Supply Connection Plans of the PANDA Cluster- Jet Target, Beam Dump and its Interface with other Modules

Size: px
Start display at page:

Download "Supply Connection Plans of the PANDA Cluster- Jet Target, Beam Dump and its Interface with other Modules"

Transcription

1 Supply Connection Plans of the PANDA Cluster- Jet Target, Beam Dump and its Interface with other Modules MEC session GSI Darmstadt Benjamin Hetz WWU Münster Institut für Kernphysik WWU Münster

2 Content of this talk Two main topics: PANDA target supply connections and later on spectrometer platform wiring Beam dump backing pump pipe ideas Target status information interface Benjamin Hetz WWU Münster 2017/12/14 2

3 Status of the PANDA WWU Münster Setup in very close to PANDA geometry with final Beam Dump Daily Cluster-Jet production and optimizations studies running Current activities: Investigation/optimization of vacuum conditions at interaction point distance Beam dump backflow rates Target density optimization using PANDA Prototype target Last electronic/software improvements for COSY in summer 2018 Benjamin Hetz WWU Münster 2017/12/14 3

4 Sketch of the needed electrical, gas supply, coolant, etc. of the PANDA cluster-jet target. 4

5 Components placed upon the target spectrometer platform Benjamin Hetz WWU Münster 2017/12/14 5

6 Antiproton Beamline 6

7 Components placed upon the beam dump platform 7

8 Our idea is to have two separate located distribution patch panels (provided by FAIR) offering us power, gas, coolant etc. with the desired connectors at each platform. 8

9 From the distribution patch panels the connection is made to the target devices, e.g. the CEE power connectors. 9

10 Target modules connected internally (cables and pipes bundled in cable ducts). 10

11 PANDA Hydrogen Gas/Purifier System can be located anywhere but somewhere near the solenoid. More details will come from the responsible Vienna group about sizes connections etc. Benjamin Hetz WWU Münster 2017/12/14 11

12 Location of the Cluster-Jet Target Rack We bring our own rack for the cluster-jet source Already completely filled and set into operation at Münster Concrete location and size already shown in the latest PANDA step files Connections, power lines, etc. shown in the previous slides Benjamin Hetz WWU Münster 2017/12/14 12

13 Location of the Beam Dump Rack The rack 42U-T1009 on platform TW East can be claimed (talked with Jost Luehning) So we d like to claim the whole rack for the beam dump electronics About 1/2 is filled with the turbopump supply units The other half can be used for the final BD slow control system by the Warsaw group No concrete plans how much space is needed, yet Benjamin Hetz WWU Münster 2017/12/14 13

14 Cable Duct Ø 40 mm 19" Rack CJ- Source MEC GSI A (very) rough sketch of the target/pumping station location View onto the target spectrometer platform Cable Duct Ø 160 mm Compressor Cluster-Jet Source Frame Cable Duct Ø 51 mm Pumping Station Indicated is the routing of our cable ducts for internal target communication only, these wires do not need communication with something else but our slow control system More or less to treat as one big cable External communication given by WAN connection point from the 19 rack (see prev. slides) Benjamin Hetz WWU Münster 2017/12/14 14

15 Backing Pumping Pipe Ø 70 mm MEC GSI A (very) rough sketch of the needed beam dump backing pump line Pumping Station Beam dump located beneath the detector Beam dump needs a backing pumping pipe to the pumping station at the target spectrometer platform Additionally a backup backing pump near the beam dump would be worthwhile No concrete plans do exist about pumping line routing, yet Beam Dump Benjamin Hetz WWU Münster 2017/12/14 15

16 Information for and from the other detector modules Which concrete target parameter are wished to be directly accessible by others? (cf. Excel Tables of PANDA controls requirements) Pressures? Valve states? etc How to supply this information? Hard wired? EPICS? We need: Information about target cross shutters (FZ Jülich), best hard wired Luminosity Monitor information E.g. some feedback loop for instant thickness adjustments Benjamin Hetz WWU Münster 2017/12/14 16

17 Summary Target supply connection and wiring wishes shown Concretization of backing pump system for beam dump needed Separate backing pump/long backing pipe/both? Which target status information should be shared in which manner? DSS/Interlock, etc. wishes? Benjamin Hetz WWU Münster 2017/12/14 17

HPS Slow Controls Overview

HPS Slow Controls Overview HPS Slow Controls Overview Hovanes Egiyan 6/18/2014 Hovanes Egiyan HPS Collaboration Meeting 1 Content Introduction HPS SVT Controls ECAL Controls Hall B controls Summary 6/18/2014 Hovanes Egiyan HPS Collaboration

More information

Cryostat Instrumentation Cabling Grounding and Shielding. Eric Hazen Boston University 12/15/08 1

Cryostat Instrumentation Cabling Grounding and Shielding. Eric Hazen Boston University 12/15/08 1 Cryostat Instrumentation Cabling Grounding and Shielding Eric Hazen Boston University 12/15/08 1 Electromagnetic Compatibility We need to classify our instrumentation in terms of Emission and Susceptibility

More information

A SQUID-BASED BEAM CURRENT MONITOR FOR FAIR / CRYRING

A SQUID-BASED BEAM CURRENT MONITOR FOR FAIR / CRYRING A SQUID-BASED BEAM CURRENT MONITOR FOR FAIR / CRYRING OUTLINE 2 -Future Installations at FAIR -Challenges -Cryogenic Current Comparator (CCC) principle -Experimental results for improved sensitivity -Conclusions

More information

The FAIR plinac RF Systems

The FAIR plinac RF Systems The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)

More information

Setting up your Roland V-Drums with Melodics.

Setting up your Roland V-Drums with Melodics. Setting up your Roland V-Drums with Melodics. melodics.com Introduction Level up your timing. Play along with classic breaks. Mix it up with modern styles. Melodics the critically acclaimed beat training

More information

A New 4MW LHCD System for EAST

A New 4MW LHCD System for EAST 1 EXW/P7-29 A New 4MW LHCD System for EAST Jiafang SHAN 1), Yong YANG 1), Fukun LIU 1), Lianmin ZHAO 1) and LHCD Team 1) 1) Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, China E-mail

More information

Operation of CEBAF photoguns at average beam current > 1 ma

Operation of CEBAF photoguns at average beam current > 1 ma Operation of CEBAF photoguns at average beam current > 1 ma M. Poelker, J. Grames, P. Adderley, J. Brittian, J. Clark, J. Hansknecht, M. Stutzman Can we improve charge lifetime by merely increasing the

More information

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

An Overview of Beam Diagnostic and Control Systems for AREAL Linac An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

Drift Tubes as Muon Detectors for ILC

Drift Tubes as Muon Detectors for ILC Drift Tubes as Muon Detectors for ILC Dmitri Denisov Fermilab Major specifications for muon detectors D0 muon system tracking detectors Advantages and disadvantages of drift chambers as muon detectors

More information

A new Scintillating Fibre Tracker for LHCb experiment

A new Scintillating Fibre Tracker for LHCb experiment A new Scintillating Fibre Tracker for LHCb experiment Alexander Malinin, NRC Kurchatov Institute on behalf of the LHCb-SciFi-Collaboration Instrumentation for Colliding Beam Physics BINP, Novosibirsk,

More information

Muon Forward Tracker. MFT Collaboration

Muon Forward Tracker. MFT Collaboration Muon Forward Tracker MFT Collaboration QGP France 2013 Introduction Summary of what «physically» MFT looks like: - Silicon detector - Data flow - Mechanical aspects - Power supplies - Cooling - Insertion/Extraction

More information

HICUBE. The modular pumping stations for all applications in high and ultra-high vacuum

HICUBE. The modular pumping stations for all applications in high and ultra-high vacuum HICUBE The modular pumping stations for all applications in high and ultra-high vacuum HICUBE The modular pumping stations for all applications in high and ultra-high vacuum Ideal for any application Intelligent

More information

Screen investigations for low energetic electron beams at PITZ

Screen investigations for low energetic electron beams at PITZ 1 Screen investigations for low energetic electron beams at PITZ S. Rimjaem, J. Bähr, H.J. Grabosch, M. Groß Contents Review of PITZ setup Screens and beam profile monitors at PITZ Test results Summary

More information

HIGH VACUUM PUMPS. Hybrid Turbomolecular Pumps. ATH series. Adixen by Alcatel Vacuum Technology

HIGH VACUUM PUMPS. Hybrid Turbomolecular Pumps. ATH series. Adixen by Alcatel Vacuum Technology H I G H V A C U U M P U M P S Adixen by Alcatel Vacuum Technology Hybrid Turbomolecular Pumps 139 Introduction Alcatel offers the of hybrid turbomolecular pumps with pumping speeds ranging from 30 to 300

More information

TORCH a large-area detector for high resolution time-of-flight

TORCH a large-area detector for high resolution time-of-flight TORCH a large-area detector for high resolution time-of-flight Roger Forty (CERN) on behalf of the TORCH collaboration 1. TORCH concept 2. Application in LHCb 3. R&D project 4. Test-beam studies TIPP 2017,

More information

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2 Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010 Plan of the program at ILC2010 Focus of efforts Work on parameter set for a possible

More information

A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications

A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications A fast and precise COME & KISS* QDC and TDC for diamond detectors and further applications 3 rd ADAMAS Collaboration Meeting (2014) Trento, Italy *use commercial elements and keep it small & simple + +

More information

Vertical Electropolishing at Marui & KEK

Vertical Electropolishing at Marui & KEK Vertical Electropolishing at Marui & KEK June 2017 AWLC17 V Chouhan Marui Galvanizing Co., Ltd Y Ida, K Nii & T Yamaguchi (Marui Galvanizing Co., Ltd., Japan) S Kato, H Hayano, T Saeki, M Sawabe & H Monjushiro

More information

GENCOA Key Company Facts. GENCOA is a private limited company (Ltd) Founded 1995 by Dr Dermot Monaghan. Located in Liverpool, UK

GENCOA Key Company Facts. GENCOA is a private limited company (Ltd) Founded 1995 by Dr Dermot Monaghan. Located in Liverpool, UK GENCOA Key Company Facts GENCOA is a private limited company (Ltd) Founded 1995 by Dr Dermot Monaghan Located in Liverpool, UK Employs 34 people 6 design (Pro E 3D CAD) 4 process development & simulation

More information

HD Review March 30, 2011 Franz Klein

HD Review March 30, 2011 Franz Klein HD Review March 30, 2011 Franz Klein !! Circularly & linearly polarized photon beam on longitudinally polarized target Circularly polar. photon via helicity transfer from 92 calendar days Linearly polar.

More information

40-Meter Subsystems: As LIGO-Like as Possible

40-Meter Subsystems: As LIGO-Like as Possible 40-Meter Subsystems: As LIGO-Like as Possible PSL» Commissioning» Noise performance Vacuum» Operating pressure goal» EPICS control system PEM» Weather, seismic monitoring» Cable flexibility testing» STACIS

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

Lensed Fibers & Tapered Ends Description:

Lensed Fibers & Tapered Ends Description: Lensed Fibers & Tapered Ends Description: LaseOptics Corporation ( LaseOptics ) has been producing next generation optical lensed fibers. LaseOptics Lensed Optical Fibers technology is proprietary integrated

More information

CHA EVAPORATOR. User guidelines. p.1. by Carlos Manzanedo. Last revised: 10/05/2000

CHA EVAPORATOR. User guidelines. p.1. by Carlos Manzanedo. Last revised: 10/05/2000 CHA EVAPORATOR User guidelines by Carlos Manzanedo. Last revised: 10/05/2000 p.1 Introduction. The CHA evaporator has the following characteristics: 1. 2 independent resistive power supplies. 2. 1 Electron

More information

Hall-B Beamline Commissioning Plan for CLAS12

Hall-B Beamline Commissioning Plan for CLAS12 Hall-B Beamline Commissioning Plan for CLAS12 Version 1.5 S. Stepanyan December 19, 2017 1 Introduction The beamline for CLAS12 utilizes the existing Hall-B beamline setup with a few modifications and

More information

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Status of the FAIR Project Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Finland France Germany India Poland Romania Russia Slovenia Sweden UK FAIR Strategic objectives FAIR phase

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su

li, o p a f th ed lv o v ti, N sca reb g s In tio, F, Z stitu e tests o e O v o d a eters sin u i P r th e d est sezio tefa ectro lity stem l su Design and prototype tests of the system for the OPERA spectrometers Stefano Dusini INFN sezione di Padova Outline OPERA Detector Inner Tracker Design Mechanical support Gas & HV Production and Quality

More information

SPECIFICATION NO Model 207 Automatic GTAW Welding System

SPECIFICATION NO Model 207 Automatic GTAW Welding System 1.0 Introduction The Model 207 is a completely self-contained Gas Tungsten Arc Welding (GTAW) System requiring only input power, inert gas and AMI Welding Head (or manual torch) for operation. Its small

More information

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds

Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Performance of a double-metal n-on-n and a Czochralski silicon strip detector read out at LHC speeds Juan Palacios, On behalf of the LHCb VELO group J.P. Palacios, Liverpool Outline LHCb and VELO performance

More information

Peerless Forming Die Test Press Hydraulic Motion Control System

Peerless Forming Die Test Press Hydraulic Motion Control System Peerless Forming Die Test Press Hydraulic Motion Control System ECET 491 Final Presentation Gary Atchison April 30, 2010 1 What Is Going To Be Covered The problem for Peerless & background Information

More information

CREATE. CONTROL. CONNECT.

CREATE. CONTROL. CONNECT. CREATE. CONTROL. CONNECT. CREATE. CONTROL. CONNECT. DYVI offers unprecedented creativity, simple and secure operations along with technical reliability all in a costeffective, tailored and highly reliable

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

A new Interlock Design for the TESLA RF System

A new Interlock Design for the TESLA RF System A new Interlock Design for the TESLA RF System H. Leich 1, A. Kretzschmann 1, S. Choroba 2, T. Grevsmühl 2, N. Heidbrook 2, J. Kahl 2, 1 (DESY Zeuthen) 2 (DESY Hamburg) The Problem The Interlock Architecture

More information

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland

CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland Available on CMS information server CMS NOTE 1999/012 The Compact Muon Solenoid Experiment CMS Note Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland February 23, 1999 Assembly and operation of

More information

HiPace 300 with TC 110 and power supply OPS 100, DN 100 ISO-F

HiPace 300 with TC 110 and power supply OPS 100, DN 100 ISO-F HiPace 300 with TC 110 and power supply OPS 100, DN 100 ISO-F HiPace 300 with TC 110 and power supply OPS 100, DN 100 ISO-F Similar Image Rugged, powerful turbopump with a pumping speed of up to 260 l/s

More information

Digital audio is superior to its analog audio counterpart in a number of ways:

Digital audio is superior to its analog audio counterpart in a number of ways: TABLE OF CONTENTS What s an Audio Snake...4 The Benefits of the Digital Snake...5 Digital Snake Components...6 Improved Intelligibility...8 Immunity from Hums & Buzzes...9 Lightweight & Portable...10 Low

More information

CONTROL VISIO 0033 (0) ASSISTANCE ACCESSORIES SUPERVISION WALL UNIT INTEGRATION. Direct line

CONTROL VISIO 0033 (0) ASSISTANCE ACCESSORIES SUPERVISION WALL UNIT INTEGRATION. Direct line CONTROL VISIO ASSISTANCE Our qualified technicians are at your disposal for: Electronics signals of medical gas networks by VISIO concept, (ISO 7396 norm) is the solution to prevent any defaults of medical

More information

EPJ Web of Conferences 95,

EPJ Web of Conferences 95, EPJ Web of Conferences 95, 04012 (2015) DOI: 10.1051/ epjconf/ 20159504012 C Owned by the authors, published by EDP Sciences, 2015 The ELENA (Extra Low Energy Antiproton) project is a small size (30.4

More information

WAVES Cobalt Saphira. User Guide

WAVES Cobalt Saphira. User Guide WAVES Cobalt Saphira TABLE OF CONTENTS Chapter 1 Introduction... 3 1.1 Welcome... 3 1.2 Product Overview... 3 1.3 Components... 5 Chapter 2 Quick Start Guide... 6 Chapter 3 Interface and Controls... 7

More information

SuperFRS GEM-TPC Development Status Report

SuperFRS GEM-TPC Development Status Report SuperFRS GEM-TPC Development Status Report COLLABORATORS F. García, R. Turpeinen, J. Heino, A. Karadzhinova, E. Tuominen, R. Lauhakangas Helsinki Institute of Physics University of Helsinki - Finland R.

More information

CLEX (CLIC Experimental Area)

CLEX (CLIC Experimental Area) CLEX (CLIC Experimental Area) Status and plans G.Geschonke for Hans Braun CERN CT3 coll meetg 2005 CLEX 1 CT3 objectives R1.1 CLIC accelerating structure, R1.2 rive beam scheme with a fully loaded linac

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

Digital Video Engineering Professional Certification Competencies

Digital Video Engineering Professional Certification Competencies Digital Video Engineering Professional Certification Competencies I. Engineering Management and Professionalism A. Demonstrate effective problem solving techniques B. Describe processes for ensuring realistic

More information

with Low Cost and Low Material Budget

with Low Cost and Low Material Budget Gaseous Beam Position Detectors, with Low Cost and Low Material Budget Gyula Bencédi on behalf of the REGaRD group MTA KFKI RMKI, ELTE November 29, 2011, Outline Physics Motivation Newish MWPCs, the Close

More information

FTS84/85 Feature Application Field. Temperature & Humidity / Flow Measuring Specialist. Monitor gas and flow for industrial process

FTS84/85  Feature Application Field. Temperature & Humidity / Flow Measuring Specialist. Monitor gas and flow for industrial process FTS84/8 Feature Application Field Capable of temperature compensation and linear adjustment Double line character : air velocity & temperature Switch for physical quantity:[m/s] [ft/s] [km/h] [mph] [knot]

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman PEP-II longitudinal feedback and the low groupdelay woofer Dmitry Teytelman 1 Outline I. PEP-II longitudinal feedback and the woofer channel II. Low group-delay woofer topology III. Why do we need a separate

More information

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

Grounding-type plugs and sockets K Product information

Grounding-type plugs and sockets K Product information Product information Plugs and sockets for harsh conditions. SCHUO by MENNEES with the hammer symbol. Acc. to VDE 0105 part 115. Made of high-grade AMAPLAST. Acc. to VDE 0620 for harsh conditions. Application

More information

INSTALATION AND OPERATION MANUAL ABYSSAL OS Overlay Module Version 1.0.1

INSTALATION AND OPERATION MANUAL ABYSSAL OS Overlay Module Version 1.0.1 INSTALATION AND OPERATION MANUAL ABYSSAL OS Overlay Module Version 1.0.1 Thank you for purchasing the Abyssal OS Overlay Module for your ROV. This instruction manual contains all the information you ll

More information

PROPORTIONAL VALVES Sentronic plus

PROPORTIONAL VALVES Sentronic plus 04GB-06/R0 PROPORTIONAL VALVES Sentronic plus with external pressure supply G / FEATURES Sentronic plus is a highly dynamical -way proportional valve with digital control. Sentronic plus stands for: Digital

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector

Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector Scintillation Tile Hodoscope for the PANDA Barrel Time-Of-Flight Detector William Nalti, Ken Suzuki, Stefan-Meyer-Institut, ÖAW on behalf of the PANDA/Barrel-TOF(SciTil) group 12.06.2018, ICASiPM2018 1

More information

INSTALATION AND OPERATION MANUAL ABYSSAL OS Overlay Module Version 1.3

INSTALATION AND OPERATION MANUAL ABYSSAL OS Overlay Module Version 1.3 INSTALATION AND OPERATION MANUAL ABYSSAL OS Overlay Module Version 1.3 Thank you for purchasing the Abyssal OS Overlay Module for your ROV. This instruction manual contains all the information you ll need

More information

Dick Loveless. 20 November 2008 SLHC Workshop. Dick Loveless SLHC Workshop 20 Nov

Dick Loveless. 20 November 2008 SLHC Workshop. Dick Loveless SLHC Workshop 20 Nov ME4/2 Integration Dick Loveless 20 November 2008 SLHC Workshop Dick Loveless SLHC Workshop 20 Nov 2008 1 CMS Endcap Dick Loveless SLHC Workshop 20 Nov 2008 2 ME4/2 Upgrade Dick Loveless SLHC Workshop 20

More information

Size B INDUSTRIAL STANDARD

Size B INDUSTRIAL STANDARD Size B INDUSTRIA STANDARD Actuators series DIN EN 70-80 Industrial standard + ow housing Degree of protection IP6 Wired versions Moulded versions Degree of protection IP67 Female power connector Cable

More information

Westrex RA1713B Auxiliary Record Electronics

Westrex RA1713B Auxiliary Record Electronics Westrex RA1713B Auxiliary Record Electronics INTRODUCTION The RA-1713B is an auxiliary electronics system for use with the Westrex RA- 1712B. It comprises a current regulated, digital readout, recorder

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

Prototyping and construction

Prototyping and construction Computer Aspect of HCI Prototyping techniques Prototyping and construction What is a prototype? Why prototype? Different kinds of prototyping low fidelity high fidelity Compromises in prototyping Construction

More information

SRS and ERLP developments. Andrew moss

SRS and ERLP developments. Andrew moss SRS and ERLP developments Andrew moss Contents SRS Status Latest news Major faults Status Energy Recovery Linac Prototype Latest news Status of the RF system Status of the cryogenic system SRS Status Machine

More information

Click Here To Start Demo

Click Here To Start Demo Click Here To Start Demo AirLogix Demo Title Screen AirLogix Interactive Demonstrator Version 3.0 Copyright 2005 by Case Engineering inc This is intended as a working active demonstration only. Every attempt

More information

Linac 4 Instrumentation K.Hanke CERN

Linac 4 Instrumentation K.Hanke CERN Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase

More information

HIGH CURRENT IMPLANTER 200KeV - SERIES 1090 TECHNICAL DESCRIPTION

HIGH CURRENT IMPLANTER 200KeV - SERIES 1090 TECHNICAL DESCRIPTION HIGH CURRENT IMPLANTER 200KeV - SERIES 1090 TECHNICAL DESCRIPTION Manufacturer: Danfysik A/S Møllehaven 31 DK-4040 Jyllinge Denmark Tel. +45 4679 0000 Fax +45 4679 0001 danfysik@danfysik.dk www.danfysik.com

More information

PEP-II Disassembly Technical Systems

PEP-II Disassembly Technical Systems PEP-II Disassembly Technical Systems PEP-II D&D Review 6-Aug-2007 S.DeBarger S.Ecklund, A.Hill, D.Kharakh, M.Zurawel Outline Project safety Disassembly of technical systems Shielding Vac/Mechanical Cable

More information

PITZ Introduction to the Video System

PITZ Introduction to the Video System PITZ Introduction to the Video System Stefan Weiße DESY Zeuthen June 10, 2003 Agenda 1. Introduction to PITZ 2. Why a video system? 3. Schematic structure 4. Client/Server architecture 5. Hardware 6. Software

More information

DAQ Systems in Hall A

DAQ Systems in Hall A CODA Users Workshop Data Acquisition at Jefferson Lab Newport News June 7, 2004 DAQ Systems in Hall A Overview of Hall A Standard Equipment: HRS, Beamline,... Parity Experiments Third Arms: BigBite, RCS

More information

A flexible FPGA based QDC and TDC for the HADES and the CBM calorimeters TWEPP 2016, Karlsruhe HADES CBM

A flexible FPGA based QDC and TDC for the HADES and the CBM calorimeters TWEPP 2016, Karlsruhe HADES CBM A flexible FPGA based QDC and TDC for the HADES and the CBM calorimeters TWEPP 2016, Karlsruhe + + + = PaDiWa-AMPS front-end Adrian Rost for the HADES and CBM collaborations PMT Si-PM (MPPC) 27.09.2016

More information

Requirements for the Beam Abort Magnet and Dump

Requirements for the Beam Abort Magnet and Dump Requirements for the Beam Abort Magnet and Dump A beam abort kicker (pulsed dipole magnet) and dump are required upbeam of the LCLS undulator in order to protect the undulator from mis-steered and poor

More information

Preliminary Conclusions from Recent Q weak Target Density Fluctuation Studies Mark Pitt, Virginia Tech

Preliminary Conclusions from Recent Q weak Target Density Fluctuation Studies Mark Pitt, Virginia Tech Preliminary Conclusions from Recent Q weak Target Density Fluctuation Studies Mark Pitt, Virginia Tech Brief report on results of the Qweak June 008 luminosity monitor studies of the dependence of target

More information

IQOTXS Dual-Channel Single-Mode Fibre Optic Transmitter for SDI

IQOTXS Dual-Channel Single-Mode Fibre Optic Transmitter for SDI Dual-Channel Single-Mode Fibre Optic Transmitter for SDI CC Module Description The is a dual-channel Single-mode (SM) fibre optic transmitter for SDI. The unit takes two inputs of SDI at 270 Mbits/s and

More information

BUS UNITRONIC BUS CAN

BUS UNITRONIC BUS CAN BUS UNITRONIC BUS CAN For CAN bus systems; stationary applications; 120 Ω LAPP KABEL UNITRONIC BUS CAN UNITRONIC BUS CAN is designed to the CAN open and ISO11898 standard. It is well suited for high-speed

More information

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

MICROFOCUS X-RAY SOURCE PROJECT*

MICROFOCUS X-RAY SOURCE PROJECT* MICROFOCUS X-RAY SOURCE PROJECT* Dan Mancuso, CHESS, Cornell University, NY, USA ABSTRACT At the Cornell High Energy Synchrotron Source (CHESS), scientists in all fields and from all over the world utilize

More information

Full IEFC workshop Feb.

Full IEFC workshop Feb. How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix How does one keep a 50 51 year old running for another 25 years? accelerator How

More information

KEL 24 Cable entry frames

KEL 24 Cable entry frames 24 Cable entry frames Split inserts Description Type Order No. Inserts KT PU small large The 24 matches exactly the cut-out dimensions of 24-pole standard industrial connectors. 24 42241 - The split insert

More information

VGA AUDIO SWITCHER S MANUAL

VGA AUDIO SWITCHER S MANUAL VGA AUDIO SWITCHER S MANUAL Milestone s VGA Audio Switcher is a unit whereby multiple (2/4/8/16) VGA + Audio can be switched to two (2) or multiple (simultaneous) VGA + Audio output. The switchers are

More information

CGEM-IT project update

CGEM-IT project update BESIII Physics and Software Workshop Beihang University February 20-23, 2014 CGEM-IT project update Gianluigi Cibinetto (INFN Ferrara) on behalf of the CGEM group Outline Introduction Mechanical development

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

TWO BUNCHES WITH NS-SEPARATION WITH LCLS* TWO BUNCHES WITH NS-SEPARATION WITH LCLS* F.-J. Decker, S. Gilevich, Z. Huang, H. Loos, A. Marinelli, C.A. Stan, J.L. Turner, Z. van Hoover, S. Vetter, SLAC, Menlo Park, CA 94025, USA Abstract The Linac

More information

Beamline improvement during g2p experiment. Pengjia Zhu

Beamline improvement during g2p experiment. Pengjia Zhu Beamline improvement during g2p experiment Pengjia Zhu Review for g2p Q2 0.02 0.20 GeV2 o 6 forward angle detection Review for g2p Polarized NH3 target 1K Refrigerator 2.5/5T Transverse target field Polarization

More information

SciFi A Large Scintillating Fibre Tracker for LHCb

SciFi A Large Scintillating Fibre Tracker for LHCb SciFi A Large Scintillating Fibre Tracker for LHCb Roman Greim on behalf of the LHCb-SciFi-Collaboration 14th Topical Seminar on Innovative Particle Radiation Detectors, Siena 5th October 2016 I. Physikalisches

More information

ADVANCED OPTICAL FIBER SOLUTIONS

ADVANCED OPTICAL FIBER SOLUTIONS Fiber Laser Building Blocks Fiber Laser Cavities and All-Fiber Beam Combiners A Furukawa Company www.ofsoptics.com ADVANCED OPTICAL FIBER SOLUTIONS for Your Next Multi-Kilowatt Fiber Laser Applications

More information

Installation & Operation Manual. BEC PM1 Controller Time/Flow/Volume Controller. Water Control Solutions

Installation & Operation Manual. BEC PM1 Controller Time/Flow/Volume Controller. Water Control Solutions Installation & Operation Manual BEC PM1 Controller Time/Flow/Volume Controller Water Control Solutions Table of Contents Introduction 4 Chapter 1 Technical Data and I/O Connections 6 DC Solenoid 6 Power

More information

University of Minnesota Minnesota Nano Center Standard Operating Procedure

University of Minnesota Minnesota Nano Center Standard Operating Procedure Equipment Name: CHA Evaporator Coral Name: ebevap-cha Revision Number: 12 Model: SEC 600 Revisionist: L. von Dissen Location: PAN Bay 3 Date: 04/13/2018 1 Description The CHA Evaporator is a single source

More information

Hitachi Kokusai Electric Comark LLC

Hitachi Kokusai Electric Comark LLC Hitachi Kokusai Electric Comark LLC TRANSMIT TER OF THE FUTURE Solid State. Broadband. Affordable. The future has arrived. With rapid changes in solid state RF device technologies and design techniques,

More information

PUBLICATION. Measurement setup at light source operational: Milestone M4.3

PUBLICATION. Measurement setup at light source operational: Milestone M4.3 CERN-ACC-2016-0110 Future Circular Collider PUBLICATION Measurement setup at light source operational: Milestone M4.3 Perez, Francis (ALBA) et al. 24 August 2016 The European Circular Energy-Frontier Collider

More information

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov

Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Compact Muon Solenoid Detector (CMS) & The Token Bit Manager (TBM) Alex Armstrong & Wyatt Behn Mentor: Dr. Andrew Ivanov Part 1: The TBM and CMS Understanding how the LHC and the CMS detector work as a

More information

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room 6MSD Weekly Scheduling Meeting Wednesday @ 1:30, MCC Conference Room July 6, 2011 1) Glance Back and 2-Week Look Ahead (F. Pilat)... 10 mins 2) PMI Report (P. Collins)... 5 mins 3) Critical Path Service

More information

Status Radial Services and cable tray. 1) Holes, Flexrails, WireMesh Ctray.

Status Radial Services and cable tray. 1) Holes, Flexrails, WireMesh Ctray. Status Radial Services and cable tray. 1) Holes, Flexrails, WireMesh Ctray. Status. Tapered holes for wire mesh Ctray, flexrails, grond, patch panels and thermal screen supports. Completed on all the wheels.

More information

FTS84/85 Feature Application Field. Temperature & Humidity / Flow Measuring Specialist. Monitor gas and flow for industrial process

FTS84/85   Feature Application Field. Temperature & Humidity / Flow Measuring Specialist. Monitor gas and flow for industrial process FTS84/8 Feature Application Field Capable of temperature compensation and linear adjustment Double line character : air velocity & temperature Switch for physical quantity:[m/s] [ft/s] [km/h] [mph] [knot]

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

Review of Diamond SR RF Operation and Upgrades

Review of Diamond SR RF Operation and Upgrades Review of Diamond SR RF Operation and Upgrades Morten Jensen on behalf of Diamond Storage Ring RF Group Agenda Stats X-ray and LN2 pressure results Cavity Failure Conditioning in the RFTF Cavity Simulations

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

SLAC ILC Accelerator R&D Program

SLAC ILC Accelerator R&D Program SLAC ILC Accelerator R&D Program SLUO Meeting September 26 th, 2005 Tor Raubenheimer SLAC 2005 ILC Program NLC group was redirected towards ILC Developed a program aimed at the topics identified in the

More information

Keyed LC Connector Solution A LANscape Solutions Product

Keyed LC Connector Solution A LANscape Solutions Product Applications Department of Defense installations Secure government facilities Research labs Organizations with a desire to segregate networks due to privacy or security concerns Keyed LC Connector Solution

More information

InkZoneLoop & InkZonePerfect. Pre Installation Check List

InkZoneLoop & InkZonePerfect. Pre Installation Check List InkZoneLoop & InkZonePerfect Pre Installation Check List Digital Information Ltd. Technoparkstrasse 1 CH-8005 Zürich Copyright by Digital Information Ltd. 2014 The copyright for this technical documentation

More information