1 P.O. Box 281 o Nome, Alaska ADDENDUM NO. 6 DATE: May 22, 2017 TO: Proposers FROM: Joy Baker, Project Manager RE: PORT OF NOME SECURITY CAMERA PROJECT RFP NOTES TO PROPOSERS: The Proposal submittal deadline remains the same of 3:00pm on June 1, 2017, and is not changed by this Addendum. Proposers must acknowledge receipt of all Addenda in their proposal. Failure to do so may subject the proposer to disqualification. This addendum consists of 14 pages. Contractor Performance Period begins August 1, 2017 with work completed by October 20, After project award, tentatively estimated to be June 12, 2017, an estimated 45 days will be required by the City to complete Layer 3 network and associated infrastructure. City will coordinate with awarded contractor on specific schedule following award. Facility Tours and Questions (Reference Request for Proposals for the Security Camera System Project, Section 7) A mandatory pre-proposal conference will be held at 2:00 p.m. on Tuesday, May 9, 2017 in the Council Chambers at 102 Division St., Nome, AK Addendum 2, Question 1, clarified that physical attendance at the pre-proposal conference was not required; participation could be by teleconference. At the referenced pre-proposal conference, it was noted Exhibit B1 was a photograph, not a controlled mosaic. It was highly recommended proposers not rely solely on the Exhibits, but in their sole discretion might wish to consider conducting an independent site visit if determined necessary or advisable, to perform any necessary verification of the depicted information. Two (2) proposers have contacted the City requesting and were accompanied on guided tours of project areas. Generally there has been unfettered access to the sites during regular business hours, so it is unknown if other proposers visited independently to review or ground truth information depicted on Exhibit B1 (photograph) or Exhibit 2 (location detail spreadsheet). g
2 P.O. Box 281 o Nome, Alaska If any other proposer desires a guided tour, please contact the Project Manager to schedule. Verbal questions will not be accepted or answered on a tour; questions or clarification requests must be submitted in writing. The deadline for requesting and conducting a tour is by May 25, 2017, the deadline (as revised in Addendum No. 3) for submitting written questions. ADDENDUM CHANGES, CLARIFICATIONS, AND RESPONSE TO WRITTEN QUESTIONS A. Fiber Access Points 1. (Reference: Addendum 4, Question/Response #2) Connection via wireless versus fiber connection is intended to be part of the proposal. Existing fiber connectivity (patch) locations have been identified. If additional fiber extensions or outdoor-rated PoE CAT cable for extension is required, it will be provided in-house by City/NJUS. The response was based on information request and intended to clarify Specification 1.1.7: (1) proposals can include wireless connectivity, (2) confirm fiber connectivity (patch) locations existing where wireless or wired options could gain network access, and (3) if the City determined additional fiber extensions or outdoor-rated PoE CAT cable extension for nodes was required, it would be provide in-house. The underlined text was erroneously omitted. The City subsequently identified two additional fiber extensions to be provided, outlined below. CHANGE: Addendum 4, Response #2 is revised: Connection via wireless versus fiber connection is intended to be part of the proposal. Existing fiber connectivity (patch) locations have been identified. No additional trenching will be provided by the City for fiber optic cable or CAT cable connections between any poles, including Poles H-I-J-K on the Industrial Pad. Sufficient pole space is available for an additional messenger cable to support additional fiber optic cable or intermediary CAT cable between a camera location and a node. The City will also consider the option of these cables being tied to the existing messengered fiber cable. Contractor must coordinate with the Utility any additional pole attachments proposed to be provided. Buried cable between any pole, if determined not to use an existing aerial route or an existing buried conduit, is the responsibility of the contractor. 2. (Reference: Addendum 5, Question/Response #16 and Exhibit B1-Revised ) g
3 P.O. Box 281 o Nome, Alaska NJUS will be extending/terminating a fiber cable from the Harbormaster Office to the Belmont Sewer Lift Station near new Pole E, making wired configuration possible. CHANGE: Fiber will be available at Pole E. (Extension of a fiber terminated cable will be made by City/NJUS from Harbormaster Office.) 3. (Reference: Addendum 5, Exhibit B1 Revised ) Fiber terminations exist at: Water Truck Shop CHANGE: Fiber will be available at Pole G. (Extension of a fiber terminated cable will be made by City/NJUS from Water Truck Shop.) 4. (Reference: Addendum 4, Question/Response 5) Fiber connectivity panels exist at Poles H and J. CHANGE: Fiber connectivity panels exist near Pole H and near J. (See Exhibit B2.1 photograph dated ) 5. (Reference: Addendum 5, Exhibit B1 Revised ) Existing fiber terminations (cross-connect or network access points) are identified at the Causeway, Port Industrial Pad, Harbor Office and Water Truck Shop. CHANGE: Exhibit B1 is revised It now identifies an additional fiber termination (cross-connect or network access point) on the Port Industrial Pad near the NJUS Tank Farm (blue tanks on southwest corner) as well as the NJUS Power Plant. B. Pole/Camera Locations 1. (Reference: Addendum 4, Question/Response #16) The City has previously deployed cameras (AXIS models P212, P214 and P3301) on an existing City monitoring network. Three (3) existing Port area cameras with limited or no reliability (one at Pole A & two at Pole C) are identified for replacement as part of this Project. 2. (Reference: Addendum 4, Exhibit B1 Revised and Location Detail Spreadsheet, Question/Response #3) a. Addendum clarified fiber termination points and modified the project segment on the Causeway containing Poles L-M-N to note cameras would not be mounted to High Mast Lights (HMLs); the City is placing new poles adjacent to the HMLs. g
4 P.O. Box 281 o Nome, Alaska CHANGE: See Exhibit B1 Revised , included with the Addendum. New pole locations are now identified as L1, M1, and N1. (See (See Exhibit B2.1 photograph dated ) Buried conduit will be provided by the City if required in this area for power/ connectivity between adjoining fiber termination points and new poles. b. Upon further evaluation, camera location at the Small Boat Harbor previously identified to be on Pole D is revised. CHANGE: See Exhibit B1 Revised and Exhibit B , included with the Addendum. Revised camera location now identified as D1 is to be on the southernmost light pole along the west Small Boat Harbor dock face. This location can only be served by a wireless option. c. The Port-owned GARCO Building has been identified on Exhibit B1 Revised On either side of this facility there are two long arrows. The start of the arrows is not intended to indicate camera locations, but additional desired viewing area. CHANGE: See Exhibit B1 Revised , included with the Addendum. The GARCO Building is identified. (For reference, the City GARCO Building is also indicated on photographic Exhibits B2.1 and B ) d. The City is responsible for network operations and has determined backup power is not required to be available at camera or intermediary devices supplied by the contractor. CHANGE: Section reference to the requirement for a disaster recovery plan is eliminated. However, Section 2.2.2, describing automated camera operation recovery after both short-term or longer term power failures, must be still be addressed. C. Work Stations/Monitors (Reference: Addendum 5, Question/Response #8) A minimum of 2 work stations w/ one large viewing monitor each will be needed in the Harbor office, plus a viewing only screen in the customer service area. The option for displaying camera views at other external locations is desired. g
5 P.O. Box 281 o Nome, Alaska CHANGE: Two (2) work stations are required with two (2) monitors attached to each station; one (1) 27-inch (with desk or wall mount option) and one (1) 48-inch (wall mount) monitor. Video card must have on-board processing capability, independent of work station CPU. Monitor connections and cabling provided with must allow the monitors to be located up to 50 feet away from work station. Specification A 1028 x 768 (viewing) resolution is preferred. Minimum resolution per camera for viewing must meet or exceed the minimum recording stream resolution (1920 x 1280). D. Storage-Archiving (Reference: Addendum 4, Question/Response #10) Real-time viewing is desired in high resolution. Storage recording archive to be configured to allow for a minimum 30-day review period. Archiving will be on motion detection (not full-time), estimated not to exceed 20% but may vary seasonally. Minimum frames per second = 15 at sufficient resolution to provide detail of activity captured. 30 FPS is desirable. Data recording to be configured in RAID 5 or 6. Further review results in the following changes to be considered in proposing storage recording archive size (disk requirements). CHANGE: o Minimum frames per second = 12 o Minimum resolution = 1920 x 1280 o Assumption: One-half of cameras will record-archive full time (24/7/365) One-half of cameras will record on motion detection, estimated not to exceed 40%, but may vary seasonally. E. Head-end equipment, location, space and available power (Reference: Addendum 4, Question/Response #9) 1. RFP Exhibit B was amended by above response to note change in location of head end equipment. Head-end server(s) equipment will be located in sufficiently-existing race space located at the NJUS Power Plant either Nome Police Department data centers, or both. The City will determine final location when server(s) space, switch and power requirements are known. RESTATEMENT: The City will determine final location when server(s) space, switch and power requirements are known. g
6 P.O. Box 281 o Nome, Alaska The Network Video Recorder (server) location remains to be determined by the City based on proposals received. Equipment will be located at existing data center(s) at the NJUS Power Plant or Nome Police Department. The City has determined the server(s) will be within one or both of these noted locations, not in the Harbormaster s Office (or other facility which could also be accessed/available through fiber network cross-connect). o Space requirements for server or any other required equipment at the server location must be clearly stated in the proposal. At least 6RU will be available in a cluster at cityselected location, with availability for additional space in the cluster space or in an adjoining data center rack. o Total power requirements must be stated in the proposal. Available electrical power in data center(s): 120V and/or 208V AC. 2. Specification 2.6 Server and Storage Specifications CHANGE (ADDITION): Server(s) and other equipment that will be located in data center(s) must be equipped with redundant power supplies. F. NETWORK SWITCHES, FIBER BACKBONE AND TESTING The City is providing main networking switches and the fiber optic backbone with sufficient integrity and quality for network operation between camera switches and network switch/servers, and will perform testing it determines required or desirable. The contractor is responsible to terminate connections with sufficient integrity and quality at any intermediary devices and cameras. G. EXHIBITS Exhibits B1 and 2 included with Addendum 4 and referenced in Addendum 5 are superseded by revisions dated , included herewith. Three additional photographs with annotations (B2.1 Port Industrial Pad Area, B2.2 Small Boat Harbor Area, and B2.3 Causeway Area, al dated ) are included herewith. Annotations are intended for general reference only; they have not been pinpointed by survey. Contractor should field-verify all depicted Exhibit information. g
7 P.O. Box 281 o Nome, Alaska H. CONTRACTOR WRITTEN QUESTIONS AND CITY RESPONSES The following written questions have been received. Responses are provided below each question. QUESTION #1: Will Performance/Payment Bonds be required with the resulting contract? Response #1: Yes, Performance & Payment Bonds will be required for this project per the following: BONDING REQUIREMENTS The following Contract Bonds are required: a. Payment Bond: 100% of the Total Project Bid amount b. Performance Bond: 100% of the Total Project Bid amount Payment and Performance Bonds may be either of the following: a. Corporate Surety (bonding company) b. Individual Surety: adequacy of individual surety will be determined by the Owner. Where individual sureties are used, two individual sureties must each put up one hundred percent (100%) of the bond requirement. Any costs incurred by a Contractor or personal surety shall be borne by the Contractor. QUESTION #2: Please confirm as was stated in the Pre-Bid Conference that the City will trench, bury conduit, install Fiber Optic (FO) cable, and provide stub up boxes between poles and between poles and the Harbor Master s Office as needed. QUESTION #3: Based upon statements at the Pre-Bid Conference, at this time it appears that a trench with FO cable will be needed from the FO cable stubbed up at Pole H to Pole I. QUESTION #4: Based upon statements made at the Pre-Bid Conference, at this time it appears that a trench with FO cable will be needed from Pole J to Pole K. QUESTION #5: Based upon statements made at the Pre-Bid Conference, at this time it appears that a trench with FO cable will be needed from Pole L to Pole M. RESPONSE #2-#5: See A.1. Also see photographic Exhibits, including B2.1, B2.2, and B2.3. QUESTION #6: Based upon Statements made at the Pre-Bid Conference, at this time it appears that a trench with FO cable will be needed from Pole D to the Harbor Master s Office.
8 P.O. Box 281 o Nome, Alaska RESPONSE #6: See B.1.b. QUESTION #7: Based upon Statements made at the Pre-Bid Conference and implied in the RFP documents, it appears that a trench with FO cable will be needed from new Pole E to the Harbor Master s Office. RESPONSE #7: See A.2. QUESTION #8: Please clarify if the contractor will be expected to run either CAT5E cable or FO cable overhead between any two poles and/or between any Pole and the Harbor Master s Office. RESPONSE #8: See A.1. Question #9: Please clarify that all existing FO cables terminate in the Harbor Master s Office. RESPONSE #9: The City has a vast fiber optic network. From any identified fiber termination node points on the Exhibits, the City can cross-connect fiber at identified locations back to Harbor Master s Office. QUESTION #10: The existing cameras are made by AXIS. Please give us the model numbers of these cameras? RESPONSE #10: See B.1. QUESTION #11: Does the Network Video Recorder and other network equipment go in the Police Department data center, the Nome Joint Utilities power plant or both? Please clarify that the head end equipment does not go in the Harbor Master s Office per clarifications-answers in Addendum #4 QUESTION #12: How much space for new equipment is available in the Police Department data center? QUESTION #13: How much space for new equipment is available in the Nome Joint Utilities power plant? QUESTION #14: What is the available electrical power at the Police Dept. data center? QUESTION #15: What is the available electrical power at the Nome Joint Utilities power plant? RESPONSE #11-15: See E.1.
9 P.O. Box 281 o Nome, Alaska QUESTION #16: The City of Nome will provide any additional fiber or CAT cable that is required and will provide any additional electrical power circuits that are required (per addendum No. 4). Who will terminate these City provided cables? RESPONSE #16: See A.1. QUESTION #17: Is this project federally funded? If so what agency is providing the funds? RESPONSE #17: See RFP Section 2.1. Additional required matching funding will be provided by the City of Nome Port Enterprise Fund. QUESTION #18: Do the Federal Acquisition Regulations apply to this project? RESPONSE #18: Information and requirements relating to the Federal 2015 Port Security Grant Program can be found at QUESTION #19: Have the existing fiber optic cables been tested for integrity and quality of signal? RESPONSE #19: See F. QUESTION #20: Per Addendum # 5, no back-up is required. What does the RFP refer to when it asks for information on disaster recovery? RESPONSE #20: See B.1.d. QUESTION #21: Addendum # 5 at response 5 references an Exhibit 2. Where is this document to be found? RESPONSE #21: Latest revision when Addendum 5 was issued was included with Addendum 4. Exhibits B1 and 2 are revised ( ) and included herewith. END OF ADDENDUM NO. 6
10 E Fiber terminations exist at: Water Truck Shop Harbor Office Poles E & G (in progress) Fiber Terminations exist north of H and near J, at Tank Farm and Power Plant. H Office > Pole A = 230' Pole A > B = 71' Office > C = 148' Pole C > D = (under 100') Office > Pole F = 30' Shop > Pole G = 320' Water Truck Shop Pole H > I = 170' Pole I > J = 180' Pole J > K = 216' G I Communications tower on NE corner of building is pole F J K Harbor Office F C A B E D1 Fiber Terminations exist near L & N L1 L1 Pole location just north of High Mast Base M1 Pole location just south of High Mast Base N1 Pole location just north of hydrant N1 M1 Existing poles shown as New pole needed Range of coverage areas PORT OF NOME SECURITY SYSTEM PROJECT PSGP: DHS-EMW-2015-PU S01 EXHIBIT B1 Revised
11 Port of Nome Security Camera Project Location Detail PSGP: DHS-EMW-2015-PU S01 Site Pole Specific Equipment needed Preferences Winter Area ID Location Pole Cabling Camera Zoom Pan Fixed Motion Sensor Cabling Notes SBH A Top of Light Pole at West Floating Dock x x x x " " " x x x x * SBH B Top of Light Pole at East Floating Dock x x x x x " " " x x x x * SBH C Top of Light Pole at North End Fish Dock x x x x x " " " x x x x * SBH D1 Top of Light Pole at Southernmost End of Fish Dock x x x x x requires wireless option SBH E Top of New Pole (installed by City) x x x x x * fiber will be provided at Pole E SBH F Top of Radio Tower at Port Office - Belmont St. x x x x x Tower is at NE Corner of Office. Cable CAT to city-provided inside switch? Pathway into " " " x x x x x building exists BB G Top of Light Pole at Seppala Dr. and Prospect Place x x x x x fiber will be provided at Pole G IP H Top of Northern Light Pole along East IP Bank + x x x x IP I Top of 2nd Light Pole from North along East IP Bank + x x x x IP J Top of 3rd Light Pole from North along East IP Bank + x x x x IP K Top of 4th Light Pole from North along East IP Bank + x x x x Cswy L1 Top of New Pole (installed by City) x # x x x * " " " # x x x x Cswy M1 Top of New Pole (installed by City) x # x x x * " " " # x x x x Cswy N1 Top of New Pole (installed by City) x # x x x * " " " # x x x x Legend: Notes: Options to consider: SBH - Small Boat Harbor # denotes fiber in nearby trench, not up poles *hibernation during winter BB - Belmont Beach + DENOTES AERIAL FIBER EXISTING ON POLES H AND J; selected views preferred for public URL access IP - Industrial Pad Cswy - Causeway aerial cabling pathway (by lashing or new messenger) exists EXHIBIT 2 - REVISED YELLOW HIGHLIGHTS REFLECT NEW OR REVISED INFORMATION Buried conduit exists Harbormast Office to A and to B where fiber or CAT connectivty exists Buried conduit exists between B-C fiber termination point available north of H and between J-K; buried conduit exist from NE pad corner to Pole H. Aerial pathway exists between H-K. New poles will be installed by City. Fiber termination point exists North of N and North of L. If required, buried cable raceway will be provided /jlb
12 CITY GARCO BUILDING Fiber Termination Node--> <--Pole K Fiber Termination Node------> <--Pole J <--Pole I <--Pole H AERIAL PATHWAY AVAILABLE BURIED CONDUIT ROUTE EXHIBIT B Fiber Termination Node-->
13 <--J <----AERIAL PATHWAY AVAILABLE----> I H _BURIED CONDUIT ROUTE_ < Fiber Termination Nodes > G E D1 [D] C <--Fiber Termination Node Harbormaster Office <<-Fiber Termination Node F A B EXHIBIT B
14 <-Fiber Termination Node K <-Fiber Termination Nodes-> )Area of Poles H, I, J <-Fiber Termination Node CITY GARCO BUILDING G [L] [M] <--Fiber Termination Node *L1 (new pole) [N] *M1 (new pole) <--Fiber Termination Node *N1 (new pole) EXHIBIT B
REQUEST FOR PROPOSALS PORT OF NOME SECURITY CAMERA SYSTEM PROJECT NOME, ALASKA
REQUEST FOR PROPOSALS PORT OF NOME SECURITY CAMERA SYSTEM PROJECT NOME, ALASKA OWNER: CITY OF NOME P.O. BOX 281 NOME, ALASKA 99762 907-443-6663 (PHONE) 907-443-5345 (FAX) The City of Nome will receive
More informationRETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP
RETURN THIS AMENDMENT TO THE ISSUING OFFICE AT: AMENDMENT (1) ONE to RFP 160000071 Department of Military and Veterans Affairs Division of Administrative Services Procurement Section P.O. Box 5800 Joint
More informationRequest for Proposals Fiber Optic Network Backbone Upgrades
Introduction Request for Proposals Fiber Optic Network Backbone Upgrades RFP Released on February 18, 2015 The Dexter R-11 Public School District is seeking proposals from qualified service providers to
More informationBILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School
BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street
More informationColorado River Union High School District 1004 Hancock Rd Bullhead City, AZ (928)
Colorado River Union High School District 1004 Hancock Rd Bullhead City, AZ 86442 (928) 758-3961 NOTICE OF REQUEST FOR PROPOSAL RFP NAME: 2018 MHS Office Low Voltage. MATERIAL OR SERVICE: CRUHSD is seeking
More informationFurnish & Install Video Surveillance System for Lot B. Exhibits
C-1443 Furnish and Install Video Surveillance System for Lot B Ernest N. Morial New Orleans Exhibition Hall Authority 900 Convention Center Boulevard New Orleans, LA 70130 ADDENDUM NO. 1 Project Name:
More informationMonday, January 7, 2019
ADDENDUM NO. 3 TO THE REQUEST FOR PROPOSALS (RFP) FOR VIDEO AND ACCESS CONTROL SYSTEMS VARIOUS LOCATIONS CITY WIDE FOR THE CITY OF HYATTSVILLE, MARYLAND RFP #DPW18-010 Monday, January 7, 2019 The City
More informationCASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS
CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of a centralized
More informationMarch 4 th, Addendum No. 1. Brooklyn College Systems Integrator Broadcast Television Equipment Project No: BY019/
Facilities Planning, Construction, and Management Office of Financial Management Procurement Services 555 West 57 th Street 11 th Floor New York, New York 10019 CUNY.Builds@mail.cuny.edu March 4 th, 2013
More informationCity of Winter Springs, FL
City of Winter Springs, FL Request for Quote RFQ/006/17/LS Commission Chambers Audio Visual System Upgrades The City of Winter Springs will be upgrading its Commission Chambers (Chambers) audio visual
More informationSAK Information Technology Department. Invitation to Bid For the Implementation Of IP-CCTV
SAK Information Technology Department Invitation to Bid For the Implementation Of IP-CCTV Release Date: Oct 22, 2013 Table of Contents. 1.1 Introduction 03 1.2 Brief About The design 03 1.3 RFP Contact
More informationSECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA
SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA TABLE OF CONTENTS Section Title Page 5901 GENERAL... 2 5902 DESIGN CRITERIA... 2 5902.1 Codes and Standards... 2 5902.2 Signal
More informationCASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS
CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of: a door card
More informationPURCHASING DEPARTMENT. Project # Addendum # # of pages Original Issue Date Request Doc # April 15, see text below
PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.norwalkct.org Adobe Acrobat reader is required to view this document. If you do
More informationRequest for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling
Request for Quote E- Rate Eligible Services Scope of Work Network Infrastructure and Structured Cabling Due Date: Allowable Contract Date from Posted 470 The Clarkdale- Jerome School District is requesting
More informationTEXAS LOTTERY COMMISSION REQUEST FOR PROPOSALS FOR DRAWING STUDIO AND PRODUCTION SERVICES # RESPONSES TO PROPOSERS QUESTIONS
TEXAS LOTTERY COMMISSION REQUEST FOR PROPOSALS FOR DRAWING STUDIO AND PRODUCTION SERVICES #362-14-0003 RESPONSES TO PROPOSERS QUESTIONS January 28, 2014 REQUEST FOR PROPOSALS FOR DRAWING STUDIO AND PRODUCTION
More informationRequest for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points
Request for Quote E- Rate Eligible Services Scope of Work - Wireless LAN and Cabling for Access Points Due Date: Allowable Contract Date from Posted 470 The Palo Verde Elementary School District is requesting
More informationGolden Empire Transit District Addendum #3 to Request for Proposals # G061 On-Board Video Surveillance System
Golden Empire Transit District Addendum #3 to Request for Proposals # G061 On-Board Video Surveillance System Golden Empire Transit District is issuing this Addendum to respond to questions raised by parties
More informationRequest for Proposal Questions and Responses. Request for Proposal: Software Based CMED Radio Console and Associated Equipment
Request for Proposal Questions and Responses Request for Proposal: Software Based CMED Radio Console and Associated Equipment Proposal Due Date: Friday December 14, 2018 All Prospective Proposers: In reference
More information2. Are there any outside connectivity requirements? No, we will not have a need to allow outside devices to connect
AUDIO VIDEO PROCUREMENT, INSTALLATION AND CONFIGURATION CCUA BID No. 14/15-A12 CCUA Job# 2015-047 PRE-BID CONFERENCE MEETING QUESTIONS AND ANSWERS June 15, 2015 1. Where will the controls be? Video controls
More informationADDENDUM #3. SPECIAL NOTE: Addendum #3 information shall supersede the information contained in the Contract Documents
WESLEYAN U N I V E R S I T Y Facilities 170 Long Lane Middletown, Connecticut 06457 (860) 685-3476 FAX (860) 685-3101 ADDENDUM #3 Date: March 4, 2013 Project: To: CFA A Rehearsal Hall AHU Replacement Annual
More informationHONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA
Section 00000 SECURITY ACCESS AND SURVEILLANCE HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA PART 1 GENERAL 1.01 SUMMARY The intent of this document is to specify the minimum criteria for the
More informationFacilities Management Design and Construction Services
Facilities Management Design and Construction Services ADDENDUM NO. 1 April 4,, 2019 REQUEST FOR PROPOSALS AUDIO/VISUAL SYSTEMS Indefinite Delivery Indefinite Quantity (IDIQ) UNIVERSITY OF ARKANSAS, FAYETTEVILLE
More informationADDENDUM NO. 1 FDVA-ITB B ITB TITLE: JENKINS AUDIO/VIDEO SECURITY SYSTEM ISSUE DATE: THURSDAY, JUNE 30, 2016
Glenn Sutphin Interim Executive Director State of Florida DEPARTMENT OF VETERANS AFFAIRS Division of Administration and Public Information 11351 Ulmerton Road, #311-K Largo, FL 33778-1630 Phone: (727)
More informationSECTION 686 VIDEO DECODER DESCRIPTION
686 SECTION 686 VIDEO DECODER DESCRIPTION 686.01.01 GENERAL A. This specification describes the functional, performance, environmental, submittal, documentation, and warranty requirements, as well as the
More informationATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION
ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, insurance, accessories, tools, transportation, supplies,
More informationTarget Interface / Construction Compliance Inspection Checklist
A. Targets Quantities meet DD, applicable TC -, and CEHNC Design Guide 0-- (Standard is single UTOs and Double UTOs) B. Roads-Service, Lanes Adequate access is provided to the and AAR D. Testing Results-provided
More informationTelecommunication Infrastructure Project September 20, 2002
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Testing Publications and Standards B. Category rated UTP systems shall be provided and tested in accordance with the performance level established in Specification
More informationSECTION TESTING, IDENTIFICATION AND ADMINISTRATION
PART 1 - GENERAL 1.1 SUMMARY SCOPE SECTION 25170 TESTING, IDENTIFICATION AND ADMINISTRATION 1. This section includes the minimum requirements for the testing, certification administration and identification
More informationCOLUMBIA COUNTY, WISCONSIN COURTROOM VIDEO CONFERENCE & AV SYSTEMS REQUEST FOR PROPOSALS
COLUMBIA COUNTY, WISCONSIN COURTROOM VIDEO CONFERENCE & AV SYSTEMS REQUEST FOR PROPOSALS Optional Pre-Bid Conference: June 7, 2017, at 1:00 p.m. CST Columbia County Administration Building 112 E. Edgewater
More informationREQUEST FOR PROPOSALS: FOR AN INTEGRATED IN-CAR AND BODY-WORN VIDEO MANAGEMENT SYSTEM
REQUEST FOR PROPOSALS: FOR AN INTEGRATED IN-CAR AND BODY-WORN VIDEO MANAGEMENT SYSTEM Addendum #1 Responses to Vendor Questions August 17, 2017 El Centro Police Department John Seaman, Sergeant Question
More informationDESIGN STANDARD FOR AUDIOVISUAL SYSTEMS
DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS General: The SCC is intent on moving to 21 st century unified communications and data systems, consistent with industry standards and best practices as they evolve.
More informationPOTCSC - Integrated Small Target Detection Radar and Acoustic Deterrence System RFP Questions and Answers
Question 1: Specification Sections 26 05 00, 1.4, A, 1 and 1.4, K, 4, d require O&M manuals to be in original manufacturer printed stock. Can the Contractor print electronic, manufacturer-produced O&M
More informationVerizon NY Section 2 Network Services Issue C, December, 2001
Verizon NY Section 2 Evaluating Requests 2.01 While inquiries for information will be accepted in any form, requests for licensing agreements regarding Pole Attachments, Conduit Occupancy and/or (private
More informationFamily Health Centers, Inc. Request for Proposal. for. Family Health Centers East Broadway Data and Communications Cabling Project
Family Health Centers, Inc. Request for Proposal for Family Health Centers East Broadway Data and Communications Cabling Project Date Issued: 06/07/2014 Date Due: 06/16/2014 Page 1 of 22 Table of Contents
More informationUNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE
UNIVERSITY of NORTH DAKOTA LOW VOLTAGE COMMUNICATIONS STANDARDS FOR CABLING, PATHWAYS, AND SPACE Prepared in cooperation and approval from BICSI Building Industry Consulting Services International and
More informationPurchasing Department Finance Group INVITATION TO BID
Purchasing Department Finance Group July 3, 2013 INVITATION TO BID The City of Norwalk is soliciting bids for the Building Management Department for Network Video Recording (NVR) Equipment for the existing
More informationSTRUCTURED CABLE SYSTEM (SCS)
PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated
More informationAerial Cable Installation Best Practices
Aerial Cable Installation Best Practices Panduit Corp. 2007 BEST PRACTICES Table of Contents 1.0 General... 3 2.0 Introduction... 3 3.0 Precautions... 4 4.0 Pre-survey... 5 5.0 Materials and Equipment...
More informationREQUEST FOR PROPOSALS UK Audiovisual System to Renovate/Expand the Law Building ADDENDUM #2 1/16/2019
REQUEST FOR PROPOSALS UK-1893-19 Audiovisual System to Renovate/Expand the Law Building ADDENDUM #2 1/16/2019 ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. IMPORTANT:
More informationCITY OF DIXON REQUEST FOR PROPOSAL
CITY OF DIXON REQUEST FOR PROPOSAL PROFESSIONAL AND SPECIALIZED SERVICES FOR REMOVAL AND REPLACEMENT OF AUDIO AND VIDEO EQUIPMENT IN THE CITY COUNCIL CHAMBER FOR THE CITY OF DIXON Publishing Date: November
More informationDESIGN STANDARD FOR AUDIOVISUAL SYSTEMS
DESIGN STANDARD FOR AUDIOVISUAL SYSTEMS General: Solano Community College (SCC) is intent on moving to 21 st century unified communications and data systems, consistent with industry standards and best
More information1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience
Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GENERAL
More informationPrimex Wireless, Inc. July, Wells Street Lake Geneva, WI
Division 0 0 0 0 Primex Wireless, Inc. July, 00 Wells Street Lake Geneva, WI 00--0 www.primexwireless.com Product Guide Specification Specifier Note: This product specification is written according to
More informationCHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT
CHABOT- LAS POSITAS COMMUNITY COLLEGE DISTRICT Purchasing and Warehouse Services Department October 1, 2007 Addendum No. 1 INVITATION FOR BID No. 08-09 Temporary Faculty Offices, Chabot College All Prospective
More informationELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE
ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE E0.01 FIRST FLOOR DEMOLITION E1.01 10 E2 11 12 12 G2 14 15 D1 D2 17 18 18 19 1 2 3 4 19 21 1 3 2 4 5 1 3 2 4 5 7 6 7 A2 E1 C2 A2 H1 H2 A1 E1 E2 6 8 A1 11 C1
More informationELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE
ELECTRICAL LEGEND NOTES AND FIXTURE SCHEDULE E0.01 FIRST FLOOR DEMOLITION E1.01 10 E2 11 12 12 G2 14 15 D1 D2 17 18 18 19 1 2 3 4 19 21 1 3 2 4 5 1 3 2 4 5 7 6 7 A2 E1 C2 A2 H1 H2 A1 E1 E2 6 8 A1 11 C1
More informationMediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98)
Mediacom Upgrade/Splicing Procedures (based on original document from Corporate dated 4/16/98) 1. Splicing specifications are provided by Mediacom, but due to resplice conditions, many locations become
More informationREQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus
REQUEST FOR QUOTE: TELECOMMUNICATIONS CABLING Library/Classroom Building, Beltline Campus PART 1: GENERAL REQUIREMENTS A. Contractor Work 1. Provide and install (except as noted in this document), cable,
More informationDT RFP # Public Safety Building Microwave Radio Communication System Design-Build Services. e-questions and Answers April 10, 2014
1. Are City/County building permits required for the microwave equipment installation? No, permits are not required for the microwave equipment installation. 2. Twin peaks structural- The RFQ states that
More informationTelephone, Cable TV, Radio Contract San Diego Convention Center
Telephone, Cable TV, Radio Contract San Diego Convention Center Exhibitor Company Name: Show Name: Billing Company Name: Show Dates: / / To / / Billing Company Address: Incentive Order Deadline: 14 Days
More informationFLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO.: 2 Date: January 16, 2015 To: From: All Bidders Greg Hill, Procurement Agent Subject: Questions & Answers LED Based Open/Closed Embedded Signage Insert:
More informationVERIZON MARYLAND INC.
VZ MD 271 Attachment 207 VERIZON MARYLAND INC. Methods and Procedures for Access To Poles, Ducts, Conduits and Rights-of-Way for Telecommunications Providers VERIZON MARYLAND INC. Methods and Procedures
More informationADDENDUM NO. 1 CITY OF FREDERICK
September 19, 2017 ADDENDUM NO. 1 To: All Potential Proposers Subject: RFP 18-C AV Control Room Upgrade Consisting of: Pre-Proposal Meeting Minutes and Sign-in Sheet, Boardroom Diagram, City Hall As-Built
More information1. Can companies based outside of the United States respond to this RFP?
University of West Florida Procurement and Contracts 11000 University Parkway Bldg. 20W, Rm 159 Pensacola, FL 32514 June 20, 2017 ADDENDUM NUMBER # 1 16ITN-10BP Pay-For-Print Kiosk Solution for Student
More informationPreparing a home for TransACT fibre-to-the-premise (FTTP) services
Preparing a home for TransACT fibre-to-the-premise (FTTP) services A guide for builders, telecommunications cablers and home owners transact.com.au For more information call TransACT s FTTP Sales Manager,
More informationINVITATION TO BID SURVEILLANCE SYSTEM UPGRADE
INVITATION TO BID SURVEILLANCE SYSTEM UPGRADE You are hereby invited to submit a bid to upgrade an existing surveillance system within the City of Compton, as follows: Upgrade an existing City of Compton
More informationCalifornia Polytechnic State University ITS Telecommunications PART 1 GENERAL SECTION AUDIO VISUAL STATION CABLES 1.
PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such construction, all materials and equipment incorporated
More informationRFP No R VIDEO PRODUCTION SYSTEMS & INSTALLATION FOR ANNE ARUNDEL COUNTY PUBLIC SCHOOLS. ADDENDUM NO. 2 April 21, 2016
County Executive Steven R. Schuh RFP No. 16-058R VIDEO PRODUCTION SYSTEMS & INSTALLATION FOR ANNE ARUNDEL COUNTY PUBLIC SCHOOLS ADDENDUM NO. 2 April 21, 2016 TO ALL BIDDERS: PLEASE NOTE THE FOLLOWING CHANGES:
More informationEngineering Instruction
Engineering Instruction Electrical Distribution Unit Approved by: Paul Poynton, A/Professional Head Electrical Engineering, Sydney Trains Authorised by: Jonathon McKinnon, Engineering Technical Publications
More informationRequest for Proposal, 15MCO503 VIDEO VISITATION Date Required: Thursday, Jun 4, 2015 Time Required: 3:00 PM Local Time
Request for Proposal, 15MCO503 VIDEO VISITATION Date Required: Thursday, Jun 4, 2015 Time Required: 3:00 PM Local Time The following document contains questions submitted by Prospective Bidders and the
More informationVNP 100 application note: At home Production Workflow, REMI
VNP 100 application note: At home Production Workflow, REMI Introduction The At home Production Workflow model improves the efficiency of the production workflow for changing remote event locations by
More informationELIGIBLE INTERMITTENT RESOURCES PROTOCOL
FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 848 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL FIRST REPLACEMENT VOLUME NO. I Original Sheet No. 850 ELIGIBLE INTERMITTENT RESOURCES PROTOCOL Table of Contents
More informationRFP P2019, North Cobb HS Scoreboard and Videoboard
1. VU Score Sec. 5.1-10 x30 generally refers to the older light bulb technology scoreboards, which needed more face room; most of your newer LED digit scoreboards are 8 tall. May I assume an 8 x30 minimum
More informationSapling IP Clock System Section Master Guide Specification Page 1 October 2013
Master Guide Specification Page 1 SAPLING GUIDE NOTE: This master specification section includes guide notes identified as SAPLING GUIDE NOTE for information purposes and to assist the specification writer
More informationLyndhurst Secondary Technology Package Addendum # Bid Date: Wednesday, August 30, 1:00PM. Items issued in this addendum:
Lyndhurst Secondary Technology Package Addendum #7 8.29.2017 Bid Date: Wednesday, August 30, 2017 @ 1:00PM Items issued in this addendum: A. Contractor questions and responses B. Clarifications A. Contractor
More informationSECTION FIBER OPTIC STATION CABLES
PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications shall include all labor necessary to perform and complete such construction, all materials and equipment incorporated
More informationTownship of Egg Harbor August 15, 2011 Planning Board
Township of Egg Harbor August 15, 2011 Planning Board Solicitor: Engineer: Planner: Christopher Brown, Esq.(Ted Strickland, Esq., in attendance for Solicitor Brown) James Mott, P.E. (Mott and Associates),
More information1.0 GENERAL. 1.2 SUMMARY.1 Section Includes:
1.0 GENERAL 1.1 DOCUMENTS.1 This section of the Specification forms part of the Contract Documents and is to be read, interpreted, and coordinated with all other parts. 1.2 SUMMARY.1 Section Includes:
More informationREQUEST FOR PROPOSALS UK Audiovisual System to Renovate/Expand the Law Building ADDENDUM #3 1/17/2019
REQUEST FOR PROPOSALS UK-1893-19 Audiovisual System to Renovate/Expand the Law Building ADDENDUM #3 1/17/2019 ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. IMPORTANT:
More informationUNM IT/Telecommunications Guide Specification Labeling 11/07/
Labeling 1 PART 1: GENERAL 1.01 SCOPE OF WORK A. Work covered by this Section shall consist of furnishing labor, equipment, supplies, materials, and testing unless otherwise specified, and in performing
More informationChallenges of Launching DOCSIS 3.0 services. (Choice s experience) Installation and configuration
(Choice s experience) Installation and configuration (cont.) (Choice s experience) DOCSIS 3.0 Components M-CMTS deployment DTI Server Edge QAM Modular CMTS I-CMTS Integrated CMTS Integrated DOCSIS 3.0
More informationSapling Synchronous Communication Clock System Section Master Guide Specification Page 1 October 2013
Master Guide Specification Page 1 SAPLING GUIDE NOTE: This master specification section includes guide notes identified as SAPLING GUIDE NOTE for information purposes and to assist the specification writer
More informationThe University of Texas at Austin September 30, 2011
SECTION 27 08 20 COPPER TESTING PART 1 - GENERAL 1.1 SUMMARY A. Test measurements shall be taken for all balanced-twisted pair cabling, including horizontal and backbone copper cables and wall-to-rack
More informationSECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES
2017 - SECTION 25 CLOSED CIRCUIT TELEVISION INSPECTION OF SEWER LINES 25.1 GENERAL This section of the specifications shall form a part of the contract documents and should be read in conjunction with
More informationCAPEX and OPEX Savings in HD Camera Deployments Using a Powered Fiber Cable System. Chris Raynor CommScope
CAPEX and OPEX Savings in HD Camera Deployments Using a Powered Fiber Cable System Chris Raynor CommScope The rise of Security Cameras Where are cameras? Source: http://www.emc.com/collateral/solution-overview/h14230-federal-surveillance-market-so.pdf
More informationATND Series White Paper
Direct to Dante Protocol Why Dante Consultants, contractors, and end users have long been aware that when they ask for more out of their AV systems, they can expect the cost to rise usually exponentially.
More informationSapling Wireless Clock System Section Master Guide Specification Page 1 October 2013
Master Guide Specification Page 1 SAPLING GUIDE NOTE: This master specification section includes guide notes identified as SAPLING GUIDE NOTE for information purposes and to assist the specification writer
More informationBUSD Ramona Middle School Gymnasium Project AV Project
BUSD Ramona Middle School Gymnasium Project AV Project Scope: Provide all part necessary for the completion of an AV System for the new Middle School Gymnasium per the attached parts lists and drawings.
More informationInvitation to Bid SCOREBOARD - WHH
Invitation to Bid SCOREBOARD - WHH Responses to an Invitation to Bid will be received by the Purchasing Supervisor, Sumner County Board of Education, 1500 Airport Road, Gallatin, TN 37066 for SCOREBOARD
More informationVERINT EDGEVR 200 INTELLIGENT DIGITAL VIDEO RECORDER (Rev A)
VERINT EDGEVR 200 INTELLIGENT DIGITAL VIDEO RECORDER (Rev A) TECHNICAL SPECIFICATIONS SECURITY SYSTEM DIVISION 28 ELECTRONIC SAFETY AND SECURITY LEVEL 1 28 20 00 ELECTRONIC SURVEILLANCE LEVEL 2 28 23 00
More informationPage 1 of 6 PROCUREMENT PROCEDURE OF CPRI (NON WORKS) Revision No. : 03 Issue No : 2 Dt of Revision : Issue Dt. :
Page 1 of 6 1 Place where equipment /service to be supplied /provided SHORT-CIRCUIT LAB : CPRI BENGALURU 2 Scope Supply, Installation and Training Page 2 of 6 3 CAMERA i) Full HD Image with Video Capturing
More informationStriking Clarity, Unparalleled Flexibility, Precision Control
Striking Clarity, Unparalleled Flexibility, Precision Control Product Brochures English 460XW 460C 460C 800 ieditor The - tents and processed camera inputs to provide the monitoring by supporting camera
More informationMinimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE)
PART 1: GENERAL 1.01 Telecommunications Engineer Minimum qualifications for the Telecommunications Engineer are: A. Texas Licensed Profession Engineer (PE) B. Registered Communications Distribution Designer
More informationDepartment of Corrections Facilities Bureau Security Equipment Solicitation #TO8133
Department of Corrections Facilities Bureau Security Equipment Solicitation #TO8133 General Information: The Department of Corrections Facilities Bureau seeks bids for CCTV and Audio Equipment, delivery,
More informationCI-218 / CI-303 / CI430
CI-218 / CI-303 / CI430 Network Camera User Manual English AREC Inc. All Rights Reserved 2017. l www.arec.com All information contained in this document is Proprietary Table of Contents 1. Overview 1.1
More informationThe GTP-32 Control Processor helps you solve equipment interface, control and monitoring problems, quickly and easily
12843 Foothill Blvd. Suite C Sylmar, California 91342 V: 818.898.3380 F: 818.898.3360 sales@dnfcontrols.com www.dnfcontrols.com helps you solve equipment interface, control and monitoring problems, quickly
More informationREPORT TO THE PLANNING COMMISSION
REPORT TO THE PLANNING COMMISSION Meeting Date: May 13, 2015 Application: Design Review PDR15-0006 Location / APN: Near 19700 Prospect Road / 386-35-070 Owner / Applicant: Staff Planner: City of Saratoga
More informationSITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018
DATE: 04/03/2018 TO: The Contractor FROM: System Protection & Control Projects 20413 SUBJECT: Technical Specifications for Center Park APSTF Project PROJECT OVERVIEW This is a general specification that
More informationSPECIAL SPECIFICATION :1 Video (De) Mux with Data Channel
1993 Specifications CSJ 0924-06-223 SPECIAL SPECIFICATION 1160 8:1 Video (De) Mux with Data Channel 1. Description. This Item shall govern for furnishing and installing an 8 channel digital multiplexed
More information1.1 Introduction Getting Connected Guide - Wireless Setting up a Wireless Network Getting Connected Guide - Wired...
PCTV SERVICE MANUAL Introduction CHAPTER 1: INTRODUCTION 1.1 Introduction...1 CHAPTER 2: NETWORK CONFIGURATION & SETUP 2.1 Getting Connected Guide - Wireless...3 2.2 Setting up a Wireless Network...5 2.3
More informationSTAFF REPORT TO THE CITY COUNCIL. The Mayor and Members of the City Council. Margaret Roberts, Administrative Services Director
STAFF REPORT TO THE CITY COUNCIL DATE: Regular Meeting of March 25, 2014 TO: SUBMITTED BY: SUBJECT: The Mayor and Members of the City Council Margaret Roberts, Administrative Services Director Upgrade
More informationSECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.
SECTION 33 71 49.23 MEDIUM VOLTAGE CABLE INSTALLATION PART 1 GENERAL 1.1 SCOPE A. Work included in this Section: Medium Voltage Cable (4 kv and 12 kv) Installation and Termination. Removal and return of
More informationReview of the Comcast. Fort Collins Cable System. Technical Characteristics
Review of the Comcast Fort Collins Cable System Technical Characteristics Prepared by: January 30, 2004 Dick Nielsen Senior Engineer CBG Communications, Inc. Introduction and Background CBG Communications,
More informationAmendment No. 1 SOLEDAD UNIFIED SCHOOL DISTRICT Request for Proposal DISTRICT NETWORK CABLING UPGRADE
March 4, 2016 Amendment No. 1 SOLEDAD UNIFIED SCHOOL DISTRICT 2016 Request for Proposal DISTRICT NETWORK CABLING UPGRADE NOTICE TO ALL BIDDERS This amendment is made a part of the above entitled specifications
More informationRequest for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS
VOFP Cabling RFP 1 Request for Purchase DESIGN AND INSTALLATION OF STRUCTURED COMMUNICATIONS CABLE SYSTEMS For The Village of Franklin Park 2014 VOFP Cabling RFP 2 TABLE OF CONTENTS I. PROJECT DESCRIPTION
More informationMOTOROLA CANOPY APPLICATION NOTE: REMOTE ACCESS POINT. Issue 1
MOTOROLA CANOPY APPLICATION NOTE: REMOTE ACCESS POINT Issue 1 TABLE OF CONTENTS Introduction...1 Configuration...1 Deployment...2 Antenna Characteristics...5 i The information in this publication is subject
More informationOCC Installation Figure 8 Guidelines Excerpt from Optical Cable Corporation s INSTALLATION GUIDE
Installation Figure 8 Guidelines Excerpt from Optical Corporation s INSTALLATION GUIDE Figure 8 A figure 8 fiber optic cable design incorporates a steel or dielectric messenger into the fiber optic cable
More informationNew York MX700 Room. PWD-NY5-MX700-P60 List Price: $11, SLA Price: $1,100.00/year (Other options available See Appendix B)
New York MX700 Room PWD-NY5-MX700-P60 List Price: $11,000.00 SLA Price: $1,100.00/year (Other options available See Appendix B) Statement of Work (SoW) Project Summary RoomReady will install the following
More informationPoE: Adding Power to (IoT)
Sponsored by: PoE: Adding Power to (IoT) Sponsored by: December 20th, 2018 1 Today s Speakers Sponsored by: Steve Bell Senior Analyst - IoT Heavy Reading Mohammad Shahid Khan Chief Manager (PLM & AE),
More information