3 rd ILSF Advanced School on Synchrotron Radiation and Its Applications

Size: px
Start display at page:

Download "3 rd ILSF Advanced School on Synchrotron Radiation and Its Applications"

Transcription

1 3 rd ILSF Advanced School on Synchrotron Radiation and Its Applications September 14-16, 2013 : 1392/06/23 :

2 ILSF-IPM, Sep

3 ILSF-IPM, Sep

4 3 rd ILSF School on Synchrotron n Radiation and Its Applications (Storage Ring) Parameter Unit Value Energy GeV 3 Circumference m Natural emittance Nm.rad 0.93 Number Length of Straight Section - m Tune (Qx/Qy) ξ Natural Chromaticity ( ) / x / ξ y Energy Spread E-4 Radiation loss per turn KeV RF frequency MHz 500 Harmonic Number Dipole/Quadrupole/Sextupole - 56/252/196 ILSF-IPM, Sep

5 3 rd ILSF School on Synchrotron n Radiation and Its Applications (Booster) Parameter Unit Value Energy@ injection/extrcation GeV 0.150/3 Circumference m 168 Maximum Current ma 10 Natural emittance Nm.rad Harmonic Number Tune (Qx/Qy) /4.290 Natural Chromaticity ( ) ξ x / ξ y / Energy Spread E-04 Radiation loss per turn KeV ILSF-IPM, Sep

6 3 rd ILSF School on Synchrotron n Radiation and Its Applications ابزار ويژگی تاثير روی باريکه غير مخرب اندازه گيری جريان و ساختار طولی باريکه WCM غير مخرب اندازه گيری جريان FCT غير مخرب اندازه گيری جريان ميانگين DCCT مخرب اندازه گيری جريان Faraday Cup مخرب اندازه گيری پروفايل FS گيری پروفايل و سايز OTR اندازه مخرب غير مخرب اندازه گيری سايز و پروفايل عرضی و SRM طولی باريکه غير مخرب اندازه گيری مکان باريکه Button BPM غير مخرب اندازه گيری مکان باريکه و تيون Stripline غير مخرب اندازه گيری مکان و شدت تلفات BLM مخرب اندازه گيری پارامترھای ديناميکی و حذف Scraper ھالو باريکه ILSF-IPM, Sep

7 ILSF-IPM, Sep

8 LTB ILSF-IPM, Sep

9 Booster ILSF-IPM, Sep

10 BTS ILSF-IPM, Sep

11 Storage Ring ILSF-IPM, Sep

12 3 rd ILSF School on Synchrotron n Radiation and Its Applications Wall current Monitor (WCM) Fast Current Transformer (FCT) DCCT Faraday Cup ILSF-IPM, Sep

13 Wall Current Monitor ILSF-IPM, Sep

14 Toolkit ILSF-IPM, Sep

15 WCM ILSF-IPM, Sep

16 Fast Current Transformer ILSF-IPM, Sep

17 Fast Current Transformer ILSF-IPM, Sep

18 DCCT ILSF-IPM, Sep

19 DCCT ILSF-IPM, Sep

20 Faraday Cup ILSF-IPM, Sep

21 Faraday Cup ILSF-IPM, Sep

22 ILSF-IPM, Sep

23 3 rd ILSF School on Synchrotron n Radiation and Its Applications Scintillation Screen (FS) Optical Transition Radiation (OTR) Synchrotron Radiation Monitor ILSF-IPM, Sep

24 (Scintillation Screen) ILSF-IPM, Sep

25 (Scintillation Screen) ILSF-IPM, Sep

26 3 rd ILSF School on Synchrotron n Radiation and Its Applications (Scintillation Screen) پروفايل اندازه گيری شده توسط صفحات سوسوزن برای اورانيوم با انرژی 300MeV ILSF-IPM, Sep

27 Optical Transition Radiation (OTR) ILSF-IPM, Sep

28 Optical Transition Radiation (OTR) ILSF-IPM, Sep

29 OTR ILSF-IPM, Sep

30 Synchrotron Radiation Monitor (SRM) ILSF-IPM, Sep

31 Synchrotron Radiation Monitor (SRM) ILSF-IPM, Sep

32 Synchrotron Radiation Monitor (SRM) ILSF-IPM, Sep

33 Button BPMs Stripline Test Stand ILSF-IPM, Sep

34 Button BPMs ILSF-IPM, Sep

35 Button BPMs ILSF-IPM, Sep

36 Button BPM ILSF-IPM, Sep

37 (Booster) Button BPM ILSF-IPM, Sep

38 Button BPM ILSF-IPM, Sep

39 ILSF Button BPM ILSF-IPM, Sep

40 ILSF Button BPM V Wake-Loss-Factor: 6.99E-3 V/Pc ILSF-IPM, Sep

41 Stripline ILSF-IPM, Sep

42 Stripline ILSF-IPM, Sep

43 Stripline ILSF-IPM, Sep

44 Test Stand ILSF-IPM, Sep

45 Test Stand ILSF-IPM, Sep

46 Test Stand ILSF-IPM, Sep

47 Test Stand ILSF-IPM, Sep

48 Vacuum Test ILSF-IPM, Sep

49 Beam Loss Monitor (BLM) ILSF-IPM, Sep

50 BLM ILSF-IPM, Sep

51 BLM ILSF-IPM, Sep

52 BLM ILSF-IPM, Sep

53 Scraper ILSF-IPM, Sep

54 Photon BPMs ILSF-IPM, Sep

55 3 rd ILSF School on Synchrotron n Radiation and Its Applications Peter Forck, (2012), Lecture Notes on Beam Instrumentation & Diagnostics, Joint University Accelerator School L. N. Large and w. S. Whitlock, Proc, Phys. Soc. (London)79,148(1962). R. A. Baragiola, E. V. Alonso, and A. Olivia-Florio, Phys. Rev. B19, 121 (1979) Glenn F. Knoll, (2000), Third edition, Radiation Detection and Measurement, John Wiley and sons press, page 30 A.olmos, T.Gunzel, F.Perez, BPM Design for the ALBA synchrotron,proceeding of EPAC2006. Stephen R.Smith (1996), Beam Position Monitor Engineering, SLAC T.Suada, K.Tamiya, T.Urano, H.Kobayashi, New Analysis and performance of a wall current monitor, Nuclear Instruments & Methods in Physic research A, (1997) R.S.Shinde, Development of nodestructive type of FCT, Ferrit and pulsed magnet technology, Accelerator Magnet technology devision, vol 25, issue1, (2012) ILSF-IPM, Sep

56 ILSF-IPM, Sep

Accelerator Systems of the TPS

Accelerator Systems of the TPS Ambient Ground Motion and Civil Engineering for Low Emittance Electron Storage Ring July 2-22, 2005, Hsinchu, Taiwan Accelerator Systems of the TPS Preinjector, Booster Synchrotron, Transfer Line, and

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

Beam instrumentation at the 1-MW proton J-PARC RCS

Beam instrumentation at the 1-MW proton J-PARC RCS Beam instrumentation at the 1-MW proton J-PARC RCS HB2014 54th ICFA Advanced Beam Dynamics Workshop on High-Intensity, High-Brightness and High Power Hadron Beams East Lansing, MI Nov.12, 2014 Kazami Yamamoto

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX T. Koseki, M. Ikegami, M. Tomizawa, Accelerator Laboratory, KEK, Tsukuba, Japan F. Noda, JAEA, Tokai, Japan Abstract The J-PARC (Japan Proton

More information

NSLS2 Diagnostic System Commissioning and Measurements

NSLS2 Diagnostic System Commissioning and Measurements NSLS2 Diagnostic System Commissioning and Measurements Weixing Cheng, on behalf of NSLS2 diagnostic group and commissioning team 3 rd International Beam Instrumentation Conference Monterey, California,

More information

Position Resolution of Optical Fibre-Based Beam Loss Monitors using long electron pulses

Position Resolution of Optical Fibre-Based Beam Loss Monitors using long electron pulses Position Resolution of Optical Fibre-Based Beam Loss Monitors using long electron pulses E. Nebot del Busto (1,2, 3), M. J. Boland (4,5), S. Doebert (1), F. S. Domingues (1), E. Effinger (1), W. Farabolini

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

Summary report on synchronization, diagnostics and instrumentation

Summary report on synchronization, diagnostics and instrumentation Summary report on synchronization, diagnostics and instrumentation A.P. Freyberger and G.A. Krafft Jefferson Lab, 12000 Jefferson Avenue, Newport News, VA. 23606 Abstract The proceedings of Working Group

More information

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications

More information

Radiation Safety System for Stanford Synchrotron Radiation Laboratory*

Radiation Safety System for Stanford Synchrotron Radiation Laboratory* SLAC PUB-8817 April 16, 2001 Radiation Safety System for Stanford Synchrotron Radiation Laboratory* James C. Liu, N. E. Ipe and R. Yotam Stanford Linear Accelerator Center, P. O. Box 4349, Stanford, CA

More information

Status of Elettra, top-up and other upgrades

Status of Elettra, top-up and other upgrades Status of Elettra, top-up and other upgrades Emanuel Karantzoulis ELETTRA / Trieste, Italy / 2010 November 25-26 Past and Present Configurations 1994-2007 From 2008 No full energy injection Full energy

More information

AARHUS UNIVERSITET November, ASTRID2 Status. Heine Dølrath Thomsen on behalf of the ASTRID2 Team

AARHUS UNIVERSITET November, ASTRID2 Status. Heine Dølrath Thomsen on behalf of the ASTRID2 Team 21-22 November, 2013 ASTRID2 Status Heine Dølrath Thomsen on behalf of the ASTRID2 Team præsen TATION ASTRID2 ASTRID2 is the new synchrotron light source being commissioned in Aarhus, Denmark ASTRID2 main

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

SSRF Beam Diagnostics Commissioning. LENG Yongbin on behalf of SSRF BI group

SSRF Beam Diagnostics Commissioning. LENG Yongbin on behalf of SSRF BI group SSRF Beam Diagnostics Commissioning LENG Yongbin on behalf of SSRF BI group 2009.05.25 Outline Instruction of SSRF Overview of SSRF BI system Subsystem Beam position monitor Tune monitor Current & charge

More information

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Presentation at University of Saskatchewan April 22-23, 2010 Yoshitaka Kawashima Brookhaven National Laboratory NSLS-II,

More information

OPERATIONAL EXPERIENCE AT J-PARC

OPERATIONAL EXPERIENCE AT J-PARC OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization

More information

COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE

COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE Proceedings of DIPAC9, Basel, Switzerland MOOB2 COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE K. Balewski #, G. Kube, K. Wittenburg, A. Brenger, H.-T. Duhme, V. Gharibyan, J.

More information

Introduction to Synchrotron Radiation and Storage Ring Light Sources.

Introduction to Synchrotron Radiation and Storage Ring Light Sources. Introduction to Synchrotron Radiation and Storage Ring Light Sources. Monday 22 Nov 2010 at 12:15 (00h55') Primary authors : Dr. PODOBEDOV, Boris (BNL) Co-authors : Presenter : Dr. PODOBEDOV, Boris (BNL)

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

Linac 4 Instrumentation K.Hanke CERN

Linac 4 Instrumentation K.Hanke CERN Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase

More information

Top-Up Experience at SPEAR3

Top-Up Experience at SPEAR3 Top-Up Experience at SPEAR3 Contents SPEAR 3 and the injector Top-up requirements Hardware systems and modifications Safety systems & injected beam tracking Interlocks & Diagnostics SPEAR3 Accelerator

More information

Beam Instrumentation for X-ray FELs

Beam Instrumentation for X-ray FELs Beam Instrumentation for X-ray FELs 05/16/2011 1 1 Outline X-ray FEL overview Diagnostics requirements for X-ray FELs Transverse Diagnostics Longitudinal Diagnostics Summary 2 2 X-ray FEL Overview 100

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

Status of SOLARIS Arkadiusz Kisiel

Status of SOLARIS Arkadiusz Kisiel Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS

More information

Safety Considerations For The Top-up Operation Of An 8 GeV Class Synchrotron Radiation Facility

Safety Considerations For The Top-up Operation Of An 8 GeV Class Synchrotron Radiation Facility Safety Considerations For The Top-up Operation Of An 8 GeV Class Synchrotron Radiation Facility Yoshihiro Asano 1, and Tetsuya Takagi 2 1 Synchrotron Radiation Research Center. Japan Atomic Energy Research

More information

JLab 10kW FEL Driver Beam Diagnostics

JLab 10kW FEL Driver Beam Diagnostics JLab 10kW Driver Beam Diagnostics Kevin Jordan, S. V. Benson, J. Coleman, D. Douglas, R. Evans, A. Grippo, D. Gruber, G. Krafft, W. Moore, N. Nishimori, P. Piot, D. Sexton, J. Song and S. Zhang Outline.

More information

Summary of the 1 st Beam Line Review Meeting Injector ( )

Summary of the 1 st Beam Line Review Meeting Injector ( ) Summary of the 1 st Beam Line Review Meeting Injector (23.10.2006) 15.11.2006 Review the status of: beam dynamics understanding and simulations completeness of beam line description conceptual design of

More information

Jae-Young Choi On behalf of PLS-II Linac team

Jae-Young Choi On behalf of PLS-II Linac team PLS-II Linac 2015. 4. 8. Jae-Young Choi On behalf of PLS-II Linac team Accelerators in Pohang Accelerator Laboratory XFEL (under construction) 400 M$ Machines under installation PLS-II PAL : Chronology

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

Sérgio Rodrigo Marques

Sérgio Rodrigo Marques Sérgio Rodrigo Marques (on behalf of the beam diagnostics group) sergio@lnls.br Outline Introduction Stability Requirements General System Requirements FOFB Strategy Hardware Overview Performance Tests:

More information

DESIGN AND DEVELOPMENT OF CONFIGURABLE BPM READOUT SYSTEM FOR ILSF

DESIGN AND DEVELOPMENT OF CONFIGURABLE BPM READOUT SYSTEM FOR ILSF DESIN AND DEVELOPMENT OF CONFIURABLE BPM READOUT SYSTEM FOR ILSF M. Shafiee 1,2, J.Rahighi, M.Jafarzadeh, 1 ILSF, Tehran, Iran A.H.Feghhi, 2Shahid beheshti University, Tehran, Iran Abstract A configurable

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010

More information

Trigger-timing signal distribution system for the KEK electron/positron injector linac

Trigger-timing signal distribution system for the KEK electron/positron injector linac Trigger-timing signal distribution system for the KEK electron/positron injector linac T. Suwada, 1 K. Furukawa, N. Kamikubota, and M. Satoh, Accelerator Laboratory, High Energy Accelerator Research Organization

More information

Operational Status of PF-Ring and PF-AR after the Earthquake

Operational Status of PF-Ring and PF-AR after the Earthquake Journal of Physics: Conference Series Operational Status of PF-Ring and PF-AR after the Earthquake To cite this article: T Honda et al 2013 J. Phys.: Conf. Ser. 425 042014 Related content - Design and

More information

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

An Overview of Beam Diagnostic and Control Systems for AREAL Linac An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic

More information

Challenges in Accelerator Beam Instrumentation

Challenges in Accelerator Beam Instrumentation Proceedings of the DPF-2009 Conference, Detroit, MI, July 27-31, 2009 1 Challenges in Accelerator Beam Instrumentation M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, USA The challenges

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

EPJ Web of Conferences 95,

EPJ Web of Conferences 95, EPJ Web of Conferences 95, 04012 (2015) DOI: 10.1051/ epjconf/ 20159504012 C Owned by the authors, published by EDP Sciences, 2015 The ELENA (Extra Low Energy Antiproton) project is a small size (30.4

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

PEP II STATUS AND PLANS *

PEP II STATUS AND PLANS * PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex

More information

TOP-UP OPERATION IN LIGHT SOURCES

TOP-UP OPERATION IN LIGHT SOURCES TOP-UP OPERATION IN LIGHT SOURCES H. Ohkuma * JASRI/SPring-8, Hyogo 679-5198, Japan Abstract The top-up operation for user experiments has been performed at several light sources, and at most of the new

More information

LCLS Injector Technical Review

LCLS Injector Technical Review LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4 2003 Review Committee Members: Prof. Patrick O Shea Chair University of Maryland Dr. E. Colby Stanford Linear Accelerator

More information

Linac-Beam Characterizations at 600 MeV Using Optical Transition Radiation Diagnostics *

Linac-Beam Characterizations at 600 MeV Using Optical Transition Radiation Diagnostics * Linac-Beam Characterizations at 6 MeV Using Optical Transition Radiation Diagnostics * A. H. Lumpkin, W. J. Berg, B. X. Yang, and M. White Advanced Photon Source, Argonne National Laboratory 97 South Cass

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement. Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed

More information

CONSTRUCTION AND COMMISSIONING OF BEPCII

CONSTRUCTION AND COMMISSIONING OF BEPCII Abstract CONSTRUCTION AND COMMISSIONING OF BEPCII C. Zhang, J.Q. Wang, L. Ma and G.X.Pei for the BEPCII Team, IHEP, CAS P.O.Box 918, Beijing 100049, China BEPCII is the major upgrade of BEPC (Beijing Electron-

More information

KARA and FLUTE RF Overview/status

KARA and FLUTE RF Overview/status KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research

More information

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers Non-Invasive for the JLAB Experimental Program via Synchrotron Light Interferometers P. Chevtsov, T. Day, A.P. Freyberger, R. Hicks Jefferson Lab J.-C. Denard Synchrotron SOLEIL 20th March 2005 1. Energy

More information

Future Performance of the LCLS

Future Performance of the LCLS Future Performance of the LCLS J. Welch for many* SLAC National Accelerator Laboratory FLS 2010, ICFA Beam Dynamics Workshop on Future Light Sources, March 1-5, 2010. SLAC National Accelerator Laboratory,

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

Development at Jefferson Lab

Development at Jefferson Lab JLABACC9727 5 MeV Mott Polarimeter Development at Jefferson Lab J.S. Price* B.M. Poelker* C.K. Sinclair* K.A. Assamagant L.S. Cardman* J. Gramest J. Hansknecht* D.J. Mack* and P. Piot* *Jefferson Lab 1.2000

More information

BUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY

BUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY Proceedings of IBIC, Tsukuba, Japan MOPB8 BUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY Gian Luca Orlandi, Masamitsu Aiba, Simona Bettoni, Bolko Beutner, Helge Brands,

More information

Compact, e-beam based mm-and THzwave light sources

Compact, e-beam based mm-and THzwave light sources Compact, e-beam based mm-and THzwave light sources S.G. Biedron, S.V. Milton (CSU) and G.P. Gallerano (ENEA) Frontiers of THz Science Workshop Sept. 5-6, 2012 SLAC 1 Collaborators involved with the enclosed

More information

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006 Program Risks Risk Analysis Fallback Plans for the PEP-II B-FactoryB John T. Seeman DOE PEP-II Operations Review April 26, 2006 OPS Review Topics Are there any PEP-II program risks? Has the laboratory

More information

ASTRID2 the UV and soft x-ray synchrotron light source with the ultimate brilliance

ASTRID2 the UV and soft x-ray synchrotron light source with the ultimate brilliance ASTRID2 the UV and soft x-ray synchrotron light source with the ultimate brilliance Niels Hertel, Søren Pape Møller and Jørgen S. Nielsen / 28-07-2009 1 Introduction and general remarks... 2 2 ASTRID2

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Periodic Seasonal Variation of Magnets Level of the STB ring

Periodic Seasonal Variation of Magnets Level of the STB ring Periodic Seasonal Variation of Magnets Level of the STB ring Shigenobu Takahashi Laboratory of Nuclear Science,Tohoku University, Mikamine 1-2-1, Taihaku-ku, Sendai 982-0826, Japan 1. Introduction The

More information

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK)

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK) A possibility of ring collider for Higgs factory 13 Feb. 2012 K. Oide (KEK) Inspired by A. Blondel and F. Zimmermann, A High Luminosity e+e- Collider in the LHC tunnel to study the Higgs Boson, V2.1 -

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

DELIVERY RECORD. Location: Ibaraki, Japan

DELIVERY RECORD. Location: Ibaraki, Japan DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October

More information

Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun

Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun A. Sakumi, M. Uesaka, Y. Muroya, T. Ueda Nuclear Professional School, University of Tokyo J. Urakawa, KEK, Japan

More information

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project 16/11/2016 20th ELS-RF Workshop Pollina JP 1 and Status of the ThomX LINAC project Operational experience with the SOLEIL

More information

Beam Instrumentation for CTF3 and CLIC

Beam Instrumentation for CTF3 and CLIC Beam Instrumentation for CTF3 and CLIC Beam loss - Beam halo monitoring developments CLIC diagnostic Common developments with other projects Specific requirements for CLIC Beam Loss and Beam Halo measurement

More information

Beam Loss Detection for MPS at FRIB

Beam Loss Detection for MPS at FRIB Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

Brilliance. Electron Beam Position Processor

Brilliance. Electron Beam Position Processor Brilliance Electron Beam Position Processor Many instruments. Many people. Working together. Stability means knowing your machine has innovative solutions. For users, stability means a machine achieving

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

Photoinjector Laser Operation and Cathode Performance

Photoinjector Laser Operation and Cathode Performance Photoinjector Laser Operation and Cathode Performance Daniele Sertore, INFN Milano LASA Siegfried Schreiber, DESY Laser operational experience Laser beam properties Cathode performances Outlook TTF and

More information

TECHNIQUES FOR OBSERVING BEAM DYNAMICAL EFFECTS CAUSED BY THE PRESENCE OF ELECTRON CLOUDS*

TECHNIQUES FOR OBSERVING BEAM DYNAMICAL EFFECTS CAUSED BY THE PRESENCE OF ELECTRON CLOUDS* Proceedings of ECLOUD10, Ithaca, New York, USA TECHNIQUES FOR OBSERVING BEAM DYNAMICAL EFFECTS CAUSED BY THE PRESENCE OF ELECTRON CLOUDS* M. Billing, G. Dugan, R. Meller, M. Palmer, G. Ramirez, J. Sikora,

More information

arxiv: v1 [physics.acc-ph] 19 Nov 2013

arxiv: v1 [physics.acc-ph] 19 Nov 2013 Conditioning of BPM pickup signals for operations of the Duke storage ring with a wide range of single-bunch current * arxiv:1311.4613v1 [physics.acc-ph] 19 Nov 213 XU Wei 1,2;1) LI Jing-Yi 1,2;2) HUANG

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

Advanced Photon Source - Upgrades and Improvements

Advanced Photon Source - Upgrades and Improvements Advanced Photon Source - Upgrades and Improvements Horst W. Friedsam, Jaromir M. Penicka Argonne National Laboratory, Argonne, Illinois, USA 1. INTRODUCTION The APS has been operational since 1995. Recently

More information

PRESENT STATUS OF J-PARC

PRESENT STATUS OF J-PARC PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize

More information

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

TWO BUNCHES WITH NS-SEPARATION WITH LCLS* TWO BUNCHES WITH NS-SEPARATION WITH LCLS* F.-J. Decker, S. Gilevich, Z. Huang, H. Loos, A. Marinelli, C.A. Stan, J.L. Turner, Z. van Hoover, S. Vetter, SLAC, Menlo Park, CA 94025, USA Abstract The Linac

More information

Development of an Abort Gap Monitor for High-Energy Proton Rings *

Development of an Abort Gap Monitor for High-Energy Proton Rings * Development of an Abort Gap Monitor for High-Energy Proton Rings * J.-F. Beche, J. Byrd, S. De Santis, P. Denes, M. Placidi, W. Turner, M. Zolotorev Lawrence Berkeley National Laboratory, Berkeley, USA

More information

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments P. Adderley, M. Baylac, J. Clark, A. Day, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman PESP

More information

Energy Upgrade Options for the LCLS-I Linac

Energy Upgrade Options for the LCLS-I Linac Energy Upgrade Options for the LCLS-I Linac LCLS-II TN-14-10 11/12/2014 John Sheppard, F.J. Decker, R. Iverson, H.D. Nuhn, M. Sullivan, J. Turner November 18, 2014 LCLSII-TN-14-07 LCLS 1 Linac Energy Increase

More information

ARIEL e-linac Machine Protection System Requirements

ARIEL e-linac Machine Protection System Requirements TRIUMF Document-85636 ARIEL e-linac Machine Protection System Requirements Document Type: Requirement (Specifications) Release: 02 Release Date: 2013/06/17 Author(s): Shane Koscielniak Note: Before using

More information

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev. Commissioning Experience from PEP-II HER Longitudinal Feedback 1 S. Prabhakar, D. Teytelman, J. Fox, A. Young, P. Corredoura, and R. Tighe Stanford Linear Accelerator Center, Stanford University, Stanford,

More information

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2 PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND

More information

KEKB Accelerator Physics Report

KEKB Accelerator Physics Report KEKB Accelerator Physics Report Y. Funakoshi for the KEKB commissioning group KEK, 1-1 Oho, Tsukuba, Ibaraki 305-0801,Japan Abstract 1 INTRODUCTION The KEKB B-Factory is an electron-positron double ring

More information

Progress of Beam Instrumentation in J-PARC Linac

Progress of Beam Instrumentation in J-PARC Linac IBIC2012 International Beam Instrumentation Conference Tsukuba, Ibaraki, JAPAN, 1 st to 4 th, Oct. 2011 Progress of Beam Instrumentation in J-PARC Linac Akihiko MIURA with the Beam Monitor Group in J-PARC

More information

PUBLICATION. Measurement setup at light source operational: Milestone M4.3

PUBLICATION. Measurement setup at light source operational: Milestone M4.3 CERN-ACC-2016-0110 Future Circular Collider PUBLICATION Measurement setup at light source operational: Milestone M4.3 Perez, Francis (ALBA) et al. 24 August 2016 The European Circular Energy-Frontier Collider

More information

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study EUROFEL-Report-2007-DS4-095 EUROPEAN FEL Design Study Deliverable N : D 4.3 Deliverable Title: Task: Authors: Generation of 3rd harmonic photons at 90 nm DS-4 see next page Contract N : 011935 Project

More information

LHC Nominal injection sequence

LHC Nominal injection sequence LHC Nominal injection sequence Mike Lamont Acknowledgements: Reyes Alemany Fernandez, Brennan Goddard Nominal injection Overall injection scheme Pilot R1, Pilot R2, Intermediate R1 Optimise Intermediate

More information

Precision measurements of beam current, position and phase for an e+e- linear collider

Precision measurements of beam current, position and phase for an e+e- linear collider Precision measurements of beam current, position and phase for an e+e- linear collider R. Corsini on behalf of H. Braun, M. Gasior, S. Livesley, P. Odier, J. Sladen, L. Soby INTRODUCTION Commissioning

More information

BEAM STABILITY IN SYNCHROTRON LIGHT SOURCES*

BEAM STABILITY IN SYNCHROTRON LIGHT SOURCES* BEAM STABILITY IN SYNCHROTRON LIGHT SOURCES* Glenn Decker Advanced Photon Source, Argonne National Laboratory Argonne, IL 60439, USA Abstract Numerous third-generation light sources are now in a mature

More information

PEP-II STATUS REPORT *

PEP-II STATUS REPORT * PEP-II STATUS REPORT * Jonathan Dorfan Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA For the SLAC, LBNL, LLNL PEP-II group Abstract The main design features of the PEP-II

More information

PEP II Status and Plans

PEP II Status and Plans SLAC-PUB-6854 September 1998 PEP II Status and Plans By John T. Seeman Invited talk presented at the 16th IEEE Particle Accelerator Conference (PAC 95) and International Conference on High Energy Accelerators,

More information

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The ESS Accelerator For Norwegian Industry and Research Oslo, 24 Sept 2013 Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The Hadron Intensity Frontier Courtesy of M. Seidel (PSI)

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER SLAC-PUB-7786 (August 1998) RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER J. C. Liu, X. S. Mao, W. R. Nelson, J. Seeman, D. Schultz, G. Nelson, P. Bong, B. Gray Stanford

More information

NSLS-II RF BEAM POSITION MONITOR COMMISSIONING UPDATE

NSLS-II RF BEAM POSITION MONITOR COMMISSIONING UPDATE NSLS-II RF BEAM POSITION MONITOR COMMISSIONING UPDATE Joseph Mead#, Anthony Caracappa, Weixing Cheng, Christopher Danneil, Joseph DeLong, Al DellaPenna, Kiman Ha, Bernard Kosciuk, Marshall Maggipinto,

More information