1 Michael Pacholok Director Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Professional Services August 15, 2016 Posted via PDF: (4 page + 4 attachments) ADDENDUM NO. 2 REQUEST FOR TENDER NO CONTRACT NO. MCP For: Construction Services for the replacement of aging "Electrical Substation West" at Humber Wastewater Treatment Plant CLOSING DATE: 12:00 NOON (LOCAL TIME); SEPTEMBER 07, (REVISED) Please refer to the above Request for Tender (RFT) document in your possession and be advised of the following: I. MANDATORY SITE MEETING The following had representation on August 09, 2016, mandatory site meeting: Ainsworth Inc. Beacon UtilityContractors Limited Industrial Electrical Contractors Limited Plan Group Sutherland-Schultz WS Nicholls Construction Inc. Alberici Constructors Cymi Canada Inc. Morgado Construction Ltd. Quantech Electrical Contractors Ltd Trade Mark Industrial Inc. II. LIST OF ATTACHMENTS Attachment 1 Revised Pricing Table Attachment 2: UPS System drawings Attachment 3: Semi-Auto Transfer Scheme complete with associated drawings Attachment 4: Shutdown Request/ Notification (SRN) form III. ADDITIONS & REVISIONS ADDITIONS A) Uninterrupted Power Supply (UPS) System: Based on the scope of work mentioned below provide price for item-21 (UPS Replacement) in Section 3, the Schedule of Price (Page 3-14). 1) Refer to the specification and drawing of Uninterrupted Power Supply (UPS) and battery and provide the following: i. UPS system in Digester 7-10 electrical room ii. UPS system in the basement of blower/administration-building 2) Provide all the required labour, material, tools and accessories for the installation, testing and commissioning of UPS system. Addendum-2 Tender #

2 3) UPS-6493 System (Located in the basement of Blower/Administration Building): i. Remove the existing UPS, battery-bank and all its accessories. ii. Provide a new UPS at the same location where the old UPS is located. The UPS shall be rated as per the following: 30 kva UPS, 3-Phase, 60Hz Incoming power supply: 208V, 3-phase, 60 Hz UPS output power supply: 208/120V, 3-phase, 60 Hz, 4-Wire iii. Provide battery-bank in an enclosure, shall provide an uninterrupted power supply to full load (30kVA) for 30 minutes in case incoming normal power supply fails iv. Provide new transformer, disconnect switch, manual transfer switch and all the required cables and required accessories. These equipment shall be mounted minimum one (1) meter above ground. Refer to the drawing for details. v. Before proceeding for the installation provide a written sequence of construction to the plant staff for their approval. The power interruption to the connected loads shall be minimized. vi. Relocate all the items stored in the UPS room to a different location in the plant, as directed by the plant staff; and clean the room. 4) UPS-9563 System (Located in Digester # 7-10 Electrical-Room): i. Provide a new circuit breaker in the existing Motor Control Centre (MCC) located in the room. ii. Provide new transformer, manual transfer switch, distribution panel, junction box (with proper terminal connector), all the required cables/wires and accessories. Mount the transformer on the wall. Refer to the drawing for details. iii. Before proceeding for the installation provide a written sequence of construction to the plant staff for their approval. The power interruption to the connected loads shall be minimized. iv. Remove the existing UPS, battery-bank and all its accessories v. Provide a new UPS at the same location where the old UPS is located. The UPS shall be rated as per the following: 20 kva UPS, 3-Phase, 60Hz Incoming power supply: 208V, 3-phase, 60 Hz UPS output power supply: 208/120V, 3-phase, 60 Hz, 4-Wire vi. Provide battery-bank in an enclosure, shall provide an uninterrupted power supply to full load (20kVA) for 30 minutes in case incoming normal power supply fails. B) SEMI-AUTOMATIC TRANSFER SCHEME: Based on the scope of work mentioned below provide price for item-22 (Semi Auto Transfer Scheme) in Section 3, the Schedule of Price (Page 3-14). A semi-automatic transfer scheme will be implemented at the Humber Treatment Plant - Main Substation: 1) In Mimic Panel THR-ELS-CP-0001 replace Semi- Auto three position switch with a two position, maintained, ON/OFF selector switch with a contact in both positions. Modify the selector switch label to Semi-Auto On-Off. Addendum-2 Tender #

3 REVISIONS 2) In 5kV Switchgear, modify the logic of JRT-0103 and JRT-0203 associated with the main 4.16kV breakers SWG-0103 and SWG-0203 to trip on undervoltage. Modify relay R4 logic to close on undervoltage. 3) In 5kV Switchgear, modify logic of JRT-0002 associated with the tie 4.16kV breaker SWG-0002 to provide a syncrocheck between Bus 1 and Bus 2. Syncrocheck to confirm one bus is dead or both buses are synchronized before a transfer is allowed. 4) In 5kV Switchgear SWG-0002, modify the semi auto selector switch test mode label to semi auto. The semi auto transfer switch shall be modified to be a two position ON/Off switch rather than Bus 1 test/bus 2 test. The pilot light is to rewired such that the light is activated/on when the semi auto transfer switch is in off position. The pilot light label to indicate Off. 5) The semi auto transfer switch is to be rewired such that in On position of the selector switch, the semi-auto transfer scheme operation shall be allowed. 6) Remove syncrocheck connection on Relay JRT Only one voltage input so synchronization is not possible 7) Test transfer scheme through actual conditions not simulation. Details of settings and wiring schematics have been included in the Semi-Auto Transfer Scheme package, as an attachment to the Addendum. A. Tender Document: 1) Replace item 1.1/.9 of Section (Summary of Work) with the following: "Provide a temporary generator 2000kW, 600V, 3-phase power to the West substation during construction stage. Two sources of power should be maintained for the loads at all the times". 2) Replace "Shut-down Notification Form" provided under Section (Use of owner's site during construction), with the new "Shutdown Request/Notification (SRN)" form provided as an attachment with the addendum. 3) Replace item 1.16/.5 Section (Use of owner's site during construction), with the following: "The contractor will fill the "Shutdown Request/Notification (SRN)" form and submit it to the Contract Administrator. The operations lead of the plant will review the SRN form and coordination with all the affected operations and maintenance staff for the proposed shutdown, and identify any extraordinary activities required to accommodate the shutdown. Operations lead will approve/issue the shutdown notification." B. Drawing: 1) Drawing I8 Notes 5: The fibre optic cable is to be routed through existing duct bank and then through the fibre duct in the Primary Sludge Building-2. The Fibre Optic Cable shall be terminated in the Primary Sludge Pumping 2 access closet (THR-SPC-COM-1200). See drawing E39 for cable schedule. Additional Note (Note 7): The Enervista cable is to be routed through existing duct bank (in a 25mm flex. PVC conduit) and then through the existing fibre duct in the Primary Sludge Building -2. The Enervista Cable shall be terminated in the Primary Sludge Pumping 2 Multilink Panel (THR-SPC-1210). Addendum-2 Tender #

4 IV. QUESTIONS AND ANSWERS Q.1 Is it possible to have a 2 week extension on the closing date? Manufacturers are on vacation and is difficult to get the pricing by 24 August. A1. Please refer to the first page of the Addendum for the revised closing date. Q2. Tender clause 6.2.A.1 in Section 2 Information for Bidders, be amended to remove Ontario and read (2) similar projects of comparable nature, size and scope within Canada in the last ten (10) years with a minimum value of $2,000,000 Canadian Dollars.:. A2. Due to the specialized nature of the work, the Bidder shall meet the qualification and experience requirements mentioned in the Tender document. Tender clause 6.2.A.1 in Section 2 Information for Bidders will not be amended, and will remain as in the Tender. Q3. Can the tender document be send electronically? A3. Unfortunately the tender document is not provided electronically, only the drawings. Q4. In section 3 page 13 schedule of pricing the item numbers seem to skip#3. A4. See revised pricing table in attachement. Should you have any questions regarding this addendum contact Candida Charles at ccharle@toronto.ca or Please attach this addendum to your Tender document and be governed accordingly. Bidders must acknowledge receipt of all addenda in their Tender in the space provided on the Tender Submission Form as per Appendix A, Section 4 - Addenda of the Tender document or your response will be declared noncompliant and will not be considered. All other aspects of the Tender remain the same. Yours truly, Robert Nichols Acting Supervisor Professional Services Addendum-2 Tender #

5 Section 3 Tender Submission Package Schedule of Prices to cover alterations, extras or deductions Tender Call No Contract No. MCP Addendum No 2 SCHEDULE OF PRICES TO COVER ALTERATIONS, EXTRAS OR DEDUCTIONS Item No 1 Description Estimated Provisional Quantity Unit Addition/Deleti on Unit Price Total Price Weekly Work Stoppage for potential Asbestos Abatement. 6 weeks $ /week $ Concrete Repair for damaged concrete areas with non-shrink grout. (removal, disposal, supply & install) Supply and install additional firestopping over and above that required as part of base scope for the following opening ranges I. 0.25m 2 opening or smaller II. 0.25m 2 to 0.5m 2 opening III. 0.5m 2 to 1.05m 2 opening Labour and material to supply & install new 1000mm wide by 100mm high Aluminum Cable Tray Labour and Material for additional concrete coring, including all requirements as per Section (assume 8 diameter and 8 width/depth). Replacement of Feeder Cables for Gas Compressor Building from PDP or PDP-0602 (CB-1511 or CB- 1512) to Gas Compressor MCC-1501 or MCC-1502 including all labour and materials to remove existing feeder cables and replace with new complete with termination of both ends. Replacement of Feeder Cables for Admin Building from PDP-0501 or PDP-0602 (CB-2501 or CB-2602) to Admin Building PDP-2501 or PDP including all labour and materials to remove existing feeder cables and replace with new complete with termination of both ends. Replacement of Feeder Cables for North Grit Building from PDP-0501 or PDP-0602 (CB-3201 or CB-3202) to North Grit MCC-3201 or MCC-3202 including all labour and materials to remove existing feeder cables and 100 m 2 $ /m 2 $ 10 units $ unit $ 10 units $ unit $ 10 units $ unit $ 50 M $ /m $ 20 each $ /ea $ LS $ $ LS $ $ LS $ $ PMMD V Page 3-13

6 Section 3 Tender Submission Package Schedule of Prices to cover alterations, extras or deductions Tender Call No Contract No. MCP Addendum No 2 replace with new complete with termination of both ends. 9 Replacement of Feeder Cables for Digester 1-6 Building from PDP-0501 or PDP-0602 (CB-1411 or CB-1412) to Digester 1-6 MCC-1401 or MCC including all labour and LS $ $ materials to remove existing feeder cables and replace with new complete with termination of both ends. 10 Replacement of Feeder Cables for Head House Building from PDP-0501 or PDP-0602 (CB-2922 or CB-2922) to Head House MCC-2922 or MCC including all labour and LS $ $ materials to remove existing feeder cables and replace with new complete with termination of both ends. 11 Daily rate for additional assistance: 1. Licensed electrician 60 Days $ / day $ 12 Additional Standby Generator 2000 kw, 600 V, 3 Phase, 60 Hz Provide a weekly rate (supply, installation and 8 weeks $ / week $ removal). 13 Allowance for removal and disposal of Designated Substance Materials. - - $50, Changes to Control System wiring including labour & material for the - - $50,000 investigation, supply and installation 15 Spare Parts and Special Tool Allowance - - $40,000 Labour and Material to supply and 16 install additional Source of Power 50 each $ $ /ea Tags (Lamacoid Tag Type F). Labour and Material to supply and 17 install additional tags (Lamacoid Tag 50 each $ $ /ea Type D). Labour and Material to supply and 18 install additional Aluminum Equipment Tags (Teflon coated 50 each $ /ea $ Aluminum). 19 Changes to electrical system from the results of the Arc Flash study - - $25, Smog Alert Response Allowance - - $20, UPS Replacement LS $ 22 Semi Auto Transfer Scheme Provide programming and support for the implementation of the Semi-Auto LS $ Transfer Scheme. 23 Additional Labour for Programming (OIT/PLC/SCADA) by $25,000 PMMD V Page 3-14

7 Section 3 Tender Submission Package Schedule of Prices to cover alterations, extras or deductions Tender Call No Contract No. MCP Addendum No 2 24 System Integrator Allowance for electrical system upgrades over and above those identified in the Contract Documents. $50,000 TOTAL ALLOWANCE FOR SCHEDULE OF PRICES $ (Carry forward to Page 3-7) The prices listed herein shall be used by the City of Toronto to determine payments for alterations, extras and deductions to the original Contract quantities and are excluding HST, but inclusive all other taxes as well as the Contractor's overheads and profits. The contingency allowance is for potential extra work which may be required beyond the scope of this Contract and is subject to approval of the General Manager. Payments from the contingency allowance will be made only following issuance of an Extra Work Orde r approved by the General Manager. Any unused portion of the contingency allowance shall be deduct ed from the Total Lump Sum Price. The unit prices inserted above for provisional quantities shall be applicable to extras or deductions even if actual quantities are found to vary considerably from them. The Bidder agrees that no part of the Total Allowance for Schedule of Prices aforementioned shall be expended without written direction from the General Manager. In addition, all unused portions of the Schedule of Prices shall be deducted from the Total Lump Sum Tender Price. In the event of o bvious mathematical errors in the Schedule of Prices, the unit prices tendered shall be considered correct and arithmetic extensions and totals shall be corrected accordingly. Any such corrections resulting in adjustment to the total for the Schedule of Prices will be similarly applied as an adjustment to the Total Lump Sum Price tendered for the project. Amounts for extras or deductions based on the Schedule of Prices will be added or deducted from the Total Lump Sum Price. Payment for deductions or additions of items not listed will be made in accordance with the General Conditions and specific condition. Harmonized Sales Tax (HST) is to b e applied to the prices submitted as specified in the relevant sections of the call document or in the Price Schedule provided in the call. HST for the supply and delivery of materials/goods are to be shown as additional separate line items on the Price Schedule and any subsequent invoices. PMMD V Page 3-15

8 C2 Cable # C1: 1X3C #4 AWG + #6 AWG GND EXISTING MCC-1002 (Length: 20 Meters) 600V, 3Ph, 60Hz Cable # C2: 1X4C 1/O AWG + #6 AWG GND (Length: 50 Meters) EXISTING C.B. 60A C.B. EXISTING CABLE 100A, 3-Pole 600V BATTERY BANK INVERTER RECTIFIER STATIC SW ITCH AUTOM ATIC M AINTENANCE BYPASS C1 30KVA UPS C.B. 45 KVA TR 600V, 3Ph, 60Hz (Primery) 208/120V, 3Ph, 60Hz (Sec.) 208/120V, 3Ph, 60Hz FEED FROM PDP-2101 EXISTING CABLE BATTERIES WITH CABINET RATED FOR 30KVA, 208/120V, 3-Phase Load 30 MINUTE POWER BACK-UP AT FULL LOAD C2 MANUAL TRANSFER SWITCH 200A, 4-Pole, 600 VAC C2 EXISTING DISTRIBUTION PANEL 208/120V, 3Ph, 4W SINGLE LINE DIAGRAM UPS (Location: Basement of Blower/Admin. Building) Water TORONTO WATER Operational Support Capital Works Delivery HUMBER TREATMENT PLANT UPS-6493 LOCATION SINGLE LINE DIAGRAM(SLD) DESIGN: DRAFTING: CHECK: CONTRACT No. MCP NO. DATE REVISIONS INITIAL SIGNED SCALE: DATE: N.T.S. AUGUST 5, 2016 DRAWING NUMBER: UPS-6493

9 EXISTING MCC-3402A C2 600V, 3Ph, 60Hz MANUAL TRANSFER SWITCH Non-Fusible 100A, 4-Pole, 600V NEW C.B. 60AT (Adjustable) C1 C2 30 KVA TR 600/208/120V C.B. 20KVA UPS Cable # C1: 1X3C #4 AWG + #6 AWG GND (Length: 40 Meters) Cable # C2: 1X4C #2 AWG + #6 AWG GND C2 BATTERY BANK INVERTER RECTIFIER STATIC SW ITCH AUTOM ATIC M AINTENANCE BYPASS (Length: 60 Meters) C.B. Branch Circuits # C3: 24 Circuits 2X1C #12 AWG + #12 AWG GND (Each Circuit Length: 25 Meters) BATTERIES WITH CABINET RATED FOR 20KVA, 208/120V, 3-Phase Load 30 MINUTE POWER BACK-UP AT FULL LOAD C2 DISTRIBUTION PANEL 208/120V, 3Ph, 4W 100A, 3P Main C.B. 24 BRANCH C.B.: 15A, 1P EACH C3 JUNCTION BOX EXISTING CONDUIT & BRANCH CIRCUITS SINGLE LINE DIAGRAM UPS (Location: Digester 7-10 Electrical Room) Water TORONTO WATER Operational Support Capital Works Delivery HUMBER TREATMENT PLANT UPS 9563 SINGLE LINE DIAGRAM(SLD) DESIGN: DRAFTING: CHECK: CONTRACT No. CONTRACT No. NO. DATE REVISIONS INITIAL SIGNED SCALE: DATE: N.T.S. AUGUST 5, 2016 DRAWING NUMBER: UPS-9563

10 Semi- Automatic Transfer Scheme The 4.16kV main breakers SWG-0103 and SWG-0203 are presently set to trip on a long or short time overcurrent (51) and to trip and lock out on an instantaneous current. The main breakers will also trip on a bus fault (B90) or a fault on the associated 27.6kV breaker SWG-0101 or SWG-0201 ahead of the transformer supplying the 4.16kV switchgear. Presently, the semi-automatic transfer scheme is initiated from the two R4 auxiliary relays of the GE 750 Multilin Relay (JRT-0103/JRT-0203) of SWG-0103 and SWG They are set to change state on overcurrent (50 and 51) of the incoming feeder. This will cause the tie breaker SWG-0002 to close only if one of the main breakers is open. It does not allow for a transfer if there is a bus fault and this should be maintained as transferring into a fault would be disastrous. The transferring into a faulted bus is prevented by the B90 relays (JRT-0001/A/B/C AND JRT- 0002/A/B/C) on the 4.16kV busesbus-0001 and BUS If either bus is faulted the tie breaker will trip and lock out. In addition, the synchrocheck component of the GE750 can prevent transfer onto a live bus where synchronism is not possible. For the Semi- Automatic Transfer scheme between BUS-0201 and BUS-0202, the transfer should be initiated based on undervoltage on the incoming line. This would entail changing the programming of the SWG-0103 and SWG-0203 GE 750 Multilin relay to trip and to have the auxiliary relay R4 close on undervoltage. Voltage to BUS-0201 and BUS-0202 can also be supplied from co-generators and from emergency generators. In order, for the tie breaker to be allowed to close on undervoltage (on the loss of a main incoming source), confirmation that the bus is not powered or will not be powered from an alternative source must be achieved. From discussions with GHD, the co-generator system will be configured to trip the co-generators if there is a trip on the main 27.6kV breaker, the transformer feeder 27.6kV breakers or the 4.16kV main breakers. Confirmation that the emergency generator is not powering the bus at the same time as the utility is confirmed by a key interlock scheme preventing the main breakers and the emergency generator breakers from being closed at the same time. Voltage to BUS-0201 and BUS-0202 can also be supplied from one utility source Manby or Horner and confirmation that the bus that will be providing power is not in an undervoltage condition as well is required. This can be achieved by the use of the synchrocheck condition on the JRT-0002 of the tie breaker SWG-0002 this wiring is already present. The two main breakers SWG-0103 and SWG-0203 and the tie breaker SWG-0002 of the 4.16kV switchgear are hard-wired interlocked such that only two of the three breakers can be closed at any one time. This provides the required safety of this transfer scheme. The addition of the breaker trip on undervoltage is required as there are switching operations and there may be faults that will not open the main 4.16kV breaker that is seeing an undervoltage. The breaker would have to be tripped to allow the close of the tie breaker. It should be noted that, with this change the transformer breakers on the 27.6kV switchgear SWG-0101 and SWG-0201 would have to be closed to provide voltage to the main 4.16kV switchgear SWG-0103 and SWG-0203, otherwise the trip coil on the breakers will remain energized. The main incoming breakers (SWG-0100 and SWG-0200) have overvoltage and undervoltage protection settings. These protection settings will assist in protecting the plant from a voltage issue from Toronto Hydro. The Co-Generation System should provide protection from undervoltage and overvoltage either through the Co-Generation Breakers or the generator controls.

11 The function of the undervoltage relays on SWG-0103 and SWG-0203 is to initiate the transfer to a live bus on loss of power to either BUS-0201 or BUS The following settings are recommended for the Line Undervoltage settings of JRT-0103 and JRT-0203 of the SWG-0103 and SWG-0203, respectively. This causes a trip and lockout of the breaker in undervoltage conditions. Line Undervoltage: Trip Line Undervoltage Relays:4 Line Undervoltage PickUp = 0.8 x VT Line Undervoltage Curve=Definite Time Time Delay= 10s Line Undervoltage Minimum Voltage = 0.1 x VT to be confirmed at Site For JRT-0002 of SWG-0002 (the tie breaker on the 4.16kV switchgear), the synchrocheck setting can be incorporated to block transfer to a bus when one bus is not dead or in synchronism with the other bus. Without the Co-generators, there will be no source that will allow for synchronism across the bus. The two Toronto Hydro sources from Manby and Horner cannot be synchronized. The synchrocheck settings are recommended for JRT-0002: Synchrocheck Function: Alarm Synchrocheck Relays: 4 Dead Source Permissive: DLxDB (Dead Line or Dead Bus) Dead Bus Max: = 0.10 xvt to be confirmed at site Dead Line Max: = 0.10 xvt to be confirmed at site Live Bus Min = 0.80 x VT Live Line Min = 0.80 x VT Maximum Voltage Difference = 416V Maximum Angle Difference = 0 degree Maximum Frequency Difference = 0Hz 80% Voltage level was selected for trip on the undervoltage on the main 4.16kV breakers so the breaker should trip and transfer on 80%. Manual transfers can still be made on the 4.16kV by opening one of the main breakers and closing the tie. It is only at the 4.16kV level that an electronic transfer scheme can be incorporated. At the 27.6kV level there is only an open and close pushbutton on the remote panel for the breakers. The breakers are kirk interlocked so any transfer would have to be made manually. The only changes required to implement this automatic transfer system are: The switch on the Mimic panel must be changed to a two position switch with Semi-Automatic Transfer System On and Off as the positions Programming on the two 4.16kV Main Breakers relays JRT-0103 and JRT-0203 on SWG-0103 and SWG-0203 must be programmed to trip on undervoltage through Auxiliary Relay 4. As noted above. This is already wired up. Programming on JRT-0002 must be configured to provide a synchrocheck on Auxiliary Relay 4 as noted above. This will be more of a function to determine that the bus being transferred into is dead then a synchrocheck. This is already wired up in this matter.

12 Breaker Logic 4.16KV Tie Breakers JRT-0002 GE 750 Relay Output Contacts Function Trip Close Aux3 Aux4 Aux5 Aux6 Aux7 50 x x 51 x x Synch x Input Logic Input 8 Breaker Closed. Relay Indication. Input 9 Breaker Open. Relay Indication. Input 10 Breaker Tripped and Locked Out. Relay Indication. Combine with Aux 3. Input 14 Maintenance Mode. Disable OC1 Settings and Enable OC2 Settings. Analog B1-B2 -Average rms Voltage Output mA See Semi Automatic Transfer Scheme for Synch Setting

13 Breaker Logic 4.16KV Main Breakers JRT-0103 and JRT-0203 GE 750 Relay Output Contacts Function Trip Close Aux3 Aux4 Aux5 Aux6 Aux7 50 x x 51 x x 27 Line x x Input Logic Input 8 Breaker Closed. Relay Indication. Input 9 Breaker Open. Relay Indication. Input 10 Breaker Tripped and Locked Out. Relay Indication. Combine with Aux 3. Input 14 Maintenance Mode. Disable OC1 Settings and Enable OC2 Settings. Analog B1-B2 -Average rms Voltage Output mA See Semi Automatic Transfer Scheme for Undervoltage Setting. Although shown on the breaker schematics from Eaton the Auxiliary 5 Relay cannot act on synchrocheck as there is only one voltage input to the relay. Any connections to Aux 5 should be removed

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35 QMS quality environment health & safety SHUTDOWN REQUEST / NOTIFICATION QMS REFERENCE: FM-WWT-6202 DOCS#: REVISION DATE: JUNE 13, 2014 Contractor Reference No. City Reference No. Section 1 Contractor Information to be completed by the contractor 1.1 General Information Project Name Contract/Order No. Request Date Click here to enter a date. Contact Information Name & Title Company/Division Telephone # (Direct) Contractor/Vendor Click here to enter Primary Contact text. Contractor/Vendor Click here to enter Secondary Contact text. Contract Administrator Click here to enter text. City Project Manager Click here to enter text. 1.2 Overall Objective 1.3 Shutdown Request Information Equipment/Service to be Shutdown Start Date Click here to enter a date. Time Click here to enter text. End Date Click here to enter a date. Time Click here to enter text. Duration Click here to enter text. 1.4 Location Information Specific Location 1.5 Detailed Description Description Attachments Page 1 of 3

36 QMS quality environment health & safety SHUTDOWN REQUEST / NOTIFICATION QMS REFERENCE: FM-WWT-6202 DOCS#: REVISION DATE: JUNE 13, 2014 Section 2 City Information To be completed by the City 2.1 General Information Contact Information Name Title Telephone # (Direct) Shutdown Coordinator Click here to enter text. Secondary Shutdown Click here to enter Coordinator text. Plant Project Lead Click here to enter text. 2.2 Approval Approved Name: Approved as noted Name: Rejected Name: 2.3 Shutdown Location Plant TAB/HTP/THC TAB Only TNT Work Area(s) WA1 WA2 WA3 WA4 WA5 WA6 WA7 WA8 TNT Equipment/Service to be Shut Down 2.4 Shutdown Directive Start Date Click here to enter a date. Refer to Section 1.5 Detailed Description Lockouts Required Attachments Time Click here to enter text. End Date Click here to enter a date. Time Click here to enter text. Duration Click here to enter text. 2.5 Prerequisites and Conditions Conditions for Approval Check if Sign Off is Required in Section Notification and Distribution TAB/HTP/THC EHS Construction Rep WA1 ASPOM WA2 ASPOM WA3 ASPOM WA4 ASPOM Plant Manager Plant Engineers EI Specialist PCS Support All Contractors Additional Recipients TAB Only Info Action Info Action WA5 ASPOM WA6 ASPOM WA7 ASPOM WA8 ASPOM TNT ASPOM District Operations Page 2 of 3

37 QMS quality environment health & safety SHUTDOWN REQUEST / NOTIFICATION QMS REFERENCE: FM-WWT-6202 DOCS#: REVISION DATE: JUNE 13, 2014 Section 3 Sign Off 3.1 City Sign Off - Must be signed prior to starting the work Name Title Signature Additional Comments By signing above the City is indicating that the equipment listed in the shutdown directive has been shut down and locked out. The contractor may proceed with the work. Please add any last minute comments if necessary (i.e.: changes to lockouts, timing, etc). 3.2 Prerequisites and Conditions Sign off - Must be signed prior to starting the work (only if indicated in section 2.6) Name Title Signature Date Contractor Contract Administrator By signing above the Contractor and Contractor Administrator are acknowledging that they have read, understood and any tasks outlined in section 2.5: Prerequisites and Conditions have been completed (if required), and that to the best of their knowledge, work may now proceed. 3.3 Completed Work Sign Off - Must be signed on completion of the work Name Title Signature Date Contractor Contract Administrator By signing above the Contractor and Contractor Administrator are indicating that the work is complete, that the work/equipment has been tested (as required), contractor locks have been removed, and that the equipment is ready to be returned to service (if applicable). Page 3 of 3

Toronto Hydro - Electric System

Toronto Hydro - Electric System Toronto Hydro - Electric System FIT Commissioning Requirements and Reports Comments and inquiries can be e-mailed to: FIT@torontohydro.com Customers without e-mail access can submit through regular mail

More information

High performance circuit breakers

High performance circuit breakers Series High performance Description The high performance MCB offers a compact solution to circuit protection. The devices are DIN rail mounted. The is available with application-specific trip characteristics

More information

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes.

SECTION MEDIUM VOLTAGE CABLE INSTALLATION. 1. Section Underground Ducts and Manholes. SECTION 33 71 49.23 MEDIUM VOLTAGE CABLE INSTALLATION PART 1 GENERAL 1.1 SCOPE A. Work included in this Section: Medium Voltage Cable (4 kv and 12 kv) Installation and Termination. Removal and return of

More information

DMX and 4000 air circuit breakers from 800 to 4000 A

DMX and 4000 air circuit breakers from 800 to 4000 A DMX 3 20 and 00 air circuit breakers from 800 to 00 NEW 286 56 + 288 02 (p. 4) 286 4 + 288 02 (p. 4) 28 56 + 288 02 (p. 4) Dimensions (p. to 53) Electrical characteristics (p. 54 to 5) ir circuit breakers

More information

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130

Operating Manual (Edition 04/2004) sinamics. Line Reactors SINAMICS G130 Operating Manual (Edition 04/2004) sinamics Line Reactors SINAMICS G130 Contents 1. Safety Information 2 2. General 5 3. Mechanical Installation 6 4. Electrical Installation 8 5. Technical Specifications

More information

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA

REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA 21, rue d'artois, F-75008 Paris http://www.cigre.org B3-110 Session 2004 CIGRÉ REFURBISHMENT OF SECONDARY SYSTEMS IN HIGH VOLTAGE SUBSTATIONS LESSONS LEARNED IN VENEZUELA by E. PADILLA * L. CEDEÑO E. PELAYO

More information

CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT

CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 620 APRIL 2017 CONSTRUCTION SPECIFICATION FOR TRAFFIC SIGNAL EQUIPMENT TABLE OF CONTENTS 620.01 SCOPE 620.02 REFERENCES 620.03 DEFINITIONS 620.04

More information

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018

SITE All work shall be performed at Center Park Substation (1895 Kernan Blvd, Jacksonville, Fl ). DATE: 04/03/2018 DATE: 04/03/2018 TO: The Contractor FROM: System Protection & Control Projects 20413 SUBJECT: Technical Specifications for Center Park APSTF Project PROJECT OVERVIEW This is a general specification that

More information

Safety Codes Council Conference Banff C Panel Discussion

Safety Codes Council Conference Banff C Panel Discussion Safety Codes Council Conference Banff 2014 90 C Panel Discussion Tim Driscoll OBIEC Consulting Ltd. George Morlidge Fluor Canada Ltd. Scott Basinger Eaton Canada René Leduc Marex Canada Limited Perspectives

More information

MATE3 Owner s Manual Addendum

MATE3 Owner s Manual Addendum Purpose MATE3 Owner s Manual Addendum This document is an addendum to 900-0117-01-00, Revision C of the MATE3 System Display and Controller Owner s Manual. It provides descriptions of changes to the MATE3

More information

SINAMICS G130 / G150. Line harmonics filter. Operating Instructions 05/2010 SINAMICS

SINAMICS G130 / G150. Line harmonics filter. Operating Instructions 05/2010 SINAMICS SINAMICS G130 / G150 Line harmonics filter Operating Instructions 05/2010 SINAMICS s Safety information 1 General 2 SINAMICS SINAMICS G130 / G150 Operating Instructions Mechanical installation 3 Electrical

More information

3AH3 Vacuum Circuit-Breakers

3AH3 Vacuum Circuit-Breakers Catalog HG 11.03 Edition 2018 3AH3 Vacuum Circuit-Breakers Medium-Voltage Equipment siemens.com/3ah3 2 3AH3 Vacuum Circuit-Breakers Siemens HG 11.03 2018 R-HG11-373.tif Contents 3AH3 Vacuum Circuit-Breakers

More information

FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure

FORENSIC CASEBOOK. By Bob Huddleston, Eastman Chemical Co. One of the most common. reasons for marriage failure The Case of the Energized Cable Cutting Incident How miscommunication leads to an electrical helper slicing through live 13.8kV cable and miraculously walking away to tell about it By Bob Huddleston, Eastman

More information

Operating Instructions 07/2007 Edition. SINAMICS G130/G150 Line harmonics filter. sinamics

Operating Instructions 07/2007 Edition. SINAMICS G130/G150 Line harmonics filter. sinamics Operating Instructions 07/2007 Edition SINAMICS G130/G150 Line harmonics filter sinamics s Safety information 1 General 2 SINAMICS SINAMICS G130/G150 Operating Instructions Mechanical installation 3 Electrical

More information

Generator protection relay

Generator protection relay Page 1 Issued: April 1999 Status: New Data subject to change without notice Features Off-the-shelf generator protection relay for small and medium sized power generators Three-phase time overcurrent and

More information

PLC Control Unit for a CSM-E Electrical Compact Clean Steam Generator

PLC Control Unit for a CSM-E Electrical Compact Clean Steam Generator 3.635.5275.254 IM-P486-18 CH Issue 3 PLC Control Unit for a CSM-E Electrical Compact Clean Steam Generator Installation, Start-up and Operation Manual 1. Safety information 2. General product information

More information

Transfer Switch. OTECA (Spec A) OTECB (Spec A) OTECC (Spec A) OTECD (Spec A) Amperes. English Original Instructions (Issue 5)

Transfer Switch. OTECA (Spec A) OTECB (Spec A) OTECC (Spec A) OTECD (Spec A) Amperes. English Original Instructions (Issue 5) Operator Manual Transfer Switch 40-1000 Amperes OTECA (Spec A) OTECB (Spec A) OTECC (Spec A) OTECD (Spec A) English Original Instructions 10-2015 962-0131 (Issue 5) Table of Contents 1. SAFETY PRECAUTIONS...

More information

KENYA ELECTRICITY GENERATING COMPANY PLC. KGN-HYD

KENYA ELECTRICITY GENERATING COMPANY PLC. KGN-HYD KENYA ELECTRICITY GENERATING COMPANY PLC. KGN-HYD-050-208. TENDER FOR SUPPLY, INSTALLATION AND COMMISSIONING OF A COMMERCIAL GRADE DISPLAY SCREEN AT KAMBURU CONTROL CENTRE. 7 th January, 209. ADDENDUM

More information

Specification. NGTS Issue 1 October 1993

Specification. NGTS Issue 1 October 1993 The Electrical Standards for SHE Transmission s area are non-maintained versions of National Grid Technical Specifications that are applicable to the SHE Transmission System only. These specific versions

More information

Purchasing Department Finance Group INVITATION TO BID

Purchasing Department Finance Group INVITATION TO BID Purchasing Department Finance Group July 3, 2013 INVITATION TO BID The City of Norwalk is soliciting bids for the Building Management Department for Network Video Recording (NVR) Equipment for the existing

More information

City of Winter Springs, FL

City of Winter Springs, FL City of Winter Springs, FL Request for Quote RFQ/006/17/LS Commission Chambers Audio Visual System Upgrades The City of Winter Springs will be upgrading its Commission Chambers (Chambers) audio visual

More information

SQM40/41 Actuators for air and gas dampers

SQM40/41 Actuators for air and gas dampers SQM40/41 Actuators for air and gas dampers Description SQM40/41 actuators are used for the positioning of flow control valves, butterfly valves, dampers or any application requiring rotary motion. The

More information

Systems Pow-R Breakers Renewal Parts and Accessories

Systems Pow-R Breakers Renewal Parts and Accessories Systems Pow-R Breakers Renewal Parts and Accessories Renewal Parts RP01301013E Effective February 2006 Supersedes RPD29-890A pages 1 16 dated, March 2000 Cutler-Hammer SPB 100, 65 and 50 Series Contents

More information

PRINCIPLES AND APPLICATIONS

PRINCIPLES AND APPLICATIONS GENERATION & NETWORK Digital Automation Measuring and Control Devices AMS7000 PROCOM The optimum operation of an electrical network depends particularly on the reliability and the availability of the protection,

More information

ex 800 Series ematrix System

ex 800 Series ematrix System Protecting Your Human Assets During Emergency ex 800 Series ematrix System The ex 800 Series ematrix System is a fully integrated and versatile public address system which is designed distinctively to

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT A PLUS INDUSTRIES LIMITED. Plot-28, Milk Vita Rd., Section-07, Mirpur, Dhaka Factory List: 1. A Plus Industries Ltd. Inspected by: Yoon Report Generated by: Nezar Inspected

More information

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience

1. The contractor shall ensure that: c) Contractor or sub-contractor has at least 5 years experience Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GENERAL

More information

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA

HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA Section 00000 SECURITY ACCESS AND SURVEILLANCE HONEYWELL VIDEO SYSTEMS HIGH-RESOLUTION COLOR DOME CAMERA PART 1 GENERAL 1.01 SUMMARY The intent of this document is to specify the minimum criteria for the

More information

A Unique Power Supply for the PEP II Klystron at SLAC*

A Unique Power Supply for the PEP II Klystron at SLAC* I : SLAC-PUB-7591 July 1997 A Unique Power Supply for the PEP II Klystron at SLAC* R. Case1 and M. N. Nguyen Stanford Linear Accelerator Center Stanford University, Stanford, CA 94309 Presented at the

More information

FTC AGL System Controller Reference Manual Part Number

FTC AGL System Controller Reference Manual Part Number SERIAL NUMBER FTC 190-1 AGL System Controller Reference Manual Part Number 7911901 Flash Technology, 332 Nichol Mill Lane, Franklin, TN 37067 (615) 261-2000 Front Matter Abstract This manual contains information

More information

POWER MONITORS ENERIUM RANGE. Minimize your energy consumption and optimize your installation

POWER MONITORS ENERIUM RANGE. Minimize your energy consumption and optimize your installation POWER MONITORS ENERIUM RANGE Minimize your energy consumption and optimize your installation From 0.2s critical electricity metering to the collection of metering data on all utilities Electrical feeder

More information

4.0 Description. 2-channel operation D1 and D2 rated at 200 VA each. 1-channel operation D1 rated at 400 VA (see connection chap. 6.

4.0 Description. 2-channel operation D1 and D2 rated at 200 VA each. 1-channel operation D1 rated at 400 VA (see connection chap. 6. _307 238_EN_LUXOR 405_310 410 01_D.qxd 21.09.16 10:54 Seite 1 Operating Manual Dimmer module 4050100 1.0 Designated use The LUXOR dimmer module expands the existing LUXOR series of devices. It switches

More information

AT&T January, 2012 Revised December, 2018 TABLE OF CONTENTS SECTION 1--INTRODUCTION...1-1

AT&T January, 2012 Revised December, 2018 TABLE OF CONTENTS SECTION 1--INTRODUCTION...1-1 SECTION 1--INTRODUCTION...1-1 1. General...1-1 1.1. Introduction...1-1 1.2. Purpose...1-2 1.3. Application...1-2 1.4. Definitions...1-3 1.5. General Requirements...1-3 1.6. Proprietary Information...1-5

More information

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School

BILOXI PUBLIC SCHOOL DISTRICT. Biloxi Junior High School BILOXI PUBLIC SCHOOL DISTRICT Biloxi Junior High School Request for Proposals E-Rate 2014-2015 - Internal Connections Submit Proposals To: Purchasing Department Attn: Traci Barnett 160 St. Peter Street

More information

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment.

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment. Film-Tech The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment. These manuals are designed to facilitate the exchange of information related to cinema

More information

CH1 CH2 CH3 CH4. Master /Fade CH5. 600s CH6. 60s SC1 SC2 SC4 SC3 SC5. SC6 Off/Pro. AL Fade 6 Pro. User guide

CH1 CH2 CH3 CH4. Master /Fade CH5. 600s CH6. 60s SC1 SC2 SC4 SC3 SC5. SC6 Off/Pro. AL Fade 6 Pro. User guide 1 1 CH1 CH2 1 1 CH4 CH 1 CH3 6s Master /Fade CH6 1 SC1 6s SC4 SC2 SC SC3 SC6 Off/Pro AL Fade 6 Pro User guide CONTENTS INTRODUCTION...2 Welcome 2 Safety 2 Supplied items 3 INSTALLATION...4 Mounting 4

More information

Improved Synchronization System for Thermal Power Station

Improved Synchronization System for Thermal Power Station Improved Synchronization System for Thermal Power Station Lokeshkumar.C 1, Logeshkumar.E 2, Harikrishnan.M 3, Margaret 4, Dr.K.Sathiyasekar 5 UG Students, Department of EEE, S.A.Engineering College, Chennai,

More information

Owners SW-LCD 2.0 Manual & Specifications

Owners SW-LCD 2.0 Manual & Specifications Owners SW-LCD 2.0 Manual & Specifications Contents 1. Preface. 19 2. Appearance and Size.20 2.1 Material and Color 20 2.2 Display Size and Installation Size 20 3. Function Summary and Button Definition

More information

MCR3 POWER EQUIPMENT. Microprocessor Controlled Constant Current Regulator. Compliance with Standards. Uses. Features

MCR3 POWER EQUIPMENT. Microprocessor Controlled Constant Current Regulator. Compliance with Standards. Uses. Features Microprocessor Controlled Constant Current Regulator Compliance with Standards FAA: ICAO: IEC: 61822 CENELEC: AC 150/5345-10 (current edition), L-828, L-829. Aerodrome Design Manual Part 5, para. 3.2 (current

More information

Medium and High Voltage Circuit Breakers Characteristic Time Quantities of the Circuit Breaker with Applications

Medium and High Voltage Circuit Breakers Characteristic Time Quantities of the Circuit Breaker with Applications Workshop 6: Maintenance and monitoring Medium and High Voltage Circuit Breakers Characteristic Time Quantities of the Circuit Breaker with Applications Alexander Herrera OMICRON electronics GmbH 3 December

More information

Online Control System Migration of Industrial Centrifuge Project Description

Online Control System Migration of Industrial Centrifuge Project Description Canadian Consulting Engineering Awards 2017 Online Control System Migration of Industrial Centrifuge Project Description Category: Natural Resources, Mining, Industry & Energy Fort McMurray, AB Table of

More information

EA63-7D. Generator Automatic Voltage Regulator Operation Manual. Self Excited Automatic Voltage Regulator

EA63-7D. Generator Automatic Voltage Regulator Operation Manual. Self Excited Automatic Voltage Regulator EA63-7D Generator Automatic Voltage Regulator Operation Manual Self Excited Automatic Voltage Regulator SP POWERWORLD LTD Willows, Waterside, Ryhall, Stamford, Lincs, PE9 4EY, UK Tel: +44 1780 756872 -

More information

Instruction Manual. Series 3000 Model R-165A. Audio/Video IF/RF Relay Panel. CATV Switching and Control

Instruction Manual. Series 3000 Model R-165A. Audio/Video IF/RF Relay Panel. CATV Switching and Control Series 3000 Model R-165A Audio/Video IF/RF Relay Panel Instruction Manual CATV Switching and Control 585-765-2254 fax 585-765-9330 100 Housel Ave. Lyndonville NY 14098 www.monroe-electronics.com Table

More information

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of a centralized

More information

HIGH COURT OF BOMBAY AT GOA

HIGH COURT OF BOMBAY AT GOA HIGH COURT OF BOMBAY AT GOA Calling Quotations for Supply and Installation of Wireless Synchronized Digital Clocks Quotations are invited from the Manufacturers/Suppliers of Wireless Synchronized Digital

More information

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS

CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS CASS COUNTY, MICHIGAN CASSOPOLIS, MI REQUEST FOR PROPOSAL SPECIFICATIONS Cass County, Michigan invites qualified vendors to submit proposals for the purchase, installation, and programming of: a door card

More information

8000 Plus Series Safety Light Curtain Installation Sheet ( CD206A/ CD206B )

8000 Plus Series Safety Light Curtain Installation Sheet ( CD206A/ CD206B ) SMARTSCAN 8000 PLUS LIGHT CURTAIN 1 Unpacking 8000 Plus Series Safety Light Curtain Installation Sheet ( CD206A/0160306 CD206B160306 ) Remove all packaging material and retain it Locate and keep the delivery

More information

ORM0022 EHPC210 Universal Controller Operation Manual Revision 1. EHPC210 Universal Controller. Operation Manual

ORM0022 EHPC210 Universal Controller Operation Manual Revision 1. EHPC210 Universal Controller. Operation Manual ORM0022 EHPC210 Universal Controller Operation Manual Revision 1 EHPC210 Universal Controller Operation Manual Associated Documentation... 4 Electrical Interface... 4 Power Supply... 4 Solenoid Outputs...

More information

2. SUPERPATH Mbps Digital Service 2.1. General

2. SUPERPATH Mbps Digital Service 2.1. General Page 1 Rates and charges for services explained herein are contained in Part M, Section 3, Service Charges referred to herein are explained in Part A, Section 3 and contained in Part M, Section 1. 2.1

More information

OPTEVA 828 LOBBY ATM FRONT LOAD PLAN VIEW FRONT ELEVATION SIDE ELEVATION

OPTEVA 828 LOBBY ATM FRONT LOAD PLAN VIEW FRONT ELEVATION SIDE ELEVATION L0 CALL -800--600 OPTEVA 88 LOBBY ATM FRONT LOAD WITH 0mm ( 6") CEN III AND CEN IV SAFE CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND INFORMATION. PLEASE SEE PLANNING AND

More information

multi-function meters

multi-function meters multi-function meters eclipse 2 eclipse 7 installation and operating manual 1 GENERAL DESCRIPTION 2 INSTALLATION 3 WIRING INFORMATION 4 2 ECLIPSE 2 METERS 2.1 PROGRAMMING THE METER 5 2.2 INFORMATION 6

More information

Protective function Systems, cable, selectivity and generator protection. i 2 t constant function: switchable. I r A

Protective function Systems, cable, selectivity and generator protection. i 2 t constant function: switchable. I r A DATASHEET - NZMN3-VE630 Circuit-breaker, 3p, 630A Part no. NZMN3-VE630 Catalog No. 259133 EL-Nummer (Norway) 0004358791 Similar to illustration Delivery program Product range Circuit-breaker Protective

More information

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements

A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements DRAFT 6 V4 Standard PRC-006- RFC-01 01/11/11 A. Introduction 1. Title: Automatic Underfrequency Load Shedding Requirements Deleted: Deleted: 10 Deleted: 20 9 2. Number: PRC 006 RFC 01. Purpose: To establish

More information

Invitation to Bid SCOREBOARD - WHH

Invitation to Bid SCOREBOARD - WHH Invitation to Bid SCOREBOARD - WHH Responses to an Invitation to Bid will be received by the Purchasing Supervisor, Sumner County Board of Education, 1500 Airport Road, Gallatin, TN 37066 for SCOREBOARD

More information

GP-500 SERIES - Low Voltage

GP-500 SERIES - Low Voltage M O T O R & G E N E R A T O R P R O T E C T I O N AUTOMATIC INSULATION RESISTANCE TESTERS Meg-Alert is an automatic, in-line insulation resistance tester and monitor with test capabilities from 500 to

More information

0.1. Outage Management Process Summary

0.1. Outage Management Process Summary 0.1 Outage Management Process Summary Issue: 1.0 Issue Date: August 27, 2014 Table of Contents 1. Introduction... 4 1.1 Purpose... 4 1.2 Glossary... 4 State Transition Model... 8 2. Outage Management Processes...

More information

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings

NERC Reliability Standard PRC-024 Generator Frequency and Voltage Protective Relay Settings NERC Reliability Standard PRC-024 024-1 Generator Frequency and Voltage Protective Relay Settings Rick Terrill Luminant Power Generation Compliance NERC Standards Drafting Team Member Reliability Standard

More information

New York MX700 Room. PWD-NY5-MX700-P60 List Price: $11, SLA Price: $1,100.00/year (Other options available See Appendix B)

New York MX700 Room. PWD-NY5-MX700-P60 List Price: $11, SLA Price: $1,100.00/year (Other options available See Appendix B) New York MX700 Room PWD-NY5-MX700-P60 List Price: $11,000.00 SLA Price: $1,100.00/year (Other options available See Appendix B) Statement of Work (SoW) Project Summary RoomReady will install the following

More information

EG4015. Digital Generator Governor Controller User Manual

EG4015. Digital Generator Governor Controller User Manual EG4015 Digital Generator Governor Controller User Manual Digital Governor for use in Gas and Diesel Generators with smoke and idle controls. Senses generator frequency, no magnetic pickup unit (MPU) is

More information

Capital Works process for Medium Works contracts

Capital Works process for Medium Works contracts Capital Works process for Medium Works contracts Guidance Notes Contracts valued between $50k-$500k Please note this process only applies to Ministry-led Medium Works projects. These notes provide further

More information

OWNERS MANUAL. Revision /01/ Lightronics Inc. 509 Central Drive Virginia Beach, VA Tel

OWNERS MANUAL. Revision /01/ Lightronics Inc. 509 Central Drive Virginia Beach, VA Tel OWNERS MANUAL Revision 1.8 09/01/2002 OWNERS MANUAL Page 2 of 12 AR-1202 UNIT DESCRIPTION The AR-1202 consists of a processor and 12 dimmer channels of 2.4KW each. Each dimmer channel is protected by a

More information

Engineering Instruction

Engineering Instruction Engineering Instruction Electrical Distribution Unit Approved by: Paul Poynton, A/Professional Head Electrical Engineering, Sydney Trains Authorised by: Jonathon McKinnon, Engineering Technical Publications

More information

Small System Packages. Strand Dimming Systems

Small System Packages. Strand Dimming Systems 12 Dimmer System Model 98502 Two SD 6C dimmer packs 12/24 channel lighting console Rack with locking front door Six 23-50 Zoom spotlights Six 6 inch Fresnels Three 15 foot circuit strips Applications:

More information

Identification - electrical services

Identification - electrical services Identification - electrical services Aesthetic All live phase cable sheathing to be brown coloured and neutral phase cable sheathing to be blue coloured, all labelled L1, L2, L3 & N respectively in accordance

More information

SITOP power supply. Technical data, April SITOP Power Supply. Answers for industry.

SITOP power supply. Technical data, April SITOP Power Supply. Answers for industry. SITOP power supply Technical data, April 2010 SITOP Power Supply Answers for industry. SITOP reliable power supply Efficient operation of a machine or plant requires a reliable, constant power supply.

More information

REGO Start&Go USER MANUAL

REGO Start&Go USER MANUAL REGO Start&Go USER MANUAL Version 0 Rev. B of 03/03/16 Page 1 of 15 Introduction The purpose of the manual is to describe all of the steps required to commission and correctly operate the REGO Start&Go

More information

User Guide. Centrex Recording Interface

User Guide. Centrex Recording Interface User Guide Centrex Recording Interface Table of Contents Introduction... 2 The Meridian Business Set... 3 Key Numbering Plan (18 button add-on)... 4 Key Numbering Plan (36 button add-on)... 5 Key Numbering

More information

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab*

Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* Tender Report for Supply and installation of LAN in *Biomedical Imaging and Bioinformatics Lab* General Scope of Work: Supply and installation of Computer Laboratory setup in MIU Location of Installation:

More information

Alberta Electric System Operator

Alberta Electric System Operator Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement June 1, 2016 Alberta Utilities Commission Decision 21038-D01-2016 Downtown Calgary 138-kV Transmission System Reinforcement

More information

Function Manual SIMATIC HMI TP900. Operator Panel.

Function Manual SIMATIC HMI TP900. Operator Panel. Function Manual SIMATIC HMI TP900 Operator Panel Edition 10/2016 www.siemens.com Introduction 1 Safety notes 2 Medium-voltage converters SIMATIC Description 3 Screens 4 Installing software 5 Function

More information

Sentinel I24 Digital Input and Output Configuration

Sentinel I24 Digital Input and Output Configuration Application Bulletin: #155 Date: October 19, 2007 Sentinel I24 Digital Input and Output Configuration The Sentinel I24 can communicate with external hardware using digital inputs and outputs. There are

More information

Description Set value in neutral conductor is synchronous with set value Ir of main pole. R.m.s. value measurement and thermal memory CSA 100

Description Set value in neutral conductor is synchronous with set value Ir of main pole. R.m.s. value measurement and thermal memory CSA 100 DATASHEET - NZMN3-4-AE400 Circuit-breaker, 4p, 400A Part no. NZMN3-4-AE400 Catalog No. 265891 Similar to illustration EL-Nummer (Norway) 0004358857 Delivery program Product range Circuit-breaker Protective

More information

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd.

ELECTRICAL SAFETY INSPECTION REPORT. MTM Garments Ltd. ELECTRICAL SAFETY INSPECTION REPORT MTM Garments Ltd. 15934/16004, Chanpara, Medical Road, Uttarkhan, Dhaka, Bangladesh. Factory List MTM Garments Ltd. Inspected by: Hemlal Dahal Report Generated by: Hemlal

More information

CAMTO LTD. Arc detecting system DC/AC

CAMTO LTD. Arc detecting system DC/AC CAMTO LTD Arc detecting system DC/AC Arc detecting system DC/AC The system is based on experience with arc protection since 1962. The system units are built into boxes that all fit on a 35 mm DIN-rail.

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-27 05 14.00 10 (April 2006) -------------------------------- Preparing Activity: USACE Superseding UFGS-27 05 14.00 10 (April 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

TRF STEP-DOWN TRANSFORMER USER MANUAL

TRF STEP-DOWN TRANSFORMER USER MANUAL TRF STEP-DOWN TRANSFORMER USER MANUA www.ventilation-system.com 2013 ! WARNING The present operation manual consisting of the technical details, operating instructions and technical specification applies

More information

SURGE PROTECTIVE DEVICES

SURGE PROTECTIVE DEVICES SURGE PROTECTIVE DEVICES COMPANY INTRODUCTION Bridex Singapore Pte Ltd is founded in 1978 as a manufacturer of instruments transformer for the Asian market. We are the first local electrical switchgear

More information

Circuit-Breakers for Motor Protection Series 8523/8

Circuit-Breakers for Motor Protection Series 8523/8 > Accessories Auxiliary contacts 1 NC + 1 NO or 2 NC + 2 NO Undervoltage trip Shunt release > Switch operation with knop > Secure switching > Clear switch setting indicator > Different current setting

More information

Analog Input Module HART Ex i / I.S. Inputs, 8 Channels Type 9461/

Analog Input Module HART Ex i / I.S. Inputs, 8 Channels Type 9461/ > 8 channels for 2-wire HART transmitters > Intrinsically safe inputs Ex ia IIC > Galvanic separation between inputs and system > Open-circuit and short-circuit monitoring for each field circuit > Module

More information

AUTOMATIC TRANSFER SWITCHES. Product Guide

AUTOMATIC TRANSFER SWITCHES. Product Guide AUTOMATIC TRANSFER SWITCHES Product Guide CUSTOM CONFIGURATION The chart tells the story. You can custom configure switches by choosing the exact components needed. This standard process allows Kohler

More information

Multi-functional safety relay modules PROTECT SRB-E

Multi-functional safety relay modules PROTECT SRB-E Multi-functional safety relay modules PROTECT SRB-E PROTECT SRB-E The configurable User-friendly Up to 16 different applications can be selected Monitoring of all conventional safety switchgear Safety

More information

I r A Protection against direct contact Finger and back of hand proof to VDE 0106 Part 100

I r A Protection against direct contact Finger and back of hand proof to VDE 0106 Part 100 DATASHEET - NZMH2-A100 Circuit-breaker, 3p, 100A Part no. NZMH2-A100 Catalog No. 259099 Similar to illustration Delivery program Product range Circuit-breaker Protective function System and cable protection

More information

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12") MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12) MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL OPTEVA 868 THROUGH THE WALL ATM WITH 40mm ( 6") CEN III AND CEN IV SAFE L0 CALL -800--600 0 (6") REQUIRED FOR WALLS EXCEEDING 0mm (2") CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS

More information

Monday, January 7, 2019

Monday, January 7, 2019 ADDENDUM NO. 3 TO THE REQUEST FOR PROPOSALS (RFP) FOR VIDEO AND ACCESS CONTROL SYSTEMS VARIOUS LOCATIONS CITY WIDE FOR THE CITY OF HYATTSVILLE, MARYLAND RFP #DPW18-010 Monday, January 7, 2019 The City

More information

Telemetry Receiver Installation Guide

Telemetry Receiver Installation Guide BBV Telemetry Receiver Installation Guide Models covered Rx200 Building Block Video Ltd., Unit 1, Avocet Way, Diplocks Industrial Estate, Hailsham, East Sussex, UK. Tel: +44 (0)1323 842727 Fax: +44 (0)1323

More information

www.greenelectricalsupply.com MaxLite 6 & 8 Commercial Downlight Retrofit General Safety Information To reduce the risk of death, personal injury or property damage from fire, electric shock, falling parts,

More information

Report on Comments June 2013 NFPA 70

Report on Comments June 2013 NFPA 70 10-1 Log #1392 NEC-P10 Dennis Darling, Stantec Consulting Ltd. 10-5 Delete text to read as follows: Localization of an overcurrent condition to restrict outages to the circuit or equipment affected, accomplished

More information

HYL-035D0850G103. Constant current LED driver DALI Dimmable. LED Driver. Product description. Benefits. Interfaces.

HYL-035D0850G103. Constant current LED driver DALI Dimmable. LED Driver.   Product description. Benefits. Interfaces. Constant current LED driver DALI Dimmable Product description Dimmable Independent constant current Adjustable output current between 350 and 1,050mA via DIP switch Max. output power 35 W Up to 88 % efficiency

More information

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12") MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL

R OPTEVA 868 THROUGH THE WALL ATM. 305mm (12) MAXIMUM WALL THICKNESS IN AREA OF UNIT OUTLINE OF OPTIONAL ILLUMINATED SIGNAGE PANEL OPTEVA 868 THROUGH THE WALL ATM WITH mm ( 2") CEN-L SAFE L00 CALL -800-999-600 22 (9 6") REQUIRED FOR WALLS EXCEEDING 0mm (2") CONSULT WITH DIEBOLD INSTALLATION/SERVICE BRANCH FOR ADDITIONAL DETAILS AND

More information

Electronic Timer Control Day Astronomic Electronic Control

Electronic Timer Control Day Astronomic Electronic Control Electronic Timer Control - 365-Day Astronomic Electronic Control Item ET90215CRE / EAN-Code PRODUCT DESCRIPTION The ET90000 Series combines powerful and intuitive scheduling with truly maintenance-free

More information

Implementation of a High-Speed Distribution Network Reconfiguration Scheme by Greg Hataway, Ted Warren, and Chris Stephens.

Implementation of a High-Speed Distribution Network Reconfiguration Scheme by Greg Hataway, Ted Warren, and Chris Stephens. The following technical papers supporting this presentation are available at www.selinc.com: Trip and Restore Distribution Circuits at Transmission Speeds by Jeff Roberts and Karl Zimmerman International

More information

RFIs AND RESPONSES; ANSWERS ARE IN RED.

RFIs AND RESPONSES; ANSWERS ARE IN RED. January 4, 2013 ADDENDUM #3 TITLE OF RFQ: Gateway Audio Visual Bid REFERENCE: 12/13 B-30 Please note the following information regarding 12/13 B-30: 1. The due date is: January 11, 2013 at 1:00 p.m. in

More information

A. Section Includes: Division 1 applies to this section. Provide GPS wireless clock system, complete.

A. Section Includes: Division 1 applies to this section. Provide GPS wireless clock system, complete. SPECIFICATIONS GPS Wireless Clock System Section 16730 TIME SYSTEM PART 1 - GENERAL 1.01 SUMMARY A. Section Includes: Division 1 applies to this section. Provide GPS wireless clock system, complete. B.

More information

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS

SECTION INTERCOMMUNICATIONS AND PROGRAM SYSTEMS SECTION 27 51 23 SPEC WRITER NOTES: 1. Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Contact Department of Veterans

More information

T5, T8, TC-L. PC T5 PRO lp W V 50/60/0 Hz, HO. Electronic ballasts Linear lamps T5, T8 and compact lamps TC-L

T5, T8, TC-L. PC T5 PRO lp W V 50/60/0 Hz, HO. Electronic ballasts Linear lamps T5, T8 and compact lamps TC-L T, T8, TC-L Electronic ballasts PC T PRO lp 80 W 0 0 V 0/0/0 Hz, HO L D,1 0, 1 side fixing feature side fixing feature ø,1 defined lamp warm start is 1. s constant light output independent of fluctuations

More information

Operating Manual RISH OPTIMA VAF

Operating Manual RISH OPTIMA VAF Operating Manual RISH OPTIMA VAF 2-60-006-00-00511_Rev. A - 5/2014 Section DIGITAL MULTIFUNCTION INSTRUMENT Programmable Multi-function Digital Panel Meter Installation & Operating Instructions Contents

More information

Soft starter, 66 A, V AC, Us= 24 V DC, with control unit, Frame size N. Function Soft starter for three-phase loads, with control unit

Soft starter, 66 A, V AC, Us= 24 V DC, with control unit, Frame size N. Function Soft starter for three-phase loads, with control unit DATASHEET - S811+N66N3S Delivery program Soft starter, 66 A, 200-600 V AC, Us= 24 V DC, with control unit, Frame size N Part no. S811+N66N3S Catalog No. 168978 Eaton Catalog No. S811PLUSN66N3S EL-Nummer

More information

Electrical Depth CAL IT 2. Brian Smith. Introduction

Electrical Depth CAL IT 2. Brian Smith. Introduction Electrical Depth Introduction The University of California, San Diego Cal IT 2 Building was electrically designed for a lot of future growth. With my changes in the lighting system and control zones, a

More information

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA

SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA SECTION 5900 TRAFFIC SIGNALS CITY OF LEE S SUMMIT, MISSOURI DESIGN CRITERIA TABLE OF CONTENTS Section Title Page 5901 GENERAL... 2 5902 DESIGN CRITERIA... 2 5902.1 Codes and Standards... 2 5902.2 Signal

More information

IndyGo Facility Upgrades Project 35671EE

IndyGo Facility Upgrades Project 35671EE SECTION 260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Identification for raceways. 2. Identification of power and control cables. 3. Identification for

More information