CMS Upgrades the Role of US Universities

Size: px
Start display at page:

Download "CMS Upgrades the Role of US Universities"

Transcription

1 CMS Upgrades the Role of US Universities Joel Butler, Fermilab US CMS Research Program Manager Presented to the High Energy Physics University Grant Program Subpanel SLAC Jan. 8, 2007 UGPS Jan. 8, 2007, SLAC 1

2 Outline The timing of the SLHC upgrade and associated R&D Scope of SLHC upgrade and R&D Readiness to start R&D How CMS is organizing for this effort Funding required for R&D and construction Role of US universities in CMS upgrade R&D UGPS Jan. 8, 2007, SLAC 2

3 LHC luminosity upgrade: why and when? fast performance ramping Ultimate L Nominal L years 1 2 year Ldt How fast performance is expected to increase: 4 y to nominal L (1x10 34 /cm 2 -s) 4 y to nominal L & 2 y up to ultimate L (2.3x10 34 /cm 2 -s) 4 y to ultimate IR quadrupole lifetime ~ 7-8 years owing to high radiation doses Years to halve errors Radiation damage limit integrated luminosity [fb-1] halving time of the statistical error 5 y already after 4-5 y of operation luminosity upgrade to be planned for the middle of next decade years 0 Somewhere circa 2013, reach the point of diminishing returns and need upgrade!

4 SLHC - Motivations The SLHC is an upgrade to the LHC designed to increase the delivered integrated luminosity by an order of magnitude over the design luminosity of the LHC. ~1000 fb -1 /year cm -2 s -1 peak luminosities Would likely require a long shutdown around 2014 To allow time enough to install new optics for the IR Also gives time for replacement of CMS tracking detectors and other required upgrades Why are we discussing this now before the LHC and experiments have even started operations? long lead times required both for machine R&D and for detector R&D This will be a challenging machine to develop The detectors will require significant upgrades to be able to deliver physics at LHC quality or better Given the time it took to develop detectors for LHC, it is clear we need to start well in advance How far in advance basically NOW! Need to have a project well-enough defined to get the construction project into the funding cycle in a timely way UGPS Jan. 8, 2007, SLAC 4

5 CMS Upgrade Issues These upgrade scenarios put different constraints on the detector Beam crossing interval is NO LONGER AN UNKNOWN (it seems) 50 ns BC Interval is the baseline 25 ns BC Interval (the current baseline) is a fallback This allows electronics/trigger/ daq designs to proceed Detector issues Tracking Pattern recognition, vertex resolution B-tagging - how much worse with factor 20(10) pile-up? Trigger BCI decision leads to design based on existing 40MHz clock. Buffer sizes may need to be enlarged for more interactions distributed in the same number or half the number of crossings. Effects on Calorimetry Noise from pile-up: Background *10 = pile-up noise * 10 Jet and e/γ resolution worse Forward jet tagging - may be compromised by IR changes (IR quads will reach the end of their useful life due to radiation damage this is still an uncertainty but has a relatively narrow impact.) Remaining details of the machine upgrade, such as possible IR modifications for lower β*, are not yet defined and but DO NOT severely limit the type of R&D that can be productively undertaken except in a few instances UGPS Jan. 8, 2007, SLAC 5

6 EPP2010 UGPS Jan. 8, 2007, SLAC 6

7 P5 Upgrade R&D UGPS Jan. 8, 2007, SLAC 7

8 P5 Upgrade Construction The SLHC Upgrade R&D and Construction will go forward and will require significant effort from the US university community and will help sustain and develop its capabilities. UGPS Jan. 8, 2007, SLAC 8

9 SLHC: Detector Challenges 10X higher luminosity 10X higher radiation levels Track occupancy higher, depending on crossing frequency (20X, 10X) The major change and challenge for CMS at the SLHC is an extensive replacement of the TRACKING and TRIGGER TRACKING finer granularity, more channels to control occupancy More radiation hard Tracker information used in Level 1 trigger for first time in CMS TRIGGER/DAQ Doubling the Level 1 trigger latency Adding a new group of tracking triggers at Level 1 Cross component correlation of trigger primitives Some less extensive modifications needed for muon system, and calorimetry are also required Tracking and Trigger are areas where US Universities have made major contributions to CMS both in R&D and construction and should continue to do so UGPS Jan. 8, 2007, SLAC 9

10 CMS from LHC to SLHC cm -2 s For reference: inner layer of pixels have occupancy of 6X10-4 at LHC so will increase to about 1% (OK from a tracking point of view) UGPS Jan. 8, 2007, SLAC 10

11 SLHC Level Occupancy Degraded performance of algorithms Electrons: reduced rejection at fixed efficiency from isolation Muons: increased background rates from accidental coincidences Larger event size to be read out New Tracker: higher channel count & occupancy large factor Reduces the max level-1 rate for fixed bandwidth readout. Trigger Rates Try to hold max L1 rate at 100 khz by increasing readout bandwidth Avoid rebuilding front end electronics/readouts where possible Limits: readout time (< 10 µs) and data size (total now 1 MB) Use buffers for increased latency for processing, not post-l1a May need to increase L1 rate even with all improvements Greater burden on DAQ Implies raising E T thresholds on electrons, photons, muons, jets and use of less inclusive triggers Need to compensate for larger interaction rate & degradation in algorithm performance due to occupancy Radiation damage -- Increases for part of level-1 trigger located on detector 35 UGPS Jan. 8, 2007, SLAC 11

12 Roadmap for tracker/trigger upgrades Within 5 years of LHC start New layers within the volume of the current Pixel tracker which incorporate some tracking information for Level 1 Trigger Room within the current envelope for additional layers Will need to replace existing layers due to expected radiation damage! Pathfinder for full tracking trigger Proof of principle, prototype for larger system Elements of new Level 1 trigger Utilize the new tracking information Correlation between systems Upgrade to full new tracker system by SLHC (8-10 years from LHC Startup) Includes full upgrade to trigger system New Layers Concept New ROC/New Sensor Fabricate Install Full Tracker Monte Carlo Concept New ROC/New Sensor Fabricate UGPS Jan. 8, 2007, SLAC 12

13 Ideas on a new tracker concept? Strawman - A much larger pixel tracker, some triggering layers, more segmented strips 10 cm layer with current pixels (500 ChF/cm 2 ) Around 1m 2 20/40/60 cm layers with bigger pixels (100 Chf/cm 2 ) around 25 m 2 25 MChf Outer layers long pixels/short strips (30 Chf/cm 2 ) Around 170 m 2 50 MChf Some triggering layers. 1 layer for Pt cut only or 2 layers to measure Pt Or perhaps full scale hardware pattern recognition? How much can we re-use to save effort and money? Can we use the TOB mechanical structures (a copy at least) Can we re-use services Re-use of some of the TOB - at least the concept if not the actual modules TOB TOB TIB PD UGPS Jan. 8, 2007, SLAC 13 TIB PD TID TEC

14 Level 1 Trigger The trigger/daq system of CMS will require an upgrade to cope with the higher occupancies and data rates at SLHC One of the key issues for CMS is the requirement to include some element of tracking in the Level 1 Trigger There may not be enough rejection power using the muon and calorimeter triggers to handle the higher luminosity conditions at SLHC Using the studies for HLT applications gives an idea of what could be gained using elements of the tracker in the Level 1 Use of tracking at Level 1 has impact on the architecture of the Level 1 trigger UGPS Jan. 8, 2007, SLAC 14

15 LHC: CMS SLHC Trigger Architecture Level 1: Regional to Global Component to Global L1 Trigger SLHC Proposal: Combine Level-1 Trigger data between tracking, calorimeter & muon at Regional Level at finer granularity Increase the Level 1 latency to 6.4 μsec Transmit physics objects made from tracking, calorimeter & muon regional trigger data to global trigger Implication: perform some of tracking, isolation & other regional trigger functions in combinations between regional triggers New Regional cross-detector trigger crates Leave present L1+ HLT structure intact (except latency) No added levels --minimize impact on CMS readout UGPS Jan. 8, 2007, SLAC 15

16 CMS L1 Algorithm Stages Current for LHC: Trigger Primitive Generator RCT GCT GT Proposed for SLHC (with tracking added): TPG Clustering Correlator Selector Trigger Primitives Tracker L1 Front End e / γ / τ clustering 2x2, φ-strip TPG µ track finder DT, CSC / RPC Regional Track Generator Jet Clustering Missing E T Seeded Track Readout Regional Correlation, Selection, Sorting Global Trigger, Event Selection Manager UGPS Jan. 8, 2007, SLAC 16

17 R&D - starting now Pixel technology Hybrid - cheaper bonding MAPS/SOI - need an answer now if it can be used Geometry How many different sensors Layout of inner/outer pixels Triggering layers How many/where Readout Current ROC to 130 nm New ROC to push Col hit info for stacks Correlator Chip Link and Control technology Effort started at CERN Radiation tolerance and robustness of 130nm/90nm Technology for a very inner layer Different sensor Power/Material DC-DC/Serial power - Some R&D underway UGPS Jan. 8, 2007, SLAC 17

18 SLHC R&D:Next steps Expression of Interest Reasonably brief document (40 pages) Section authors identified Brief case for upgrade Outlines scope of upgrade work What detectors/timescale To be submitted by End 2006 Circulated to collaboration September CMS Week Prepare funding agencies Letter of Intent A larger document More complete physics case Includes organization and rough costing of detector work Including how CMS will organize the effort Submitted to LHCC Allow funding agencies to release funding Target Summer 2007 Next workshop Joint ATLAS-CMS workshop at CERN is Mar 19-21, UGPS Jan. 8, 2007, SLAC 18

19 CMS R&D Proposals SLHC Upgrade Steering Group formed in 2005 This group is charged with Recommending R&D proposals for approval to CMS MB/CB Planning SLHC workshops Outreach to collaboration Interaction/Co-ordination with Machine and ATLAS on SLHC matters Regular Reporting to MB/CB R&D Proposals get a stamp of CMS approval before going to funding agencies UGPS Jan. 8, 2007, SLAC 19

20 4 th 4 th CMS SLHC Upgrade Workshop Perugia Apr 3, Agenda Technology Session I Optical links, power, rapid prototyping New Pixel Layers Performance requirements at SLHC, Radiation Damage, MAPS. Technology Session II New materials: diamond, high O2 silicon, amorphous silicon Trigger Upgrades Tracking Trigger concept, L1 Pixel Trigger, new trigger technologies, TTC replacement Technology Session III 130nm technology Other Issues Calorimeter, muon upgrades UGPS Jan. 8, 2007, SLAC 20

21 SLHC Upgrade Steering Group Members Technical Coordination : EC (chair, Jordan Nash), DTC Representatives from Tracker, ECAL, HCAL, Muons and Level-1 Trigger Nominated by PMs Tracker : G. Hall (TK Upgrade Working Group has been formed) Level-1 Trigger: W. Smith (Trigger Upgrade Working Group) ECAL : P. Busson HCAL: D. Baden CPT: D. Acosta US CMS university MUONS: M. Dallavalle faculty Electronics WG Conveners Micro Electronics (A. Marchioro) Opto Electronics (F. Vasey) Radiation Expert - TBD SP/DSP/TC (Ex-Officio) Others as needed UGPS Jan. 8, 2007, SLAC 21

22 Proposed CMS Working Sub-Groups for Tracker Upgrade Performance and detector layout Sensor material and operation Outer tracker readout system definition Pixel system and triggering Manufacture and material budget Tracker upgrade is a large part of the total SLHC upgrade. The Tracker community is now actively organizing for the upgrade effort. The US wants to play a large role. UGPS Jan. 8, 2007, SLAC 22

23 CMS Detector Replacements M&S Only Inner Tracker 30 MChf Outer Tracker 90 MChf Level 1 Trigger 20 MChf DAQ 10 MChf Other Front Ends 10 MChf Infrastructure 15 MChf Total Across collaboration ~ 900 FTE!!!!! 175 MChf Materials Cost for Collaboration (CORE) UGPS Jan. 8, 2007, SLAC 23

24 USCMS Upgrade Budget Profile US Funding Metric - Draft USCMS Upgrade Budget Total = $150M $M Other Trigger/DAQ Tracker Pixel Major activity in Pixel replacement frontloads budget profile. Major items are Tracker replacements - pixels and strips plus triggering ability in order to confront the much greater trigger rates. US CMS is ~ 33% of the collaboration, would be expected to cover that fraction of upgrades and the upgrade R&D. Expect heavy involvement in new pixel, new tracker, track trigger, trigger upgrades. Exact contributions must be worked out in the future with our funding agencies Assume intermediate Pixel Detector 2011, full SLHC Startup 2014 UGPS Jan. 8, 2007, SLAC 24

25 Guesstimate of Scale of Resources for CMS SLHC Upgrade A personal guess (not representing anyone but myself) of the required R&D funding is 10-15% of the construction cost ~ $15-~20M for R&D Time scale is driven by opportunity afforded by intermediate pixel detector replacement The full R&D for the final detector does not need to be done in time for the intermediate replacement, but some of it is certainly necessary UGPS Jan. 8, 2007, SLAC 25

26 Current R&D Funding in US CMS R&D budget held by RPM Limited R&D budget in each subsystem, probably amounting to $1M/yr total after 07 including use of engineers and technicians for upgrade when not occupied in maintenance This funding level does not get us where we need to be (remedial actions discussed at end of talk) AY $k AY K$ US CMS Upgrade R&D M&O Cost Estimate FY02-FY08 Total $2,706,893 AY$ 1,400 1,200 1, WBS 20. FY02 FY03 FY04 FY05 FY06 FY07 FY08 Subsystem R&D Costs (FY04 - FY08 Total = $2.4M) FY04 FY05 FY06 FY07 FY08 Labor M&S Trig SiTrk HCAL EMU ECAL FPix UGPS Jan. 8, 2007, SLAC 26

27 Role of US Universities US universities played a significant role in R&D for CMS detector More than 90% of the physics power of US CMS is based in the universities. In particular, 100% of the graduate students and 90% of the Post docs are in the university community These are the groups whose position allows them to focus intensely on the experiment They will play a perhaps even more significant role in the SLHC upgrade because The main issues are tracking and trigger Optimizations depend on detailed simulations The focus will be on small scale R&D, radiation hardness studies, test beam measurements and detailed testing These activities do not require substantial large-scale engineering or manufacturing infrastructure They can gain much from collaboration with engineering and scientific resources at the universities University R&D is cost effective because of the availability of effort from graduate students and RAs and advantageous overhead Universities have 85% of the PhDs and 100% of the students Electronics design can also be carried out at universities and labs Engineers who are needed (and funded) to carry out M&O existing detector can be used (and funded), when not busy with that, to do R&D for SLHC UGPS Jan. 8, 2007, SLAC 27

28 Some US R&D on Current Detector ECAL Collaboration with Hamamatsu to develop a rad-hard APD for use in ECAL (Minnesota) HCAL Development of HPD in collaboration with DEP. (Minnesota) Development of manufacturing design and techniques for HCAL optics (Rochester) Development of low profile optical connectors (UIC) Development of air-powered radioactive source drives (Purdue) Development of Cerenkov calorimeter based on quartz fibers (TTU/Iowa/Iowa State/BU) Development of low-cost quartz fibers. (Iowa in collaboration with Poly Micro) Pixels Development of radiation hard sensors Development of Radiation hard sequencer for pixel readout Testing and input to Pixel Readout Chip development Trigger large effort expert on this committee! UGPS Jan. 8, 2007, SLAC 28

29 USCMS R&D Activities Optical Links: Study next generation optical links. Important for new tracker. Joint project with CMS/ATLAS HCAL: Replacements for high eta HE region. Collaboration with RDMS EMU: Studies of EMU Trigger functionality at SLHC luminosity. Pixel: Starting to think through Pixel Replacement, Pixel Trigger. First Dedicated Workshop Oct 10-12, 2006 at FNAL. Trigger/DAQ: Upgrade studies for higher frequency operation UGPS Jan. 8, 2007, SLAC 29

30 US Tracker R&D Interests Prototyping this year Hamamatsu is interested in SOI. Designing sensor test pieces Study individual & ganged pixels: probed, in cosmics, in test beam Follow up with test pieces having some initial basic readout circuitry. Studying new pair modules and rod supports, cooling (UCSB) Calculate heat-loads and cooling requirements. Prototypes for comparisons with calculations Study performance of various configurations Use GEANT, simulate events and run pattern recognition. Activity in new materials with RD50 (Rochester, Purdue,FNAL) MCz sensors produced, work done in collaboration with pixel group Telescope under construction for study of sensors Will coordinate with US Pixel group on future R& Would like to ramp up to make a substantial contribution. For current tracker we are a substantial part of final production (roughly 50%) and integration (roughly 25%) and we will also be a major part of operation (roughly 25%). For SLHC we should continue at the same level of involvement, but it is critically important that we participate in the R&D, design, and construction from the beginning. We are coordinating with our international CMS collaborators. UGPS Jan. 8, 2007, SLAC 30

31 Pixel Workshop Attendance G. Landsberg, M. Narain Brown University C. da Via Brunel University, London K. Ecklund University of Buffalo, NY J. Nash CERN J. Adelman, E. Brubaker University of Chicago I. Redondo CIEMAT, Madrid M. Bunce, K. Stenson, S. Wagner University of Colorado J. Alexander, J. Thom Cornell University D. E. Pellett University of California, Davis J. Incandela University of California, Santa Barbara B. Baldin, K. Burkett (WG2 co-lead), J. Butler, G. Cardoso, H. Cheung (WG3 co-lead), D. Christian, M. Demarteau, E. Gottschalk (WG3 co-lead), J. Howell, M. Johnson, U. Joshi, S. Kwan (WG1 co-lead), V. Pavlicek, L. Spiegel, P. Tan, M. Turqueti, L. Uplegger, M. Wang, Jin-yuan Wu, R. Yarema Fermilab, Batavia IL, USA M. Bruzzi Universita di Firenze C. Gerber University of Illinois, Chicago Campus J. Jones Imperial College, London C. Newsom, L. Perera University of Iowa T. Bolton Kansas State University A. Bean University of Kansas L. Cremaldi Louisiana State University S. Eno, N. Hadley University of Maryland Dominguez (WG2 co-lead), M. Eads, S. Malik University of Nebraska, Lincoln, NE, USA W. Erdmann, R. Horisberger, H. Kaestli, D. Kotlinski, T.Rohe Paul Scherer Institute X. Huang, A. Lopez University of Puerto Rico K. Arndt, G. Bolla, D. Bortoletto (WG1 co-lead), M. Jones, P. Merkel, I. P. Shipsey Purdue University V. Cuplov, N. Parashar Purdue University, Calumet E. Bartz, S. Schnetzer Rutgers University M. Artuso Syracuse University M. Swartz Johns Hopkins University S. Spanier University of Tennessee P. Sheldon Vanderbilt University W. Smith, S. Dasu University of Wisconsin Note: participation by members of Silicon Strip group, Trigger group, as well as US and European CMS pixel groups. The CMS SLHC program leader attended. Members of ATLAS and RD50 also participated. UGPS Jan. 8, 2007, SLAC 31

32 Summary of CMS Pixel Group Preparatory Workshop on Upgrades Major Findings 1 Interest of US groups in pixel/tracker upgrades: An important aspect of the workshop was to determine the level of interest in the pixel groups for carrying out this R&D, and to determine whether other collaborators in CMS share this interest. The attendance at the workshop was excellent. More then 50 people participated in some phase of the activities. When asked by their working group leader, most expressed a desire to work on upgrade R&D and on the upgrade projects Urgency to begin R&D The design and construction of the tracking and trigger systems for CMS took a decade. The upgrades are less extensive, but by necessity, more ambitious and complex. It is necessary to begin the R&D very soon Relationship to definition of the SLHC machine upgrade The overall luminosity goals for the SLHC are defined. However, key details such as the bunch crossing interval are not yet specified. Early efforts in SLHC R&D should concentrate on key areas that do not depend on characteristics of the upgraded LHC that have not yet been fixed or should address technology issues that occur under any of the potential upgrade scenarios Relationship to other CMS and LHC efforts While this workshop was hosted by the CMS pixel group, it was attended by members of the Silicon Strip Tracker and the Trigger Groups. While the current detector has two tracking technologies, pixels to about 15 cm in radius and strips from 20 cm on out, the upgraded detector may have more technologies and may have different transition radii. Some layers may be introduced specifically to facilitate triggering. The pixel group should participate in the Tracking Upgrade and in CMS upgrade workshops and activities as well as activities involving other LHC experiments Possible opportunities for external collaboration to develop new technologies The short time scale, the complexity, and the cost of the new technologies that are likely to be needed for the SLHC upgrade strongly argue for collaboration with other LHC experiments and with industry. UGPS Jan. 8, 2007, SLAC 32

33 General recommendations The Pixel Upgrade effort should be part of the overall CMS Tracking upgrade effort, which is in turn part of the CMS SLHC upgrade effort. Either through the tracking upgrade or by some other arrangement, the Pixel Upgrade effort must maintain close collaboration with the trigger upgrade. The Pixel Subgroup should adopt a formal structure and organization to pursue the SLHC R&D. The group structure adopted for the pixel workshop could provide the basis for this organization. A simulation package that permits one to easily modify the geometry of the tracking system and to add layers of different types is essential to developing the tracking and trigger upgrades. The package should permit a prompted reconstruction with a method for adding alignment errors, inefficiencies, confusion, backgrounds, and noise. The existing CMS simulation packages should be evaluated for their suitability to this task before one considers developing a new program UGPS Jan. 8, 2007, SLAC 33

34 Comments 2007 R&D will be mostly simulation studies and participation in common activities such as RD50 For some issues. it is premature to spend large quantities of money before 08, when we start to get operational experience with LHC We will, however, have to make some decisions before we have all the information we might like to have. Need infusion of money starting in 08 to hold this schedule. (First pixel replacement in 2011; SLHC in 2014.) Out year budgets will have to include a larger share of R&D Close collaboration with ATLAS important to control costs (chip submission in 130nm process, optical link development, new sensor material development.) UGPS Jan. 8, 2007, SLAC 34

35 Near-term Steps and Conclusion Will appoint a US CMS Upgrade R&D Coordinator Will reevaluate portion of budget from 08 and forward that is devoted to SLHC R&D Changes will have to be carefully evaluated due to needs of ongoing program and data analysis Will try to encourage and support US Universities to pursue other funding opportunities, such as competing for R&D grants Will try to achieve maximum synergy with other efforts, especially at FNAL, including ILC Will work with our colleagues in DOE and NSF to try to improve the budget I anticipate breakthroughs that will encourage national investment in the LHC program! Outreach will be a vehicle for making the case. The LHC and SLHC will provide the outstanding physics research and detector R&D opportunities that will sustain the US HEP academic community and keep it at the forefront of HEP research as we hopefully prepare for the ILC. UGPS Jan. 8, 2007, SLAC 35

36 Backup Slides UGPS Jan. 8, 2007, SLAC 36

37 Radiation environment for trackers R. Horisberger UGPS Jan. 8, 2007, SLAC 37

38 Signal efficiency versus fluence for various sensor technologies UGPS Jan. 8, 2007, SLAC 38

39 Data loss in pixel readout chip assuming that there are no buffer size limitations. Mask costs for different CMOS processes Data loss at different radii for SLHC luminosity. Increase in power density of electronics over the years. UGPS Jan. 8, 2007, SLAC 39

40 Preliminary study of the integrated material distribution of the tracker as a function of h. The left-hand plot shows the number of radiation lengths separately for the contributions of different components, including services. The plot on the right shows the number of radiation lengths separated by the sub-detector of the tracker. Efficiency for reconstructing single pions with PT = 1, 10, and 100 GeV/c in the tracker. The left-hand plot shows the algorithmic efficiency, where the denominator contains tracks with at least two pixels hits and hits in at least eight tracker layers. The plot on the right shows the overall efficiency, including the effect of tracks that interact in the inner layers and do not reach the outside of the tracker. UGPS Jan. 8, 2007, SLAC 40

41 Tracking trigger might have a few layers, perhaps between the current Pixel Detector and the Inner Strips, that identify hi-p t track candidates to associate with calorimeter and muon trigger primitives. HLT single-muon trigger rates as a function of the pt threshold for a luminosity of 1034 information available at cm-2s-1. The rates are shown for L1, L2, and L3, with and without isolation for L2 and L3 (HLT). The rate generated in the simulation is also shown. At L2, using the HLT, a muon must be reconstructed in the muon system and have an valid extrapolation to the collision vertex. At L3 a muon must have more than 5 silicon hits in total in the pixel and strip tracking system [vii]. UGPS Jan. 8, 2007, SLAC 41

42 US CMS tracker group: Overview Currently, deeply involved in installation and commissioning. We have begun a few projects for SLHC Studying general layout, prototyping some rad-hard sensors, developing lightweight mechanics Would like to ramp up to make a substantial contribution. For current tracker we are a substantial part of final production (roughly 50%) and integration (roughly 25%) and we will also be a major part of operation (roughly 25%). For SLHC we should continue at the same level of involvement, but it is critically important that we participate in the R&D, design, and construction from the beginning. We are coordinating with our international CMS collaborators. UGPS Jan. 8, 2007, SLAC 42

43 Straw-man Layout Example 12 Measurement Layers Organized in 3 Super-Layers Fewer but more poweful layers with pixels at small radii, long pixels or short strips elsewhere. Each Super-Layer = Stack of 2 Sensor Pairs (4 measurement layers / Super-Layer) Inner Super-Layer ~ 10-20cm Middle Super-Layer ~ 60cm Possible High Pt Discrimination Scheme Stacks of Sensor Pairs, improved local Pt measurement Outer Super-Layer ~ 100cm M. Mannelli at Perugia Workshop UGPS Jan. 8, 2007, SLAC 43 43

CMS Upgrade Activities

CMS Upgrade Activities CMS Upgrade Activities G. Eckerlin DESY WA, 1. Feb. 2011 CMS @ LHC CMS Upgrade Phase I CMS Upgrade Phase II Infrastructure Conclusion DESY-WA, 1. Feb. 2011 G. Eckerlin 1 The CMS Experiments at the LHC

More information

The CMS Detector Status and Prospects

The CMS Detector Status and Prospects The CMS Detector Status and Prospects Jeremiah Mans On behalf of the CMS Collaboration APS April Meeting --- A Compact Muon Soloniod Philosophy: At the core of the CMS detector sits a large superconducting

More information

LHC Physics GRS PY 898 B8. Trigger Menus, Detector Commissioning

LHC Physics GRS PY 898 B8. Trigger Menus, Detector Commissioning LHC Physics GRS PY 898 B8 Lecture #5 Tulika Bose Trigger Menus, Detector Commissioning Trigger Menus Need to address the following questions: What to save permanently on mass storage? Which trigger streams

More information

A new Scintillating Fibre Tracker for LHCb experiment

A new Scintillating Fibre Tracker for LHCb experiment A new Scintillating Fibre Tracker for LHCb experiment Alexander Malinin, NRC Kurchatov Institute on behalf of the LHCb-SciFi-Collaboration Instrumentation for Colliding Beam Physics BINP, Novosibirsk,

More information

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC 1 A L E J A N D R O A L O N S O L U N D U N I V E R S I T Y O N B E H A L F O F T H E A T L A

More information

Trigger Cost & Schedule

Trigger Cost & Schedule Trigger Cost & Schedule Wesley Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review May 9, 2001 1 Baseline L4 Trigger Costs From April '00 Review -- 5.69 M 3.96 M 1.73 M 2 Calorimeter Trig. Costs

More information

Trigger Report. Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004

Trigger Report. Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004 Trigger Report Wesley H. Smith CMS Trigger Project Manager Report to Steering Committee February 23, 2004 Outline: Calorimeter Triggers Muon Triggers Global Triggers The pdf file of this talk is available

More information

WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 11, 2000

WBS Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 11, 2000 WBS 3.1 - Trigger Wesley Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review April 11, 2000 US CMS DOE/NSF Review, April 11-13, 2000 1 Outline Overview of Calorimeter Trigger Calorimeter Trigger

More information

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Juan Palacios, On behalf of the LHCb VELO group J.P. Palacios, Liverpool Outline LHCb and VELO performance

More information

IPRD06 October 2nd, G. Cerminara on behalf of the CMS collaboration University and INFN Torino

IPRD06 October 2nd, G. Cerminara on behalf of the CMS collaboration University and INFN Torino IPRD06 October 2nd, 2006 The Drift Tube System of the CMS Experiment on behalf of the CMS collaboration University and INFN Torino Overview The CMS muon spectrometer and the Drift Tube (DT) system the

More information

arxiv: v1 [physics.ins-det] 1 Nov 2015

arxiv: v1 [physics.ins-det] 1 Nov 2015 DPF2015-288 November 3, 2015 The CMS Beam Halo Monitor Detector System arxiv:1511.00264v1 [physics.ins-det] 1 Nov 2015 Kelly Stifter On behalf of the CMS collaboration University of Minnesota, Minneapolis,

More information

Test Beam Wrap-Up. Darin Acosta

Test Beam Wrap-Up. Darin Acosta Test Beam Wrap-Up Darin Acosta Agenda Darin/UF: General recap of runs taken, tests performed, Track-Finder issues Martin/UCLA: Summary of RAT and RPC tests, and experience with TMB2004 Stan(or Jason or

More information

A pixel chip for tracking in ALICE and particle identification in LHCb

A pixel chip for tracking in ALICE and particle identification in LHCb A pixel chip for tracking in ALICE and particle identification in LHCb K.Wyllie 1), M.Burns 1), M.Campbell 1), E.Cantatore 1), V.Cencelli 2) R.Dinapoli 3), F.Formenti 1), T.Grassi 1), E.Heijne 1), P.Jarron

More information

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1

US CMS Endcap Muon. Regional CSC Trigger System WBS 3.1.1 WBS Dictionary/Basis of Estimate Documentation US CMS Endcap Muon Regional CSC Trigger System WBS 3.1.1-1- 1. INTRODUCTION 1.1 The CMS Muon Trigger System The CMS trigger and data acquisition system is

More information

SciFi A Large Scintillating Fibre Tracker for LHCb

SciFi A Large Scintillating Fibre Tracker for LHCb SciFi A Large Scintillating Fibre Tracker for LHCb Roman Greim on behalf of the LHCb-SciFi-Collaboration 14th Topical Seminar on Innovative Particle Radiation Detectors, Siena 5th October 2016 I. Physikalisches

More information

Muon Forward Tracker. MFT Collaboration

Muon Forward Tracker. MFT Collaboration Muon Forward Tracker MFT Collaboration QGP France 2013 Introduction Summary of what «physically» MFT looks like: - Silicon detector - Data flow - Mechanical aspects - Power supplies - Cooling - Insertion/Extraction

More information

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC

The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC The ATLAS Tile Calorimeter, its performance with pp collisions and its upgrades for high luminosity LHC Tomas Davidek (Charles University), on behalf of the ATLAS Collaboration Tile Calorimeter Sampling

More information

Electronics procurements

Electronics procurements Electronics procurements 24 October 2014 Geoff Hall Procurements from CERN There are a wide range of electronics items procured by CERN but we are familiar with only some of them Probably two main categories:

More information

TORCH a large-area detector for high resolution time-of-flight

TORCH a large-area detector for high resolution time-of-flight TORCH a large-area detector for high resolution time-of-flight Roger Forty (CERN) on behalf of the TORCH collaboration 1. TORCH concept 2. Application in LHCb 3. R&D project 4. Test-beam studies TIPP 2017,

More information

Trigger Menus and Rates

Trigger Menus and Rates Trigger Menus and Rates Trigger Menu Development Group: Leonard Apanasevich, Anne Fleur Barfuss, Pedram Bargassa, Eric Conte, Sivia Goy Lopez, Jonathan J. Hollar, Chi Nhan Nguyen CMS Physics Week May 13th,

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

Report from the Tracking and Vertexing Group:

Report from the Tracking and Vertexing Group: Report from the Tracking and Vertexing Group: October 10, 2016 Sally Seidel, Petra Merkel, Maurice Garcia- Sciveres Structure of parallel session n Silicon Sensor Fabrication on 8 wafers (Ron Lipton) n

More information

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Part 1: The TBM and CMS Understanding how the LHC and the CMS detector work as a

More information

Status of CMS Silicon Strip Tracker

Status of CMS Silicon Strip Tracker 1 Status of CMS Silicon Strip Tracker N. Demaria a on behalf of the CMS Tracker Collaboration a INFN Sez. di Torino, v. P.Giuria 1, I-10125 Torino Italy E-mail: Natale.Demaria@to.infn.it The CMS Silicon

More information

ALICE Muon Trigger upgrade

ALICE Muon Trigger upgrade ALICE Muon Trigger upgrade Context RPC Detector Status Front-End Electronics Upgrade Readout Electronics Upgrade Conclusions and Perspectives Dr Pascal Dupieux, LPC Clermont, QGPF 2013 1 Context The Muon

More information

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors

Atlas Pixel Replacement/Upgrade. Measurements on 3D sensors Atlas Pixel Replacement/Upgrade and Measurements on 3D sensors Forskerskole 2007 by E. Bolle erlend.bolle@fys.uio.no Outline Sensors for Atlas pixel b-layer replacement/upgrade UiO activities CERN 3D test

More information

CGEM-IT project update

CGEM-IT project update BESIII Physics and Software Workshop Beihang University February 20-23, 2014 CGEM-IT project update Gianluigi Cibinetto (INFN Ferrara) on behalf of the CGEM group Outline Introduction Mechanical development

More information

Commissioning of the ATLAS Transition Radiation Tracker (TRT)

Commissioning of the ATLAS Transition Radiation Tracker (TRT) Commissioning of the ATLAS Transition Radiation Tracker (TRT) 11 th Topical Seminar on Innovative Particle and Radiation Detector (IPRD08) 3 October 2008 bocci@fnal.gov On behalf of the ATLAS TRT community

More information

CMS Tracker Synchronization

CMS Tracker Synchronization CMS Tracker Synchronization K. Gill CERN EP/CME B. Trocme, L. Mirabito Institut de Physique Nucleaire de Lyon Outline Timing issues in CMS Tracker Synchronization method Relative synchronization Synchronization

More information

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes.

Minutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes. Minutes of the ALICE Technical Board, November 14 th, 2013 ALICE MIN-2013-6 TB-2013 Date 14.11.2013 1. Minutes The draft minutes of the October 2013 TF meeting were approved without any changes. 2. LS1

More information

The Silicon Pixel Detector (SPD) for the ALICE Experiment

The Silicon Pixel Detector (SPD) for the ALICE Experiment The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the SPD Project in the ALICE Experiment INFN and Università Bari, Comenius University Bratislava, INFN and Università

More information

CSC Data Rates, Formats and Calibration Methods

CSC Data Rates, Formats and Calibration Methods CSC Data Rates, Formats and Calibration Methods D. Acosta University of Florida With most information collected from the The Ohio State University PRS March Milestones 1. Determination of calibration methods

More information

The hybrid photon detectors for the LHCb-RICH counters

The hybrid photon detectors for the LHCb-RICH counters 7 th International Conference on Advanced Technology and Particle Physics The hybrid photon detectors for the LHCb-RICH counters Maria Girone, CERN and Imperial College on behalf of the LHCb-RICH group

More information

The Status of the ATLAS Inner Detector

The Status of the ATLAS Inner Detector The Status of the ATLAS Inner Detector Introduction Hans-Günther Moser for the ATLAS Collaboration Outline Tracking in ATLAS ATLAS ID Pixel detector Silicon Tracker Transition Radiation Tracker System

More information

WBS Calorimeter Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000

WBS Calorimeter Trigger. Wesley Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review April 12, 2000 WBS 3.1.2 - Calorimeter Trigger Wesley Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review April 12, 2000 1 Calorimeter Electronics Interface Calorimeter Trigger Overview 4K 1.2 Gbaud serial

More information

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

PIXEL2000, June 5-8, FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration PIXEL2000, June 5-8, 2000 FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy For the ALICE Collaboration CONTENTS: Introduction: Physics Requirements Design Considerations Present development status

More information

Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC

Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC University of Bristol Brunel University Imperial College London Rutherford Appleton Laboratory Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC 1 Executive Summary... 2 2. Project

More information

ATLAS Pixel Subsystem and Simulation

ATLAS Pixel Subsystem and Simulation ATLAS Pixel Subsystem and Simulation Charles Young On behalf of the SLAC ATLAS Team Annual DOE HEP Program Review (June 2007) 6/13/07 C. Young (Pixels and Simulation in ATLAS) 1 The Pixel Subsystem Basic

More information

The ATLAS Pixel Detector

The ATLAS Pixel Detector The ATLAS Pixel Detector Fabian Hügging arxiv:physics/0412138v2 [physics.ins-det] 5 Aug 5 Abstract The ATLAS Pixel Detector is the innermost layer of the ATLAS tracking system and will contribute significantly

More information

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration

Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration Proposal by the Ohio State University High Energy Physics to join the BABAR Collaboration Introduction: The Ohio State University high energy physics group consisting of Profs. Gan, Honscheid, Kagan, and

More information

Status of GEM-based Digital Hadron Calorimetry

Status of GEM-based Digital Hadron Calorimetry Status of GEM-based Digital Hadron Calorimetry Snowmass Meeting August 23, 2005 Andy White (for the GEM-DHCAL group: UTA, U.Washington, Tsinghua U., Changwon National University, KAERI- Radiation Detector

More information

Commissioning and Initial Performance of the Belle II itop PID Subdetector

Commissioning and Initial Performance of the Belle II itop PID Subdetector Commissioning and Initial Performance of the Belle II itop PID Subdetector Gary Varner University of Hawaii TIPP 2017 Beijing Upgrading PID Performance - PID (π/κ) detectors - Inside current calorimeter

More information

Design, Realization and Test of a DAQ chain for ALICE ITS Experiment. S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi

Design, Realization and Test of a DAQ chain for ALICE ITS Experiment. S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi Design, Realization and Test of a DAQ chain for ALICE ITS Experiment S. Antinori, D. Falchieri, A. Gabrielli, E. Gandolfi Physics Department, Bologna University, Viale Berti Pichat 6/2 40127 Bologna, Italy

More information

An extreme high resolution Timing Counter for the MEG Upgrade

An extreme high resolution Timing Counter for the MEG Upgrade An extreme high resolution Timing Counter for the MEG Upgrade M. De Gerone INFN Genova on behalf of the MEG collaboration 13th Topical Seminar on Innovative Particle and Radiation Detectors Siena, Oct.

More information

Studies of large dynamic range silicon photomultipliers for the CMS HCAL upgrade

Studies of large dynamic range silicon photomultipliers for the CMS HCAL upgrade Studies of large dynamic range silicon photomultipliers for the CMS HCAL upgrade Yuri Musienko* FNAL(USA) Arjan Heering University of Notre Dame (USA) For the CMS HCAL group *On leave from INR(Moscow)

More information

DEPFET Active Pixel Sensors for the ILC

DEPFET Active Pixel Sensors for the ILC DEPFET Active Pixel Sensors for the ILC Laci Andricek for the DEPFET Collaboration (www.depfet.org) The DEPFET ILC VTX Project steering chips Switcher thinning technology Simulation sensor development

More information

Drift Tubes as Muon Detectors for ILC

Drift Tubes as Muon Detectors for ILC Drift Tubes as Muon Detectors for ILC Dmitri Denisov Fermilab Major specifications for muon detectors D0 muon system tracking detectors Advantages and disadvantages of drift chambers as muon detectors

More information

CMS Conference Report

CMS Conference Report Available on CMS information server CMS CR 1997/017 CMS Conference Report 22 October 1997 Updated in 30 March 1998 Trigger synchronisation circuits in CMS J. Varela * 1, L. Berger 2, R. Nóbrega 3, A. Pierce

More information

The CALICE test beam programme

The CALICE test beam programme Journal of Physics: Conference Series The CALICE test beam programme To cite this article: F Salvatore 2009 J. Phys.: Conf. Ser. 160 012064 View the article online for updates and enhancements. Related

More information

THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR )

THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR ) THE TIMING COUNTER OF THE MEG EXPERIMENT: DESIGN AND COMMISSIONING (OR HOW TO BUILD YOUR OWN HIGH TIMING RESOLUTION DETECTOR ) S. DUSSONI FRONTIER DETECTOR FOR FRONTIER PHYSICS - LA BIODOLA 2009 Fastest

More information

Concept and operation of the high resolution gaseous micro-pixel detector Gossip

Concept and operation of the high resolution gaseous micro-pixel detector Gossip Concept and operation of the high resolution gaseous micro-pixel detector Gossip Yevgen Bilevych 1,Victor Blanco Carballo 1, Maarten van Dijk 1, Martin Fransen 1, Harry van der Graaf 1, Fred Hartjes 1,

More information

THE ATLAS Inner Detector [2] is designed for precision

THE ATLAS Inner Detector [2] is designed for precision The ATLAS Pixel Detector Fabian Hügging on behalf of the ATLAS Pixel Collaboration [1] arxiv:physics/412138v1 [physics.ins-det] 21 Dec 4 Abstract The ATLAS Pixel Detector is the innermost layer of the

More information

3.2.2 Plans for next 6 months... 19

3.2.2 Plans for next 6 months... 19 REPORT TO THE STFC OVERSIGHT COMMITTEE ON THE 24 TH APRIL 2009 ON ATLAS UK RESEARCH AND DEVELOPMENT TOWARDS THE REPLACEMENT TRACKER FOR A HIGH LUMINOSITY LHC UPGRADE University of Birmingham, University

More information

Data Quality Monitoring in the ATLAS Inner Detector

Data Quality Monitoring in the ATLAS Inner Detector On behalf of the ATLAS collaboration Cavendish Laboratory, University of Cambridge E-mail: white@hep.phy.cam.ac.uk This article describes the data quality monitoring systems of the ATLAS inner detector.

More information

Status of the CSC Track-Finder

Status of the CSC Track-Finder Status of the CSC Track-Finder D. Acosta, S.M. Wang University of Florida A.Atamanchook, V.Golovstov, B.Razmyslovich PNPI CSC Muon Trigger Scheme Strip FE cards Strip LCT card CSC Track-Finder LCT Motherboard

More information

The CMS Phase 1 Pixel Detector

The CMS Phase 1 Pixel Detector BPIX FPIX The CMS Phase Pixel Detector Julia Gray University of Kansas On behalf of CMS Tracker Collaboration BPIX supply tube: Module connections Optical links DC-DC conversion Cooling loop FPIX Service

More information

The Scintillating Fibre Tracker for the LHCb Upgrade. DESY Joint Instrumentation Seminar

The Scintillating Fibre Tracker for the LHCb Upgrade. DESY Joint Instrumentation Seminar The Scintillating Fibre Tracker for the LHCb Upgrade DESY Joint Instrumentation Seminar Presented by Blake D. Leverington University of Heidelberg, DE on behalf of the LHCb SciFi Tracker group 1/45 Outline

More information

arxiv:hep-ex/ v1 27 Nov 2003

arxiv:hep-ex/ v1 27 Nov 2003 arxiv:hep-ex/0311058v1 27 Nov 2003 THE ATLAS TRANSITION RADIATION TRACKER V. A. MITSOU European Laboratory for Particle Physics (CERN), EP Division, CH-1211 Geneva 23, Switzerland E-mail: Vasiliki.Mitsou@cern.ch

More information

Report from the 2015 AHCAL beam test at the SPS. Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015

Report from the 2015 AHCAL beam test at the SPS. Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015 Report from the 2015 AHCAL beam test at the SPS Katja Krüger CALICE Collaboration Meeting MPP Munich 10 September 2015 Goals and Preparation > first SPS test beam with 2nd generation electronics and DAQ

More information

LHCb and its electronics.

LHCb and its electronics. LHCb and its electronics. J. Christiansen, CERN On behalf of the LHCb collaboration jorgen.christiansen@cern.ch Abstract The general architecture of the electronics systems in the LHCb experiment is described

More information

Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC

Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC University of Bristol Brunel University London Imperial College London Rutherford Appleton Laboratory Upgrades of the Tracker and Trigger of the CMS experiment at the CERN LHC 1 Executive Summary... 2

More information

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector William Nalti, Ken Suzuki, Stefan-Meyer-Institut, ÖAW on behalf of the PANDA/Barrel-TOF(SciTil) group 12.06.2018, ICASiPM2018 1

More information

Review Report of The SACLA Detector Meeting

Review Report of The SACLA Detector Meeting Review Report of The SACLA Detector Meeting The 2 nd Committee Meeting @ SPring-8 Date: Nov. 28-29, 2011 Committee Members: Dr. Peter Denes, LBNL, U.S. (Chair of the Committee) Prof. Yasuo Arai, KEK, Japan.

More information

Sensors for the CMS High Granularity Calorimeter

Sensors for the CMS High Granularity Calorimeter Sensors for the CMS High Granularity Calorimeter Andreas Alexander Maier (CERN) on behalf of the CMS Collaboration Wed, March 1, 2017 The CMS HGCAL project ECAL Answer to HL-LHC challenges: Pile-up: up

More information

Tests of the boards generating the CMS ECAL Trigger Primitives: from the On-Detector electronics to the Off-Detector electronics system

Tests of the boards generating the CMS ECAL Trigger Primitives: from the On-Detector electronics to the Off-Detector electronics system Tests of the boards generating the CMS ECAL Trigger Primitives: from the On-Detector electronics to the Off-Detector electronics system P. Paganini, M. Bercher, P. Busson, M. Cerutti, C. Collard, A. Debraine,

More information

TRT Software Activities

TRT Software Activities TRT Software Activities - 08/14/2009 SPLASH EVENT IN THE TRT I will mainly focus on the activities where the Duke group is more directly involved 1 TRT SW Offline Duke Group heavily involved in several

More information

A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications

A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications 3 rd ADAMAS Collaboration Meeting (2014) Trento, Italy *use commercial elements and keep it small & simple + +

More information

Diamond detectors in the CMS BCM1F

Diamond detectors in the CMS BCM1F Diamond detectors in the CMS BCM1F DESY (Zeuthen) CARAT 2010 GSI, 13-15 December 2010 On behalf of the DESY BCM and CMS BRM groups 1 Outline: 1. Introduction to the CMS BRM 2. BCM1F: - Back-End Hardware

More information

Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC

Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC Dena Giovinazzo University of California, Santa Cruz Supervisors: Davide Ceresa

More information

S.Cenk Yıldız on behalf of ATLAS Muon Collaboration. Topical Workshop on Electronics for Particle Physics, 28 September - 2 October 2015

S.Cenk Yıldız on behalf of ATLAS Muon Collaboration. Topical Workshop on Electronics for Particle Physics, 28 September - 2 October 2015 THE ATLAS CATHODE STRIP CHAMBERS A NEW ATLAS MUON CSC READOUT SYSTEM WITH SYSTEM ON CHIP TECHNOLOGY ON ATCA PLATFORM S.Cenk Yıldız on behalf of ATLAS Muon Collaboration University of California, Irvine

More information

Study of the performances of the ALICE muon spectrometer

Study of the performances of the ALICE muon spectrometer Study of the performances of the ALICE muon spectrometer Blanc Aurélien, December 2008 PhD description Study of the performances of the ALICE muon spectrometer instrumentation/detection. Master Physique

More information

Status of CMS and preparations for first physics

Status of CMS and preparations for first physics Status of CMS and preparations for first physics A. H. Ball (for the CMS collaboration) PH Department, CERN, Geneva, CH1211 Geneva 23, Switzerland The status of the CMS experiment is described. After a

More information

The Readout Architecture of the ATLAS Pixel System

The Readout Architecture of the ATLAS Pixel System The Readout Architecture of the ATLAS Pixel System Roberto Beccherle / INFN - Genova E-mail: Roberto.Beccherle@ge.infn.it Copy of This Talk: http://www.ge.infn.it/atlas/electronics/home.html R. Beccherle

More information

Mechanical Considerations in the Outer Tracker and VXD. Bill Cooper Fermilab

Mechanical Considerations in the Outer Tracker and VXD. Bill Cooper Fermilab Mechanical Considerations in the Outer Tracker and VXD Fermilab August 23, 2005 1 Overview I ll describe developments since the SLAC workshop in mechanical design efforts at Fermilab related to SiD tracking.

More information

SLHC tracker upgrade: challenges and strategies in ATLAS

SLHC tracker upgrade: challenges and strategies in ATLAS SLHC tracker upgrade: challenges and strategies in ATLAS 1 Rutherford Appleton Laboratory, STFC, Harwell Science and Innovation Campus, Didcot, OX11 0QX, UK E-mail: m.m.weber@rl.ac.uk The Large Hadron

More information

A TARGET-based camera for CTA

A TARGET-based camera for CTA A TARGET-based camera for CTA TeV Array Readout with GSa/s sampling and Event Trigger (TARGET) chip: overview Custom-designed ASIC for CTA, developed in collaboration with Gary Varner (U Hawaii) Implementation:

More information

Short summary of ATLAS Japan Group for LHC/ATLAS upgrade review Liquid Argon Calorimeter

Short summary of ATLAS Japan Group for LHC/ATLAS upgrade review Liquid Argon Calorimeter Preprint typeset in JINST style - HYPER VERSION Short summary of ATLAS Japan Group for LHC/ATLAS upgrade review Liquid Argon Calorimeter ATLAS Japan Group E-mail: Yuji.Enari@cern.ch ABSTRACT: Short summary

More information

LHCb and its electronics. J. Christiansen On behalf of the LHCb collaboration

LHCb and its electronics. J. Christiansen On behalf of the LHCb collaboration LHCb and its electronics J. Christiansen On behalf of the LHCb collaboration Physics background CP violation necessary to explain matter dominance B hadron decays good candidate to study CP violation B

More information

Commissioning of the Transition Radiation Tracker

Commissioning of the Transition Radiation Tracker Commissioning of the Transition Radiation Tracker Second ATLAS Physics Workshop of the Americas Simon Fraser University 17 June 2008 Evelyn Thomson University of Pennsylvania on behalf of Brig Williams,

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration First LHC Beams in ATLAS Peter Krieger University of Toronto On behalf of the ATLAS Collaboration Cutaway View LHC/ATLAS (Graphic) P. Krieger, University of Toronto Aspen Winter Conference, Feb. 2009 2

More information

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD

FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD FRONT-END AND READ-OUT ELECTRONICS FOR THE NUMEN FPD D. LO PRESTI D. BONANNO, F. LONGHITANO, D. BONGIOVANNI, S. REITO INFN- SEZIONE DI CATANIA D. Lo Presti, NUMEN2015 LNS, 1-2 December 2015 1 OVERVIEW

More information

The ATLAS Beam Conditions and Beam Loss Monitors

The ATLAS Beam Conditions and Beam Loss Monitors RD09 9th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors The ATLAS Beam Conditions and Beam Loss Monitors Boštjan Maček J. Stefan Institute, Ljubljana

More information

What the experiments have planned

What the experiments have planned What the experiments have planned Chamonix: 25 Jan 2011 AB Austin Ball, with many thanks to J. Baechler, R. Lindner, M. Nessi, W. Riegler. Pattern of shutdowns & technical stops, current baseline timing

More information

Neutron Irradiation Tests of an S-LINK-over-G-link System

Neutron Irradiation Tests of an S-LINK-over-G-link System Nov. 21, 1999 Neutron Irradiation Tests of an S-LINK-over-G-link System K. Anderson, J. Pilcher, H. Wu Enrico Fermi Institute, University of Chicago, Chicago, IL E. van der Bij, Z. Meggyesi EP/ATE Division,

More information

Synchronization of the CMS Cathode Strip Chambers

Synchronization of the CMS Cathode Strip Chambers Synchronization of the CMS Cathode Strip Chambers G. Rakness a, J. Hauser a, D. Wang b a) University of California, Los Angeles b) University of Florida Gregory.Rakness@cern.ch Abstract The synchronization

More information

ILC requirements Review on CMOS Performances: state of the art Progress on fast read-out sensors & ADC Roadmap for the coming years Summary

ILC requirements Review on CMOS Performances: state of the art Progress on fast read-out sensors & ADC Roadmap for the coming years Summary Status on CMOS sensors Auguste Besson on behalf of DAPNIA/Saclay, LPSC/Grenoble, LPC/Clermont-F., DESY, Uni. Hamburg, JINR-Dubna & IPHC/Strasbourg contributions from IPN/Lyon, Uni. Frankfurt, GSI-Darmstadt,

More information

Prospect and Plan for IRS3B Readout

Prospect and Plan for IRS3B Readout Prospect and Plan for IRS3B Readout 1. Progress on Key Performance Parameters 2. Understanding limitations during LEPS operation 3. Carrier02 Rev. C (with O-E-M improvements) 4. Pre-production tasks/schedule

More information

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS

Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS Note on the preliminary organisation for the design, fabrication and test of a prototype double-sided ladder equipped with MAPS J.Baudot a, J.Goldstein b, A.Nomerotski c, M.Winter a a IPHC - Université

More information

Progress Update FDC Prototype Test Stand Development Upcoming Work

Progress Update FDC Prototype Test Stand Development Upcoming Work Progress Update FDC Prototype Test Stand Development Upcoming Work Progress Update OU GlueX postdoc position filled. Simon Taylor joins our group July 1, 2004 Position funded jointly by Ohio University

More information

The Readout Architecture of the ATLAS Pixel System. 2 The ATLAS Pixel Detector System

The Readout Architecture of the ATLAS Pixel System. 2 The ATLAS Pixel Detector System The Readout Architecture of the ATLAS Pixel System Roberto Beccherle, on behalf of the ATLAS Pixel Collaboration Istituto Nazionale di Fisica Nucleare, Sez. di Genova Via Dodecaneso 33, I-646 Genova, ITALY

More information

SCT Activities. Nick Bedford, Mateusz Dyndal, Alexander Madsen, Edoardo Rossi, Christian Sander. DESY ATLAS Weekly Meeting 03. Jun.

SCT Activities. Nick Bedford, Mateusz Dyndal, Alexander Madsen, Edoardo Rossi, Christian Sander. DESY ATLAS Weekly Meeting 03. Jun. SCT Activities Nick Bedford, Mateusz Dyndal, Alexander Madsen, Edoardo Rossi, Christian Sander DESY ATLAS Weekly Meeting 03. Jun. 2016 1 Semi-Conductor Tracker Barrel 4 Layers 2112 identical modules Endcaps

More information

Tracking Detector R&D at Cornell University and Purdue University

Tracking Detector R&D at Cornell University and Purdue University Tracking Detector R&D at Cornell University and Purdue University We have requested funding for this research from NSF through UCLC. Information available at the web site: * this presentation Cornell University

More information

DAQ Systems in Hall A

DAQ Systems in Hall A CODA Users Workshop Data Acquisition at Jefferson Lab Newport News June 7, 2004 DAQ Systems in Hall A Overview of Hall A Standard Equipment: HRS, Beamline,... Parity Experiments Third Arms: BigBite, RCS

More information

Design of the Level-1 Global Calorimeter Trigger

Design of the Level-1 Global Calorimeter Trigger Design of the Level-1 Global Calorimeter Trigger For I reckon that the sufferings of this present time are not worthy to be compared with the glory which shall be revealed to us The epistle of Paul the

More information

SuperB- DCH. Servizio Ele<ronico Laboratori FrascaA

SuperB- DCH. Servizio Ele<ronico Laboratori FrascaA 1 Outline 2 DCH FEE Constraints/Estimate & Main Blocks front- end main blocks Constraints & EsAmate Trigger rate (150 khz) Trigger/DAQ data format I/O BW Trigger Latency Minimum trigger spacing. Chamber

More information

The Read-Out system of the ALICE pixel detector

The Read-Out system of the ALICE pixel detector The Read-Out system of the ALICE pixel detector Kluge, A. for the ALICE SPD collaboration CERN, CH-1211 Geneva 23, Switzerland Abstract The on-detector electronics of the ALICE silicon pixel detector (nearly

More information

FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration

FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy. For the ALICE Collaboration PIXEL2000, June 5-8, 2000 FRANCO MEDDI CERN-ALICE / University of Rome & INFN, Italy For the ALICE Collaboration JUNE 5-8,2000 PIXEL2000 1 CONTENTS: Introduction: Physics Requirements Design Considerations

More information

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004

Monolithic Thin Pixel Upgrade Testing Update. Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Monolithic Thin Pixel Upgrade Testing Update Gary S. Varner, Marlon Barbero and Fang Fang UH Belle Meeting, April 16 th 2004 Basic Technology: Standard CMOS CMOS Camera Because of large Capacitance, need

More information

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain

Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain Status of the CUORE Electronics and the LHCb RICH Upgrade photodetector chain Lorenzo Cassina - XXIX cycle MiB - Midterm Graduate School Seminar Day Outline Activity on LHCb MaPTM qualification RICH Upgrade

More information