1 LHC Machine check out R.Giachino / M.Albert 1v1 Be/op 12th March 2012
2 Hardware Commissioning: M. Pojer, R. Schmidt and M. Solfaroli Summary of week 10 Machine checkout: R. Giachino, M.Albert and J. Wenninger Aims of the week Finish HWC Prepare machine for first beam LHC 8:30 meeting
3 LHC check-out Main targets of the week: Finish HWC, Close the beam interlock loop, Test the beam dump, Test the injection kickers, Run the LHC through a full machine cycle, Check the control system. LHC 8:30 meeting
4 Progress : HWC & checkout From Monday to Friday HWC and machine checkout activities had to be performed in parallel. Priorities were defined every day for HWC and for checkout activities, the focus shifting from HWC to checkout along the week. Collaboration HWC-machine checkout, was very smooth due to a better planning of the activities. LHC 8:30 meeting
5 Status of powering tests In total, 8185 tests steps (including preparations of powering tests) have been done Progressive availability of cryogenic conditions
6 Powering status Heat runs: All sectors were tested Pre-cycles work well. Several full machine cycles were performed Without hardware powering faults. RQT13.L8B1 increased IPNO from 400 to 450(B*.6m) LHC 8:30 meeting
7 HWC was completed Wednesday afternoon when the machine was handed over to beam operation. The same evening, the machine was pushed through the nominal proton cycle: Pre-cycling of the magnets, Injection, Ramp, Squeeze. control issues were identified have been fixed or will be fixed in the coming days. Machine cycle LHC 8:30 meeting
8 LHC progress : beam interlock and kickers To close the beam interlock loop requires a number of conditions, the most difficult ones to achieve were: LHC closed no access (also experiments), No powering failures, Vacuum valves open, BLM system operational. >> tough constraints given parallel HWC activities. The BIS loop was closed the first time Friday evening. Saturday late night both dump and injection kicker systems were pulsing. LHC 8:30 meeting
9 LHC progress: LBDS & MKI tests BETS fully tested at 450GeV and 4GeV. Injection inhibitions between LBDS and MKI are OK. TSU clients tested: BIS BETS Internal failure (frev switch off) LBDS trigger Circulate & dump Inject & dump -> functionality OK issue with XPOC (see below) TSU synchronisation. TSU IPOC thresholds have been adjusted. MKI synchronisation checks with beam show a shift of the kick by +160ns w.r.t. beam (to be decided how to adjust it) Inject & dump status is badly returned by one of the 2 CPLDs on the TSU (to be decided) 9
10 LHC 8:30 meeting Controls Along the week the OP teams with support from numerous equipment groups tested applications, front-ends, LSA core etc..
11 The Vacuum system was operational on Friday evening after a big effort in point 2&8. RF was ready to ramp for the week end. BI was extensively tested without beam. Collimators setting and calibration is finished. The cryogenic system, has been stable all along the HWC. EN/EL, EN/CV at nominal configuration. LHC 8:30 meeting
12 Injectors and transfer lines (1) PSB started up with beam 20 th February. LHC-indiv Lhc50 LHC-probe LHC25 PS started up with beam 23 th February. LHC-probe, LHC-indiv. LHC50 12b setting up SPS started up with beam 25 th February. SPS aligned, probe bunch ready to be extracted to the LHC. LHC-Indiv, LHC-probe, LHC50 multibatch Scrubbing LHC Bunches LHC 8:30 meeting
13 Injectors and transfer lines (2) Thursday probe bunches were extracted into the TT60 & TT40. Saturday afternoon beams were sent down the 3 km long TI2 and TI8 transfer lines to the downstream (LHC end) dumps. Saturday night stability checks were performed. TI8 TI2 LHC 8:30 meeting
14 Open issues TI 2 Transfer line PC RBIV26407 tripped (to be checked) RQT13.L8B1 increased from IPNO from 400 to 450 (b*.6m) Done ok RCBV27R4B1 communication lost RCBXH1.L1 tripped (circuit super-locked) RQTL11.R1B2 problem on TT893 temperature sensor RD34.LR3 ramp-down settings are out of limits RQX.R2 QPS controller communication problem; oscillating RQTD/F circuits unable to load ramp/squeeze function (Fidel on Monday) RQF/RQD require higher commissioning current for high beta (50 A) Inject & dump status is badly returned by one of the 2 CPLDs on the TSU MKI synchronisation checks with beam show a shift of the kick by +160ns w.r.t. beam (to be decided how to adjust it RF) 14
15 Access Radiation veto after machine closed!!! Access system PAD problem PM25 Possible intervention Monday morning Alfa Monday morning Point 1 BT Access point 6 for TSU inject and Dump R2E Monday morning TX76 1Hr X ray 2 & 8 Monday afternoon point 8 Tuesday morning point 2
16 16 Planning
17 Situation of the machine: Summary The LHC magnet and powering system is fully commissioned and the machine is in a very good state as demonstrated by the cycling of the machine. RF need 2-4 hrs for fine tuning before beam. LBDS & MKI minors adjustments before declaring operational. Essential beam instrumentation and feedbacks tested. fine tuning with beam. Control system operational smaller issues will be fixed in the coming days. First beam hopefully Tuesday afternoon! LHC 8:30 meeting
18 Saturday 09:00 Start LBDS tests 09:13 Starting ramp of RF and ADT. stay at flat top with the RF to stress the cavities. 15:30 Beams down TI8 & TI2 Application Collimator Scan is tested and worked fine. 18
19 Last night 22:30 Alfa interlock. Tests couldn t be performed Problems related to the movement of their XRPs there s presumably a problem with their logic control; experts will check it this morning 22:50 Etienne finished the tests on MKI. Now left to do the circulate and dump for both Beams. Circulate & DUMP B1&B2 (~50 shots each) Short access for ATLAS to verify the cooling system; They will need to intervene this morning to fix a problem they have identified (estimate: ~4h, to be scheduled) Ramp of PCs (except RQTD/F) Squeeze without RQT13.L8B1 (out of limits error) and RQTD/F circuits 19
20 Last night RQX.R1, RTQX1.R1 and RTQX2.R1 tripped while executing RAMPDOWN[START] function but no fault present (only PC_PERMIT went away) RD34.LR3 gives a "out of limit" when loading the ramp-down function ALICE requested some time for a cosmic.. Executed ramp of PCs (without RQTD/F & RCS/O/D) & RF 20
21 LBDS MKI tests BETS fully tested at 450GeV and 4GeV. Ramp was OK. Error check during the ramp still to be done on Monday by Nicolas V. Injection inhibitions between LBDS and MKI are OK. Response times are within specification TSU clients tested: BIS -> OK BETS -> OK Internal failure (frev switch off) -> OK LBDS trigger --> OK Circulate & dump -> OK Inject & dump -> functionnality OK issue with XPOC (see below) TSU synchronisation -> OK TSU IPOC thresholds have been adjusted All OK now MKI synchronisation checks with beam show a shift of the kick by +160ns w.r.t. beam (to be decided how to adjust it) Inject & dump status is badly returned by one of the 2 CPLDs on the TSU (to be decided) 21
22 LBDS tests BIS loop closed and arm beam dump- done Check injection inhibition from LBDS- done TSU tests for about 4 hours to test clients (BIS, BETS, )- done Circulate and dump for TSU testing for about one hour. Done Mask modules in XPOC which are not yet receiving data.- Check IQC- ok Synchronization of MKI with AGK without beam, loops closed.-checked Beam down TL TI2 and TI8. Rough steering.- done TCDI machine protection tests done TCDI set-up tests.- chiara Direct interlock of LASS to LBDS-.>>> done LBDS energy tracking interlocks by trimming only needs BETS armed, not BIS.- done Check BIS timestamps and redundancy of signals to LBDS (with CM, if time available)- Other tests from MP Web page. 22
23 Injection status Managed to pulse both kickers. Need to check why only the TCDIs beam 1 are interlocking in parking and not beam. Problem with timing system: hidden tables loaded in MTG. Cannot see them and cannot unload them, but they are played (injection, injection_bi). Inject & dump does not work currently. Circulate & dump is fine (uses the hidden tables automatically). Running circulate & dump in a loop not possible masking on XPOC not working anymore. (Roman). >>Done 23
24 MKI MPS tests MKI MPS tests Toggling MKI status and checking input state on injection BIC, both beams - Verifying and adapting soft-start settings (normal and extended), both beams - adjusted operational limits around nominal value (entries 7 and 8) - changed voltage step size for extended settings (entry 14) Probed voltage limit for which MKIs not pulsing anymore (1 kv above nominal value, 1 kv below conditioning value), only for P8 done Loading kicker soft-start settings from TRIM and FESA, not possible to change without MCS role, possible with MCS role Changing critical settings in MKI application only possible with MCS role 24
25 MKI MPS tests Tried to do the energy tracking tests: changing LHC energy: SIS injection energy consistency check stopped us from trimming the RBs above the BETS limit of 0.96 GeV, need a workaround for the commissioning to still perform this test in the next days - changing MKI voltage: within operational limits the kickers are pulsing, need to check with limits further open (MCS role needed) MKI tests not finished. MPS interlock tests for collimators TCDI, TDI, TCLI and TCDD in P2 done 25
26 Injection status IQC all data collection is fine, but the soft-start buffer is pushed to PM too early before it is updated after the pulse. -> The IQC does not find it having pulsed. Done. OASIS for MKI signals still needs follow up next week. Currently not fully operational. Done 26
27 Summary TSU test (both beams) Check TSU clients: - BIS triggering --> OK - BETS triggering --> OK - Internal failure triggering --> OK - LBDS slow control triggering --> OK - Inject and dump triggering --> Works fine but bad status acquisition from CPLD2 (XPOC error) - Circulate and dump --> OK Issues to be followed: - Inject and dump detection (TSU card CPLD2) - Spurious bad XPOC analysis on TSU (missing dump request detection, XPOC event builder synchronisation) ALL dumps properly synchronised... Thresholds adjusted for TSU-IPOC analysis: - re-trigger detection decreased to 199us - DBRF length detection adjusted to 1us - BRF length detection adjusted to 0.9us - BAGK length reduced to 10.9us 27
28 ABT Software ABT and BI had to adapt many FESA devices in a manner to have their PM buffers properly saved into PM data store for IQC and XPOC analysis. Impacted systems are:- MKI/BETS- MKI/IPOC- LBDS/TSU- BTVDD Now everything is fine for both IQC and XPOC. We only miss Vacuum data for XPOC, so we had to mask the VAC module temporarily. It seems that work is ongoing on TE/VSC side to find a solution to the problem. 28
29 Safe Machine Parameters System 29
S67: PRE-CYCLE & RAMP
HWC CURRENT STATUS HWC slowly coming to an end (11 circuits remaining) Quench training of RB.A34 resumed (10881 A) Quench training of RB.A45 is slow (10484 A) PGCs ongoing Pre-cycles and ramps being performed
More information1. General principles for injection of beam into the LHC
LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary
More informationBeam systems without failures what can be done?
Acknowledgements: T.Baer, C.Bracco, G.Bregliozzi, G.Lanza, L.Ponce, S.Redaelli, A.Butterworth Beam systems without failures what can be done? After LS1 Session 07-09 th February 2012 M.Solfaroli/J.Uythoven
More informationWHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS
WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS J. Wenninger, CERN, Geneva Abstract A large fraction of the LHC Machine Protection System was commissioned in 2008 in view of the first LHC
More informationInjectors. Injectors ready
Injectors Injectors ready Linac2 > 04/02 ; PSB > 09/02 ; PS et TT2 > 11/02 ; SPS > 14/04; Ring patrol done Ti8 patrol done DSO Test Done 10/11 Feb EIS tests Ongoing Point 8/2 closed Alice/LHCb closed 12/13
More informationLHC Nominal injection sequence
LHC Nominal injection sequence Mike Lamont Acknowledgements: Reyes Alemany Fernandez, Brennan Goddard Nominal injection Overall injection scheme Pilot R1, Pilot R2, Intermediate R1 Optimise Intermediate
More informationbeam dump from P2 losses this morning
beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous
More informationFriday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB
07:00 13:00 : Establishing reference orbit golden Jorg Wenninger Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB Offset in vertical plane, ~1 mm seems real. 13:00 14: 00 : Injection oscillation
More informationProcedures for the Commissioning of the Beam Interlock System for the CNGS and SPS-LHC Transfer Lines
CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project CERN Div./Group or Supplier/Contractor Document No. AB-OP EDMS Document No. 735534 Date: 2006-05-16 Interlock Test Procedure Procedures
More informationREVIEW OF LHC OPERATION
REVIEW OF LHC OPERATION M. Lamont, CERN, Geneva, Switzerland Abstract LHC beam commissioning re-started on the 20 th November 2009 and continued for three and a half weeks. A summary of the progress made
More informationLHC COMMISSIONING PLANS
LHC COMMISSIONING PLANS R. Alemany Fernández, CERN, Geneva, Switzerland Abstract Operating the Large Hadron Collider (LHC) at design performance is not going to be easy. The machine is complex and with
More informationINITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP
INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP Abstract The initial commissioning of the LHC injections and beam dumps allowed the basic functionality of the systems to be verified, together with
More information2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2
PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND
More informationFull IEFC workshop Feb.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix How does one keep a 50 51 year old running for another 25 years? accelerator How
More informationAccelerator Controls Part2: CERN central timing system
Accelerator Controls Part2: CERN central timing system CAS 2009@Divonne Hermann Schmickler Outline Part 2 Requested Functionality of the CERN timing system Implementation: Hardware Details Software Details:
More informationWhat can be learned from HERA Experience for ILC Availability
What can be learned from HERA Experience for ILC Availability August 17, 2005 F. Willeke, DESY HERA Performance Critical Design Decisions What could be avoided if HERA would have to be built again? HERA
More information3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline
3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The
More informationLHC Beam Instrumentation Further Discussion
LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz
More informationTHE ARCHITECTURE, DESIGN AND REALISATION OF THE LHC BEAM INTERLOCK SYSTEM
10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO2.031-3 (2005) THE ARCHITECTURE, DESIGN AND REALISATION OF THE LHC BEAM INTERLOCK SYSTEM B. Todd
More informationThe 2011 LHC Run - Lessons in Beam Diagnostics
The 2011 LHC Run - Lessons in Beam Diagnostics LHC Performance Workshop Chamonix 2012 6 th 10 th February Rhodri Jones on behalf of the CERN Beam Instrumentation Group Outline This Presentation will focus
More informationMACHINE PROTECTION WORKSHOP REVISITED OPEN ISSUES, PROGRESS AND DECISIONS ON MAJOR TOPICS
MACHINE PROTECTION WORKSHOP REVISITED OPEN ISSUES, PROGRESS AND DECISIONS ON MAJOR TOPICS D. Wollmann*,, C. Bracco, M. Zerlauth, CERN, Geneva, Switzerland Abstract At the Machine Protection Workshop, held
More informationBeam Loss Detection for MPS at FRIB
Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.
More informationOPERATIONAL EXPERIENCE WITH CIRCULATING BEAM
OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM S. Redaelli on behalf of the LHC beam commissioning team CERN, Geneva, Switzerland Abstract Following various injection tests, the full LHC beam commissioning
More informationA Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC
10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO2.042-4 (2005) A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC M.Werner
More informationCommissioning of the CNGS Extraction in SPS LSS4
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN AB DEPARTMENT AB-Note-27-7 OP Commissioning of the CNGS Extraction in SPS LSS4 V. Kain, E. Gaxiola, B. Goddard, M. Meddahi, Heinz Vincke, Helmut Vincke,
More informationSession 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators
- First Results & Next Steps Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix 2009 Rhodri Jones on behalf of BE/BI & all our collaborators LHC BTV System All screens
More informationInformation here generates the timing configuration and is hence the definitive source. The situation is quite volatile, new events and telegram
LHC General Machine Timing g( (GMT) Julian Lewis AB/CO/HT Some general points on LHC timing The Basic-Period in the LHC machine is the UTC second. The millisecond modulo represents the millisecond in the
More informationCLIC Feasibility Demonstration at CTF3
CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for
More informationLinac3 experience for LHC ion runs
Linac3 experience for LHC ion runs G Bellodi for the Linac3 team Keywords: beam performance reliability set up time results of MDs remaining unknowns 1 A year in perspective Source removed: change of main
More informationEquipment Installation, Planning, Layout, organisation and updates
Equipment Installation, Planning, Layout, organisation and updates Simon Mataguez, Julie Coupard with contributions of the LIU-PLI team Table of contents: LIU installation activities Organisation of the
More informationRF PERFORMANCE AND OPERATIONAL ISSUES
RF PERFORMANCE AND OPERATIONAL ISSUES A. Butterworth, L. Arnaudon, P. Baudrenghien, O. Brunner, E. Ciapala, W. Hofle, J. Molendijk, CERN, Geneva, Switzerland Abstract During the 2009 LHC run, a number
More informationLHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump
2016-01-07 Chiara.Bracco@cern.ch LHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump C. Bracco,R. Bruce and E. Quaranta CERN, Geneva, Switzerland Keywords: asynchronous dump, abort
More informationBunch-by-bunch feedback and LLRF at ELSA
Bunch-by-bunch feedback and LLRF at ELSA Dmitry Teytelman Dimtel, Inc., San Jose, CA, USA February 9, 2010 Outline 1 Feedback Feedback basics Coupled-bunch instabilities and feedback Beam and feedback
More informationSUMMARY OF SESSION 4 - UPGRADE SCENARIO 2
Published by CERN in the Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans, Centre de Convention, Archamps, France, 29 31 October 2013, edited by B. Goddard and F. Zimmermann, CERN 2014 006
More informationFILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017
FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017 G. Iadarola*, L. Mether, G. Rumolo, CERN, Geneva, Switzerland Abstract Several measures implemented in the 2016-17 Extended Year End Technical Stop (EYETS)
More informationStatus of the X-ray FEL control system at SPring-8
Status of the X-ray FEL control system at SPring-8 T.Fukui 1, T.Hirono 2, N.Hosoda 1, M.Ishii 2, M.Kitamura 1 H.Maesaka 1,T.Masuda 2, T.Matsushita 2, T.Ohata 2, Y.Otake 1, K.Shirasawa 1,M.Takeuchi 2, R.Tanaka
More informationThe Elettra Storage Ring and Top-Up Operation
The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)
More informationarxiv: v1 [physics.acc-ph] 9 Aug 2016
Beam Transfer and Machine Protection V. Kain CERN, Geneva, Switzerland arxiv:1608.02745v1 [physics.acc-ph] 9 Aug 2016 1 Introduction Abstract Beam transfer, such as injection into or extraction from an
More informationExperience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation
Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF
More informationANKA RF System - Upgrade Strategies
ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu
More informationLinac 4 Instrumentation K.Hanke CERN
Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase
More informationLLRF at SSRF. Yubin Zhao
LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip
More informationSPEAR 3: Operations Update and Impact of Top-Off Injection
SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3
More informationStatus of SOLARIS. Paweł Borowiec On behalf of Solaris Team
Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX
More informationCommissioning of the ATLAS Transition Radiation Tracker (TRT)
Commissioning of the ATLAS Transition Radiation Tracker (TRT) 11 th Topical Seminar on Innovative Particle and Radiation Detector (IPRD08) 3 October 2008 bocci@fnal.gov On behalf of the ATLAS TRT community
More informationDetailed Design Report
Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...
More informationLESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV)
LESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV) E.B. Holzer, B. Dehning, E. Effinger, J. Emery, S. Grishin, C. Jr Hajdu, H. Ikeda,
More informationPICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?
Published by CERN in the Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans, Centre de Convention, Archamps, France, 29 31 October 2013, edited by B. Goddard and F. Zimmermann, CERN 2014 006
More informationCommissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)
Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning
More informationNorth Damping Ring RF
North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution
More informationPoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland
CERN 1211 Geneva 23, Switzerland E-mail: andrew.butterworth@cern.ch O. Brunner CERN 1211 Geneva 23, Switzerland E-mail: olivier.brunner@cern.ch R. Calaga CERN 1211 Geneva 23, Switzerland E-mail: rama.calaga@cern.ch
More informationAvailability and Reliability Issues for the ILC
Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some
More informationSTATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR
Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.
More informationCommissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC
Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC 1 A L E J A N D R O A L O N S O L U N D U N I V E R S I T Y O N B E H A L F O F T H E A T L A
More informationDigital BPMs and Orbit Feedback Systems
Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit
More informationThe ESRF Radio-frequency Data Logging System for Failure Analysis
The ESRF Radio-frequency Data Logging System for Failure Analysis Jean-Luc REVOL Machine Division European Synchrotron Radiation Facility Accelerator Reliability Workshop 4-6 February 2002 Impact of the
More informationRF upgrade program in LHC injectors and LHC machine
RF upgrade program in LHC injectors and LHC machine E r k J e n s e n, o n b e h a l f o f B E - RF Many thanks to M. E. Angoletta, O. Brunner, R. Calaga, E. Ciapala, H. Damerau, W. Höfle, E. Montesinos,
More informationLCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems
LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end
More information1 Digital BPM Systems for Hadron Accelerators
Digital BPM Systems for Hadron Accelerators Proton Synchrotron 26 GeV 200 m diameter 40 ES BPMs Built in 1959 Booster TT70 East hall CB Trajectory measurement: System architecture Inputs Principles of
More informationOak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project
Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources
More informationPresent Status and Future Upgrade of KEKB Injector Linac
Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future
More informationFIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC
FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,
More informationUpgrading LHC Luminosity
1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per
More informationA Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.
A1.01 PROJECT MANAGEMENT BNL/Cornell Michnoff A1.01.01 Milestones BNL/Cornell Michnoff This scope is a placeholder for all project high level milestones for NYSERDA. There is no cost or labor related to
More information5 Project Costs and Schedule
93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for
More informationThe FAIR plinac RF Systems
The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)
More informationCLEX (CLIC Experimental Area)
CLEX (CLIC Experimental Area) Status and plans G.Geschonke for Hans Braun CERN CT3 coll meetg 2005 CLEX 1 CT3 objectives R1.1 CLIC accelerating structure, R1.2 rive beam scheme with a fully loaded linac
More informationFirst LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration
First LHC Beams in ATLAS Peter Krieger University of Toronto On behalf of the ATLAS Collaboration Cutaway View LHC/ATLAS (Graphic) P. Krieger, University of Toronto Aspen Winter Conference, Feb. 2009 2
More informationSystem: status and evolution. Javier Serrano
CERN General Machine Timing System: status and evolution Javier Serrano CERN AB-CO-HT 15 February 2008 Outline Motivation Why timing systems at CERN? Types of CERN timing systems. The General Machine Timing
More informationRequirements for the Beam Abort Magnet and Dump
Requirements for the Beam Abort Magnet and Dump A beam abort kicker (pulsed dipole magnet) and dump are required upbeam of the LCLS undulator in order to protect the undulator from mis-steered and poor
More informationCommissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling
Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be
More informationTesting and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC
Testing and Characterization of the MPA Pixel Readout ASIC for the Upgrade of the CMS Outer Tracker at the High Luminosity LHC Dena Giovinazzo University of California, Santa Cruz Supervisors: Davide Ceresa
More informationP. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract
Abstract 7 0 0 k W M A I N I N J E C T O R O P E R A T I O N S F O R N O νa AT FNAL P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA Following a successful career as an antiproton
More information5 MeV Mott Polarization Measurement Procedure--DRAFT
5 MeV Mott Polarization Measurement Procedure--DRAFT Document Number: Revision Number: Rev. 5; November 22, 2000 Technical Custodian:? Estimated Time to Perform: 20 minutes Procedure Overview This procedure
More informationDevelopment of an Abort Gap Monitor for High-Energy Proton Rings *
Development of an Abort Gap Monitor for High-Energy Proton Rings * J.-F. Beche, J. Byrd, S. De Santis, P. Denes, M. Placidi, W. Turner, M. Zolotorev Lawrence Berkeley National Laboratory, Berkeley, USA
More informationProceedings of the 1997 Workshop on RF Superconductivity, Abano Terme (Padova), Italy
BEAM RELATED THERMAL LOSSES ON THE CRYOGENIC AND VACUUM SYSTEMS OF LEP G. Cavallari, Ph. Gayet, G. Geschonke, D. Kaiser, J.M. Jimenez CERN, 111 GENEVA 3 (Switzerland) Abstract The LEP Collider was operated
More informationTRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT
Discovery, accelerated 1 TRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT Arthur Leung High Power DC Systems 2018-10-05 TRIUMF stands for TRI University Meson Facility Founded by University of British
More informationStatus of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting
Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity
More informationStatus of SOLARIS Arkadiusz Kisiel
Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS
More informationWeek 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17
Week 0: PPS Certification and Processing Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Work in tunnel Work in tunnel PPS Certification PPS Certification PPS Certification
More informationRF2TTC and QPLL behavior during interruption or switch of the RF-BC source
RF2TTC and QPLL behavior during interruption or switch of the RF-BC source Study to adapt the BC source choice in RF2TTC during interruption of the RF timing signals Contents I. INTRODUCTION 2 II. QPLL
More informationLEP Status and Performance in 2000
LEP Status and Performance in 2 R. Assmann, SL/OP for the SL Division Outline: Operational strategy Overview on luminosity and energy performance Energy reach Luminosity performance Other issues Further
More informationStatus of RF Power and Acceleration of the MAX IV - LINAC
Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed
More informationStudy of the performances of the ALICE muon spectrometer
Study of the performances of the ALICE muon spectrometer Blanc Aurélien, December 2008 PhD description Study of the performances of the ALICE muon spectrometer instrumentation/detection. Master Physique
More informationHD Review March 30, 2011 Franz Klein
HD Review March 30, 2011 Franz Klein !! Circularly & linearly polarized photon beam on longitudinally polarized target Circularly polar. photon via helicity transfer from 92 calendar days Linearly polar.
More informationControl of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback
Journal of Physics: Conference Series PAPER OPEN ACCESS Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback To cite this article: J. Fox et al 2018 J. Phys.: Conf. Ser. 1067 072024
More informationRadiation Safety System for Stanford Synchrotron Radiation Laboratory*
SLAC PUB-8817 April 16, 2001 Radiation Safety System for Stanford Synchrotron Radiation Laboratory* James C. Liu, N. E. Ipe and R. Yotam Stanford Linear Accelerator Center, P. O. Box 4349, Stanford, CA
More informationP. Emma, et al. LCLS Operations Lectures
P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1
More information2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)
2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution
More informationGlast beam test at CERN
Glast beam test at CERN Glast Collaboration Meeting 2005 R. Bellazzini 1 LAT beam test at CERN Main goals LAT-TD-02152, see Steve slides Required beam types and related measurements 1. tagged-photon beam
More informationAssembly of the HIE-ISOLDE accelerator cavities in a clean room.
Final adjustments being made in the LHC tunnel before the return of beams. On 5 April, particles began circulating in the accelerator for the first time following the Long Shutdown. (CERN-PHOTO-201503-058-1)
More informationSynchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo
Operation of ALBA RF Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo Outline ALBA RF Overview: Booster and SR RF Operation with beam Statistics of first year operation Cavities
More informationPEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman
PEP-II longitudinal feedback and the low groupdelay woofer Dmitry Teytelman 1 Outline I. PEP-II longitudinal feedback and the woofer channel II. Low group-delay woofer topology III. Why do we need a separate
More informationABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION
ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010
More informationSpear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.
Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed
More informationScavenger Extraction. Karen Goldsmith Shawn Alverson
Scavenger Extraction Karen Goldsmith Shawn Alverson Topics Beam line and area maps High Power Target (HPT) How to establish first beam to HPT Setting energy (configs, multiknobs, Fast Phase Shifters, etc.)
More informationHIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *
HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * J. Galambos, W. Blokland, D. Brown, C. Peters, M. Plum, Spallation Neutron Source, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract Satisfying
More informationStatus of Elettra, top-up and other upgrades
Status of Elettra, top-up and other upgrades Emanuel Karantzoulis ELETTRA / Trieste, Italy / 2010 November 25-26 Past and Present Configurations 1994-2007 From 2008 No full energy injection Full energy
More informationA FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1
A FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1 J. M. Bussat 1, G. Bohner 1, O. Rossetto 2, D. Dzahini 2, J. Lecoq 1, J. Pouxe 2, J. Colas 1, (1) L. A. P. P. Annecy-le-vieux, France (2) I. S. N. Grenoble,
More informationCOGGING & FINE ADJUST OF THE BEAM BEAM PHASE
COGGING&FINEADJUST OFTHEBEAM BEAMPHASE HINTSFOROPERATION DEFINITIONS COGGING The Cogging is the choice of the Frev(= Revolution Frequency = orbit) coarse phase of BEAM2 versus BEAM1(by steps of one RF