Readout requirements Hardware design Electronics boards Integration

More information

Drift Tubes as Muon Detectors for ILC

Drift Tubes as Muon Detectors for ILC Drift Tubes as Muon Detectors for ILC Dmitri Denisov Fermilab Major specifications for muon detectors D0 muon system tracking detectors Advantages and disadvantages of drift chambers as muon detectors

More information

Features. = +25 C, IF = 1 GHz, LO = +13 dbm*

Features. = +25 C, IF = 1 GHz, LO = +13 dbm* v.5 HMC56LM3 SMT MIXER, 24-4 GHz Typical Applications Features The HMC56LM3 is ideal for: Test Equipment & Sensors Point-to-Point Radios Point-to-Multi-Point Radios Military & Space Functional Diagram

More information

Report from the Tracking and Vertexing Group:

Report from the Tracking and Vertexing Group: Report from the Tracking and Vertexing Group: October 10, 2016 Sally Seidel, Petra Merkel, Maurice Garcia- Sciveres Structure of parallel session n Silicon Sensor Fabrication on 8 wafers (Ron Lipton) n

More information

An extreme high resolution Timing Counter for the MEG Upgrade

An extreme high resolution Timing Counter for the MEG Upgrade An extreme high resolution Timing Counter for the MEG Upgrade M. De Gerone INFN Genova on behalf of the MEG collaboration 13th Topical Seminar on Innovative Particle and Radiation Detectors Siena, Oct.

More information

Study of the performances of the ALICE muon spectrometer

Study of the performances of the ALICE muon spectrometer Study of the performances of the ALICE muon spectrometer Blanc Aurélien, December 2008 PhD description Study of the performances of the ALICE muon spectrometer instrumentation/detection. Master Physique

More information

Review Report of The SACLA Detector Meeting

Review Report of The SACLA Detector Meeting Review Report of The SACLA Detector Meeting The 2 nd Committee Meeting @ SPring-8 Date: Nov. 28-29, 2011 Committee Members: Dr. Peter Denes, LBNL, U.S. (Chair of the Committee) Prof. Yasuo Arai, KEK, Japan.

More information

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes.

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes. Minutes of the ALICE Technical Board, November 14 th, 2013 ALICE MIN-2013-6 TB-2013 Date 14.11.2013 1. Minutes The draft minutes of the October 2013 TF meeting were approved without any changes. 2. LS1

More information

ILC Detector Work. Dan Peterson

ILC Detector Work. Dan Peterson ILC Detector Work Dan Peterson ** Cornell/Purdue TPC development program Large Detector Concept TPC Detector Response Simulation and Track Reconstruction World Wide Study Detector R&D Panel This project

More information

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Monolithic Thin Pixel Upgrade Testing Update Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Basic Technology: Standard CMOS CMOS Camera Because of large Capacitance, need

More information

The Pixel Trigger System for the ALICE experiment

The Pixel Trigger System for the ALICE experiment CERN, European Organization for Nuclear Research E-mail: gianluca.aglieri.rinella@cern.ch The ALICE Silicon Pixel Detector (SPD) data stream includes 1200 digital signals (Fast-OR) promptly asserted on

More information

NT Output LCD Segment/Common Driver NT7701. Features. General Description. Pin Configuration 1 V1.0

NT Output LCD Segment/Common Driver NT7701. Features. General Description. Pin Configuration 1 V1.0 160 Output LCD Segment/Common Driver Features (Segment mode)! Shift Clock frequency : 14 MHz (Max.) (VDD = 5V ± 10%) 8 MHz (Max.) (VDD = 2.5V - 4.5V)! Adopts a data bus system! 4-bit/8-bit parallel input

More information

Wafer Thinning and Thru-Silicon Vias

Wafer Thinning and Thru-Silicon Vias Wafer Thinning and Thru-Silicon Vias The Path to Wafer Level Packaging jreche@trusi.com Summary A new dry etching technology Atmospheric Downstream Plasma (ADP) Etch Applications to Packaging Wafer Thinning

More information

The CALICE test beam programme

The CALICE test beam programme Journal of Physics: Conference Series The CALICE test beam programme To cite this article: F Salvatore 2009 J. Phys.: Conf. Ser. 160 012064 View the article online for updates and enhancements. Related

More information

Pixel Detector Control System

Pixel Detector Control System Pixel Detector Control System DCS Workshop October 2001, Amsterdam Overview on the Pixel DCS Interlock Box Pixel DCS Hierachy First Experience with PVSS Outlook to work in 2002 Wishes for PVSS Estimated

More information

MICROLITHIC DOUBLE-BALANCED MIXER

MICROLITHIC DOUBLE-BALANCED MIXER Page 1 The is a Microlithic double balanced mixer. As with all Microlithic mixers (patent pending), it features excellent conversion loss, isolations, and spurious performance across a broad bandwidth

More information

Scan. This is a sample of the first 15 pages of the Scan chapter.

Scan. This is a sample of the first 15 pages of the Scan chapter. Scan This is a sample of the first 15 pages of the Scan chapter. Note: The book is NOT Pinted in color. Objectives: This section provides: An overview of Scan An introduction to Test Sequences and Test

More information

ATLAS Pixel Subsystem and Simulation

ATLAS Pixel Subsystem and Simulation ATLAS Pixel Subsystem and Simulation Charles Young On behalf of the SLAC ATLAS Team Annual DOE HEP Program Review (June 2007) 6/13/07 C. Young (Pixels and Simulation in ATLAS) 1 The Pixel Subsystem Basic

More information