1 UPGRADE OF THE PSI CYCLOTRON FACILITY TO 1.8 MW M. Seidel, P.A. Schmelzbach Paul Scherrer Insititute, CH-53 Villigen PSI, Switzerland Abstract The cyclotron based proton accelerator facility at PSI is regularly operated with beam currents close to ma at a kinetic energy of 59MeV. The present efforts in developing the facility are directed towards a further increase of the beam power from 1.MW to 1.8MW. This is achieved by the continued installation of new high gradient resonators in the Ring cyclotron as well as in the injector cyclotron, permitting to increase the turn separation which results in lower relative beam losses. Supporting measures include the installation of harmonic buncher systems for both cyclotrons. The paper discusses technical and beam dynamical aspects of this improvement program. INTRODUCTION TO THE FACILITY AND IT S UTILIZATION The PSI facility produces a high power proton beam for the generation of intense pion and muon beams as well as to drive the neutron spallation source SINQ. The beam with a final kinetic energy of 59 MeV is accelerated by a Cockroft-Walton pre-accelerator and a chain of two cyclotrons. With a current of nearly ma in CW operation the beam power amounts to 1. MW. The beam passes then consecutively through two Meson production targets, realized as radiation cooled, rotating graphite wheels with.5 cm and cm thickness. Because of scattering in the targets about 3% of the protons have to be collimated to obtain a beam small enough for the further transport to the spallation target in the SINQ neutron source. The spallation target consists of lead filled Zircaloy tubes which are cooled by heavy water D O to minimize the absorption of the generated neutrons. The experimental applications are related to the fields of condensed matter research and particle physics. All instruments are intensively used over roughly 9 months per year. In fact it is not possible to satisfy all requests for experimental time. The number of users has continuously grown over the last years. Table 1 gives some statistical numbers on the utilization of the different experimental areas. For comparison PSI s synchrotron radiation facility, the SLS is included in the table. For all applications it is desirable to raise the flux of secondary particles either to reduce the duration of measurements or to increase their precision. Continuous efforts are undertaken to raise the beam current. For the operation of the facility the most important aspect is the control of the beam losses and the limitation of component activation. Per year the facility is typically operated for ~5h and the availability is in the range of 85-9%. The legal obligations for the operation of the facility require the provision of an elaborate infrastructure, especially in the field of radiation safety. Table1: Statistical figures on the utilization of the PSI high power proton facility and the Swiss Light Source [1]. user statistics 6 SLS photons SINQ neutr. SμS muons LTP particle physics beamlines/instr experiments users involved Fig.1: The PSI Proton accelerator complex showing the Cockroft-Walton pre-accelerator, the Injector II, the Ring Cyclotron, the Meson production targets with attached secondary beamlines and the transport channel to SINQ. 157

2 UPGRADE PHILOSOPHY Already in the past the facility has been continuously upgraded and improved. Fig. shows a statistics on the yearly beam charge achieved and the number of operating hours which reflect the reliability of the facility. In 199 the target E station was rebuild. delivered charge [Ah] h 5 h 89 h 33 h 631 h 3 h 336 h 356 h 381 h 378 h 77 h 35 h 57 h 59 h 76 h 5 h h 95 h 98 h 3 h 3 h 3 h 51 h 85 h 37 h year 57 h 5 h 31 h 56 h 565 h 71 h 5 h 58 h Fig. : The delivered charge per year in the PSI proton accelerator. The number of operating hours is indicated above each column for the corresponding year. I [ma] average voltage gain per turn [MV] est. 3.mA est..6ma 7 scaling law I max N -3 limit scaled limit cavity mode turns in Ring Cyclotron Fig. 3: Development of turn numbers and beam current in the Ring Cyclotron. The point in was obtained by running at the acceptable limit of losses, while standard operation leaves some room to manoeuvre. Estimated turn numbers for the increased currents are indicated. Despite the increases in beam current the uncontrolled beam losses in the cyclotrons and transport lines have to be kept constant to maintain the activation at acceptable levels. In other words, the relative losses have to be reduced in the same proportion as the beam current is increased. Presently the typical relative beam losses in the Ring Cyclotron amount to 1 -. A key property for small beam losses is a low particle density between last and second last turn in the cyclotrons at the location of the electrostatic extraction element. With a given ring geometry the turn separation is increased by a higher energy gain per turn, which is especially important on the outer turns. This can be achieved by upgrading the RF system and/or installation of improved resonators. With the higher energy gain the number of turns is reduced. During the operation history of the Ring Cyclotron the number of turns has been reduced considerably (Fig. 3). Space charge effects Space charge effects play an important role for the loss generation in cyclotrons. By combining several simple arguments it was shown by W. Joho [] that losses caused by longitudinal space charge forces scale as the third power with the turn number in cyclotrons. The practical relevance of this rule can be seen in Fig. 3. Since the absolute losses have been kept constant, the typical current of the Ring Cyclotron scales inversely with the third power of the turn number. The strong space charge effects which occur with very short bunches result in a new operating regime [3], where the particles in the core of the bunch basically rotate around the bunch centre, in this way forming a stable circular bunch shape throughout the acceleration process. Fig. illustrates qualitatively the behaviour of individual protons that move in the field of a rigid spherical bunch with a superimposed outer magnetic field in vertical orientation. The model neglects focusing forces and relativistic effects. The coordinate system is moving with the bunch and the integration time corresponds to 5 turns in the Ring Cyclotron. As was shown already in 198 by Chasman et al. [], the particles in regions with strong space charge forces move on cloverleaf trajectories around the bunch centre. Though the Coulomb force is repulsive, the particles are bound. A stable round beam was first observed in PSI s Injector cyclotron and there is hope that a similar operating regime can be established in the Ring Cyclotron. The required short bunch length is achieved by employing a 1 th harmonic buncher at 5 MHz which significantly compresses the bunch at injection. Space charge simulations using multiparticle codes and detailed field maps of the Ring Cyclotron are discussed by A. Adelmann at this conference [5]. longitudinal position [m] transverse position [m] initial positions bunch center transverse position [m] Fig. : Motion of protons in the field of a rigid circular bunch and a constant outer magnetic field. The rms bunch-radius is.7 cm in the left picture and 1.6 cm in the right one. 158

3 COMPONENTS OF THE UPGRADE PROGRAM ECR Ion Source The presently used source to generate the proton beam is a multi-cusp ion source. It uses electrically heated filaments to generate the plasma. The filaments have to be exchanged roughly every two weeks and this causes a downtime of about two hours per exchange. A new compact microwave source is under development and was tested with promising results. The magnetic field is generated by an arrangement of permanent magnets. Besides the better reliability further advantages of the new source are smaller beam emittance and better stability. A detailed description of the new source is presented at this conference [6]. Further improvements are planned for the Cockroft-Walton pre-accelerator where a new stabilizing system for the high-voltage generation will be installed. Harmonic Bunchers at 87 kev and 7 MeV Proton source and Cockroft-Walton pre-accelerator generate a continuous beam. In the transport line to the Injector a 5MHz buncher cavity impresses a velocity modulation on the beam which leads to a bunching process at the entrance of the injector. Equilibrium between bunching and space charge repulsion results in a very small energy spread at the injection point, which is desirable for the formation of short, round bunches during the acceleration process. The nonlinear behavior of the sinusoidal buncher voltage at larger deviations from the ideal phase leads to imperfect bunching, i.e. a fraction of the beam cannot be captured in the cyclotron. This is improved by applying a second buncher voltage at the third harmonic of the fundamental 5 MHz frequency. The ratio of the two amplitudes is chosen such as to maximize the linear part of the resulting sum voltage curve. A 3 rd harmonic buncher was installed in the 87 kev transport line in the shutdown 6. As expected the capture efficiency could be significantly increased, resulting in a maximum extracted current of.7 ma. Details on this buncher system are presented at this conference [7]. Table : Parameters of the buncher systems. The 1 th harmonic buncher is not yet installed. Fundamental 3 rd harm. 1 th harm. E k [MeV] f [MHz] U nom [kv] P nom [kw] P max [kw] Another buncher which operates at the 1 th harmonic of the Ring Cyclotron RF frequency will be installed in the 7 MeV transport line [8]. As discussed in the last section, this will result in a much shorter bunch in the cyclotron, which should lead to a self stabilization of the bunch shape. This superbuncher has to generate relatively high voltages. Parameters of all buncher devices are shown in table. A CAD drawing of the 5 MHz buncher is shown in Fig. 5. Fig. 5: 5 MHz drift tube cavity with two gaps, to be utilized as 1 th harmonic buncher for improved injection into the Ring Cyclotron. New Resonators for both Cyclotrons As discussed above the major upgrade path for the facility consists in reducing the losses by applying a larger energy gain per turn. New resonators will be designed and installed in the Injector cyclotron. Presently the injector cyclotron is equipped with two 5 MHz accelerating resonators and two 15 MHz third harmonic flattop resonators. Because of the short injected bunch length and strong space charge effects the bunches stay in a compact round form throughout the acceleration process and the two flattop resonators are not needed anymore. This opens the opportunity to replace them by two additional accelerating resonators. The new resonators will be made from aluminum. Because of the specific injector geometry they exhibit a sector shape and the mechanical tolerances, especially with respect to the vacuum sealing surfaces which are tilted against each other, are very tight. Consequently the allowed deformations resulting from the atmospheric pressure are small as well. The resonators will be manufactured at an industrial company. Delivery of the first resonator is planned for 9. In the Ring Cyclotron the existing four aluminium resonators are to be replaced by new ones with a copper surface on the inner side and a steel structure for mechanical stability [9]. Two of the new resonators are already installed and operated with excellent performance since 6. They achieved a gap voltage of 1. MV on a test bench and in the Ring Cyclotron they are now routinely operated at 83 kv. Because of the higher conductivity of copper the RF-quality factor is higher and at the same operating voltage as for the aluminium resonators roughly 3 kw of dissipated power can be saved. Further improvements over the old resonators include better vacuum sealing surfaces resulting in smaller leak rates, and better RF couplers which give faster conditioning times and less dark current. 159

4 Fig. 7: New copper resonator for the Ring Cyclotron. Fig. 6: Design of the new 5MHz resonator for the injector cyclotron. Besides the four accelerator cavities the Ring Cyclotron contains a 15 MHz flattop cavity. Because of amplifier and cooling limitations is not possible to scale the voltage of this resonator proportional to the voltages attainable with the new accelerating resonators. However, from beam dynamics simulations [5] we are confident that the shorter bunches, generated by the 5 MHz buncher, will behave well with a smaller flattop voltage. Table 3: Parameters of the cyclotron resonators. Ring Cyclotron Injector old reson. new reson. new reson. U max [MV] U nom [MV] P wall [MW]... P beam [MW] Q 3k 5k 8k Meson Production Targets and SINQ Target Two Meson production targets made from graphite and with thicknesses of 5 and mm are installed in the beam path [1]. The produced Muon and Pion beams are of essential importance for the scientific program of the facility. Thermo-mechanical calculations have shown that both targets can accept a 3 ma beam. The limitation is given by the sublimation rate of carbon atoms from the surface of the graphite wheels, which is strongly temperature dependent. For the thick target the loss of material due to sublimation is expected to become unacceptable just above currents of 3 ma, whereas the thin target could be operated up to 5 ma. A more severe limitation comes from the collimation of the scattered beam. A fraction of 3% of the beam has to be collimated behind the thick target on circular copper collimators (Fig. 8). Above.6 ma current the cooling of these absorbers is not sufficient. The upgrade program foresees to replace the absorbers by new ones that allow a more even distribution of the beam losses on the three collimators, together with an improved cooling scheme. Fig. 8: Top view of the beamline geometry in the vicinity of target E. The absorbers 1,,3 used for stopping a 3% fraction of scattered beam are indicated. The rotation axis of the target wheel is tilted by 5 deg against the incoming beam. 16

5 The beam current density on the SINQ target will be raised from μa/cm to 6 μa/cm. The principle cooling scheme for the lead filled Zircalloy tubes using circulating D O is still applicable at these parameters. However, the heavy water flow has to be raised. Fine tuning of the exact arrangement pattern of the tubes in the target geometry has to be applied as well. LEGAL REQUIREMENTS AND AUXILIARY MEASURES Besides mastering the technical problems considerable efforts are required in the area of complying to legal regulations, licensing of the facility and the provision of the necessary infrastructure for handling radioactive components as well as professional radioactive waste management. The present license for operating the facility allows a maximum current of. ma during routine operation. In order to obtain the license for the desired 3. ma operation we have to demonstrate that the established typical values for the radiation exposure of the PSI personnel as well as the emission of traces of radio nuclides will not be exceeded with the higher current. As discussed above a key element for the upgrade path is to keep the absolute beam losses constant. Since PSI has been following this philosophy also in the past, one can demonstrate with statistical data the absence of any correlation between the average beam current and radiological data as the residual dose rates measured in the vicinity of the accelerator. This also holds for the radiation dose of the personnel, which is archived for every employee. To exemplify we show here local radiation dose measurements in the vicinity of the experimental hall in comparison with the average current development over 1 years (Fig. 9). One major origin of the observed dose measurements is residual radiation emitted from the accelerators in vertical direction and scattered back from the roof or the atmosphere, so called skyshine. In 6 additional local shielding was installed at the extraction of the Injector cyclotron. This measure reduced the skyshine considerably which is also reflected in Fig. 9. At locations where beam loss is intended, i.e. at the Meson production targets and the spallation target of SINQ, the residual radiation will simply scale with the beam current. Here we have to ensure by proper shielding that the higher current is acceptable. In fact we are able to demonstrate by extrapolation of the presently observed radiation levels that no additional major investments will be necessary for shielding. In 6 a liquid metal target [11] was temporarily installed in SINQ and operated for four months with the purpose of performing a pilot experiment. This target led to an increase of the neutron flux by a factor 1.8 as compared to the flux produced by the standard solid target. It gave us the practical proof that the shielding of the SINQ housing as well as that of the neutron guides is sufficient for the 3 ma operation with the standard target. local dose (n+γ) [msv] M1 M15 M133 M11 N6 int. charge time [years] Fig. 9: Selected local neutron-dose and gamma-dose measurements (sum, courtesy [1]), taken at the outer boundary of the building which houses the accelerator complex. The integrated currents for the individual years are shown in comparison. Although the relative beam losses are low in the Ring Cyclotron, the activation levels are not negligible there and may reach several msv/h at critical locations. Special transportable enclosures, exchange bottles, have been designed at PSI to allow exchange and handling of critical components like the injection/extraction elements in the Ring Cyclotron and also the graphite targets and absorbers. On the accelerator site there is a hot cell workshop available which allows working on highly activated components using remotely controlled manipulators. The whole accelerator site of the institute is monitored with a dense grid of passive dosimeters. Furthermore there are many active ionization chambers installed, which continuously monitor the radiation level in experimental areas or in beam line sections. Roughly 13 employees at PSI are radiologically monitored, although only a fraction of the personnel is directly employed at the proton facility. Another aspect which becomes more and more important for the operation of the PSI facility is the professional handling and disposal of activated components and radioactive waste [13]. In the last years specialists in the accelerator department have acquired an advanced expertise in this field. With computer tools it is possible to predict the activation of components, for example in a high radiation level area near a target [1]. For the disposal of radioactive waste the Swiss authorities require such calculations to determine or predict the inventory of long-lived radioactive nuclides in the materials, which is generally a nontrivial task. Predictions are computed with validated codes that are benchmarked using measurements of selected nuclides in representative radioactive waste components. TIME SCHEDULE AND SUMMARY The proton accelerator facility at PSI will be upgraded in the next years to raise the beam power from presently 1. MW to 1.8 MW at a beam energy of 59 MeV. A key integrated charge [Ah] 161

6 component for the upgrade are the new resonators for the Ring Cyclotron with an advanced design and each capable to transfer kw of power to the beam. As compared to linear accelerators the cyclotron concept still presents an effective alternative to generate very high power beams in continuous wave mode. The upgrade program is progressing as expected and will achieve a major milestone in 8 when the remaining two of the four new resonators will be installed in the Ring Cyclotron. Two additional resonators for beam acceleration in the Injector are designed and ordered from industry. The installation of these resonators requires also a comprehensive installation of 5 MHz RF systems including a new building. It is planned to increase the current in steps, while optimizing the parameters of the accelerator such that the beam losses can be kept constant at a tolerable level. For currents higher than.6 ma it is necessary to rebuild the absorbers which capture the scattered beam behind the cm Meson production target, because of insufficient cooling capacity. The important milestones are given in Table. The operation at the full current of 3 ma is expected for 1. Table : Selected milestones of the upgrade program. 1 / 7 authorization for short time/experimental operation at. ma given 1 / 7 5 MHz (1 th harmonic) buncher installed / 8 two new resonators in ring cyclotron installed, legal authorization for 3 ma operation given, new ECR source installed 11 / 8 new building for injector RF system incl. infrastructure completed 3 / 9 resonator for injector delivered and controls for RF system installed 3 / 1 resonator for injector delivered / 11 operation at.6 ma (1.5 MW) 1 / 11 new collimators at target E installed (power limitation); extension of cooling capacity; improvement of SINQ cooling / 1 operation at 3. ma (1.8 MW) Besides the beam power upgrade program also the functionality of the facility will we extended in the next years. A new source of ultracold neutrons (UCN) is under construction [15]. This source will also be driven by the 59 MeV beam, but in pulsed operation. The full megawatt beam will be sent to the UCN target for 8 seconds by deflecting it with a fast kicker magnet. Then the normal operation of the SINQ spallation source will continue for ~15min s before the cycle is repeated. The time period of this operation mode is motivated by the neutron lifetime which dominates the storage time of the generated neutrons. Another possible extension of the accelerator is a new irradiation facility called LISOR, using a split beam of up to 1 μa current at an energy of 7 MeV [16]. Presently irradiation experiments are performed at PSI s Injector I cyclotron which will be switched off next year. This report presents a summary of the work done by many colleagues at PSI, mainly in the department Large Facilities, GFA. REFERENCES [1] courtesy S. Janssen, private communication and PSI Scientific Report (7) [] W. Joho, High Intensity Problems in Cyclotrons, Proc. 5 th intl. Conf. on Cyclotrons and their Applications, Caen (1981) [3] Th. Stammbach, High Intensity Problems Revisited or Cyclotron Operation beyond Limits, Proc. Cyclotrons and their Applications, Caen, 369 (1998) [] C. Chasman, A.J. Baltz, Space Charge Effects in a Heavy Ion Cyclotron, Nucl. Instr. & Meth. 19 (198) 79 [5] A. Adelmann, High intensity ring cyclotron without flat-top: dream or realistic approach?, these proceedings (7) [6] P.A. Schmelzbach, A compact, permanent magnet, ECR ion source for the PSI proton accelerators, these proceedings (7) [7] J.Grillenberger et al, Commissioning and Tuning of the New Buncher System in the PSI 87 kev Injection Beamline, these proceedings (7) [8] J.Y. Raguin et al., Comparative Design Studies of a Superbuncher for the 7 MeV Injection Line of the PSI Main Cyclotron, Proc. EPAC, Lucerne () [9] M. Bopp et al., Upgrade Concepts of the PSI Accelerator RF Systems for a Projected 3 ma Operation, Proc. 16th Conf. on Cyclotrons and their Applications, East Lansing (1) [1] G. Heidenreich, Carbon and Beryllium Targets at PSI, Proc. AIP 6, 1 () [11] G. S. Bauer, M. Salvatores, G. Heusener, MEGAPIE, a 1 MW Pilot Experiment for a Liquid Metal Spallation Target, J. Nucl. Mater. 96 (1) 17 [1] A. Fuchs private communication and PSI quarterly reports on area and facility dosimetry measurements (7) [13] S. Teichmann, M. Wohlmuther, J. Züllig: Charakterisierung und Klassifizierung radioaktiver Abfälle aus den Beschleunigeranlagen des PSI, Proc. 37. Jahrestagung des Fachverbandes für Strahlenschutz e.v., Basel, Switzerland, 19 (5). [1] M. Wohlmuther, J. Züllig: Activation calculations for the target of a spallation ultra-cold neutron source at PSI, Radiation Protection Dosimetry 116, 8 (5). [15] F. Atchison et.al., The PSI UCN Source, Proc. ICANS XVII, Santa Fee (5) [16] J. Grillenberger and W. Wagner et al, priv. communication (7) 16

STATUS OF THE SwissFEL C-BAND LINAC

STATUS OF THE SwissFEL C-BAND LINAC STATUS OF THE SwissFEL C-BAND LINAC F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L. Paly, J.-Y. Raguin, L. Schulz, R. Zennaro, C. Zumbach,

More information

OPERATIONAL EXPERIENCE AT J-PARC

OPERATIONAL EXPERIENCE AT J-PARC OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

RF Power Generation II

RF Power Generation II RF Power Generation II Klystrons, Magnetrons and Gyrotrons Professor R.G. Carter Engineering Department, Lancaster University, U.K. and The Cockcroft Institute of Accelerator Science and Technology Scope

More information

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A.Beunas and G. Faillon Thales Electron Devices, Vélizy, France S. Choroba DESY, Hamburg, Germany Abstract THALES ELECTRON DEVICES has developed

More information

New Filling Pattern for SLS-FEMTO

New Filling Pattern for SLS-FEMTO SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron Available online www.ejaet.com European Journal of Advances in Engineering and Technology, 2014, 1(1): 11-15 Research Article ISSN: 2394-658X Design, Fabrication and Testing of Gun-Collector Test Module

More information

EPJ Web of Conferences 95,

EPJ Web of Conferences 95, EPJ Web of Conferences 95, 04012 (2015) DOI: 10.1051/ epjconf/ 20159504012 C Owned by the authors, published by EDP Sciences, 2015 The ELENA (Extra Low Energy Antiproton) project is a small size (30.4

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

Studies on an S-band bunching system with hybrid buncher

Studies on an S-band bunching system with hybrid buncher Submitted to Chinese Physics C Studies on an S-band bunching system with hybrid buncher PEI Shi-Lun( 裴士伦 ) 1) XIAO Ou-Zheng( 肖欧正 ) Institute of High Energy Physics, Chinese Academy of Sciences, Beijing

More information

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The ESS Accelerator For Norwegian Industry and Research Oslo, 24 Sept 2013 Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The Hadron Intensity Frontier Courtesy of M. Seidel (PSI)

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

III. Proton-therapytherapy. Rome SB - 3/5 1

III. Proton-therapytherapy. Rome SB - 3/5 1 Outline Introduction: an historical review I Applications in medical diagnostics Particle accelerators for medicine Applications in conventional radiation therapy II III IV Hadrontherapy, the frontier

More information

100 MeV H - CYCLOTRON DEVELOPMENT AND 800 MeV PROTON CYCLOTRON PROPOSAL*

100 MeV H - CYCLOTRON DEVELOPMENT AND 800 MeV PROTON CYCLOTRON PROPOSAL* Proceedings of Cyclotrons2016, Zurich, Switzerland TUC01 100 MeV H - CYCLOTRON DEVELOPMENT AND 800 MeV PROTON CYCLOTRON PROPOSAL* Tianjue Zhang and Jianjun Yang, China Institute of Atomic Energy, Beijing,

More information

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Presentation at University of Saskatchewan April 22-23, 2010 Yoshitaka Kawashima Brookhaven National Laboratory NSLS-II,

More information

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Stanley Humphries, Copyright 2012 Field Precision PO Box 13595, Albuquerque, NM 87192 U.S.A. Telephone: +1-505-220-3975

More information

PRESENT STATUS OF J-PARC

PRESENT STATUS OF J-PARC PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize

More information

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications

More information

High Power Cyclotrons

High Power Cyclotrons Accelerator Reliability Workshop ESRF, Grenoble, 04-06.02.02 High Power Cyclotrons P.A.Schmelzbach 1. The PSI Proton Accelerator Facility 2. Failure Analysis 2000/2001 3. The weak Points 4. How to improve

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

CHAPTER 4: HIGH ENERGY X-RAY GENERATORS: LINEAR ACCELERATORS. Jason Matney, MS, PhD

CHAPTER 4: HIGH ENERGY X-RAY GENERATORS: LINEAR ACCELERATORS. Jason Matney, MS, PhD CHAPTER 4: HIGH ENERGY X-RAY GENERATORS: LINEAR ACCELERATORS Jason Matney, MS, PhD Objectives Medical electron linear accelerators (often shortened to LINAC) The Basics Power Supply Magnetron/Klystron

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

Linac 4 Instrumentation K.Hanke CERN

Linac 4 Instrumentation K.Hanke CERN Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase

More information

DOSE DELIVERY SYSTEM OF THE VARIAN PROBEAM SYSTEM WITH CONTINUOUS BEAM

DOSE DELIVERY SYSTEM OF THE VARIAN PROBEAM SYSTEM WITH CONTINUOUS BEAM DOSE DELIVERY SYSTEM OF THE VARIAN PROBEAM SYSTEM WITH CONTINUOUS BEAM EUCARD 2 WORKSHOP ON INNOVATIVE DELIVERY SYSTEMS IN PARTICLE THERAPY TORINO, 23 25 FEB 2017 VARIAN PARTICLE THERAPY HOLGER GÖBEL MANGER

More information

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Outline Situation/Rationale Requirements Synchrotron choice Functions

More information

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL Nuclear Instruments and Methods in Physics Research A 475 (2001) 549 553 Performance of a DC GaAs photocathode gun for the Jefferson lab FEL T. Siggins a, *, C. Sinclair a, C. Bohn b, D. Bullard a, D.

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

Summary of the 1 st Beam Line Review Meeting Injector ( )

Summary of the 1 st Beam Line Review Meeting Injector ( ) Summary of the 1 st Beam Line Review Meeting Injector (23.10.2006) 15.11.2006 Review the status of: beam dynamics understanding and simulations completeness of beam line description conceptual design of

More information

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN E. Chiaveri, CERN, Geneva, Switzerland Abstract The conceptual design of a superconducting H - linear accelerator at CERN for a beam energy of 2.2 GeV

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1 ESS: The Machine Bucharest, 24 April 2014 Håkan Danared Deputy Head Accelerator Division H. Danared Industry & Partner Days Bucharest Page 1 2025 ESS construction complete 2009 Decision: ESS will be built

More information

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)

More information

Design Studies For The LCLS 120 Hz RF Gun Injector

Design Studies For The LCLS 120 Hz RF Gun Injector BNL-67922 Informal Report LCLS-TN-01-3 Design Studies For The LCLS 120 Hz RF Gun Injector X.J. Wang, M. Babzien, I. Ben-Zvi, X.Y. Chang, S. Pjerov, and M. Woodle National Synchrotron Light Source Brookhaven

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

Recent developments in cyclotrons for proton therapy at IBA

Recent developments in cyclotrons for proton therapy at IBA Recent developments in cyclotrons for proton therapy at IBA Yves Jongen. Founder & CRO IBA sa We Protect, Enhance and Save Lives. A typical PT center 30-55 millions for equipment 45-100 millions for the

More information

Klystron Tubes. Two forms of such a device, also called linear beam klystron, are given in the following figure.

Klystron Tubes. Two forms of such a device, also called linear beam klystron, are given in the following figure. Klystron Tubes Go to the klystron index The principle of velocity-variation, first used in Heil oscillators, was also used in other microwave amplifying and oscillating tubes. The application for klystron

More information

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh

Design and Simulation of High Power RF Modulated Triode Electron Gun. A. Poursaleh Design and Simulation of High Power RF Modulated Triode Electron Gun A. Poursaleh National Academy of Sciences of Armenia, Institute of Radio Physics & Electronics, Yerevan, Armenia poursaleh83@yahoo.com

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

Pseudospark-sourced Micro-sized Electron Beams for High Frequency klystron Applications

Pseudospark-sourced Micro-sized Electron Beams for High Frequency klystron Applications Pseudospark-sourced Micro-sized Electron Beams for High Frequency klystron Applications H. Yin 1*, D. Bowes 1, A.W. Cross 1, W. He 1, K. Ronald 1, A. D. R. Phelps 1, D. Li 2 and X. Chen 2 1 SUPA, Department

More information

THE OPERATION EXPERIENCE AT KOMAC*

THE OPERATION EXPERIENCE AT KOMAC* THAM2X01 Proceedings of HB2016, Malmö, Sweden THE OPERATION EXPERIENCE AT KOMAC* Yong-Sub Cho, Kye-Ryung Kim, Kui Young Kim, Hyeok-Jung Kwon, Han-Sung Kim, Young-Gi Song Korea Atomic Energy Research Institute,

More information

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Abstract The U.S. Department of Energy (DOE) Office of Science has funded the construction of a new accelerator-based

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

Status of SOLARIS Arkadiusz Kisiel

Status of SOLARIS Arkadiusz Kisiel Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * J. Galambos, W. Blokland, D. Brown, C. Peters, M. Plum, Spallation Neutron Source, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract Satisfying

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

TESLA FEL-Report

TESLA FEL-Report Determination of the Longitudinal Phase Space Distribution produced with the TTF Photo Injector M. Geitz a,s.schreiber a,g.von Walter b, D. Sertore a;1, M. Bernard c, B. Leblond c a Deutsches Elektronen-Synchrotron,

More information

Design of the linear accelerator for the MYRRHA project

Design of the linear accelerator for the MYRRHA project MYRRHA Multipurpose hybrid Research Reactor for High-tech Applications Design of the linear accelerator for the MYRRHA project Roberto Salemme ADT - Outline What is MYRRHA? MYRRHA accelerator: requirements

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* US High Gradient Research Collaboration Workshop. SLAC, May 23-25, 2007 45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* V.P. Yakovlev 1, S.Yu. Kazakov 1,2, and J.L. Hirshfield 1,3 1

More information

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Introduction The PITZ RF Photo Gun Field simulations Dark current simulations Multipacting simulations Summary Igor Isaev

More information

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

Low-Energy Electron Linacs and Their Applications in Cargo Inspection

Low-Energy Electron Linacs and Their Applications in Cargo Inspection Low-Energy Electron Linacs and Their Applications in Cargo Inspection Yawei Yang on behalf of Huaibi Chen *,1, Chuanxiang Tang 1 Yaohong Liu 2 *chenhb@tsinghua.edu.cn 1 Department of Engineering Physics,

More information

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Bingxin Yang, Alex H. Lumpkin, Katherine Harkay, Louis Emery, Michael Borland, and Frank Lenkszus Advanced

More information

1. General principles for injection of beam into the LHC

1. General principles for injection of beam into the LHC LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary

More information

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland CERN 1211 Geneva 23, Switzerland E-mail: andrew.butterworth@cern.ch O. Brunner CERN 1211 Geneva 23, Switzerland E-mail: olivier.brunner@cern.ch R. Calaga CERN 1211 Geneva 23, Switzerland E-mail: rama.calaga@cern.ch

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION

DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION DARK CURRENT IN SUPERCONDUCTING RF PHOTOINJECTORS MEASUREMENTS AND MITIGATION J. Teichert #, A. Arnold, P. Murcek, G. Staats, R. Xiang, HZDR, Dresden, Germany P. Lu, H. Vennekate, HZDR & Technische Universität,

More information

Cyclotron Institute upgrade project. H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, B. Roeder and G. Tabacaru

Cyclotron Institute upgrade project. H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, B. Roeder and G. Tabacaru Cyclotron Institute upgrade project H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, B. Roeder and G. Tabacaru On January 3, 2005 the Cyclotron Institute Upgrade Project (CIUP) began

More information

Development of High Power Vacuum Tubes for Accelerators and Plasma Heating

Development of High Power Vacuum Tubes for Accelerators and Plasma Heating Development of High Power Vacuum Tubes for Accelerators and Plasma Heating Vishnu Srivastava Microwave Tubes Division, CSIR-Central Electronics Engineering Research Institute, Pilani-333031, Rajasthan,

More information

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 The company was created for the development and manufacture of precision microwave vacuum-electron-tube devices (VETD). The main product areas

More information

LENS Operating Experience

LENS Operating Experience Available online at www.sciencedirect.com Physics Procedia 26 (2012 ) 161 167 Union of Compact Accelerator-driven Neutron Sources I & II LENS Operating Experience T. Rinckel *a, David V. Baxter a,b, J.

More information

The European Spallation Source

The European Spallation Source The European Spallation Source Roger Ruber Uppsala University NIKHEF industriemiddag 21 september 2011 The European Spallation Source Roger Ruber - The European Spallation Source NIKHEF, 21-Sep-2011 page

More information

THE ANTIPROTON DECELERATOR (AD)

THE ANTIPROTON DECELERATOR (AD) EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN - PS DIVISION CERN/PS 99-50 (HP) THE ANTIPROTON DECELERATOR (AD) S. Maury (on behalf of the AD team) Abstract To continue an important part of the LEAR physics

More information

Development of high power gyrotron and EC technologies for ITER

Development of high power gyrotron and EC technologies for ITER 1 Development of high power gyrotron and EC technologies for ITER K. Sakamoto 1), K.Kajiwara 1), K. Takahashi 1), Y.Oda 1), A. Kasugai 1), N. Kobayashi 1), M.Henderson 2), C.Darbos 2) 1) Japan Atomic Energy

More information

Experimental Results of the Coaxial Multipactor Experiment. T.P. Graves, B. LaBombard, S.J. Wukitch, I.H. Hutchinson PSFC-MIT

Experimental Results of the Coaxial Multipactor Experiment. T.P. Graves, B. LaBombard, S.J. Wukitch, I.H. Hutchinson PSFC-MIT Experimental Results of the Coaxial Multipactor Experiment T.P. Graves, B. LaBombard, S.J. Wukitch, I.H. Hutchinson PSFC-MIT Summary A multipactor discharge is a resonant condition for electrons in an

More information

A Brief History of High Power RF Proton Linear Accelerators

A Brief History of High Power RF Proton Linear Accelerators e A Brief History of High Power RF Proton Linear Accelerators John C. Browne Los Alamos National Laboratory Introduction The first mention of linear acceleration was in a paper by G. Ising in 1924 (Ref

More information

APT Accelerator Technology

APT Accelerator Technology APT Accelerator Technology J. David Schneider LER/APT, Los Alamos National Laboratory Los Alamos, New Mexico 87545 U.S. Abstract The proposed accelerator production of tritium (APT) project requires an

More information

Safety Considerations For The Top-up Operation Of An 8 GeV Class Synchrotron Radiation Facility

Safety Considerations For The Top-up Operation Of An 8 GeV Class Synchrotron Radiation Facility Safety Considerations For The Top-up Operation Of An 8 GeV Class Synchrotron Radiation Facility Yoshihiro Asano 1, and Tetsuya Takagi 2 1 Synchrotron Radiation Research Center. Japan Atomic Energy Research

More information

Mechanical aspects, FEA validation and geometry optimization

Mechanical aspects, FEA validation and geometry optimization RF Fingers for the new ESRF-EBS EBS storage ring The ESRF-EBS storage ring features new vacuum chamber profiles with reduced aperture. RF fingers are a key component to ensure good vacuum conditions and

More information

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings: TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,

More information

Beam instrumentation at the 1-MW proton J-PARC RCS

Beam instrumentation at the 1-MW proton J-PARC RCS Beam instrumentation at the 1-MW proton J-PARC RCS HB2014 54th ICFA Advanced Beam Dynamics Workshop on High-Intensity, High-Brightness and High Power Hadron Beams East Lansing, MI Nov.12, 2014 Kazami Yamamoto

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract Abstract 7 0 0 k W M A I N I N J E C T O R O P E R A T I O N S F O R N O νa AT FNAL P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA Following a successful career as an antiproton

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010 Recent APS Storage Ring Instrumentation Developments Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010 Ring Diagnostics Overview RF beam position monitor technology Photon beam position

More information

Low-Noise, High-Efficiency and High-Quality Magnetron for Microwave Oven

Low-Noise, High-Efficiency and High-Quality Magnetron for Microwave Oven Low-Noise, High-Efficiency and High-Quality Magnetron for Microwave Oven N. Kuwahara 1*, T. Ishii 1, K. Hirayama 2, T. Mitani 2, N. Shinohara 2 1 Panasonic corporation, 2-3-1-3 Noji-higashi, Kusatsu City,

More information

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS Y. H. Chin, KEK, Tsukuba, Japan. Abstract Recently, there has been a rising international interest in multi-beam klystrons (MBK) in the

More information

UNIT-3 Part A. 2. What is radio sonde? [ N/D-16]

UNIT-3 Part A. 2. What is radio sonde? [ N/D-16] UNIT-3 Part A 1. What is CFAR loss? [ N/D-16] Constant false alarm rate (CFAR) is a property of threshold or gain control devices that maintain an approximately constant rate of false target detections

More information

arxiv: v1 [physics.ins-det] 1 Nov 2015

arxiv: v1 [physics.ins-det] 1 Nov 2015 DPF2015-288 November 3, 2015 The CMS Beam Halo Monitor Detector System arxiv:1511.00264v1 [physics.ins-det] 1 Nov 2015 Kelly Stifter On behalf of the CMS collaboration University of Minnesota, Minneapolis,

More information

Development of an Abort Gap Monitor for High-Energy Proton Rings *

Development of an Abort Gap Monitor for High-Energy Proton Rings * Development of an Abort Gap Monitor for High-Energy Proton Rings * J.-F. Beche, J. Byrd, S. De Santis, P. Denes, M. Placidi, W. Turner, M. Zolotorev Lawrence Berkeley National Laboratory, Berkeley, USA

More information

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Michael V. Fazio C. Adolphsen, A. Jensen, C. Pearson, D.

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

Status of RF Power and Acceleration of the MAX IV - LINAC

Status of RF Power and Acceleration of the MAX IV - LINAC Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC *

BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC * BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC * L. Du #, C.T. Du, X.L. Guan, C.X. Tang, R. Tang, X.W. Wang, Q.Z. Xing, S.X. Zheng, Key Laboratory of Particle & Radiation Imaging (Tsinghua University), Ministry

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

Cyclotron Institute upgrade project. H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, and G. Tabacaru

Cyclotron Institute upgrade project. H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, and G. Tabacaru Cyclotron Institute upgrade project H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, and G. Tabacaru On January 3, 2005 the Cyclotron Institute Upgrade Project (CIUP) began with the approval

More information

Implementing a Proton Beam Scanning System within an Operating Clinical Facility

Implementing a Proton Beam Scanning System within an Operating Clinical Facility Implementing a Proton Beam Scanning System within an Operating Clinical Facility Ben Clasie Many thanks to Hassan Bentefour, Hanne Kooy, and Jay Flanz for their help preparing this presentation 1 Francis

More information

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR Rong Xiang On behalf of the BESSY-DESY-FZD-MBI collaboration and the ELBE team FEL 2009, Liverpool, United Kingdom, August 23 ~ 28, 2009 Outline Introduction

More information

NEW METHOD FOR KLYSTRON MODELING

NEW METHOD FOR KLYSTRON MODELING NEW METHOD FOR KLYSTRON MODELING Y. H. Chin, KEK, 1-1 Oho, Tsukuba-shi, Ibaraki-ken, 35, Japan Abstract We have developed a new method for a realistic and more accurate simulation of klystron using the

More information