1 21-22 November, 2013 ASTRID2 Status Heine Dølrath Thomsen on behalf of the ASTRID2 Team præsen TATION

2 ASTRID2 ASTRID2 is the new synchrotron light source being commissioned in Aarhus, Denmark ASTRID2 main parameters: Electron energy 580 MeV Emittance Beam Current Circumference Lattice 12 nm 200 ma 45.7 m 6 x DBA, combined func. dipoles 4 straight sections for insertion devices ASTRID as booster (full energy injection) Allows top-up operation Should be automatic only 2 accelerator physicists! 2

3 ASTRID2 Layout 3

4 ASTRID2 Status 90 ma steady-state top-up Problem with bumpers limits continuous top-up operation with higher currents Sep. 13: 200 ma held for 20 min of topup This week: alignment (GEOs3D) Beam lines: May 2013: First light in a beam line 5 beam lines are being installed Sep. 2013: Local test experiments performed with the AU-UV beam line (UV absorption and CD) Dec. 2013: Friendly users 4

5 ASTRID2 Cavity 105 MHz (like ASTRID), h = 16 Basically the same as MAX IV cavities Built by RI (RF design by MaxLab) Conditioned to ~80 kv (~900 W) No problems seen Will eventually condition to higher voltages 315 MHz Landau cavity ordered (from RI & based on MaxLab design). Delivery spring 2014 (expected) 5

6 6

7 Compensation of IDs Compensate tune and beta beat with global tune correction and local beta correction using pole-face windings. y [m] s - position [m] Insertion devices modeled as a long purely vertically focusing element (matrix) no insertions, Qh=5.185, Qv=2.14 MPW, no correction, Qh=5.185, Qv= MPW, tune and betabeat reduc, 7

8 ASTRID2 dynamic aperture Dynamic aperture Matlab AT toolbox Ver. [m] Hor [m] 8 no insertions, Qh=5.185, Qv=2.14 MPW, no correction, Qh=5.185, Qv= MPW tune+beta corr Qh= Qv=2 1391

9 Unexpected Problems Injection bumpers are getting excessively warm at high beam currents due to beam-induced RF heating Magnetic stray field from nearby booster (ASTRID) affects ASTRID2 beam orbit.... 9

10 Injection Bumpers v.1 10

11 Injection Bumpers v.1 Simple and cheap design (in-vacuum ferrite) no beam screen! Beam-induced RF heating of the bumper ferrite (T Curie ~ 130 C) First version: Beam current limited to 60 ma injection becomes inefficient 11

12 Injection Bumpers v.2 Shields with RF fingers added at ends + cooling of ground conductor Beam current limited to ~90 ma (+50%)! Cooling water off: 85 ma achieved. Inefficient cooling Why? 12

13 13

14 Injection Bumpers v.3? Cooling inefficiency should be assessed Add beam screen (cut foils, wires) along the ferrites How thick? Possible to cut foils into wires? Input + ideas are welcome! 14

15 Time-varying Orbit Displacement A2 BPM Time 15

16 Magnetic Stray Field From Booster Effect reduced by AMO ID! 16

17 Conclusion & Status Nominal beam current has been reached (for limited periods) Ready for users, but still have a big job to characterize and understand ASTRID2 Retrofitting bumpers to limit beam-induced heating v. 3? Landau cavity in spring 2014 ID has been moved from ASTRID -> ASTRID2: 3 IDs installed! Existing beam lines being moved to ASTRID2 Plans to change microtron filament to increase top-up stability, (Dirk Schüler, HZB) Shielding: limit radiation in adjacent, unrelated labs to < 0.3 msv / y. 17 IR beam line? Generous users with 85 k! Visits to ANKA-IR 1

Status of SOLARIS Arkadiusz Kisiel

Status of SOLARIS Arkadiusz Kisiel Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

ILC Damping Ring Lattice Status Report. Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007

ILC Damping Ring Lattice Status Report. Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007 Status Report Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007 Outline New 8-fold symmetric lattice on ILC Cornell wiki pages, as of 12/18/2007 Separated

More information

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2 PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND

More information

Periodic Seasonal Variation of Magnets Level of the STB ring

Periodic Seasonal Variation of Magnets Level of the STB ring Periodic Seasonal Variation of Magnets Level of the STB ring Shigenobu Takahashi Laboratory of Nuclear Science,Tohoku University, Mikamine 1-2-1, Taihaku-ku, Sendai 982-0826, Japan 1. Introduction The

More information

ASTRID2 the UV and soft x-ray synchrotron light source with the ultimate brilliance

ASTRID2 the UV and soft x-ray synchrotron light source with the ultimate brilliance ASTRID2 the UV and soft x-ray synchrotron light source with the ultimate brilliance Niels Hertel, Søren Pape Møller and Jørgen S. Nielsen / 28-07-2009 1 Introduction and general remarks... 2 2 ASTRID2

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement. Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed

More information

Tolerances on Magnetic Misalignments in SESAME Storage Ring

Tolerances on Magnetic Misalignments in SESAME Storage Ring Tolerances on Magnetic Misalignments in SESAME Storage Ring SES-TE-AP-TN-0003 April 20, 2014 Authored by: Reviewed by: Approved by: Access List : Maher Attal Erhard Huttle Erhard Huttle ---Internal ---------

More information

Status of Elettra, top-up and other upgrades

Status of Elettra, top-up and other upgrades Status of Elettra, top-up and other upgrades Emanuel Karantzoulis ELETTRA / Trieste, Italy / 2010 November 25-26 Past and Present Configurations 1994-2007 From 2008 No full energy injection Full energy

More information

EPJ Web of Conferences 95,

EPJ Web of Conferences 95, EPJ Web of Conferences 95, 04012 (2015) DOI: 10.1051/ epjconf/ 20159504012 C Owned by the authors, published by EDP Sciences, 2015 The ELENA (Extra Low Energy Antiproton) project is a small size (30.4

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CEBAF Accelerator Update Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CLAS12 Collaboration Meeting, June 13-16, 2017 1 Accelerator Division Leadership On April 30 Andrew

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM S. Redaelli on behalf of the LHC beam commissioning team CERN, Geneva, Switzerland Abstract Following various injection tests, the full LHC beam commissioning

More information

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross Monday, Marc Ross Linear Collider RD Most RD funds address the most serious cost driver energy The most serious impact of the late technology choice is the failure to adequately address luminosity RD issues

More information

Advanced Photon Source - Upgrades and Improvements

Advanced Photon Source - Upgrades and Improvements Advanced Photon Source - Upgrades and Improvements Horst W. Friedsam, Jaromir M. Penicka Argonne National Laboratory, Argonne, Illinois, USA 1. INTRODUCTION The APS has been operational since 1995. Recently

More information

Top-Up Experience at SPEAR3

Top-Up Experience at SPEAR3 Top-Up Experience at SPEAR3 Contents SPEAR 3 and the injector Top-up requirements Hardware systems and modifications Safety systems & injected beam tracking Interlocks & Diagnostics SPEAR3 Accelerator

More information

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske. ANKA Status Report N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske. KIT - University of the State of Baden-Wuerttemberg and National Laboratory of the Helmholtz Association

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. ANKA Status Report N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. Institute for Synchrotron Radiation KIT - University of the State of Baden-Wuerttemberg and

More information

Introduction to Synchrotron Radiation and Storage Ring Light Sources.

Introduction to Synchrotron Radiation and Storage Ring Light Sources. Introduction to Synchrotron Radiation and Storage Ring Light Sources. Monday 22 Nov 2010 at 12:15 (00h55') Primary authors : Dr. PODOBEDOV, Boris (BNL) Co-authors : Presenter : Dr. PODOBEDOV, Boris (BNL)

More information

Summary of the 1 st Beam Line Review Meeting Injector ( )

Summary of the 1 st Beam Line Review Meeting Injector ( ) Summary of the 1 st Beam Line Review Meeting Injector (23.10.2006) 15.11.2006 Review the status of: beam dynamics understanding and simulations completeness of beam line description conceptual design of

More information

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX T. Koseki, M. Ikegami, M. Tomizawa, Accelerator Laboratory, KEK, Tsukuba, Japan F. Noda, JAEA, Tokai, Japan Abstract The J-PARC (Japan Proton

More information

SUMMARY OF THE ILC R&D AND DESIGN

SUMMARY OF THE ILC R&D AND DESIGN SUMMARY OF THE ILC R&D AND DESIGN B. C. Barish, California Institute of Technology, USA Abstract The International Linear Collider (ILC) is a linear electron-positron collider based on 1.3 GHz superconducting

More information

Status of RF Power and Acceleration of the MAX IV - LINAC

Status of RF Power and Acceleration of the MAX IV - LINAC Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

THE ANTIPROTON DECELERATOR (AD)

THE ANTIPROTON DECELERATOR (AD) EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN - PS DIVISION CERN/PS 99-50 (HP) THE ANTIPROTON DECELERATOR (AD) S. Maury (on behalf of the AD team) Abstract To continue an important part of the LEAR physics

More information

Synchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo

Synchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo Operation of ALBA RF Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo Outline ALBA RF Overview: Booster and SR RF Operation with beam Statistics of first year operation Cavities

More information

Fast Orbit Feedback at the SLS. Outline

Fast Orbit Feedback at the SLS. Outline Fast Orbit Feedback at the SLS 2nd Workshop on Beam Orbit Stabilisation (December4-6, 2002, SPring-8) T. Schilcher Outline Noise Sources at SLS Stability / System Requirements Fast Orbit Feedback Implementation

More information

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Presentation at University of Saskatchewan April 22-23, 2010 Yoshitaka Kawashima Brookhaven National Laboratory NSLS-II,

More information

DELIVERY RECORD. Location: Ibaraki, Japan

DELIVERY RECORD. Location: Ibaraki, Japan DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October

More information

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK)

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK) A possibility of ring collider for Higgs factory 13 Feb. 2012 K. Oide (KEK) Inspired by A. Blondel and F. Zimmermann, A High Luminosity e+e- Collider in the LHC tunnel to study the Higgs Boson, V2.1 -

More information

PEP II STATUS AND PLANS *

PEP II STATUS AND PLANS * PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex

More information

PEP-II STATUS REPORT *

PEP-II STATUS REPORT * PEP-II STATUS REPORT * Jonathan Dorfan Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA For the SLAC, LBNL, LLNL PEP-II group Abstract The main design features of the PEP-II

More information

PRESENT STATUS OF J-PARC

PRESENT STATUS OF J-PARC PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize

More information

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Stanley Humphries, Copyright 2012 Field Precision PO Box 13595, Albuquerque, NM 87192 U.S.A. Telephone: +1-505-220-3975

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

An Operational Diagnostic Complement for Positrons at CEBAF/JLab An Operational Diagnostic Complement for Positrons at CEBAF/JLab Michael Tiefenback JLab, CASA International Workshop on Physics with Positrons at Jefferson Lab 12-15 September 2017 Operating CEBAF with

More information

Future Circular Collider Study

Future Circular Collider Study Status and Progress M. Benedikt, F. Zimmermann gratefully acknowledging input from FCC coordination group global design study team and all other contributors LHC SPS PS FCC http://cern.ch/fcc Work supported

More information

IOT Charakterization at BESSY ( HZB)

IOT Charakterization at BESSY ( HZB) IOT Charakterization at BESSY ( HZB) Agenda: Wolfgang Anders, Hans Georg Hoberg, Andreas Heugel BESSY, Berlin ESLS-RF Workshop 1.-2.10.2008 Diamond BESSY + HMI HZB MLS in Operation Bessy Transmitter IOT

More information

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract Abstract 7 0 0 k W M A I N I N J E C T O R O P E R A T I O N S F O R N O νa AT FNAL P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA Following a successful career as an antiproton

More information

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland CERN 1211 Geneva 23, Switzerland E-mail: andrew.butterworth@cern.ch O. Brunner CERN 1211 Geneva 23, Switzerland E-mail: olivier.brunner@cern.ch R. Calaga CERN 1211 Geneva 23, Switzerland E-mail: rama.calaga@cern.ch

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE

COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE Proceedings of DIPAC9, Basel, Switzerland MOOB2 COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE K. Balewski #, G. Kube, K. Wittenburg, A. Brenger, H.-T. Duhme, V. Gharibyan, J.

More information

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team AREAL- Phase 1 Progress & Status B. Grigoryan on behalf of AREAL team Contents Machine Layout Building & Infrastructure Laser System RF System Vacuum System Cooling System Control System Beam Diagnostics

More information

LEP Status and Performance in 2000

LEP Status and Performance in 2000 LEP Status and Performance in 2 R. Assmann, SL/OP for the SL Division Outline: Operational strategy Overview on luminosity and energy performance Energy reach Luminosity performance Other issues Further

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

Extraction/Separator Setup. Michael Spata Operations Stay Treat July 16, 2015

Extraction/Separator Setup. Michael Spata Operations Stay Treat July 16, 2015 Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015 Accelerator Overview Extraction System Design settings for magnets and RF Separators come from CED All beamlines have been commissioned

More information

Accelerator Systems of the TPS

Accelerator Systems of the TPS Ambient Ground Motion and Civil Engineering for Low Emittance Electron Storage Ring July 2-22, 2005, Hsinchu, Taiwan Accelerator Systems of the TPS Preinjector, Booster Synchrotron, Transfer Line, and

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

KARA and FLUTE RF Overview/status

KARA and FLUTE RF Overview/status KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research

More information

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers Non-Invasive for the JLAB Experimental Program via Synchrotron Light Interferometers P. Chevtsov, T. Day, A.P. Freyberger, R. Hicks Jefferson Lab J.-C. Denard Synchrotron SOLEIL 20th March 2005 1. Energy

More information

3 rd ILSF Advanced School on Synchrotron Radiation and Its Applications

3 rd ILSF Advanced School on Synchrotron Radiation and Its Applications 3 rd ILSF Advanced School on Synchrotron Radiation and Its Applications September 14-16, 2013 : 1392/06/23 : ILSF-IPM, Sep. 2013 2 ILSF-IPM, Sep. 2013 3 3 rd ILSF School on Synchrotron n Radiation and

More information

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 29 GEV R. W. Aßmann, CERN, Geneva, Switzerland Abstract The Large Electron-Positron Collider (LEP) at CERN completed its operation in

More information

PEP II Status and Plans

PEP II Status and Plans SLAC-PUB-6854 September 1998 PEP II Status and Plans By John T. Seeman Invited talk presented at the 16th IEEE Particle Accelerator Conference (PAC 95) and International Conference on High Energy Accelerators,

More information

Mechanical aspects, FEA validation and geometry optimization

Mechanical aspects, FEA validation and geometry optimization RF Fingers for the new ESRF-EBS EBS storage ring The ESRF-EBS storage ring features new vacuum chamber profiles with reduced aperture. RF fingers are a key component to ensure good vacuum conditions and

More information

New Filling Pattern for SLS-FEMTO

New Filling Pattern for SLS-FEMTO SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new

More information

1.0 Abstract : 2.0 The drift tube Linac for LEHIPA

1.0 Abstract : 2.0 The drift tube Linac for LEHIPA Electromagnetic design and development of quadrupole focussing lenses for drift tube linac email : sanjaym@barc.gov.in Sanjay Malhotra, U.Mahapatra Control Instrumentation Division, Bhabha Atomic Research

More information

Beam Losses During LCLS Injector Phase-1 1 Operation

Beam Losses During LCLS Injector Phase-1 1 Operation Beam Losses During LCLS Injector Phase-1 1 Operation & Paul Emma September 28, 2006 Radiation Safety Committee Review Scope of Phase 1 Operation Request for Three Operating Modes Operating Plan for Phase

More information

Proceedings of the 14th International Conference on Cyclotrons and their Applications, Cape Town, South Africa

Proceedings of the 14th International Conference on Cyclotrons and their Applications, Cape Town, South Africa COMMISSIONING OF THE COOLER SYNCHROTRON COSY R. MAIER, U. BECHSTEDT, J. DIETRICH, S. MARTIN, D. PRASUHN, A. SCHNASE, H. SCHNEIDER, H. STOCKHORST, R. TOLLE Forschungszentrum luelich GmbH, D-52425 luelich,

More information

Status of the X-ray FEL control system at SPring-8

Status of the X-ray FEL control system at SPring-8 Status of the X-ray FEL control system at SPring-8 T.Fukui 1, T.Hirono 2, N.Hosoda 1, M.Ishii 2, M.Kitamura 1 H.Maesaka 1,T.Masuda 2, T.Matsushita 2, T.Ohata 2, Y.Otake 1, K.Shirasawa 1,M.Takeuchi 2, R.Tanaka

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

STATUS AND FUTURE PROSPECTS OF CLIC

STATUS AND FUTURE PROSPECTS OF CLIC STATUS AND FUTURE PROSPECTS OF CLIC S. Döbert, for the CLIC/CTF3 collaboration, CERN, Geneva, Switzerland Abstract The Compact Linear Collider (CLIC) is studied by a growing international collaboration.

More information

TESLA FEL-Report

TESLA FEL-Report Determination of the Longitudinal Phase Space Distribution produced with the TTF Photo Injector M. Geitz a,s.schreiber a,g.von Walter b, D. Sertore a;1, M. Bernard c, B. Leblond c a Deutsches Elektronen-Synchrotron,

More information

III. Proton-therapytherapy. Rome SB - 3/5 1

III. Proton-therapytherapy. Rome SB - 3/5 1 Outline Introduction: an historical review I Applications in medical diagnostics Particle accelerators for medicine Applications in conventional radiation therapy II III IV Hadrontherapy, the frontier

More information

RF Design of the LCLS Gun C.Limborg, Z.Li, L.Xiao, J.F. Schmerge, D.Dowell, S.Gierman, E.Bong, S.Gilevich February 9, 2005

RF Design of the LCLS Gun C.Limborg, Z.Li, L.Xiao, J.F. Schmerge, D.Dowell, S.Gierman, E.Bong, S.Gilevich February 9, 2005 RF Design of the LCLS Gun C.Limborg, Z.Li, L.Xiao, J.F. Schmerge, D.Dowell, S.Gierman, E.Bong, S.Gilevich February 9, 2005 Summary Final dimensions for the LCLS RF gun are described. This gun, referred

More information

CBETA Quarterly Report 7

CBETA Quarterly Report 7 Submission date: 15 September 2018 CBETA Quarterly Report 7 Project Director (BNL): Steve Peggs Peggs@bnl.gov Project Manager (BNL): Rob Michnoff Michnoff@bnl.gov Project Manager (Cornell): Karl Smolenski

More information

Requirements for the Beam Abort Magnet and Dump

Requirements for the Beam Abort Magnet and Dump Requirements for the Beam Abort Magnet and Dump A beam abort kicker (pulsed dipole magnet) and dump are required upbeam of the LCLS undulator in order to protect the undulator from mis-steered and poor

More information

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL Nuclear Instruments and Methods in Physics Research A 475 (2001) 549 553 Performance of a DC GaAs photocathode gun for the Jefferson lab FEL T. Siggins a, *, C. Sinclair a, C. Bohn b, D. Bullard a, D.

More information

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings: TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,

More information

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Outline Situation/Rationale Requirements Synchrotron choice Functions

More information

TOSHIBA Industrial Magnetron E3328

TOSHIBA Industrial Magnetron E3328 TOSHIBA E3328 is a fixed frequency continuous wave magnetron intended for use in the industrial microwave heating applications. The average output power is 3kW in the frequency range from 2450 to 2470

More information

JLab 10kW FEL Driver Beam Diagnostics

JLab 10kW FEL Driver Beam Diagnostics JLab 10kW Driver Beam Diagnostics Kevin Jordan, S. V. Benson, J. Coleman, D. Douglas, R. Evans, A. Grippo, D. Gruber, G. Krafft, W. Moore, N. Nishimori, P. Piot, D. Sexton, J. Song and S. Zhang Outline.

More information

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator S. Cousineau (On behalf of the SNS project) HB2016, Sweden July 04, 2016 ORNL is managed by UT-Battelle for the US Department

More information

THE IBA SUPERCONDUCTING SYNCHROCYCLOTRON PROJECT S2C2

THE IBA SUPERCONDUCTING SYNCHROCYCLOTRON PROJECT S2C2 THE IBA SUPERCONDUCTING SYNCHROCYCLOTRON PROJECT S2C2 W. Kleeven, M. Abs, E. Forton, S. Henrotin, Y. Jongen, V. Nuttens, Y. Paradis, E. Pearson, S. Quets, J. Van de Walle, P. Verbruggen, S. Zaremba, IBA,

More information

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Abstract The U.S. Department of Energy (DOE) Office of Science has funded the construction of a new accelerator-based

More information

PEP-I1 RF Feedback System Simulation

PEP-I1 RF Feedback System Simulation SLAC-PUB-10378 PEP-I1 RF Feedback System Simulation Richard Tighe SLAC A model containing the fundamental impedance of the PEP- = I1 cavity along with the longitudinal beam dynamics and feedback system

More information

BEAM STABILITY IN SYNCHROTRON LIGHT SOURCES*

BEAM STABILITY IN SYNCHROTRON LIGHT SOURCES* BEAM STABILITY IN SYNCHROTRON LIGHT SOURCES* Glenn Decker Advanced Photon Source, Argonne National Laboratory Argonne, IL 60439, USA Abstract Numerous third-generation light sources are now in a mature

More information

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

Monthly Progress Report Stanford Synchrotron Radiation Laboratory Monthly Progress Report Stanford Synchrotron Radiation Laboratory April 2003 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 3 2. Cost Data 5 B. Design and Fabrication Reports 1.1 Magnets &

More information

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA. A1.01 PROJECT MANAGEMENT BNL/Cornell Michnoff A1.01.01 Milestones BNL/Cornell Michnoff This scope is a placeholder for all project high level milestones for NYSERDA. There is no cost or labor related to

More information

Screen investigations for low energetic electron beams at PITZ

Screen investigations for low energetic electron beams at PITZ 1 Screen investigations for low energetic electron beams at PITZ S. Rimjaem, J. Bähr, H.J. Grabosch, M. Groß Contents Review of PITZ setup Screens and beam profile monitors at PITZ Test results Summary

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

Cyclotron Institute upgrade project. H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, and G. Tabacaru

Cyclotron Institute upgrade project. H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, and G. Tabacaru Cyclotron Institute upgrade project H. L. Clark, F. Abegglen, G. Chubarian, G. Derrig, G. Kim, D. May, and G. Tabacaru On January 3, 2005 the Cyclotron Institute Upgrade Project (CIUP) began with the approval

More information

KEKB Accelerator Physics Report

KEKB Accelerator Physics Report KEKB Accelerator Physics Report Y. Funakoshi for the KEKB commissioning group KEK, 1-1 Oho, Tsukuba, Ibaraki 305-0801,Japan Abstract 1 INTRODUCTION The KEKB B-Factory is an electron-positron double ring

More information

Full IEFC workshop Feb.

Full IEFC workshop Feb. How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix How does one keep a 50 51 year old running for another 25 years? accelerator How

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

ATF Energy Spectrometer Experiments

ATF Energy Spectrometer Experiments ATF Energy Spectrometer Experiments Mike Hildreth representing Energy Spectrometer Enthusiasts ATF Basics 6 BPMs (3 per side) separated by 3?m LLNL (passive) girder KEK (active) girder Ultimate Goal: Measurement

More information

Empirical Model For ESS Klystron Cathode Voltage

Empirical Model For ESS Klystron Cathode Voltage Empirical Model For ESS Klystron Cathode Voltage Dave McGinnis 2 March 2012 Introduction There are 176 klystrons in the superconducting portion of ESS linac. The power range required spans a factor of

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017 Summary of CBETA Independent Cost Reviews R. Michnoff January 19, 2017 Overview On January 18 th and 19 th, 2017, independent cost reviews were conducted by phone between BNL and Cornell University for

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

High Rep Rate Guns: FZD Superconducting RF Photogun

High Rep Rate Guns: FZD Superconducting RF Photogun High Rep Rate Guns: FZD Superconducting RF Photogun J. Teichert, A. Arnold, H. Büttig, D. Janssen, M. Justus, U. Lehnert, P. Michel, K. Moeller, P. Murcek, Ch. Schneider, R. Schurig, G. Staats, F. Staufenbiel,

More information