Status of KEK X-band Test Facility and its future plans

Size: px
Start display at page:

Download "Status of KEK X-band Test Facility and its future plans"

Transcription

1 Status of KEK X-band Test Facility and its future plans Shuji Matsumoto Accelerator Lab., KEK 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 1

2 Contents The New X-band Test Facility (XTF) and X- band Klystron Test Stand Ongoing High Power Test at Klystron Test Stand: Narrow Waveguides Other X-band research Future plans and possible collaborations. Summary 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 2

3 The New XTF (Re-)Construction of New XTF is underway.. The work started in Jan. 2007, moving the equipment to new place, KEKB Injector Area. The operation of New XTF with a single klystron will be ready at the end of July. Half of the power (50MW) is available. The operation with two klystrons is possible after the reinforcement of the wall plug power completes (Additional power line will be placed). The work is planed to be done during this summer. The full power (100MW) operation of New XTF will be ready in September. 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 3

4 The New XTF New X-band Test Facility (XTF) and X-band Klystron Test Stand New XTF is under construction here. Our old place Our new place X-band Klystron Test Station. Test of Narrow Waveguides is ongoing here. Plan view of KEKB Injector 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 4

5 The New XTF XTF modulator and X-band ppm Klystrons C-band Exp. Area (bunker) Control Area This hall was used for S-band structure tests first, followed by C-band, and X-band this time. It is possible to use all these frequencies here. Plan view of Acc structure assembly hall, KEKB Injector. XTF Modulator drives two PPM X-band klystrons. The combined power from the klystrons is guided into the experimental area (bunker). The control/monitor station is located between the power source and the bunker. 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 5

6 The New XTF XTF Modulator Control Area Bunker 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 6

7 The New XTF Features of the facility (100MW, 400ns, 50pps), 24hr/day 50cm-thick concrete shield room (bunker) Control system will be basically from scratch, adapting control to KEKB Injector area Data acquisition and storage through LINUX and EPICS RF pulse shape recording for BD and preceding pulses Evaluation with stopping operation from the beginning Pulse-to-pulse evaluation to be done later (dep. on money) Phase measurement not yet planned Dark current evaluation Charge by FC, pulse shape with CT and energy by analyzer magnet Acoustic measurement (developed by SLAC) X-ray measurement with small PMT s Q-mass monitoring 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 7

8 The New XTF Data storage KEKB Inj. control New XTF control system Klystron LLRF Modulator INTLK CCG Safety System control PC Python, Linux Mod. PLC S/H & DC Amp TDS3034B (300MHz) TDS3054B (500MHz) Discri RF crystal X-ray CT DL7480 (500MHz) History 4MW/ch Various signal X-ray Etc. Acc PLC VME Acoustic (SLAC) Acoustic Etc. FPGA (100MHz) DPO7104 (1GHz) Etc. Etc. AM FC New XTF control system: from the beginning, later 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 8

9 The New XTF XTF Modulator Line-type modulator combined with Inverter charging, Thyratron switched and Pulse Transformer. Conventional design, high reliability. The modulator installs two PFNs and thyratrons in parallel. It enables to drive two klystrons simultaneously. The first modulator was made in 2003 in full spec, while the second one in 2004 mounts a single PFN and is half spec. The first will be used for New XTF. The second is used for klystron testing. It runs at Klystron Test Station (in KEKB Injector) to drive a single klystron. 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 9

10 The New XTF PFN Voltage(kV) XTF Modulator (test result and operation) The test was successfully done. Klystron : 1, Inverter PS : 4, Repe. Rate : 150 Hz, Vpfn : 35 kv. PFN Voltage Power Supply Current(Slave) Power Supply Current(Master) Time(ms) Charging Current(A) Klystron Voltage(kV) Time(µs) 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC Klystron Current Klystron Voltage Pule width : 4.5 µs Flat-top width : >1.6µs(±0.5%) Rise time : 0.9µs(10-90%) Pulse voltage stability : ±0.15% We have operated both of the modulators for past one to two years. The operation has been stable. We have had no chance to do the two-tube operation so far. This is to be done in NEW XTF Klystron Current(A)

11 The New XTF PPM X-band Klystron for XTF Operation Parameters for XTF Operating Frequency GHz RF Pulse Width 0.4 µs Peak Output Power 50 MW Beam Voltage 460 kv Repetition Rate 50 pps Efficiency 43 % The klystrons have been developed as prototypes of the GLC 75MW klystron. 4 klystrons are alive. 2 klystrons: waiting for New XTF 1 klystron: running at Klystron Test Stand. We plan to rebuild 1 klystron in this FY. 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 11

12 Contents The New X-band Test Facility (XTF) and X- band Klystron Test Stand Ongoing High Power Test at Klystron Test Stand: Narrow Waveguides Ongoing X-band research Future plans and possible collaborations. Summary 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 12

13 Ongoing Test Narrow Waveguides To study the characteristics of different materials (Cu, SUS, Mo, Ti, etc.) on high-field rf breakdown we designed a simplified waveguide, as the field of 200MV/m being realized at rf power of 100MW. Prototype Cu002 had been tested at (Old) X- Band Test Facility (XTF) for about a month. We have observed rf breakdowns by bursts of x-rays, flashes of visible lights and acoustic signals. Test of Type SUS003 has just been started at Klystron Test Stand. 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 13 K.Yokoyama, T.Higo, N. Kudoh

14 Ongoing Test Design of the Narrow Waveguide Type of Cu002 To study the characteristics of different materials on high-field rf breakdown. WR90 (the height and the width are reduced) a= mm VSWR 1.05 (HFSS) Cu, SUS, Mo, Ti, Cr, etc. b= mm 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 14 K.Yokoyama, T.Higo, N. Kudoh

15 Ongoing Test Breakdown Location and Threshold (Prototype Cu002) (This first test was done at Old XTF.) Locations of PMTs and acoustic sensors Observed BD Threshold was much lower than expected. PMT5 Array of Acoustic Sensors Breakdowns PMT4 PMT3 PMT2 PMT1 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 15 K.Yokoyama, T.Higo, N. Kudoh

16 Ongoing Test Narrow Waveguides Test has just (re)started at X-band Klystron Test Stand Klystron Test Stand with Narrow Waveguide Test Setup XTF Modulator ~50MW PPM Klystron High Power Dummy Load Apr 16: Installation started Apr 25~27: Baking May 7~: RF ON, system check May 21~: Testing of Narrow waveguides made of SUS (SUS003) Jun. ~: Testing of Narrow waveguides made of Cu (Cu004) Sep. ~: High gradient Testing is started at new XTF(once avilable). 5mm thick Lead Shield Box 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 16 K.Yokoyama, T.Higo, N. Kudoh

17 Contents The New X-band Test Facility (XTF) and X- band Klystron Test Stand Ongoing High Power Test at Klystron Test Stand: Narrow Waveguides Ongoing X-band research: Surface Treatment and RF BD and/or Dark Current Future plans and possible collaborations. Summary 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 17

18 Ongoing X-band research Attempt on small amount of dark current and breakdown rate at high gradient by removing particles and metal impurities on the cavity surface Recipe for the surface treatment removing particles and metal impurities techniques - Using a semiconductor wet cleaning solution and Mega-sonic Making thin Cu 2 O layer on the cavity surface - Vacuum baking at 500 deg.c Keeping good cleanness at installation into the high gradient test setup - Making class 100 environment High gradient test structures - Single and 3-cell SW structure Test data analysis - Needs statistically analysis - Single cell : 7 structures, 3-cell : 5 structures should be required 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 18 Yasuo Higashi

19 Ongoing X-band research Yasuo Higashi removing particles and metal impurities techniques Catalogs data of Si wafer cleaning by KANTO CHEMICAL CO. Ltd. We use Frontier Cleaner W-A02 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 19

20 Ongoing X-band research Yasuo Higashi 2 nd Single cell SW structure preparation A-02 solution + Megasonic cleaning 960kHz, 600 W, 5 minutes operation Ultra Pure Water All parts were applied megasonic cleaning Assemble envelopment: Class 10 No vacuum leak 300 degc baking, period : 5days Still needs to improve the cleaning techniques These structures may be tested once New XTF starts up. 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 20

21 Contents The New X-band Test Facility (XTF) and X- band Klystron Test Stand Ongoing High Power Test at Klystron Test Stand: Narrow Waveguides Ongoing X-band research Future plans and possible collaborations. Summary 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 21

22 Future Plans, Whole plan of X-band activity at KEK Design electrical and mechanical SLAC short-cell stack Fabrication of CLIC equivalent. acc structure Trial fabrication Fabrication of actual acc Low power test structure Feasibility of CLIC scheme High power test GLC acc structur e High power / high field experiment at New XTF Narrow Basic structure waveguide CLIC acc structure CLIC equivalent, acc structure High power test at SLAC and CERN Compact accelerator fabrication and testing RF Gun for Tokyo U. 2 nd 1MeV 1 st 1MeV accelerator accelerator Several MeV accelerator... Work not related with XTF directly although some members of KEK X- band group are doing this research. 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 22

23 Future Plans, X-band activities in 2007 Discuss with SLAC and CERN on collaboration High-field test with narrow waveguide Cu with various surface condition Comparison among Cu, SUS, Mo, Ti,. High-field test at new XTF Firstly establishing high-power test system Accelerator structure test High-field tests in general Test fabrication of CLIC structure (with MEC) Acquire the experience of CLIC design Fabrication of cavities for test at SLAC KLY lab. Surface treatment method Fabrication of compact accelerator 1MeV accelerator, RF Gun, etc. 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 23

24 Future Plans, XTF plan in 2007 KLY test station (50MW level) Apr.-July: Narrow waveguide high-field test Summer~: Continue waveguide components tests Jan.~: Rebuilt klystron test New XTF (100MW level) June-July: Check two klystron operation Aug.-Sept.: Operation with combining two klystrons Oct.: Startup high field study system with an old GLC structure Nov.-Dec.: High-field test of CLIC-related structure As needed: Narrow waveguide test, single-cell test, etc. Welcome any high power test plan 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 24

25 Summary 1. X-band activity in KEK will continue at least the next few years in close relationship with KEKB Injector RF and ACC groups MW X-Band Klystron Station is running. 100MW New XTF (name not fixed yet) will be ready to go half in summer and full in autumn We expect 100MW 0.4us 50pps pulses available at New XTF. 4. These X-band facilities are open to (international) collaborations. 5. KEK X-band group conducts basic RF breakdown experiments as well as the accelerating structure and component tests. 6. Development of the key devices or the components, such as a klystron, will be continued (although the budget is very tight.) 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 25

26 KEK X-Band Group: List of the peoples participate in these researches Mitsuo Akemoto, Shigeki Fukuda, Toshiyasu Higo, Takuya Kamitani, Noboru Kudoh, Shuji Matsumoto, Tetsuo Shidara, Kazue Yokoyama, Mitsuhiro Yoshida Accelerator Laboratory, KEK Yasuo Higashi, Toshikazu Takatomi, Kenji Ueno Mechanical Engineering Center, KEK 5/30/2007 US High Field Gradient Collaboration Workshop, SLAC. 26

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac

More information

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Towards an X-Band Power Source at CERN and a European Structure Test Facility Towards an X-Band Power Source at CERN and a European Structure Test Facility Erk Jensen and Gerry McMomagle CERN The X-Band Accelerating Structure Design and Test-Program Workshop Day 2: Structure Testing

More information

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen J/NLC Progress on R1 and R2 Issues Chris Adolphsen Charge to the International Linear Collider Technical Review Committee (ILC-TRC) To assess the present technical status of the four LC designs at hand,

More information

Linac upgrade plan using a C-band system for SuperKEKB

Linac upgrade plan using a C-band system for SuperKEKB Linac upgrade plan using a C-band system for SuperKEKB S. Fukuda, M. Akemono, M. Ikeda, T. Oogoe, T. Ohsawa, Y. Ogawa, K. Kakihara, H. Katagiri, T. Kamitani, M. Sato, T. Shidara, A. Shirakawa, T. Sugimura,

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications

Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Evaluation of Performance, Reliability, and Risk for High Peak Power RF Sources from S-band through X-band for Advanced Accelerator Applications Michael V. Fazio C. Adolphsen, A. Jensen, C. Pearson, D.

More information

KARA and FLUTE RF Overview/status

KARA and FLUTE RF Overview/status KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

Status of CTF3. G.Geschonke CERN, AB

Status of CTF3. G.Geschonke CERN, AB Status of CTF3 G.Geschonke CERN, AB CTF3 layout CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10 Drive Beam Injector ~ 50 m 3.5 A - 2100 b of 2.33 nc 150 MeV - 1.4

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests*

45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* US High Gradient Research Collaboration Workshop. SLAC, May 23-25, 2007 45 MW, 22.8 GHz Second-Harmonic Multiplier for High-Gradient Tests* V.P. Yakovlev 1, S.Yu. Kazakov 1,2, and J.L. Hirshfield 1,3 1

More information

INFN School on Electron Accelerators. RF Power Sources and Distribution

INFN School on Electron Accelerators. RF Power Sources and Distribution INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel

More information

X-Band Klystron Development at

X-Band Klystron Development at X-Band Klystron Development at SLAC Slide 1 The Beginning X-band klystron work began at SLAC in the mid to late 80 s to develop high frequency (4x SLAC s-band), high power RF sources for the linear collider

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)

More information

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments P. Adderley, M. Baylac, J. Clark, A. Day, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman PESP

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, KVI Groningen 20 Sep 2011 The Key to CLIC Efficiency NC Linac for 1.5 TeV/beam accelerating gradient: 100 MV/m RF frequency:

More information

Nick Walker DESY MAC

Nick Walker DESY MAC Nick Walker DESY MAC 4.5.2006 XFEL X-Ray Free-Electron Laser DESY ILC Project Group Accelerator Experimentation Behnke, Elsen, Walker (chair) WP 15, 16 WP 4-7 Accelerator Physics and Design WP 6 High Gradient

More information

PULSED MODULATOR TECHNOLOGY

PULSED MODULATOR TECHNOLOGY PULSED MODULATOR TECHNOLOGY Hiroshi MATSUMOTO J-PARC/KEK CONTENTS 1. VARIOUS REQUIREMENT OF THE RECENT MODULATORS SHORT PULSE WIDTH (~µsec) LONG PULSE WIDTH (~msec) AND HIGH REP. RATE. (200 Hz) OUTPUT

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

PULSED POWER FOR FUTURE LINEAR ACCELERATORS

PULSED POWER FOR FUTURE LINEAR ACCELERATORS PULSED POWER FOR FUTURE LINEAR ACCELERATORS Peter D. Pearce High-energy accelerators High-energy accelerators enable us to collide particle beams together and create conditions believed to be similar to

More information

Status of RF Power and Acceleration of the MAX IV - LINAC

Status of RF Power and Acceleration of the MAX IV - LINAC Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed

More information

!"!3

!!3 Abstract A single-mode 500 MHz superconducting cavity cryomodule has been developed at Cornell for the electronpositron collider/synchrotron light source CESR. The Cornell B-cell cavity belongs to the

More information

Solid State Modulators for X-Band Accelerators

Solid State Modulators for X-Band Accelerators Solid State Modulators for X-Band Accelerators John Kinross-Wright Diversified Technologies, Inc. Bedford, Massachusetts DTI X-Band Experience Developed and built two completely different NLC-class modulator

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA

Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Pulsed Klystrons for Next Generation Neutron Sources Edward L. Eisen - CPI, Inc. Palo Alto, CA, USA Abstract The U.S. Department of Energy (DOE) Office of Science has funded the construction of a new accelerator-based

More information

High QE Photocathodes lifetime and dark current investigation

High QE Photocathodes lifetime and dark current investigation High QE Photocathodes lifetime and dark current investigation Paolo Michelato INFN Milano - LASA Main Topics High QE photocathode lifetime QE vs. time (measurements on several cathodes, FLASH data) QE

More information

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON

A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A HIGH POWER LONG PULSE HIGH EFFICIENCY MULTI BEAM KLYSTRON A.Beunas and G. Faillon Thales Electron Devices, Vélizy, France S. Choroba DESY, Hamburg, Germany Abstract THALES ELECTRON DEVICES has developed

More information

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8

reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8 C-band RF System R&D reported by T. Shintake KEK / RIKEN Japan Summary of C-band R&D for Linear Collider at KEK New soft-x-ray FEL Project at RIKEN/SPring-8 Project was funded in 2001 April Material Science

More information

Jae-Young Choi On behalf of PLS-II Linac team

Jae-Young Choi On behalf of PLS-II Linac team PLS-II Linac 2015. 4. 8. Jae-Young Choi On behalf of PLS-II Linac team Accelerators in Pohang Accelerator Laboratory XFEL (under construction) 400 M$ Machines under installation PLS-II PAL : Chronology

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC

L-Band RF R&D. SLAC DOE Review June 15 th, Chris Adolphsen SLAC L-Band RF R&D SLAC DOE Review June 15 th, 2005 Chris Adolphsen SLAC International Linear Collider (ILC) RF Unit (TESLA TDR Layout) Gradient = 23.4 MV/m Bunch Spacing = 337 ns Fill Time = 420 µs Train Length

More information

Activities on FEL Development and Application at Kyoto University

Activities on FEL Development and Application at Kyoto University Activities on FEL Development and Application at Kyoto University China-Korea-Japan Joint Workshop on Electron / Photon Sources and Applications Dec. 2-3, 2010 @ SINAP, Shanghai Kai Masuda Inst. Advanced

More information

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC*

DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC* DEVELOPMENT OF A 10 MW SHEET BEAM KLYSTRON FOR THE ILC* D. Sprehn, E. Jongewaard, A. Haase, A. Jensen, D. Martin, SLAC National Accelerator Laboratory, Menlo Park, CA 94020, U.S.A. A. Burke, SAIC, San

More information

DELIVERY RECORD. Location: Ibaraki, Japan

DELIVERY RECORD. Location: Ibaraki, Japan DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October

More information

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project

Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project Operational experience with the SOLEIL LINAC and Status of the ThomX LINAC project 16/11/2016 20th ELS-RF Workshop Pollina JP 1 and Status of the ThomX LINAC project Operational experience with the SOLEIL

More information

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics June 22, 2006 JLab CASA Seminar 2 Background During 2000-2001,

More information

IOT RF Power Sources for Pulsed and CW Linacs

IOT RF Power Sources for Pulsed and CW Linacs LINAC 2004 Lübeck, August 16 20, 2004 IOT RF Power Sources H. Bohlen, Y. Li, Bob Tornoe Communications & Power Industries Eimac Division, San Carlos, CA, USA Linac RF source property requirements (not

More information

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

XFEL High Power RF System Recent Developments

XFEL High Power RF System Recent Developments XFEL High Power RF System Recent Developments for the XFEL RF Group Outline XFEL RF System Requirements Overview Basic Layout RF System Main Components Multibeam Klystrons Modulator RF Waveguide Distribution

More information

SRS and ERLP developments. Andrew moss

SRS and ERLP developments. Andrew moss SRS and ERLP developments Andrew moss Contents SRS Status Latest news Major faults Status Energy Recovery Linac Prototype Latest news Status of the RF system Status of the cryogenic system SRS Status Machine

More information

OF THIS DOCUMENT IS W8.MTO ^ SF6

OF THIS DOCUMENT IS W8.MTO ^ SF6 fflgh PEAK POWER TEST OF S-BAND WAVEGUIDE SWITCHES A. Nassiri, A. Grelick, R. L. Kustom, and M. White CO/0 ^"^J} 5, t * y ^ * Advanced Photon Source, Argonne National Laboratory» \^SJ ^ ^ * **" 9700 South

More information

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 The company was created for the development and manufacture of precision microwave vacuum-electron-tube devices (VETD). The main product areas

More information

STATUS AND FUTURE PROSPECTS OF CLIC

STATUS AND FUTURE PROSPECTS OF CLIC STATUS AND FUTURE PROSPECTS OF CLIC S. Döbert, for the CLIC/CTF3 collaboration, CERN, Geneva, Switzerland Abstract The Compact Linear Collider (CLIC) is studied by a growing international collaboration.

More information

Pulses inside the pulse mode of operation at RF Gun

Pulses inside the pulse mode of operation at RF Gun Pulses inside the pulse mode of operation at RF Gun V. Vogel, V. Ayvazyan, K. Floettmann, D. Lipka, P. Morozov, H. Schlarb, S. Schreiber FLASH Seminar, DESY March 29, 2011 Contents Why we need a PiPmode

More information

Status of the X-ray FEL control system at SPring-8

Status of the X-ray FEL control system at SPring-8 Status of the X-ray FEL control system at SPring-8 T.Fukui 1, T.Hirono 2, N.Hosoda 1, M.Ishii 2, M.Kitamura 1 H.Maesaka 1,T.Masuda 2, T.Matsushita 2, T.Ohata 2, Y.Otake 1, K.Shirasawa 1,M.Takeuchi 2, R.Tanaka

More information

SRF-gun Development Overview. J. Sekutowicz 17 th September, 2015 SRF15, Whistler, Canada

SRF-gun Development Overview. J. Sekutowicz 17 th September, 2015 SRF15, Whistler, Canada SRF-gun Development Overview J. Sekutowicz 17 th September, 2015 SRF15, Whistler, Canada Acknowledgment Many thanks to: A. Arnold, J. Hao, E. Kako, T. Konomi, D. Kostin, J. Lorkiewicz, A. Neumann, J. Teichert

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

Development of a Compact Load Lock System and a New Tuning Structurer for a Cs2Te Cathode RF Gun. Yoshio Kamiya, Waseda Univ.

Development of a Compact Load Lock System and a New Tuning Structurer for a Cs2Te Cathode RF Gun. Yoshio Kamiya, Waseda Univ. Development of a Compact Load Lock System and a New Tuning Structurer for a Cs2Te Cathode RF Gun Yoshio Kamiya, Waseda Univ. Works done by Advanced Research Institute for Science and Engineering, Waseda

More information

NLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003

NLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003 DOE Annual Program Review SLAC April 9-11, 2003 NLC Activities for the Past Year Accelerator Design centered around ILC-TRC studies. Technology R&D focused on the RF R&D. Modulator, klystron, SLED-II,

More information

The FLASH objective: SASE between 60 and 13 nm

The FLASH objective: SASE between 60 and 13 nm Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH

More information

RF Solutions for Science.

RF Solutions for Science. RF Solutions for Science www.thalesgroup.com State-of-the-art RF sources for your scientific needs High-power klystrons HIGH KLYSTRONS WITH RF LONG PULSE above 50 μs Thales has been one of the leading

More information

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. A 50 Hz LOW-POWER SOLID-STATE KLYSTRON-MODULATOR

CERN EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH. A 50 Hz LOW-POWER SOLID-STATE KLYSTRON-MODULATOR CERN EUROPEAN ORGANIZATION FOR NUCLEAR REEARCH CTF3 Note 051(Tech.) (IGCT witch) A 50 Hz LOW-POWER OLID-TATE KLYTRON-MODULATOR P. Pearce, L. ermeus, L. hen Abstract A solid-state klystron-modulator has

More information

The FAIR plinac RF Systems

The FAIR plinac RF Systems The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)

More information

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC

DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC DEVELOPMENT OF X-BAND KLYSTRON TECHNOLOGY AT SLAC George Caryotakis, Stanford Linear Accelerator Center P.O. Box 4349 Stanford, CA 94309 Abstract * The SLAC design for a 1-TeV collider (NLC) requires klystrons

More information

A New 4MW LHCD System for EAST

A New 4MW LHCD System for EAST 1 EXW/P7-29 A New 4MW LHCD System for EAST Jiafang SHAN 1), Yong YANG 1), Fukun LIU 1), Lianmin ZHAO 1) and LHCD Team 1) 1) Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, China E-mail

More information

RF Power Generation II

RF Power Generation II RF Power Generation II Klystrons, Magnetrons and Gyrotrons Professor R.G. Carter Engineering Department, Lancaster University, U.K. and The Cockcroft Institute of Accelerator Science and Technology Scope

More information

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS

DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS DESIGN AND PERFORMANCE OF L-BAND AND S-BAND MULTI BEAM KLYSTRONS Y. H. Chin, KEK, Tsukuba, Japan. Abstract Recently, there has been a rising international interest in multi-beam klystrons (MBK) in the

More information

High-power klystrons. The benchmark in scientific research. State-of-the-art RF sources for your accelerator

High-power klystrons.  The benchmark in scientific research. State-of-the-art RF sources for your accelerator > High- klystrons The benchmark in scientific research State-of-the-art RF sources for your accelerator Thales has been one of the leading manufacturers of RF and microwave sources for decades, and is

More information

The ALS RF systems, upgrades and ALS-U plans

The ALS RF systems, upgrades and ALS-U plans The ALS RF systems, upgrades and ALS-U plans M. Betz*, K. Baptiste, Q. Du, M. Vinco, S. Virostek 06/27/2018, CWRF2018, Hsinchu, Taiwan * mbetz@lbl.gov Outline Structure of this talk RF systems in the Advanced

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

Trigger-timing signal distribution system for the KEK electron/positron injector linac

Trigger-timing signal distribution system for the KEK electron/positron injector linac Trigger-timing signal distribution system for the KEK electron/positron injector linac T. Suwada, 1 K. Furukawa, N. Kamikubota, and M. Satoh, Accelerator Laboratory, High Energy Accelerator Research Organization

More information

STATUS OF THE SwissFEL C-BAND LINAC

STATUS OF THE SwissFEL C-BAND LINAC STATUS OF THE SwissFEL C-BAND LINAC F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L. Paly, J.-Y. Raguin, L. Schulz, R. Zennaro, C. Zumbach,

More information

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Stanley Humphries, Copyright 2012 Field Precision PO Box 13595, Albuquerque, NM 87192 U.S.A. Telephone: +1-505-220-3975

More information

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ

Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Dark current and multipacting trajectories simulations for the RF Photo Gun at PITZ Introduction The PITZ RF Photo Gun Field simulations Dark current simulations Multipacting simulations Summary Igor Isaev

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

HAPD and Electronics Updates

HAPD and Electronics Updates S. Nishida KEK 3rd Open Meeting for Belle II Collaboration 1 Contents Frontend Electronics Neutron Irradiation News from Hamamtsu 2 144ch HAPD HAPD (Hybrid Avalanche Photo Detector) photon bi alkali photocathode

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

* Work supported by Department of Energy contract DE-AC03-76SF RF Pulse Compression. for F'uture Linear Colliders* SLAC-PUB

* Work supported by Department of Energy contract DE-AC03-76SF RF Pulse Compression. for F'uture Linear Colliders* SLAC-PUB SLAC-PUB-95-6755 RF Pulse Compression for F'uture Linear Colliders* PERRY B. WILSON Stanford Linear Accelerator Center Stanford University, Stanford, CA 94309 Presented at the Conference on Pulsed RF Sources

More information

Design of a 50 MW Klystron at X-Band*

Design of a 50 MW Klystron at X-Band* SLAC-PUB-954676 July 1995 Background Eight Next Linear Collider (NLC) prototype klystrons, known as the XC-series Design of a 50 MW Klystron at X-Band* klystrons, have been evaluated at SLAC with a goal

More information

G0 Laser Status Parity Controls Injector Diagnostics

G0 Laser Status Parity Controls Injector Diagnostics G0 Laser Status Parity Controls Injector Diagnostics G0 Collaboration Mtg Jefferson Lab August 16, 2002 G0 Collaboration Mtg (August 16, 2002), 1 Installed new AOM homebuilt laser G0 Collaboration Mtg

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

RF Power Upgrade at Jefferson Lab

RF Power Upgrade at Jefferson Lab RF Power Upgrade at Jefferson Lab Rick Nelson*, Andrew Kimber *nelson@jlab.org * Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE- AC05-06OR23177. The U.S. Government

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.

Spear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement. Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed

More information

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture RF systems for CW SRF linacs S. Belomestnykh Cornell University Laboratory for Elementary-Particle Physics LINAC08, Victoria, Canada October 1, 2008 Outline L band Introduction: CW SRF linac types, requirements

More information

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron

Design, Fabrication and Testing of Gun-Collector Test Module for 6 MW Peak, 24 kw Average Power, S-Band Klystron Available online www.ejaet.com European Journal of Advances in Engineering and Technology, 2014, 1(1): 11-15 Research Article ISSN: 2394-658X Design, Fabrication and Testing of Gun-Collector Test Module

More information

Improvements to the APS LINAC and SR/Booster klystron HVPS, and Accomplishments of the 352MHz RFTS

Improvements to the APS LINAC and SR/Booster klystron HVPS, and Accomplishments of the 352MHz RFTS Improvements to the APS LINAC and SR/Booster klystron HVPS, and Accomplishments of the 352MHz RFTS G. Trento Accelerator Systems Division Argonne National Laboratory Work supported by the U.S. Department

More information

RECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz

RECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz RECENT PROGRESS IN UPGRADE OF THE HIGH INTENSITY THzzz zz-fel AT OzSAKzA UNIVERSITYzzzz G. Isoyama#, M. Fujimoto, S. Funakoshi, K. Furukawa, A. Irizawa, R. Kato, K. Kawase, A. Tokuchi, R. Tsutsumi, M.

More information

NEW METHOD FOR KLYSTRON MODELING

NEW METHOD FOR KLYSTRON MODELING NEW METHOD FOR KLYSTRON MODELING Y. H. Chin, KEK, 1-1 Oho, Tsukuba-shi, Ibaraki-ken, 35, Japan Abstract We have developed a new method for a realistic and more accurate simulation of klystron using the

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

SLAC X-band Technology R&D. Tor Raubenheimer DOE Briefing June 11 th, 2010

SLAC X-band Technology R&D. Tor Raubenheimer DOE Briefing June 11 th, 2010 SLAC X-band Technology R&D Tor Raubenheimer DOE Briefing June 11 th, 2010 Introduction Overall ARD strategy ILC Program X-band program Compact XFEL and other applications Status and development needs Proposed

More information

TOWARDS THE COMMISSIONING OF J-PARC

TOWARDS THE COMMISSIONING OF J-PARC 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, MO3.5-1O (2005) TOWARDS THE COMMISSIONING OF J-PARC T. Katoh 1, K. Furukawa 1, N. Kamikubota 1, H.

More information

Development of High Power Vacuum Tubes for Accelerators and Plasma Heating

Development of High Power Vacuum Tubes for Accelerators and Plasma Heating Development of High Power Vacuum Tubes for Accelerators and Plasma Heating Vishnu Srivastava Microwave Tubes Division, CSIR-Central Electronics Engineering Research Institute, Pilani-333031, Rajasthan,

More information

Photo cathode RF gun -

Photo cathode RF gun - Photo cathode RF gun - *),,, ( 05 Nov. 2004 Spring8 UTNL Linac & Mg Photocathode RF Gun Mg photocathode NERL, 18 MeV Linac and the RF gun Electron Beam Mg photocathode Mg photocathode RF gun of SPring8

More information