KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB
|
|
- Christina Lyons
- 5 years ago
- Views:
Transcription
1 KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac Continuous injection (CI) scheme Maintenance and R&D at CI scheme Upgrade for SuperKEKB Schematic MOP31 S.Ohsawa et al. Rf source (rf window) THP58 S. Michizono et al. SKIP THP61 T.Sugimura et al. Acceleration structure THP29 T.Kamitani et al. Dummy load Summary Linac Conference 2004 (Aug.,18,2004) 1/32
2 Superconduct ing cavities (HER) Each length: KEKB B-Factory e- ARES copper cavities (HER) 3018 m e+ Belle detector KEKB schematic ARES copper cavities (LER) 8 GeV e- ->HER 3.5 GeV e+ ->LER TRISTAN tunnel e+ target Linac Conference 2004 (Aug.,18,2004) 2/32
3 Operation Statistics PF PF PF/ AR run TRISTAN TRISTAN- AR KEKB const KEKB 2.5GeVe- e+ 8GeVe- / 3.5GeVe+ 8,000 6,000 4,000 2, (1) operation time (hour) (2 ) failure (%) (3) hum an resources year Linac Conference 2004 (Aug.,18,2004) 3/32
4 100,000 hours operation since 1982 Many of them are still working for accelerator physics! Linac Conference 2004 (Aug.,18,2004) 4/32
5 Operation status Total operation time reached 100,000 hours on March,2003. Machine failure is limited less than 5 %. Linac Conference 2004 (Aug.,18,2004) 5/32
6 Continuous Injection (CI) Scheme traditional CI since Jan.,2004 Effective luminosity increases ~20% Linac Conference 2004 (Aug.,18,2004) 6/32
7 Beam on time after CI scheme Careful beam tuning and short maintenance are required at CI. KEKB CI Linac Conference 2004 (Aug.,18,2004) 7/32
8 Dip test In order to find out the emission decrease of the klystrons, dip tests are applied to all the klystrons. Deeper dip -> operation near the shoulder. heater off time: 60 sec. Total measurements: within 10 min. Example of emission decrease 2.00 micro-perviance Sep.,2003 Dec.,2003 Mar.,2004 May, Time [sec.] Linac Conference 2004 (Aug.,18,2004) 8/32
9 Dip test Periodical measurements of the dip -> find out the emission decrease with time D ip tests at klystron gallery /09 12 KLY rem oval 03/12 K LY rem oval % /03 04/ A1 A2 A3 A4 B1 B2 B3 B4 B5 B6 B7 B8 C1 C2 C3 C4 C5 C6 C7 C Klystron gallery unit Linac Conference 2004 (Aug.,18,2004) 9/32
10 Energy spread feedback Feedback systems Energy feedback -> done Position feedback -> done Energy spread feedback -> tested with 8 electrodes BPM Linac Conference 2004 (Aug.,18,2004) 10/32
11 KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac Continuous injection (CI) scheme Maintenance and R&D at CI scheme Upgrade for SuperKEKB Schematic Rf source SKIP Acceleration structure Dummy load Summary Linac Conference 2004 (Aug.,18,2004) 11/32
12 Schematic of SuperKEKB 8 GeV positron 4.1 A New collision point design 3.5 GeV electron 9.6 A Energy exchange: e-: 8 GeV -> 3.5 GeV e+; 3.5 GeV -> 8 GeV Linac Conference 2004 (Aug.,18,2004) 12/32
13 Upgrade of the injector linac 8 GeV e- / 3.5 GeV e+ 8 GeV e+ / 3.5GeV e- Two-bunch operation kicker ~80 m S-band (2856 MHz) C-band(5712 MHz) (#3 ~ #5 sectors) Linac Conference 2004 (Aug.,18,2004) 13/32
14 Linac Accelerator module (From S-band To C-band) MOP31 S.Ohsawa et al. Present S-band accelerator module New C-band accelerator module Wave guide Pulse Modulator S-band SLED 41 MW 4 µs S-band Klystron Wave guide 40 MW 2 µs C-band compressor Pulse Modulator C-band Klystron Wave guide C-band compressor Pulse Modulator C-band Klystron 40 MW 2 µs S-band accelerating sections C-band accelerating sections Accel. field gradient = 21 MV/m Accel. field gradient = 42 MV/m Linac Conference 2004 (Aug.,18,2004) 14/32
15 Overview of C-band rf system C-band rf system from #3 to #5 sector Forty eight klystrons are installed (instead of 24 S-band klystrons) RFSystem Diagram C-band Plan(example) 10kW AMP. e- 100m 114 MHz SHB1 ElectronGun 100m 571 MHz SHB2 High Power ATT/Phase Shifter 1kW Amp. System Trigger System 20m MR Prebuncher Buncher ACC Guide SB-A 10 MHz 508 MHz 40m 5m SectorA Counter CW 571 MHz 5m SB-B Ref. Signal Generator 114 MHz (FMD-30) Coaxial Lines 30m 80m Sector B MAINDRIVE LINE SB-C 571 MHz SB MHz 30m Optical Lines 15m E/O 1kW Amp. System O/E Driver 60kW S-band Klystron SUB DRIVELINE(39D) IΦA C-band Waveguide Driving Line SUB-BOOSTER 2 50MW S-band Klystron SLED IΦA SUB-BOOSTER kWC-band Klystron SUB DRIVE LINE(WG) 50MC-band Klystron Target ACC ACC Sector C Sector 1 e+ e- Sector 2 Sector 3-1 Sector 3-2 Sector 4-1 Sector4-2 Sector 5-1 Sector MHz SLED Linac Conference 2004 (Aug.,18,2004) 15/32 SB3-2 SB4-1 SB4-2 SB5-1 SB C-band klystrons
16 KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac Continuous injection (CI) scheme Maintenance and R&D at CI scheme Upgrade for SuperKEKB Schematic Rf source (LLRF, Modulator, high-power klystron, rf window) SKIP Acceleration structure Dummy load Summary Linac Conference 2004 (Aug.,18,2004) 16/32
17 Driver klystron Retune the existing C-band 200 kw klystron for weather observation station (MELCO). Driver klystron (SB) can deliver >100 kw (35 kv). Same modulator and HV supply to S-band system is used. Klystron and magnet kV m ag:22.3a/22.3a/22.3a 35kV m ag:17.0a/17.0a/17.5a 27kV m ag 15.6A/16.8A/11.7A SBK modulator P out[kw ] Pin=0.16W mag:22.3a /22.3A /22.3A 50 P out[kw ] Pin[W ] Linac Conference 2004 (Aug.,18,2004) 17/32 V[kV]
18 Compact modulator By using invertor P.S., the modulator size can be 1/3 (4.7 m->1.8 m). Present PFN and Thyratron are reused at new modulator. Present modulator Compact modulator Thyratron Linac Conference 2004 (Aug.,18,2004) 18/32
19 C-band klystron C-band 50 MW klystron is commercially available. (developed by KEK for linear collider) Y. Ohkubo, H. Yonezawa, T. Shintake, H. Matsumoto and N. Akasaka, HighTHE C-BAND 50MW KLYSTRON USING TRAVELING-WAVE OUTPUT STRUCTURE, Linac98, Chicago, p.932. Linac Conference 2004 (Aug.,18,2004) 19/32
20 R&D of c-band rf window Requirements: 50 MW 2 µs ( S-band 50 MW 4 µs) About Sixty S-band rf windows are successfully operated in KEKB linac. (MTBF > 40,000 h.) Electric fileds should be less than rf windows used in S-band linac. Mix-mode window (TE11+TM11) enables to lower the edge electric field. Electric field at center of the ceramics [MV/m@50MW] Electric field at edge of the ceramics [MV/m@50MW] Maximum electric field on the ceramics [MV/m@50MW] S-band C-band Band width [MHz](VSWR<1.2) VSWR M Hz frequency [GHz] THP58 S. Michizono et al. Linac Conference 2004 (Aug.,18,2004) 20/32
21 Mix-mode rf window 4-Rc1/8 ネジ 4-1/4"SWL FLANGE- MALE FLANGE- FEMALE ( ) ( ) ( ) THP58 S. Michizono et al. Linac Conference 2004 (Aug.,18,2004) 21/32
22 Resonant ring in the shield High power tests of the window was carried out by resonant ring. Rough tuning: spacer Fine tuning: operation frequency (5712-> MHz) RF window THP58 S. Michizono et al. Linac Conference 2004 (Aug.,18,2004) 22/32
23 Results at resonant ring Maximum operation power of 300 MW (2μs), corresponding to 6-times larger than specification (50 MW). Only 3-times rf trips during 8 hours operation at 300 MW. Rf power (300 MW) THP58 S. Michizono et al. Linac Conference 2004 (Aug.,18,2004) 23/32
24 SKIP (SuperKEKB Injector Pulse compressor) Mode: TE015(SLED)-> TE038(LIPS) Similar cavity size to present S-band SLED. Higher Q value. Output 200 MW input Power magnification:4.7 (lower than calculated value(5.5) due to slower switching time) THP61 T.Sugimura et al. Q 0 =13200 coupling β = 6.6 Linac Conference 2004 (Aug.,18,2004) 24/32
25 KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac Continuous injection (CI) scheme Maintenance and R&D at CI scheme Upgrade for SuperKEKB Schematic Rf source (LLRF, Modulator, high-power klystron, rf window) SKIP Acceleration structure Dummy load Summary Linac Conference 2004 (Aug.,18,2004) 25/32
26 C-band accel. section (First prototype) 54 regular cells 1m-long iris diameter 2a: ~ mm Based on present S-band acceleration structure THP29 T.Kamitani et al. Filling Time t F = 234 nsec Linac Conference 2004 (Aug.,18,2004) 26/32
27 C-band accel. section installed in KEKB linac (2003 September) S-band section C-band section THP29 T.Kamitani et al. Linac Conference 2004 (Aug.,18,2004) 27/32
28 Beam acceleration study Energy gain measured by changing acceleration phase with 43.8 MW x 0.5 µs RF pulse ~80 MV THP29 T.Kamitani et al. Linac Conference 2004 (Aug.,18,2004) 28/32
29 Inside of the acceleration structure Discharge every 10 min. even after conditioning. It took place around input coupler (rf wave analysis). Discharge traces observed input coupler and first disk. output input THP29 T.Kamitani et al. Discharge location analyzed by rf waves. Coupler from inside Coupler iris from outside First disk (2a) Linac Conference 2004 (Aug.,18,2004) 29/32
30 Second acceleration structure Thicker iris Wider coupler 2 nd acceleration structure High power Aug., st coupler 2 nd coupler THP29 T.Kamitani et al. Linac Conference 2004 (Aug.,18,2004) 30/32
31 Dummy load Newly designed 2kW Matsumoto-type dummy load 26 SiC cylinders SiC diameter 12 mm High power test OK up to 2 kw (100 MW peak) heat distribution (norm alized by peak) Heat distribution C -band dummy load heat distribution dum m y N o.1 dum m y N o.3 design value Linac Conference 2004 (Aug.,18,2004) 31/32 distance from a bottom (mm)
32 Summary S-band linac has been operated > 100,000 hours. The failure rate is about 5% and it contributes to the stable KEKB operation. C-band R & D is in progress. High power test of the prototype C-band accelerator module has been performed since October Most of the components are working well. (Remaining issues) Breakdown at input coupler -> 2 nd acc. structure inverter P.S. troubles -> long term operation (related presentations tomorrow) Rf window : THP58 S. Michizono et al. SKIP: THP61 T.Sugimura et al. Acc. structure THP29 T.Kamitani et al. Linac Conference 2004 (Aug.,18,2004) 32/32
Linac upgrade plan using a C-band system for SuperKEKB
Linac upgrade plan using a C-band system for SuperKEKB S. Fukuda, M. Akemono, M. Ikeda, T. Oogoe, T. Ohsawa, Y. Ogawa, K. Kakihara, H. Katagiri, T. Kamitani, M. Sato, T. Shidara, A. Shirakawa, T. Sugimura,
More informationPresent Status and Future Upgrade of KEKB Injector Linac
Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future
More informationFirst Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac
First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16
More informationDetailed Design Report
Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...
More informationTrigger-timing signal distribution system for the KEK electron/positron injector linac
Trigger-timing signal distribution system for the KEK electron/positron injector linac T. Suwada, 1 K. Furukawa, N. Kamikubota, and M. Satoh, Accelerator Laboratory, High Energy Accelerator Research Organization
More informationDiamond RF Status (RF Activities at Daresbury) Mike Dykes
Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of
More informationStatus of KEK X-band Test Facility and its future plans
Status of KEK X-band Test Facility and its future plans Shuji Matsumoto Accelerator Lab., KEK 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 1 Contents The New X-band Test Facility (XTF)
More informationPEP II Design Outline
PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,
More information3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline
3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The
More informationCurrent status of XFEL/SPring-8 project and SCSS test accelerator
Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key
More informationINFN School on Electron Accelerators. RF Power Sources and Distribution
INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel
More informationTHE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract
SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)
More informationStatus of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting
Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity
More informationLCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems
LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end
More informationFIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC
FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,
More informationreported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8
C-band RF System R&D reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8 Project was funded in 2001 April Material Science
More informationRF considerations for SwissFEL
RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary
More information4.4 Injector Linear Accelerator
4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE
More informationSuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK)
A possibility of ring collider for Higgs factory 13 Feb. 2012 K. Oide (KEK) Inspired by A. Blondel and F. Zimmermann, A High Luminosity e+e- Collider in the LHC tunnel to study the Higgs Boson, V2.1 -
More informationABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION
ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010
More informationRF Power Generation II
RF Power Generation II Klystrons, Magnetrons and Gyrotrons Professor R.G. Carter Engineering Department, Lancaster University, U.K. and The Cockcroft Institute of Accelerator Science and Technology Scope
More informationExperience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation
Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF
More informationNorth Damping Ring RF
North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution
More informationJae-Young Choi On behalf of PLS-II Linac team
PLS-II Linac 2015. 4. 8. Jae-Young Choi On behalf of PLS-II Linac team Accelerators in Pohang Accelerator Laboratory XFEL (under construction) 400 M$ Machines under installation PLS-II PAL : Chronology
More informationDark current and multipacting trajectories simulations for the RF Photo Gun at PITZ
Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Introduction The PITZ RF Photo Gun Field simulations Dark current simulations Multipacting simulations Summary Igor Isaev
More informationIOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY
IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE
More informationNext Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack
The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475
More informationStatus of RF Power and Acceleration of the MAX IV - LINAC
Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed
More informationSTATUS OF THE INTERNATIONAL LINEAR COLLIDER
STATUS OF THE INTERNATIONAL LINEAR COLLIDER K. Yokoya, KEK, Tsukuba, Japan Abstract The International Linear Collider (ILC) is the nextgeneration electron-positron collider. Since the publication of the
More informationThe LEP Superconducting RF System
The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of
More informationSUMMARY OF THE ILC R&D AND DESIGN
SUMMARY OF THE ILC R&D AND DESIGN B. C. Barish, California Institute of Technology, USA Abstract The International Linear Collider (ILC) is a linear electron-positron collider based on 1.3 GHz superconducting
More informationXFEL High Power RF System Recent Developments
XFEL High Power RF System Recent Developments for the XFEL RF Group Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution
More informationStatus and Plans for PEP-II
Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn
More informationStatus of CTF3. G.Geschonke CERN, AB
Status of CTF3 G.Geschonke CERN, AB CTF3 layout CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10 Drive Beam Injector ~ 50 m 3.5 A - 2100 b of 2.33 nc 150 MeV - 1.4
More informationKARA and FLUTE RF Overview/status
KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research
More informationRF Upgrades & Experience At JLab. Rick Nelson
RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns
More informationDELIVERY RECORD. Location: Ibaraki, Japan
DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October
More information!"!3
Abstract A single-mode 500 MHz superconducting cavity cryomodule has been developed at Cornell for the electronpositron collider/synchrotron light source CESR. The Cornell B-cell cavity belongs to the
More informationCLIC Feasibility Demonstration at CTF3
CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for
More informationNLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003
DOE Annual Program Review SLAC April 9-11, 2003 NLC Activities for the Past Year Accelerator Design centered around ILC-TRC studies. Technology R&D focused on the RF R&D. Modulator, klystron, SLED-II,
More informationStatus of SOLARIS. Paweł Borowiec On behalf of Solaris Team
Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX
More informationIntroduction: CW SRF linac types, requirements and challenges High power RF system architecture
RF systems for CW SRF linacs S. Belomestnykh Cornell University Laboratory for Elementary-Particle Physics LINAC08, Victoria, Canada October 1, 2008 Outline L band Introduction: CW SRF linac types, requirements
More informationSpear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.
Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed
More informationILC-LNF TECHNICAL NOTE
IL-LNF EHNIAL NOE Divisione Acceleratori Frascati, July 4, 2006 Note: IL-LNF-001 RF SYSEM FOR HE IL DAMPING RINGS R. Boni, INFN-LNF, Frascati, Italy G. avallari, ERN, Geneva, Switzerland Introduction For
More informationSTATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR
Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.
More informationRF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin
RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five
More informationTowards an X-Band Power Source at CERN and a European Structure Test Facility
Towards an X-Band Power Source at CERN and a European Structure Test Facility Erk Jensen and Gerry McMomagle CERN The X-Band Accelerating Structure Design and Test-Program Workshop Day 2: Structure Testing
More informationPulses inside the pulse mode of operation at RF Gun
Pulses inside the pulse mode of operation at RF Gun V. Vogel, V. Ayvazyan, K. Floettmann, D. Lipka, P. Morozov, H. Schlarb, S. Schreiber FLASH Seminar, DESY March 29, 2011 Contents Why we need a PiPmode
More information5 Project Costs and Schedule
93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for
More informationSTATUS OF THE SwissFEL C-BAND LINAC
STATUS OF THE SwissFEL C-BAND LINAC F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L. Paly, J.-Y. Raguin, L. Schulz, R. Zennaro, C. Zumbach,
More informationOverview of NLC/JLC Collaboration *
SLAC PUB 10117 August 2002 Overview of NLC/JLC Collaboration * K. Takata KEK, Oho, Tsukuba-shi 305-0801, JAPAN On behalf of the NLC Group Stanford Linear Accelerator Center, Stanford, California 94309,
More informationCONSTRUCTION AND COMMISSIONING OF BEPCII
Abstract CONSTRUCTION AND COMMISSIONING OF BEPCII C. Zhang, J.Q. Wang, L. Ma and G.X.Pei for the BEPCII Team, IHEP, CAS P.O.Box 918, Beijing 100049, China BEPCII is the major upgrade of BEPC (Beijing Electron-
More informationPoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland
CERN 1211 Geneva 23, Switzerland E-mail: andrew.butterworth@cern.ch O. Brunner CERN 1211 Geneva 23, Switzerland E-mail: olivier.brunner@cern.ch R. Calaga CERN 1211 Geneva 23, Switzerland E-mail: rama.calaga@cern.ch
More informationThe Construction Status of CSNS Linac
The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source
More informationOverview of the X-band R&D Program
Overview of the X-band R&D Program SLAC-PUB-9442 August 2002 Abstract T.O. Raubenheimer Stanford Linear Accelerator Center, Stanford University, Stanford, California 94309 USA An electron/positron linear
More informationSRS and ERLP developments. Andrew moss
SRS and ERLP developments Andrew moss Contents SRS Status Latest news Major faults Status Energy Recovery Linac Prototype Latest news Status of the RF system Status of the cryogenic system SRS Status Machine
More informationThe Elettra Storage Ring and Top-Up Operation
The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)
More informationAvailability and Reliability Issues for the ILC
Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some
More informationARES Status 2004(JFY)
ARES Status 2004(JFY) Tetsuo Abe for KEKB-RF/ARES-cavity group High Energy Accelerator Research Organization (KEK) Outline 1. Fundamentals of the ARES-cavity system 2. Operation status 3. D04C/ARES multipactoring
More informationANKA RF System - Upgrade Strategies
ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu
More informationThe basic parameters of the pre-injector are listed in the Table below. 100 MeV
3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,
More informationThe ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics
The ESS Accelerator For Norwegian Industry and Research Oslo, 24 Sept 2013 Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The Hadron Intensity Frontier Courtesy of M. Seidel (PSI)
More informationThe PEFP 20-MeV Proton Linear Accelerator
Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.
More informationIntroduction to CTF3. G.Geschonke CERN / PS
Introduction to CTF3 G.Geschonke CERN / PS Aim of review: Review the technical solutions are they realistic? Give us technical advice Comment on alternatives Guide our funding bodies: CERN Collaborations
More informationThe ALS RF systems, upgrades and ALS-U plans
The ALS RF systems, upgrades and ALS-U plans M. Betz*, K. Baptiste, Q. Du, M. Vinco, S. Virostek 06/27/2018, CWRF2018, Hsinchu, Taiwan * mbetz@lbl.gov Outline Structure of this talk RF systems in the Advanced
More informationThe KEKB injector linac
Prog. Theor. Exp. Phys. 2013, 03A002 (38 pages) DOI: 10.1093/ptep/ptt011 KEKB Accelerator The KEKB injector linac Mitsuo Akemoto, Dai Arakawa, Atsushi Enomoto, Shigeki Fukuda, Yoshihiro Funakoshi, Kazuro
More informationUpgrading LHC Luminosity
1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per
More informationEvaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications
Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Michael V. Fazio C. Adolphsen, A. Jensen, C. Pearson, D.
More informationActivities on FEL Development and Application at Kyoto University
Activities on FEL Development and Application at Kyoto University China-Korea-Japan Joint Workshop on Electron / Photon Sources and Applications Dec. 2-3, 2010 @ SINAP, Shanghai Kai Masuda Inst. Advanced
More information9th ESLS RF Meeting September ALBA RF System. F. Perez. RF System 1/20
ALBA RF System F. Perez RF System 1/20 ALBA Synchrotron Light Source in Barcelona (Spain) 3 GeV accelerator 30 beamlines (7 on day one) 50-50 Spanish Government Catalan Government First beam for users
More informationA HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN
A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN E. Chiaveri, CERN, Geneva, Switzerland Abstract The conceptual design of a superconducting H - linear accelerator at CERN for a beam energy of 2.2 GeV
More informationLow Level RF for PIP-II. Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017
Low Level RF for PIP-II Jonathan Edelen LLRF 2017 Workshop (Barcelona) 16 Oct 2017 PIP-II LLRF Team Fermilab Brian Chase, Edward Cullerton, Joshua Einstein, Jeremiah Holzbauer, Dan Klepec, Yuriy Pischalnikov,
More informationOperational experience with the SOLEIL LINAC and Status of the ThomX LINAC project
Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project 16/11/2016 20th ELS-RF Workshop Pollina JP 1 and Status of the ThomX LINAC project Operational experience with the SOLEIL
More informationPULSED MODULATOR TECHNOLOGY
PULSED MODULATOR TECHNOLOGY Hiroshi MATSUMOTO J-PARC/KEK CONTENTS 1. VARIOUS REQUIREMENT OF THE RECENT MODULATORS SHORT PULSE WIDTH (~µsec) LONG PULSE WIDTH (~msec) AND HIGH REP. RATE. (200 Hz) OUTPUT
More informationLLRF at SSRF. Yubin Zhao
LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip
More informationHigh-gradient C-band linac for a compact x-ray free-electron laser facility
PHYSICAL REVIEW SPECIAL TOPICS - ACCELERATORS AND BEAMS 17, 080702 (2014) High-gradient C-band linac for a compact x-ray free-electron laser facility T. Inagaki, * C. Kondo, H. Maesaka, T. Ohshima, Y.
More informationKEKB Accelerator Physics Report
KEKB Accelerator Physics Report Y. Funakoshi for the KEKB commissioning group KEK, 1-1 Oho, Tsukuba, Ibaraki 305-0801,Japan Abstract 1 INTRODUCTION The KEKB B-Factory is an electron-positron double ring
More informationJ/NLC Progress on R1 and R2 Issues. Chris Adolphsen
J/NLC Progress on R1 and R2 Issues Chris Adolphsen Charge to the International Linear Collider Technical Review Committee (ILC-TRC) To assess the present technical status of the four LC designs at hand,
More informationJefferson Lab Experience with Beam Halo, Beam Loss, etc.
Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,
More informationPULSED POWER FOR FUTURE LINEAR ACCELERATORS
PULSED POWER FOR FUTURE LINEAR ACCELERATORS Peter D. Pearce High-energy accelerators High-energy accelerators enable us to collide particle beams together and create conditions believed to be similar to
More informationSTATUS AND FUTURE PROSPECTS OF CLIC
STATUS AND FUTURE PROSPECTS OF CLIC S. Döbert, for the CLIC/CTF3 collaboration, CERN, Geneva, Switzerland Abstract The Compact Linear Collider (CLIC) is studied by a growing international collaboration.
More informationDESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*
DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* A. G. Ruggiero, J. Alessi, M. Harrison, M. Iarocci, T. Nehring, D. Raparia, T. Roser, J. Tuozzolo, W. Weng. Brookhaven National Laboratory, PO Box
More informationWhat can be learned from HERA Experience for ILC Availability
What can be learned from HERA Experience for ILC Availability August 17, 2005 F. Willeke, DESY HERA Performance Critical Design Decisions What could be avoided if HERA would have to be built again? HERA
More informationOperational Status of PF-Ring and PF-AR after the Earthquake
Journal of Physics: Conference Series Operational Status of PF-Ring and PF-AR after the Earthquake To cite this article: T Honda et al 2013 J. Phys.: Conf. Ser. 425 042014 Related content - Design and
More informationPEP II STATUS AND PLANS *
PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex
More informationRECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz
RECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz G. Isoyama#, M. Fujimoto, S. Funakoshi, K. Furukawa, A. Irizawa, R. Kato, K. Kawase, A. Tokuchi, R. Tsutsumi, M.
More informationX-Band Klystron Development at
X-Band Klystron Development at SLAC Slide 1 The Beginning X-band klystron work began at SLAC in the mid to late 80 s to develop high frequency (4x SLAC s-band), high power RF sources for the linear collider
More informationProgram Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006
Program Risks Risk Analysis Fallback Plans for the PEP-II B-FactoryB John T. Seeman DOE PEP-II Operations Review April 26, 2006 OPS Review Topics Are there any PEP-II program risks? Has the laboratory
More informationDEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC
DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC George Caryotakis, Stanford Linear Accelerator Center P.O. Box 4349 Stanford, CA 94309 Abstract * The SLAC design for a 1-TeV collider (NLC) requires klystrons
More informationDESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS
DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS Y. H. Chin, KEK, Tsukuba, Japan. Abstract Recently, there has been a rising international interest in multi-beam klystrons (MBK) in the
More informationTITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:
TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,
More informationNSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011
NSLS-II RF Systems James Rose, Radio Frequency Group Leader PAC 2011 1 BROOKHAVEN SCIENCE ASSOCIATES Introduction Linac RF cavities and klystrons Booster Cavity-Transmitter Storage Ring 500 MHz SRF cavity
More informationPRESENT STATUS OF J-PARC
PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize
More information30 GHz Power Production / Beam Line
30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression
More informationESS Linac WP8 Radio Frequency Systems and Test Facilities
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team ESS Linac WP8: RF Systems Outline Work
More informationA HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON
A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A.Beunas and G. Faillon Thales Electron Devices, Vélizy, France S. Choroba DESY, Hamburg, Germany Abstract THALES ELECTRON DEVICES has developed
More information2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)
2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution
More informationCommissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling
Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be
More informationOperating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab
Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA Jefferson Lab is a $600M Department of Energy facility
More information