DW Consulting B.V. Preliminary Draft For Customer Approval

Size: px
Start display at page:

Download "DW Consulting B.V. Preliminary Draft For Customer Approval"

Transcription

1 G E O P H Y S I C S I N A R C H A E O L O G Y REPORT Boekweitakker BX Barneveld The Netherlands Tel: Internet: Geophysical Survey Report Preliminary Draft For Customer Approval Author(s): D. Wilbourn () Report Ref Nbr: 2003/04 Client: AWN Zeeland Client Ref Nbr: AWN Report Date: Copyright 2003 All rights reserved

2

3 Table of Contents SUMMARY OF RESULTS:...1 INTRODUCTION:...1 Site location...1 Site description/history...1 Survey objectives...1 Survey methods used...1 METHODS:...2 Fieldwork...2 Grid location...2 Section A...2 Section B...2 Section C...2 Section D...2 Geophysical instruments used...2 Method(s) of data presentation...2 RESULTS:...2 Description...2 Section A...3 Section B, C & D...3 Interpretation...3 Section A...3 Section B, C & D...3 CONCLUSIONS:...3 STATEMENT OF INDEMNITY...3 APPENDICES:...4 Plans/Plots...4 General plan of Resistivity survey results...5 General plan of Magnetometer survey results...6 Section A Resistivity. Greyscale plot of processed data...7 Section A Magnetometry. Greyscale plot of processed data...8 Section B Resistivity. Greyscale plot of processed data...9 Section B Magnetometry. Greyscale plot of processed data...10 Section C Resistivity. Greyscale plot of processed data...11 Section C Magnetometry. Greyscale plot of processed data...12 Section D Resistivity. Greyscale plot of processed data...13 Section D Magnetometry. Greyscale plot of processed data...14 List of Figures FIGURE FIGURE FIGURE FIGURE FIGURE FIGURE FIGURE FIGURE FIGURE FIGURE

4

5 Summary of Results: At the request of the AWN Zeeland, A range of surveys, both Magnetometer and Resistivity, were carried out within the moated farm Dunno near Oostkapelle. Archival evidence indicates that the site has been occupied since the 13 th century and was far more substantial and important than the current, simple farm complex.. Archival evidence indicated the presence of a castle of some form. The purpose of the surveys was to try to determine the size and extent of former buildings within the moated area. Resistivity results seem to have produced the best results. They confirm the presence of foundations in one corner of the site and the position of what could possibly be the original edge of the island prior to it s expansion into a rectangular shape. Introduction: Thanks to the enthusiasm of the current land owner, Mr. Lantsheer, the AWN Zeeland group have been investigating the farm known as Dunno near Oostkapelle for some time. Though the current buildings, consisting of a small farmhouse and a single large barn are not particularly special, it is obvious from the large rectangular moat surrounding the farm complex and the imposing drive, gate and bridge leading to the farm that the site once was much more important than it now is. Archival data shows that it has been in existence since at least the mid 13 th century and was an important outpost of the Abbey of Middleburg, being substantial enough to receive Counts as guests. References throughout the middle-ages indicate the continuing importance of the site. In the mid 18 th century, the Hattinga map shows the site to be in much the same form as is now seen. However there is a third structure indicated on this map in the northeast corner of the moated area. It was this building that was the primary focus of the surveys but all suitable open areas of the farm were examined. Site location The farm is located just north of Oostkapelle, Gemeente Veere, Zeeland at approx. Grid 0281, Topographic map 65AN. Site description/history The area within the moat is roughly rectangular, about 150m wide at the front (north) and stretching back 110m on the eastern side and 80m on the west. The farm is reached by means of a bridge at the middle of the north side. The farmhouse is to the west of the bridge and the barn centred on the island directly opposite the bridge. Much of the ground surrounding the farm buildings is in use for storage of hay or farm implements. The area to the rear of the farmhouse all the way to the western side of the moat is covered in a range of small sheds. The area behind the barn has also been extended in the recent past with cow sheds and some horse stables. Some of the remaining land is also an orchard. It is know that the farm has been in use in more-or-less it s current configuration since at least Survey objectives The primary objective of the survey was to determine if any traces of the suspected castle and it s associated structures could be found. Secondarily, it was hoped that other aspects of the site s history could be explained, such as the possible shape of the island prior to it being squared off. Survey methods used Because of the patchwork nature of the site, each small section that could be surveyed has been given a code letter. This letter is used throughout this report and the collected data. More than one survey method was used in each section when possible. Thanks to the manpower available from the AWN group, it was possible to use Resistivity for all of the sections close to the buildings and even larger fields when adjacent results indicated that it was worthwhile. Magnetometer surveys were carried out on all the larger sections, and even some of those close to buildings. The latter provided useful experience and reference data to enable the 2 sets of results (Magnetometer and Resistivity) to be compared.

6 Methods: Fieldwork The survey was carried out during 2 weekends in March, The weather was generally cool (±5 ), dry but overcast. The ground conditions varied depending on the section but were generally meadow and pasture fields with some mud. Grid location Because of the complexity and built-up nature of the site, each section had to be individually located. The sides and corners of the barn were found most suitable for this purpose. Section A This section was located in the SE corner of the island at the point indicated as being the location of the third, unidentified building in the Hattinga map. It is basically the area within a small field used for exercising ponies. The base point was placed on a line extended from the eastern side of the barn 8m from it s corner. The baseline was set up on this point, at right-angles to the end wall of the barn. Section B This section was located to the NW of the barn. As with Section A, the baseline was established relative to the corner of the barn. The base point was placed on a line extended 11,7m from the western corner of the barn inline with the end wall of the barn. The baseline was set up from this point and at right-angles to the end wall of the barn. Section C Continuing on round from Section A, Section C covered most of the field to the rear of the barn. It s baseline is related to that of Section A, using the same NW SE origin, but leaves an 8m gap in the NE SW axis (i.e. the grid is the same across the length of the barn but starts 48m back from the Section A baseline) Section D Continues the grid established for Section B to the NW into the adjacent field. Geophysical instruments used A Bartington Grad was used for the Magnetometer portions of the surveys. Grid size was 20m x 20m with a 1m traverse interval and 0.25m sample interval. Sensitivity was set to 0.1nT. The data was downloaded using Bartington software and processed in GeoPlot 3.0. A TR/CIA Resistivity meter was used for the Resistivity portions of the surveys. Grid size was 20m x 20m with a 1m traverse interval and 1m sample interval. Automatic logging was used. The data was downloaded and combined into composite datafiles using TR/CIA software. Further processing was done in GeoPlot 3.0. Method(s) of data presentation The data is presented in the Plans/Plots section of this report. An overview of the site with the sections marked is presented as Figure 1. Each section is then shown individually with location data, survey results for each survey method and any features seen in the data. Finally a plot of just the data for each section is shown. Results: Description Although nearly a hectare was surveyed using both Resistivity and Magnetometry, the results remain fragmented. The magnetometer in particular had difficulty in detecting features beneath the high level of background noise inevitable in close proximity to a working farm that has been occupied for perhaps 1000 years. Good results were obtained from the resistivity meter although it is difficult to determine exactly how the features seen in each area should be joined together.

7 Section A The main features visible in section A are the 2 linear high resistance areas running parallel to the waters edge and heading towards the corner. There is also a high resistance feature close to the corner of the barn. The magnetometer results for this area do not reveal anything significant though there is a slight correlation between the linear high resistance features and some magnetometer noise. Section B, C & D Sections B, C & D all show parts of similar features so will be described together. The main theme of these sections is an apparent long curving linear feature running behind the barn and curving up towards the corner of the current island behind the house. This feature is seen in both the resistivity data as a high resistance area and to an extent in the magnetometer data. Overall, the magnetometer data would not be considered definitive on it s own, but does contain features that correlate well with the resistivity data. Section D s magnetometer data shows a very strong signal close to the stables and along the small ditch. Also it s resistivity data also shows a number of clear, low resistance linear features. Interpretation Section A As mentioned above, Section A covers most of the area indicated in the archival data as being the site of another building. It is clear from the resistivity results that 2 sides of some form of foundation structure can be seen in the corner of the area. It is also possible that the high resistance feature close to the corner of the barn forms part of a third side to the structure. However this is very speculative as that area is also the entrance to the field and the signal so could be the result of more modern disturbance. Section B, C & D The resistance surveys of the three areas are dominated by the strong high resistance feature (Fig 1, purple line). Though there is no definite evidence for it, it is believed that this feature could be the remains of the original ditch around the island, prior to it being squared off perhaps in the 18 th century. Normally a naturally filled-in ditch would be expected to have a low resistance, However the high resistance could be the result of the ditch being filled deliberately, using rubble and other materials. This hypothesis is supported by the magnetometer results for the same area which show noisy readings, usually indicative of building rubble. Section D also contains another high resistance feature (Fig 1, dark blue line) which is unexplained and a number of low resistance features (Fig 1, light blue lines) that correlate with sunken troughs visible on the surface, probably indicating that these are relatively recently filled ditches. The strong positive readings on the magnetometer near the stables are almost certainly caused by adjacent fences and buildings. The noisy streak beside the small ditch could well be the result of cleaning the ditch out. Section C has a large high resistance area that seems to split off from the main linear feature. This is also unexplained but does correlate with the entrance to the field. This may therefore be caused by land use rather than archaeology. Conclusions: In general it can be concluded that two significant features have been located: the foundations of the third building shown on early maps and the possible boundary of the original island. Statement of indemnity is not responsible for any costs or damages incurred by the customer resulting from actions taken on the basis of the data and/or conclusions contained in this report.

8 Appendices: Plans/Plots Figure Coverage Processing 1 General plan of Resistivity survey Base layer (cadastrale map), Survey layer & annotation layer. results 2 General plan of Magnetometer survey Base layer (cadastrale map), Survey layer & annotation layer. results 3 Section A Resistivity Greyscale plot of processed data: Composite created in TR/CIA Resistivity app, Interpolated in both X & Y axes in Geoplot to double resolution 4 Section A Magnetometer Greyscale plot of processed data: Clip at 100 & 100 nt Absolute (I +/- 3SD), Zero Mean Traverse, Despike at default settings. Re-clip at 20 & 20 nt 5 Section B Resistivity Greyscale plot of processed data: Composite created in TR/CIA Resistivity app, Interpolated in both X & Y axes in Geoplot to double resolution Rotate 180º 6 Section B Magnetometer Greyscale plot of processed data: Clip at 300 & 300 nt Absolute (I +/- 3SD), Zero Mean Traverse, Despike at default settings. Re-clip at 36 & 36 nt Rotate 90º 7 Section C Resistivity Greyscale plot of processed data: Composite created in TR/CIA Resistivity app, Interpolated in both X & Y axes in Geoplot to double resolution 8 Section C Magnetometer Greyscale plot of processed data: Clip at 200 & 200 nt Absolute (I +/- 3SD), Zero Mean Traverse, Despike at default settings. Re-clip at 20 & 20 nt Rotate 270º 9 Section D Resistivity Greyscale plot of processed data: Composite created in TR/CIA Resistivity app, Interpolated in both X & Y axes in Geoplot to double resolution 10 Section D Magnetometer Greyscale plot of processed data: Clip at 300 & 300 nt Absolute (I +/- 3SD), Zero Mean Traverse, Despike at default settings. Re-clip at 12 & 12 nt All processing carried out using Geoplot 3.0 at default values unless otherwise stated.

9 General plan of Resistivity survey results Figure 1

10 Notes: Map oriented to survey to minimise distortion Blue: Survey grids Green arrowed lines: distances from barn Yellow dotted: possible position of third building Purple dotted: possible path of original island boundary Dark blue dotted: Unaccounted ditch Light blue dotted: Probable modern filled ditches Purple blocks: Rubble areas found during Bore survey. The values listed in the section detail tables (in Ohm - M) are arbitrary values and only relate to the grid squares within a section. They are entirely dependant in the conditions of the day of measurement and local ground conditions at the remote probes. The greyscale values of each section cannot therefore be related to those in other sections.

11 General plan of Magnetometer survey results Figure 2 Notes: Map oriented to survey to minimise distortion Blue: Survey grids Green arrowed lines: distances from barn Yellow dotted: possible position of third building Purple dotted: possible path of original island boundary Dark blue dotted: Unaccounted ditch Light blue dotted: Probable modern filled ditches Purple blocks: Rubble areas found during Bore survey. The values listed in the section detail tables (in nanoteslas - nt) are arbitrary values and only relate to the grid squares within a section. Each section has been processed to best enhance it s data without reference to other sections. The greyscale values of each section cannot therefore be related to those in other sections.

12 Section A Resistivity. Greyscale plot of processed data SD Mean 3SD Grid size: 20m x 20m Figure 3

13 Section A Magnetometry. Greyscale plot of processed data nt nt -3SD Mean 3SD Grid size: 20m x 20m Figure 4

14 Section B Resistivity. Greyscale plot of processed data SD Mean 3SD Grid size: 20m x 20m Figure 5

15 Section B Magnetometry. Greyscale plot of processed data nt nt -3SD Mean 3SD Grid size: 20m x 20m Figure 6

16 Section C Resistivity. Greyscale plot of processed data SD Mean 3SD Grid size: 20m x 20m Figure 7

17 Section C Magnetometry. Greyscale plot of processed data nt nt -3SD Mean 3SD Grid size: 20m x 20m Figure 8

18 Section D Resistivity. Greyscale plot of processed data SD Mean 3SD Grid size: 20m x 20m Figure 9

19 Section D Magnetometry. Greyscale plot of processed data nt nt -3SD Mean 3SD Grid size: 20m x 20m Figure 10

Please feel free to download the Demo application software from analogarts.com to help you follow this seminar.

Please feel free to download the Demo application software from analogarts.com to help you follow this seminar. Hello, welcome to Analog Arts spectrum analyzer tutorial. Please feel free to download the Demo application software from analogarts.com to help you follow this seminar. For this presentation, we use a

More information

How to set out a survey grid

How to set out a survey grid How to set out a survey grid Why? Covering a site with a regular grid of squares allows you to quickly establish rough or precise positions within the site. It is the standard form of position control

More information

Durham Magneto Optics Ltd. NanoMOKE 3 Wafer Mapper. Specifications

Durham Magneto Optics Ltd. NanoMOKE 3 Wafer Mapper. Specifications Durham Magneto Optics Ltd NanoMOKE 3 Wafer Mapper Specifications Overview The NanoMOKE 3 Wafer Mapper is an ultrahigh sensitivity Kerr effect magnetometer specially configured for measuring magnetic hysteresis

More information

Getting Started. Connect green audio output of SpikerBox/SpikerShield using green cable to your headphones input on iphone/ipad.

Getting Started. Connect green audio output of SpikerBox/SpikerShield using green cable to your headphones input on iphone/ipad. Getting Started First thing you should do is to connect your iphone or ipad to SpikerBox with a green smartphone cable. Green cable comes with designators on each end of the cable ( Smartphone and SpikerBox

More information

Advanced Test Equipment Rentals ATEC (2832)

Advanced Test Equipment Rentals ATEC (2832) E stablished 1981 Advanced Test Equipment Rentals www.atecorp.com 800-404-ATEC (2832) Technical Datasheet Scalar Network Analyzer Model 8003-10 MHz to 40 GHz The Giga-tronics Model 8003 Precision Scalar

More information

Interface Practices Subcommittee SCTE STANDARD SCTE Measurement Procedure for Noise Power Ratio

Interface Practices Subcommittee SCTE STANDARD SCTE Measurement Procedure for Noise Power Ratio Interface Practices Subcommittee SCTE STANDARD SCTE 119 2018 Measurement Procedure for Noise Power Ratio NOTICE The Society of Cable Telecommunications Engineers (SCTE) / International Society of Broadband

More information

PS User Guide Series Seismic-Data Display

PS User Guide Series Seismic-Data Display PS User Guide Series 2015 Seismic-Data Display Prepared By Choon B. Park, Ph.D. January 2015 Table of Contents Page 1. File 2 2. Data 2 2.1 Resample 3 3. Edit 4 3.1 Export Data 4 3.2 Cut/Append Records

More information

A Real Word Case Study E- Trap by Bag End Ovasen Studios, New York City

A Real Word Case Study E- Trap by Bag End Ovasen Studios, New York City 21 March 2007 070315 - dk v5 - Ovasen Case Study Written by David Kotch Edited by John Storyk A Real Word Case Study E- Trap by Bag End Ovasen Studios, New York City 1. Overview - Description of Problem

More information

A Real Word Case Study E- Trap by Bag End Ovasen Studios, New York City

A Real Word Case Study E- Trap by Bag End Ovasen Studios, New York City 21 March 2007 070315 - dk v5 - Ovasen Case Study Written by David Kotch Edited by John Storyk A Real Word Case Study E- Trap by Bag End Ovasen Studios, New York City 1. Overview - Description of Problem

More information

RM15 Resistivity Meter

RM15 Resistivity Meter RM15 Resistivity Meter The RM15 in its case with Cable Drum on the right. The case contains, charger, download cabless, remote probes, and remote probe cables... along with the RM15 itself. Step 1: Establish

More information

Using Manchester and NRZ Configurable Protocol Decoders

Using Manchester and NRZ Configurable Protocol Decoders Using Manchester and NRZ Configurable Protocol Decoders TECHNICAL BRIEF March 14, 2013 Summary Manchester and NRZ encoding schemes serve as building blocks for industrystandard and custom protocols. Here

More information

INSTRUMENT CATHODE-RAY TUBE

INSTRUMENT CATHODE-RAY TUBE INSTRUMENT CATHODE-RAY TUBE 14 cm diagonal rectangular flat face domed mesh post-deflection acceleration improved spot quality for character readout high precision by internal permanent magnetic correction

More information

Physics 105. Spring Handbook of Instructions. M.J. Madsen Wabash College, Crawfordsville, Indiana

Physics 105. Spring Handbook of Instructions. M.J. Madsen Wabash College, Crawfordsville, Indiana Physics 105 Handbook of Instructions Spring 2010 M.J. Madsen Wabash College, Crawfordsville, Indiana 1 During the Middle Ages there were all kinds of crazy ideas, such as that a piece of rhinoceros horn

More information

INSTRUMENT CATHODE-RAY TUBE

INSTRUMENT CATHODE-RAY TUBE Instrument cathode-ray tube D14-363GY/123 INSTRUMENT CATHODE-RAY TUBE mono accelerator 14 cm diagonal rectangular flat face internal graticule low power quick heating cathode high brightness, long-life

More information

Results of the June 2000 NICMOS+NCS EMI Test

Results of the June 2000 NICMOS+NCS EMI Test Results of the June 2 NICMOS+NCS EMI Test S. T. Holfeltz & Torsten Böker September 28, 2 ABSTRACT We summarize the findings of the NICMOS+NCS EMI Tests conducted at Goddard Space Flight Center in June

More information

GLog Users Manual.

GLog Users Manual. GLog Users Manual GLog is copyright 2000 Scott Technical Instruments It may be copied freely provided that it remains unmodified, and this manual is distributed with it. www.scottech.net Introduction GLog

More information

Agilent FieldFox RF Analyzer N9912A

Agilent FieldFox RF Analyzer N9912A Contents Agilent FieldFox RF Analyzer N9912A Quick Reference Guide Do You Have Everything?... 2 The Power Button and LED... 2 Battery Usage... 3 Measure Return Loss... 4 Measure Cable Loss (1-Port)...

More information

Copyright 2018 Geophysical Survey Systems, Inc. All rights reserved including the right of reproduction in whole or in part in any form

Copyright 2018 Geophysical Survey Systems, Inc. All rights reserved including the right of reproduction in whole or in part in any form MN36-268 Rev A Copyright 2018 Geophysical Survey Systems, Inc. All rights reserved including the right of reproduction in whole or in part in any form Published by Geophysical Survey Systems, Inc. 40 Simon

More information

RGA13, 12/10/17 Ultra High Resolution 20mm Quadrupole with Dual Zone operation

RGA13, 12/10/17 Ultra High Resolution 20mm Quadrupole with Dual Zone operation RGA13, 12/10/17 Ultra High Resolution 20mm Quadrupole with Dual Zone operation The DLS-20 Hiden s 20mm Triple Filter Quadrupole By comparison, 6mm Triple Filter Quadrupole Quadrupole High resolution Quadrupoles

More information

Function Manual SIMATIC HMI TP900. Operator Panel.

Function Manual SIMATIC HMI TP900. Operator Panel. Function Manual SIMATIC HMI TP900 Operator Panel Edition 10/2016 www.siemens.com Introduction 1 Safety notes 2 Medium-voltage converters SIMATIC Description 3 Screens 4 Installing software 5 Function

More information

Reduction of Device Damage During Dry Etching of Advanced MMIC Devices Using Optical Emission Spectroscopy

Reduction of Device Damage During Dry Etching of Advanced MMIC Devices Using Optical Emission Spectroscopy Reduction of Device Damage During Dry Etching of Advanced MMIC Devices Using Optical Emission Spectroscopy D. Johnson, R. Westerman, M. DeVre, Y. Lee, J. Sasserath Unaxis USA, Inc. 10050 16 th Street North

More information

Model 7405 High Definition Test Signal Generator Data Pack

Model 7405 High Definition Test Signal Generator Data Pack Model 7405 High Definition Test Signal Generator Data Pack E NSEMBLE D E S I G N S Revision 1.1 SW v1.1.0 This data pack provides detailed installation, configuration and operation information for the

More information

COMPOSITE VIDEO LUMINANCE METER MODEL VLM-40 LUMINANCE MODEL VLM-40 NTSC TECHNICAL INSTRUCTION MANUAL

COMPOSITE VIDEO LUMINANCE METER MODEL VLM-40 LUMINANCE MODEL VLM-40 NTSC TECHNICAL INSTRUCTION MANUAL COMPOSITE VIDEO METER MODEL VLM- COMPOSITE VIDEO METER MODEL VLM- NTSC TECHNICAL INSTRUCTION MANUAL VLM- NTSC TECHNICAL INSTRUCTION MANUAL INTRODUCTION EASY-TO-USE VIDEO LEVEL METER... SIMULTANEOUS DISPLAY...

More information

APPLICATION OF PHASED ARRAY ULTRASONIC TEST EQUIPMENT TO THE QUALIFICATION OF RAILWAY COMPONENTS

APPLICATION OF PHASED ARRAY ULTRASONIC TEST EQUIPMENT TO THE QUALIFICATION OF RAILWAY COMPONENTS APPLICATION OF PHASED ARRAY ULTRASONIC TEST EQUIPMENT TO THE QUALIFICATION OF RAILWAY COMPONENTS K C Arcus J Cookson P J Mutton SUMMARY Phased array ultrasonic testing is becoming common in a wide range

More information

DETECTING ENVIRONMENTAL NOISE WITH BASIC TOOLS

DETECTING ENVIRONMENTAL NOISE WITH BASIC TOOLS DETECTING ENVIRONMENTAL NOISE WITH BASIC TOOLS By Henrik, September 2018, Version 2 Measuring low-frequency components of environmental noise close to the hearing threshold with high accuracy requires

More information

Executive Solid Statesman FM Limiter Measured Performance Any trademarks used in this manual are the property of their respective owners. Executive Solid Statesman FM Limiter 1 Performance Measurements

More information

SC26 Magnetic Field Cancelling System

SC26 Magnetic Field Cancelling System SPICER CONSULTING SYSTEM SC26 SC26 Magnetic Field Cancelling System Makes the ambient magnetic field OK for electron beam tools in 300 mm wafer fabs Real time, wideband cancelling from DC to > 9 khz fields

More information

SC24 Magnetic Field Cancelling System

SC24 Magnetic Field Cancelling System SPICER CONSULTING SYSTEM SC24 SC24 Magnetic Field Cancelling System Makes the ambient magnetic field OK for the electron microscope Adapts to field changes within 100 µs Touch screen intelligent user interface

More information

Keysight FieldFox Microwave Analyzers

Keysight FieldFox Microwave Analyzers Quick Reference Guide Contents Keysight FieldFox Microwave Analyzers Do you have everything?... 1 The Power Button and LED... 1 Battery Usage... 2 Measure Return Loss (CAT Mode)... 3 Measure 1-Port Cable

More information

Analysis of WFS Measurements from first half of 2004

Analysis of WFS Measurements from first half of 2004 Analysis of WFS Measurements from first half of 24 (Report4) Graham Cox August 19, 24 1 Abstract Described in this report is the results of wavefront sensor measurements taken during the first seven months

More information

Application Note AN SupIRBuck MCM Power Quad Flat No-lead (PQFN) Inspection Application Note

Application Note AN SupIRBuck MCM Power Quad Flat No-lead (PQFN) Inspection Application Note Application Note AN-1133 SupIRBuck MCM Power Quad Flat No-lead (PQFN) Inspection Application Note Table of Contents Page Inspection techniques... 3 Examples of good assembly... 3 Summary of rejection criteria...

More information

SC24 Magnetic Field Cancelling System

SC24 Magnetic Field Cancelling System SPICER CONSULTING SYSTEM SC24 SC24 Magnetic Field Cancelling System Makes the ambient magnetic field OK for the electron microscope Adapts to field changes within 100 µs Touch screen intelligent user interface

More information

MARK SCHEME for the November 2004 question paper 9702 PHYSICS

MARK SCHEME for the November 2004 question paper 9702 PHYSICS UNIVERSITY OF CAMBRIDGE INTERNATIONAL EXAMINATIONS GCE Advanced Level MARK SCHEME for the November 2004 question paper 9702 PHYSICS 9702/05 Paper 5 (Practical Test), maximum raw mark 30 This mark scheme

More information

Analyze Frequency Response (Bode Plots) with R&S Oscilloscopes Application Note

Analyze Frequency Response (Bode Plots) with R&S Oscilloscopes Application Note Analyze Frequency Response (Bode Plots) with R&S Oscilloscopes Application Note Products: R&S RTO2002 R&S RTO2004 R&S RTO2012 R&S RTO2014 R&S RTO2022 R&S RTO2024 R&S RTO2044 R&S RTO2064 This application

More information

Quick Start. RSHS1000 Series Handheld Digital Oscilloscope

Quick Start. RSHS1000 Series Handheld Digital Oscilloscope Quick Start RSHS1000 Series Handheld Digital Oscilloscope General Safety Summary Carefully read the following safety precautions to avoid personal injury and prevent damage to the instrument or any products

More information

Full Disclosure Monitoring

Full Disclosure Monitoring Full Disclosure Monitoring Power Quality Application Note Full Disclosure monitoring is the ability to measure all aspects of power quality, on every voltage cycle, and record them in appropriate detail

More information

SPECIAL REPORT OF THE SUBCOMMITTEE ON POLARITY STANDARDS 1

SPECIAL REPORT OF THE SUBCOMMITTEE ON POLARITY STANDARDS 1 This document has been converted from the original publication: Thigpen, Ben B., Dalby, A. E. and Landrum, Ralph, 1975, Report on Subcommittee on Polarity Standards *: Geophysics, 40, no. 04, 694-699.

More information

Assessing and Measuring VCR Playback Image Quality, Part 1. Leo Backman/DigiOmmel & Co.

Assessing and Measuring VCR Playback Image Quality, Part 1. Leo Backman/DigiOmmel & Co. Assessing and Measuring VCR Playback Image Quality, Part 1. Leo Backman/DigiOmmel & Co. Assessing analog VCR image quality and stability requires dedicated measuring instruments. Still, standard metrics

More information

Practical Application of the Phased-Array Technology with Paint-Brush Evaluation for Seamless-Tube Testing

Practical Application of the Phased-Array Technology with Paint-Brush Evaluation for Seamless-Tube Testing ECNDT 2006 - Th.1.1.4 Practical Application of the Phased-Array Technology with Paint-Brush Evaluation for Seamless-Tube Testing R.H. PAWELLETZ, E. EUFRASIO, Vallourec & Mannesmann do Brazil, Belo Horizonte,

More information

GS122-2L. About the speakers:

GS122-2L. About the speakers: Dan Leighton DL Consulting Andrea Bell GS122-2L A growing number of utilities are adapting Autodesk Utility Design (AUD) as their primary design tool for electrical utilities. You will learn the basics

More information

Processing data with Mestrelab Mnova

Processing data with Mestrelab Mnova Processing data with Mestrelab Mnova This exercise has three parts: a 1D 1 H spectrum to baseline correct, integrate, peak-pick, and plot; a 2D spectrum to plot with a 1 H spectrum as a projection; and

More information

-Dot between RR of left CORREO. -Dots between 0 of left 120 and C of CENTS. -See lower frame line between 1 and 2 of left 120.

-Dot between RR of left CORREO. -Dots between 0 of left 120 and C of CENTS. -See lower frame line between 1 and 2 of left 120. Yv&Te_4 Type 1 Yv&Te_4 Type 2 Yv&Te_4 Type 3 -Large spot level with C of left COR. -Dot level with CO of right COR. -Semicircular spot level with R of right COR. -Dots under TS of CENTS and under 12 of

More information

BitWise (V2.1 and later) includes features for determining AP240 settings and measuring the Single Ion Area.

BitWise (V2.1 and later) includes features for determining AP240 settings and measuring the Single Ion Area. BitWise. Instructions for New Features in ToF-AMS DAQ V2.1 Prepared by Joel Kimmel University of Colorado at Boulder & Aerodyne Research Inc. Last Revised 15-Jun-07 BitWise (V2.1 and later) includes features

More information

7thSense Design Delta Media Server

7thSense Design Delta Media Server 7thSense Design Delta Media Server Channel Alignment Guide: Warping and Blending Original by Andy B Adapted by Helen W (November 2015) 1 Trademark Information Delta, Delta Media Server, Delta Nano, Delta

More information

Setting Up the Warp System File: Warp Theater Set-up.doc 25 MAY 04

Setting Up the Warp System File: Warp Theater Set-up.doc 25 MAY 04 Setting Up the Warp System File: Warp Theater Set-up.doc 25 MAY 04 Initial Assumptions: Theater geometry has been calculated and the screens have been marked with fiducial points that represent the limits

More information

DELTA MODULATION AND DPCM CODING OF COLOR SIGNALS

DELTA MODULATION AND DPCM CODING OF COLOR SIGNALS DELTA MODULATION AND DPCM CODING OF COLOR SIGNALS Item Type text; Proceedings Authors Habibi, A. Publisher International Foundation for Telemetering Journal International Telemetering Conference Proceedings

More information

QuickTIPS REMOTE CONTROL TRULINK FOR ANDROID DEVICES VOLUME CHANGES MEMORY CHANGES. PRODUCT AVAILABILITY: Halo iq, Halo 2, and Halo Devices

QuickTIPS REMOTE CONTROL TRULINK FOR ANDROID DEVICES VOLUME CHANGES MEMORY CHANGES. PRODUCT AVAILABILITY: Halo iq, Halo 2, and Halo Devices QuickTIPS TRULINK FOR ANDROID DEVICES PRODUCT AVAILABILITY: Halo iq, Halo 2, and Halo Devices For the most up-to-date information regarding Android devices that are supported for use with the TruLink application,

More information

PSC300 Operation Manual

PSC300 Operation Manual PSC300 Operation Manual Version 9.10 General information Prior to any attempt to operate this Columbia PSC 300, operator should read and understand the complete operation of the cubing system. It is very

More information

Beginners How to Test DSO138mini

Beginners How to Test DSO138mini Beginners How to Test DSO138mini You have finished assembling your DSO138mini kit. You may be anxious to see it works. But you might not be familiar with oscilloscope and you could encounter unexpected

More information

INSTALATION PROCEDURE

INSTALATION PROCEDURE INSTALLATION PROCEDURE Overview The most difficult part of an installation is in knowing where to start and the most important part is starting in the proper start. There are a few very important items

More information

MAX-MIN HLEM Survey Over the CASCADEN NORTH PROPERTY Ermatinger and Cascaden Townships, Ontario

MAX-MIN HLEM Survey Over the CASCADEN NORTH PROPERTY Ermatinger and Cascaden Townships, Ontario PO Box 9, 4579 Government Road, Larder Lake, Ontario, PK L, Canada Phone (75) 6445 Fax (75) 649 www.cxsltd.com MAX-MIN HLEM Survey Over the CASCADEN NORTH PROPERTY Ermatinger and Cascaden Townships, Ontario

More information

How to overcome/avoid High Frequency Effects on Debug Interfaces Trace Port Design Guidelines

How to overcome/avoid High Frequency Effects on Debug Interfaces Trace Port Design Guidelines How to overcome/avoid High Frequency Effects on Debug Interfaces Trace Port Design Guidelines An On-Chip Debugger/Analyzer (OCD) like isystem s ic5000 (Figure 1) acts as a link to the target hardware by

More information

Software Package WW 9038 for the Sound Intensity Analysing System Type 3360 or the Digital Frequency Analyzer Type 2131

Software Package WW 9038 for the Sound Intensity Analysing System Type 3360 or the Digital Frequency Analyzer Type 2131 Software Package WW 9038 for the Sound Intensity Analysing System Type 3360 or the Digital Frequency Analyzer Type 2131 BO 0065-11 Software Package WW 9038 for the Sound Intensity Analysing System Type

More information

Upgrading E-learning of basic measurement algorithms based on DSP and MATLAB Web Server. Milos Sedlacek 1, Ondrej Tomiska 2

Upgrading E-learning of basic measurement algorithms based on DSP and MATLAB Web Server. Milos Sedlacek 1, Ondrej Tomiska 2 Upgrading E-learning of basic measurement algorithms based on DSP and MATLAB Web Server Milos Sedlacek 1, Ondrej Tomiska 2 1 Czech Technical University in Prague, Faculty of Electrical Engineeiring, Technicka

More information

Laser Beam Analyser Laser Diagnos c System. If you can measure it, you can control it!

Laser Beam Analyser Laser Diagnos c System. If you can measure it, you can control it! Laser Beam Analyser Laser Diagnos c System If you can measure it, you can control it! Introduc on to Laser Beam Analysis In industrial -, medical - and laboratory applications using CO 2 and YAG lasers,

More information

Failure Analysis Technology for Advanced Devices

Failure Analysis Technology for Advanced Devices ISHIYAMA Toshio, WADA Shinichi, KUZUMI Hajime, IDE Takashi Abstract The sophistication of functions, miniaturization and reduced weight of household appliances and various devices have been accelerating

More information

Contents: 1 LANsmart Pro Main Unit 4 Remote Unit: ID1, ID2, ID3, ID4

Contents: 1 LANsmart Pro Main Unit 4 Remote Unit: ID1, ID2, ID3, ID4 LANsmart Pro user manual Introduction LANsmart Pro is a hand-held, multifunction Cable Map Tester and Cable Length Meter. It has an integrated Analog and Digital Tone Generator, Port Finder, and Quick

More information

Clarification for 3G Coverage Obligation Verification Data

Clarification for 3G Coverage Obligation Verification Data Clarification for 3G Coverage Obligation Verification Data Publication date: 7 June 2013 Contents Section Page 1 Introduction 1 2 Data Processing 3 3 Data Formatting 7 4 Data Validation 9 Annex Page 1

More information

UC San Diego UC San Diego Previously Published Works

UC San Diego UC San Diego Previously Published Works UC San Diego UC San Diego Previously Published Works Title Classification of MPEG-2 Transport Stream Packet Loss Visibility Permalink https://escholarship.org/uc/item/9wk791h Authors Shin, J Cosman, P

More information

United States Patent: 4,789,893. ( 1 of 1 ) United States Patent 4,789,893 Weston December 6, Interpolating lines of video signals

United States Patent: 4,789,893. ( 1 of 1 ) United States Patent 4,789,893 Weston December 6, Interpolating lines of video signals United States Patent: 4,789,893 ( 1 of 1 ) United States Patent 4,789,893 Weston December 6, 1988 Interpolating lines of video signals Abstract Missing lines of a video signal are interpolated from the

More information

DATA SHEET Panorama Rudder Indicator, TRI-2

DATA SHEET Panorama Rudder Indicator, TRI-2 DATA SHEET Panorama Rudder Indicator, TRI-2 Class 1 accuracy on CAN version Readable from up to 5 metres Single and dual CAN or analogue interface LED illumination DEIF A/S Frisenborgvej 33 DK-7800 Skive

More information

STB Front Panel User s Guide

STB Front Panel User s Guide S ET-TOP BOX FRONT PANEL USER S GUIDE 1. Introduction The Set-Top Box (STB) Front Panel has the following demonstration capabilities: Pressing 1 of the 8 capacitive sensing pads lights up that pad s corresponding

More information

Cascadable 4-Bit Comparator

Cascadable 4-Bit Comparator EE 415 Project Report for Cascadable 4-Bit Comparator By William Dixon Mailbox 509 June 1, 2010 INTRODUCTION... 3 THE CASCADABLE 4-BIT COMPARATOR... 4 CONCEPT OF OPERATION... 4 LIMITATIONS... 5 POSSIBILITIES

More information

CASE HISTORY#3 COOLING TOWER GEARBOX BEARING FAULT. Barry T. Cease Cease Industrial Consulting

CASE HISTORY#3 COOLING TOWER GEARBOX BEARING FAULT. Barry T. Cease Cease Industrial Consulting CASE HISTORY#3 COOLING TOWER GEARBOX BEARING FAULT Barry T. Cease Cease Industrial Consulting ceasevibration@icloud.com (843) 200-9705 1 COOLING TOWER GEARBOX BEARING FAULT A series of ten cooling tower

More information

Cover Sheet. Scanning Report of Flexible Riser Pipe Section EVI /7/2005. Inspection Report

Cover Sheet. Scanning Report of Flexible Riser Pipe Section EVI /7/2005. Inspection Report Cover Sheet Document Number EVI-2005-0002 Document Date 7/7/2005 Document Title Customer -other- AEA Technologies Type Inspection Report Prepared by: Date: Reviewed by: Date: Approved by: Date: Evisive,

More information

Proceedings of the Third International DERIVE/TI-92 Conference

Proceedings of the Third International DERIVE/TI-92 Conference Description of the TI-92 Plus Module Doing Advanced Mathematics with the TI-92 Plus Module Carl Leinbach Gettysburg College Bert Waits Ohio State University leinbach@cs.gettysburg.edu waitsb@math.ohio-state.edu

More information

ST10XME Power Extension Cable Test

ST10XME Power Extension Cable Test ST10XME Power Extension Cable Test Gert Gottschalk May 2005 1. Mechanical Very stable cable. The connection to the Camera and to the power supply cable is very snug. There is no indication that slight

More information

RHP-IS DESKTOP IMAGE STABILIZER

RHP-IS DESKTOP IMAGE STABILIZER RHP-IS DESKTOP IMAGE STABILIZER Instruction Manual Firmware release 2.1 and above 2005-06-22 Rock2000.com P.O. BOX 4242, Middletown, New York, 10941, USA www.rock2000.com support@rock2000.com 2 Contents

More information

What's New in LMS Smart Scope 3?

What's New in LMS Smart Scope 3? What's New in LMS Smart Scope 3? RPM, GPS and CAN traces available in the online strip... 2 Rename the recording while scoping... 2 Zoom in analysis Strip display... 3 Replay cursor in post-recording view...

More information

THE OPERATION OF A CATHODE RAY TUBE

THE OPERATION OF A CATHODE RAY TUBE THE OPERATION OF A CATHODE RAY TUBE OBJECT: To acquaint the student with the operation of a cathode ray tube, and to study the effect of varying potential differences on accelerated electrons. THEORY:

More information

Signal Stability Analyser

Signal Stability Analyser Signal Stability Analyser o Real Time Phase or Frequency Display o Real Time Data, Allan Variance and Phase Noise Plots o 1MHz to 65MHz medium resolution (12.5ps) o 5MHz and 10MHz high resolution (50fs)

More information

Micro-DCI 53ML5100 Manual Loader

Micro-DCI 53ML5100 Manual Loader Micro-DCI 53ML5100 Manual Loader Two process variable inputs Two manually controlled current outputs Multiple Display Formats: Dual Channel Manual Loader, Single Channel Manual Loader, Manual Loader with

More information

STRAND LIGHTING 200F 7-INCH TUNGSTEN LED TELEVISION FRESNEL SPECIFICATION.

STRAND LIGHTING 200F 7-INCH TUNGSTEN LED TELEVISION FRESNEL SPECIFICATION. STRAND LIGHTING 200F 7-INCH TUNGSTEN LED TELEVISION FRESNEL SPECIFICATION. GENERAL. A.) Overview. 1) The Television Fresnel fixture shall be purpose designed for television and studio lighting applications.

More information

Bat Transect Survey. The Proposed Extension to Dagnam Park, London Borough of Havering. on behalf of. The London Borough of Havering

Bat Transect Survey. The Proposed Extension to Dagnam Park, London Borough of Havering. on behalf of. The London Borough of Havering of The Proposed Extension to Dagnam Park, London Borough of Havering on behalf of The London Borough of Havering October 2011 James Blake Associates 2011 Revision Purpose Originated Checked Authorised

More information

What s New in Raven May 2006 This document briefly summarizes the new features that have been added to Raven since the release of Raven

What s New in Raven May 2006 This document briefly summarizes the new features that have been added to Raven since the release of Raven What s New in Raven 1.3 16 May 2006 This document briefly summarizes the new features that have been added to Raven since the release of Raven 1.2.1. Extensible multi-channel audio input device support

More information

2.4 Scheduled Events Schedule Recording. 1. In Multicam, click on the Schedule icon. 2. Select Schedule Edit.

2.4 Scheduled Events Schedule Recording. 1. In Multicam, click on the Schedule icon. 2. Select Schedule Edit. 2.4 Scheduled Events 2.4.1 Schedule Recording 2. Select Schedule Edit. 3. Setup basic recording schedule as follows: a. Select cameras which schedule is to be applied. b. Select Round-the-clock or Motion

More information

Digital 1 Final Project Sequential Digital System - Slot Machine

Digital 1 Final Project Sequential Digital System - Slot Machine Digital 1 Final Project Sequential Digital System - Slot Machine Joseph Messner Thomas Soistmann Alexander Dillman I. Introduction The purpose of this lab is to create a circuit that would represent the

More information

Miscellaneous Documentary Research on the Hepworth Mine, Rural Alsey, Scott County, Illinois

Miscellaneous Documentary Research on the Hepworth Mine, Rural Alsey, Scott County, Illinois Miscellaneous Documentary Research on the Hepworth Mine, Rural Alsey, Scott County, Illinois by James Yingst Fever River Research Springfield, Illinois Floyd Mansberger Principal Investigator Prepared

More information

Immunity testing example using Tekbox TEM Cells

Immunity testing example using Tekbox TEM Cells 1 Introduction A customer asked us to solve an immunity issue of a corner light. The device failed BCI testing in the test house at frequencies in the 300 MHz to 400 MHz range. The failure mode was flickering

More information

A COMPUTERIZED SYSTEM FOR THE ADVANCED INSPECTION OF REACTOR VESSEL STUDS AND NUTS BY COMBINED MULTI-FREQUENCY EDDY CURRENT AND ULTRASONIC TECHNIQUE

A COMPUTERIZED SYSTEM FOR THE ADVANCED INSPECTION OF REACTOR VESSEL STUDS AND NUTS BY COMBINED MULTI-FREQUENCY EDDY CURRENT AND ULTRASONIC TECHNIQUE More Info at Open Access Database www.ndt.net/?id=18566 A COMPUTERIZED SYSTEM FOR THE ADVANCED INSPECTION OF REACTOR VESSEL STUDS AND NUTS BY COMBINED MULTI-FREQUENCY EDDY CURRENT AND ULTRASONIC TECHNIQUE

More information

Flight Data Recorder - 10

Flight Data Recorder - 10 NATIONAL TRANSPORTATION SAFETY BOARD Office of Research and Engineering Washington, DC 20594 February 15, 2000 Flight Data Recorder - 10 Addendum 2 to Group Chairman s Factual Report by Dennis R. Grossi

More information

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time.

DISCLAIMER. This document is current at the date of downloading. Hunter Water may update this document at any time. DISCLAIMER This Standard Technical Specification was developed by Hunter Water to be used for construction or maintenance of water and/or sewerage works that are to become the property of Hunter Water.

More information

9070 Smart Vibration Meter Instruction Manual

9070 Smart Vibration Meter Instruction Manual 9070 Smart Vibration Meter Instruction Manual Overall machine and bearing conditions: vibration values are displayed with color coded alarm levels for ISO values and Bearing Damage (BDU). Easy vibration

More information

The Micropython Microcontroller

The Micropython Microcontroller Please do not remove this manual from the lab. It is available via Canvas Electronics Aims of this experiment Explore the capabilities of a modern microcontroller and some peripheral devices. Understand

More information

The Measurement Tools and What They Do

The Measurement Tools and What They Do 2 The Measurement Tools The Measurement Tools and What They Do JITTERWIZARD The JitterWizard is a unique capability of the JitterPro package that performs the requisite scope setup chores while simplifying

More information

Automatic LP Digitalization Spring Group 6: Michael Sibley, Alexander Su, Daphne Tsatsoulis {msibley, ahs1,

Automatic LP Digitalization Spring Group 6: Michael Sibley, Alexander Su, Daphne Tsatsoulis {msibley, ahs1, Automatic LP Digitalization 18-551 Spring 2011 Group 6: Michael Sibley, Alexander Su, Daphne Tsatsoulis {msibley, ahs1, ptsatsou}@andrew.cmu.edu Introduction This project was originated from our interest

More information

StaMPS Persistent Scatterer Exercise

StaMPS Persistent Scatterer Exercise StaMPS Persistent Scatterer Exercise ESA Land Training Course, Bucharest, 14-18 th September, 2015 Andy Hooper, University of Leeds a.hooper@leeds.ac.uk This exercise consists of working through an example

More information

LAUREL. Laureate Digital Panel Meter for Load Cell & Microvolt Input ELECTRONICS, INC. Features. Description

LAUREL. Laureate Digital Panel Meter for Load Cell & Microvolt Input ELECTRONICS, INC. Features. Description Description LAUREL ELECTRONICS, INC. Features Laureate Digital Panel Meter for Load Cell & Microvolt Input 20, 50, 100, 250 & 500 mv ranges Span adjust from 0 to ±99,999, zero adjust from -99,999 to +99,999

More information

Approved by Principal Investigator Date: Approved by Super User: Date:

Approved by Principal Investigator Date: Approved by Super User: Date: Approved by Principal Investigator Date: Approved by Super User: Date: Standard Operating Procedure BNC Dektak 3030 Stylus Profilometer Version 2011 May 16 I. Purpose This Standard Operating Procedure

More information

Trimble TMX-2050 Display Quick Reference Card

Trimble TMX-2050 Display Quick Reference Card Trimble TMX-2050 Display Quick Reference Card The Trimble TMX-2050 display is a touchscreen platform for precision agriculture. Home screen Left side of screen Right side of screen Tap the buttons on the

More information

Video Signals and Circuits Part 2

Video Signals and Circuits Part 2 Video Signals and Circuits Part 2 Bill Sheets K2MQJ Rudy Graf KA2CWL In the first part of this article the basic signal structure of a TV signal was discussed, and how a color video signal is structured.

More information

RF Safety Surveys At Broadcast Sites: A Basic Guide

RF Safety Surveys At Broadcast Sites: A Basic Guide ENGINEERING EXTRA REPRINTED FROM FEB. 22, 2012 The News Source for Radio Managers and Engineers RF Safety Surveys At Broadcast Sites: A Basic Guide The Process of Measuring RF Safety Compliance Often Is

More information

imso-104 Manual Revised August 5, 2011

imso-104 Manual Revised August 5, 2011 imso-104 Manual Revised August 5, 2011 Section 1 Getting Started SAFETY 1.10 Quickstart Guide 1.20 SAFETY 1.30 Compatibility 1.31 Hardware 1.32 Software Section 2 How it works 2.10 Menus 2.20 Analog Channel

More information

AFM1 Imaging Operation Procedure (Tapping Mode or Contact Mode)

AFM1 Imaging Operation Procedure (Tapping Mode or Contact Mode) AFM1 Imaging Operation Procedure (Tapping Mode or Contact Mode) 1. Log into the Log Usage system on the SMIF web site 2. Open Nanoscope 6.14r1 software by double clicking on the Nanoscope 6.14r1 desktop

More information

PCM ENCODING PREPARATION... 2 PCM the PCM ENCODER module... 4

PCM ENCODING PREPARATION... 2 PCM the PCM ENCODER module... 4 PCM ENCODING PREPARATION... 2 PCM... 2 PCM encoding... 2 the PCM ENCODER module... 4 front panel features... 4 the TIMS PCM time frame... 5 pre-calculations... 5 EXPERIMENT... 5 patching up... 6 quantizing

More information

Dektak II SOP Revision 1 05/30/12 Page 1 of 5. NRF Dektak II SOP

Dektak II SOP Revision 1 05/30/12 Page 1 of 5. NRF Dektak II SOP Page 1 of 5 NRF Dektak II SOP The Dektak II-A is a sensitive stylus profilometer. A diamond-tipped stylus is moved laterally across the surface while in contact and measures deflections of the tip. It

More information

Operation Manual for. SCU1 Signal Conditioning Unit

Operation Manual for. SCU1 Signal Conditioning Unit Operation Manual for SCU1 Signal Conditioning Unit Table of Contents 1. About this Manual 4 1.1. Symbols Glossary 4 2. Safe Use 4 3. Compatible Magnetometers 5 4. Introduction to the SCU1 5 4.1. Summary

More information

1996 Yampi Shelf, Browse Basin Airborne Laser Fluorosensor Survey Interpretation Report [WGC Browse Survey Number ]

1996 Yampi Shelf, Browse Basin Airborne Laser Fluorosensor Survey Interpretation Report [WGC Browse Survey Number ] 1996 Yampi Shelf, Browse Basin Airborne Laser Fluorosensor Survey Interpretation Report [WGC Browse Survey Number 1248.1] Prepared For Australian Geological Survey Organisation April 2000 AGSO Record No.

More information

THE OPERATION OF A CATHODE RAY TUBE

THE OPERATION OF A CATHODE RAY TUBE THE OPERATION OF A CATHODE RAY TUBE OBJECT: To acquaint the student with the operation of a cathode ray tube, and to study the effect of varying potential differences on accelerated electrons. THEORY:

More information

LAUREL ELECTRONICS, INC.

LAUREL ELECTRONICS, INC. LAUREL ELECTRONICS, INC. Laureate Digital Panel Meter for Process, Strain & Potentiometer Follower Signals Features Selectable ±0.2, ±2, ±20, ±200, ±300 & ±600 Vdc voltage ranges Selectable ±2, ±20, ±200

More information