1 HiRadMat facility: SPS extraction and Proton beam line Working Group Notes from the meeting held on 24 February 2011 Present: Jérémie Bauche, Christian Boccard, Pascal Catherine, Pierre Dahlen, Hubert Gaillard, Guillaume Gros, Alexandre Habert, Christoph Hessler, Lars Jensen, Gilles Le Godec, Catherine Magnier, Christophe Martin, Malika Meddahi, Christophe Mutin, Serge Pelletier, Paul Pepinster, Giovanna Vandoni, Yu Wang. Excused: Kristine Bestmann, Michel Arruat, Brennan Goddard, Verena Kain, Bruno Puccio. 1. Comments on the last minutes / Follow-up actions / News Malika Meddahi Comments on the last minutes: The minutes were approved without any comments. Important dates: Next technical stop: week 13 Dry run: week 14 Beam commissioning: weeks 20 and 21 News: For the dry run cycles for HiRadMat will be provided equivalent to those for the LHC. For more information see the Malika s Dear all, Some notes from my discussion with Karel: Dates reminder: - dry commissioning: week 14 (4-8 April) - beam commissioning: week 20 and week 21 (from 16 May to 27 May). Needed: HiRadMat cycles with energy of 440 GeV (not 450 GeV as for LHC): - The equivalent of the LHC PROBE - The equivalent of LHC INDIV - The equivalent of the LHC2 (the one with trains)
2 Karel said that they can prepare the HiRadMat cycle in the shadow / in parallel with LHC operation. 3 cycles will be prepared (PROBE, INDIV and TRAINS) but limited to 1 injection from the PS (not 4). I assume that for our HiRadMat commissioning programme this should be O.K. If you have any comments / suggestions, please let me know. Cheers, Malika 2. Post mortem of the winter shutdown and remaining work for the technical stop in week 13 All BI: Christian Boccard / Lars Jensen BPKG needs to be installed and connected (support is ready). The body of BTV needs to be replaced due to an error on the screen. BTV needs to be re-installed and connected after the displacement of the temporary door in TNC. EL (AC): Alexandre Habert Some racks need to be grounded. The power converters in BA7 are not yet connected CV: Paul Pepinster Some magnets need to be connected to the cooling water circuit (mainly in TJ7/TNC). This will be done during short accesses. Fibers: Yu Wang All fiber related work, which was requested, has been completed. Yu proposed to install a reserve tube in TNC for future fibers. She will make a request to Ilias / Ans / Sebastien. The fiber connection of the timing crate needs still be done. Timing: Roland Chery / Michel Arruat ( sent prior to this meeting) Hello Christoph, I have installed the timing crate in TJ7;you have different possibilities to connect your equipment to this crate (see the "Photo crate" above).we are waiting for the next technical stop to send the signal from BA7(see the mail below concerning the fiber). Best regards, Roland Chery
3 -----Original Message----- Hi Roland, We planned with the contractor to connect the TJ7 patchpanel in next technical stop. Afterwards, will connect to you device. Could you please give me information/(position/picture) about your device in TJ7? Many thanks! Best regards, Yu Survey: Kristine Bestmann ( sent on 22/02/2011 prior to the meeting) Dear Malika, Tomorrow we will finish the lissage of the 5 Quadrupoles in TJ7 and TNC. Also maybe finish alignment of MDLH and MDSH (they are already good in hight and tilt). The Quadrupoles 400 and 404 as well as the 500 and 504 can be connected, but this are only two very small connections. The problem for VAC is that there are a lot of smal equipment like BPM and BTV always between the already aligned magnets. Those we planned to do last. But if it is pressing for VAC to continue with the connections, let us now, which elements are the most needed. That can be done the next access after tomorrow. For us the most important was to finish the Quadrupoles with good pressision. After we can align everything else more easily. Thanks a lot for finding so much time for still accessing the tunnel. This is a big help for us, even if it might seam to you we are making very slow progress. Best regards, Kristine Vacuum: Giovanna Vandoni The vacuum system has been installed up to QTLF and is under vacuum. For the installation of the next components, which depends on the progress of the survey work, Giovanna made the following proposal to Kristine after the meeting:
4 Dear Kristine, Thank you for this complete report! If I remember, leaving BPMs and BTVs for the end is one of your constraints, but having quadrupoles and MDs aligned is already a big help for us, it gives us nice limits of zones to connect. So to summarize and following the logics you've chosen for better alignment, I would state the situation like this (can you please confirm my assumptions?): 1) MDLH QTLD QTLD : ready for vacuum connection 2) QTLF QTLF : ready for vacuum connection 3) MDSH : aligned and ready for vacuum connection 4) MDSV and MDLV : 1st priority for alignment 5) BPMs BTVs: second priority for alignment So if you can advance on MD s and let us know as early as possible when ready for vacuum connection, we would be very grateful. Of the 2 remaining MD s, the most urgent is MDSV which would permit us to connect and pump a long zone. I ll phone you this afternoon to see with you how you intend to proceed and if this fits into your planning. Best regards Giovanna Furthermore, Giovanna asked after the meeting if o the sheet with the opening for the vacuum pipe in the door between TCC6/TJ7 could be installed during a short access and o BTV could be replaced during a short access. Integration: Catherine Magnier After the installation is completed the plans will be released as built. Therefore, a laser scan was proposed. Power converters: Gilles Le Godec Power converters quadrupoles: Installed and tested. Power converter MBS: A semiconductor has broken, which is not yet understood. The MBB converter has the same semiconductor built in and therefore its powering test has been postponed until the problem of the MBS power converter will be fixed. 4-quadrant converters: Production completed, tests not yet done due to technical problems.
5 Latest information sent by Gilles on 25/02/2011: o Convertisseur MBS : suite à la casse, à l audit interne, aux modifications consécutives et au changement du Semi-conducteur de Puissance, nous avons redémarré ce jour sur charge de test jusqu à 1400A ce qui constitue une bonne nouvelle. Il est difficile de poser un diagnostic définitif sur l origine de cette casse. La suite pour nous est de nous connecter aux aimants pour régler nos boucles (tests Interlock mardi prochain). La route est encore longue avant les tests à pleine Puissance. o Convertisseur MBB : j avais décidé d arrêter les essais tant que le MBS ne serait pas redémarré (les semi-conducteurs de Puissance sont fournis par le même fabricant). Nous allons appliquer les mêmes mesures conservatrices sur ce convertisseur avant de poursuivre les essais de Puissance (Plan d action la semaine prochaine). o Convertisseurs bipolaires (S250) : nous arrivons au bout des tests du premier de la série. Le test à pleine puissance (déverminage) sera réalisé lundi : j ai demandé à Loic de t envoyer un pour confirmer que tout est Ok. Nous aurons probablement un deuxième convertisseur en début de test jeudi après midi autant dire que la situation est difficile sur ce package. Transport: Serge Pelletier Problem during winter shutdown: Work in TJ7 with so many teams. Serge proposed to have a covered area outside the monte-charge. This would make the handling of the radioactive test stands easier. EL: Guillaume Gros Some work on the control cables, arriving in front of the beam dump, still needs to be done. The zone is currently not yet accessible. Two magnets need to be connected. Actions to protect the cables on the floor will be discussed in a dedicated meeting. Interlock: Christophe Martin 3 users are not yet connected to the interlock system. The other connections have been tested and are operational. Magnet interlock: Pierre Dahlen The electronics have been installed. The connections in BA7 still need to be done (BA6 is ok).
6 Magnets: Jérémie Bauche / Pascal Catherine The thermo switches will be installed during short accesses. A dedicated meeting will be organized the save start-up of the magnets and the associated protection scheme. Planning: Hubert Gaillard A very preliminary version of the planning for the work concerning WG1 during the next technical stop: link During the first day of the stop the scaffolding will be dismounted and the door in TNC displaced. The details of the installation of the collimator need to be clarified with Ans. 3. AOB Dedicated meetings will be arranged whenever needed. Christoph Hessler,
Injectors. Injectors ready
Injectors Injectors ready Linac2 > 04/02 ; PSB > 09/02 ; PS et TT2 > 11/02 ; SPS > 14/04; Ring patrol done Ti8 patrol done DSO Test Done 10/11 Feb EIS tests Ongoing Point 8/2 closed Alice/LHCb closed 12/13
More informationWHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS
WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS J. Wenninger, CERN, Geneva Abstract A large fraction of the LHC Machine Protection System was commissioned in 2008 in view of the first LHC
More informationEquipment Installation, Planning, Layout, organisation and updates
Equipment Installation, Planning, Layout, organisation and updates Simon Mataguez, Julie Coupard with contributions of the LIU-PLI team Table of contents: LIU installation activities Organisation of the
More informationFriday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB
07:00 13:00 : Establishing reference orbit golden Jorg Wenninger Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB Offset in vertical plane, ~1 mm seems real. 13:00 14: 00 : Injection oscillation
More informationLHC Machine check out
LHC Machine check out R.Giachino / M.Albert 1v1 Be/op 12th March 2012 Hardware Commissioning: M. Pojer, R. Schmidt and M. Solfaroli Summary of week 10 Machine checkout: R. Giachino, M.Albert and J. Wenninger
More informationUpgrading LHC Luminosity
1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per
More informationProcedures for the Commissioning of the Beam Interlock System for the CNGS and SPS-LHC Transfer Lines
CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project CERN Div./Group or Supplier/Contractor Document No. AB-OP EDMS Document No. 735534 Date: 2006-05-16 Interlock Test Procedure Procedures
More informationCLEX (CLIC Experimental Area)
CLEX (CLIC Experimental Area) Status and plans G.Geschonke for Hans Braun CERN CT3 coll meetg 2005 CLEX 1 CT3 objectives R1.1 CLIC accelerating structure, R1.2 rive beam scheme with a fully loaded linac
More informationLHC Nominal injection sequence
LHC Nominal injection sequence Mike Lamont Acknowledgements: Reyes Alemany Fernandez, Brennan Goddard Nominal injection Overall injection scheme Pilot R1, Pilot R2, Intermediate R1 Optimise Intermediate
More information1. General principles for injection of beam into the LHC
LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary
More informationLEARN FRENCH BY PODCAST
LEARN FRENCH BY PODCAST AUDIO PODCASTS FOR LEARNERS OF FRENCH AS A FOREIGN LANGUAGE Lesson 23 Sorry, I can t make it tonight Plus Publications Bramley Douglas Road Cork Ireland (t) 353-(0)21-4847444 (f)
More informationCopy these 2 verbs into your book:
Hard Copy these 2 verbs into your book: Être = to be Je suis = I am Tu es = you are Il/elle/one est = he/she is Nous sommes = we are Vous êtes = you are Ils/elles sont = they are faire = to do Je fais
More informationAREAL- Phase 1. B. Grigoryan on behalf of AREAL team
AREAL- Phase 1 Progress & Status B. Grigoryan on behalf of AREAL team Contents Machine Layout Building & Infrastructure Laser System RF System Vacuum System Cooling System Control System Beam Diagnostics
More informationTRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT
Discovery, accelerated 1 TRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT Arthur Leung High Power DC Systems 2018-10-05 TRIUMF stands for TRI University Meson Facility Founded by University of British
More informationAssembly of the HIE-ISOLDE accelerator cavities in a clean room.
Final adjustments being made in the LHC tunnel before the return of beams. On 5 April, particles began circulating in the accelerator for the first time following the Long Shutdown. (CERN-PHOTO-201503-058-1)
More informationPICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?
Published by CERN in the Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans, Centre de Convention, Archamps, France, 29 31 October 2013, edited by B. Goddard and F. Zimmermann, CERN 2014 006
More informationbeam dump from P2 losses this morning
beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous
More informationDECORATIVE HOME FURNISHING FABRICS
BARROW INDUSTRIES DECORATIVE HOME FURNISHING FABRICS Gallery of Wovens By Merrimac Textiles Decorative Home Furnishing Fabrics BARROW INDUSTRIES Executive Offices: 3 Edgewater Drive Norwood, MA 02062 Distribution
More informationLinac 4 Instrumentation K.Hanke CERN
Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase
More informationWhat can be learned from HERA Experience for ILC Availability
What can be learned from HERA Experience for ILC Availability August 17, 2005 F. Willeke, DESY HERA Performance Critical Design Decisions What could be avoided if HERA would have to be built again? HERA
More information5 Project Costs and Schedule
93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for
More informationStatus of CTF3. G.Geschonke CERN, AB
Status of CTF3 G.Geschonke CERN, AB CTF3 layout CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10 Drive Beam Injector ~ 50 m 3.5 A - 2100 b of 2.33 nc 150 MeV - 1.4
More informationAvailability and Reliability Issues for the ILC
Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some
More informationCERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS
Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications
More informationEPJ Web of Conferences 95,
EPJ Web of Conferences 95, 04012 (2015) DOI: 10.1051/ epjconf/ 20159504012 C Owned by the authors, published by EDP Sciences, 2015 The ELENA (Extra Low Energy Antiproton) project is a small size (30.4
More informationSession 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators
- First Results & Next Steps Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix 2009 Rhodri Jones on behalf of BE/BI & all our collaborators LHC BTV System All screens
More informationOlly Richards. I Will Teach You A Language COPYRIGHT 2016 OLLY RICHARDS ALL RIGHTS RESERVED
Olly Richards I Will Teach You A Language COPYRIGHT 2016 OLLY RICHARDS ALL RIGHTS RESERVED Make sure you get my best language tips FREE by email... Please go and click the activation link in the email
More informationMinutes of the ALICE Technical Board, November 14 th, The draft minutes of the October 2013 TF meeting were approved without any changes.
Minutes of the ALICE Technical Board, November 14 th, 2013 ALICE MIN-2013-6 TB-2013 Date 14.11.2013 1. Minutes The draft minutes of the October 2013 TF meeting were approved without any changes. 2. LS1
More informationThe 2011 LHC Run - Lessons in Beam Diagnostics
The 2011 LHC Run - Lessons in Beam Diagnostics LHC Performance Workshop Chamonix 2012 6 th 10 th February Rhodri Jones on behalf of the CERN Beam Instrumentation Group Outline This Presentation will focus
More informationRF upgrade program in LHC injectors and LHC machine
RF upgrade program in LHC injectors and LHC machine E r k J e n s e n, o n b e h a l f o f B E - RF Many thanks to M. E. Angoletta, O. Brunner, R. Calaga, E. Ciapala, H. Damerau, W. Höfle, E. Montesinos,
More informationPRESENT STATUS OF J-PARC
PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize
More informationThe PEFP 20-MeV Proton Linear Accelerator
Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.
More informationBeam systems without failures what can be done?
Acknowledgements: T.Baer, C.Bracco, G.Bregliozzi, G.Lanza, L.Ponce, S.Redaelli, A.Butterworth Beam systems without failures what can be done? After LS1 Session 07-09 th February 2012 M.Solfaroli/J.Uythoven
More informationGetting started guide
Getting started guide A wearable sensor unit enabling a fast time to market (STEVAL-WESU1) SCAN ME Version 1.5 (February 2017) Overview 2 1 Getting started: assemble the items 2 Getting started: activate
More informationSite meeting. Site meeting 4/05/2007 1
Site meeting New Site study (S. Maury) Site implementation (N. Lopez) Linac4 integration (M. Timmins) Preliminary TS estimation and comparison with the previous South Hall option (N. Lopez) Discussion
More information6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room
6MSD Weekly Scheduling Meeting Wednesday @ 1:30, MCC Conference Room July 6, 2011 1) Glance Back and 2-Week Look Ahead (F. Pilat)... 10 mins 2) PMI Report (P. Collins)... 5 mins 3) Critical Path Service
More information30 GHz Power Production / Beam Line
30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression
More informationTHE ARCHITECTURE, DESIGN AND REALISATION OF THE LHC BEAM INTERLOCK SYSTEM
10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO2.031-3 (2005) THE ARCHITECTURE, DESIGN AND REALISATION OF THE LHC BEAM INTERLOCK SYSTEM B. Todd
More informationS67: PRE-CYCLE & RAMP
HWC CURRENT STATUS HWC slowly coming to an end (11 circuits remaining) Quench training of RB.A34 resumed (10881 A) Quench training of RB.A45 is slow (10484 A) PGCs ongoing Pre-cycles and ramps being performed
More informationLEARN FRENCH BY PODCAST
LEARN FRENCH BY PODCAST AUDIO PODCASTS FOR LEARNERS OF FRENCH AS A FOREIGN LANGUAGE Lesson 40 How am I going to explain it to him? Plus Publications Bramley Douglas Road Cork Ireland (t) 353-(0)21-4847444
More informationCCS Tools Catalog Pièces Grues à tour V5. 04/2018
CCS Tools Catalog Pièces Grues à tour V5. 04/2018 84054165 Kit d outillage CCS complet Complete CCS Tool kit 3 Composants Components Contents Référence Description Quantité Page 84054154 SAC A OUTILS
More informationP. Emma, et al. LCLS Operations Lectures
P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1
More informationLHC COMMISSIONING PLANS
LHC COMMISSIONING PLANS R. Alemany Fernández, CERN, Geneva, Switzerland Abstract Operating the Large Hadron Collider (LHC) at design performance is not going to be easy. The machine is complex and with
More informationListen to the following text and repeat out loud after each sentence. Pay particular attention to the sounds ou: nous bonjour.
> Bonjour, ça va? Hello, how are you? Ça va bien, merci, et vous? Fine, thank you, and yourself? 'ou' et 'ille' pronunciation practice qu'est-ce que...? what...? c'est... this is / it's il y a... there
More informationOak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project
Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources
More informationOPERATIONAL EXPERIENCE WITH CIRCULATING BEAM
OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM S. Redaelli on behalf of the LHC beam commissioning team CERN, Geneva, Switzerland Abstract Following various injection tests, the full LHC beam commissioning
More informationREVIEW OF LHC OPERATION
REVIEW OF LHC OPERATION M. Lamont, CERN, Geneva, Switzerland Abstract LHC beam commissioning re-started on the 20 th November 2009 and continued for three and a half weeks. A summary of the progress made
More informationPEP-II Disassembly Technical Systems
PEP-II Disassembly Technical Systems PEP-II D&D Review 6-Aug-2007 S.DeBarger S.Ecklund, A.Hill, D.Kharakh, M.Zurawel Outline Project safety Disassembly of technical systems Shielding Vac/Mechanical Cable
More informationSummary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017
Summary of CBETA Independent Cost Reviews R. Michnoff January 19, 2017 Overview On January 18 th and 19 th, 2017, independent cost reviews were conducted by phone between BNL and Cornell University for
More informationNegative sentence structures
So far, when making negative sentences, we only used the structure ne pas. There are actually other ways to make negative sentences and to convey other meanings with negative sentences. In this lesson,
More informationABSOLUTE DIRECTORS ROCK, CINéMA ET CONTRE-CULTURE (CAMION NOIR) (FRENCH EDITION) BY FRANCK BUIONI
Read Online and Download Ebook ABSOLUTE DIRECTORS ROCK, CINéMA ET CONTRE-CULTURE (CAMION NOIR) (FRENCH EDITION) BY FRANCK BUIONI DOWNLOAD EBOOK : ABSOLUTE DIRECTORS ROCK, CINéMA ET CONTRE- Click link bellow
More informationAct 4: Low-fat croissants
Act 4: Low-fat croissants Bonjour! C est moi Jean-Paul, your host for Act IV. Oui, Act IV already! We hope that following Jack and Michelle in their endeavor to learn French is helping you to learn as
More informationFull IEFC workshop Feb.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix How does one keep a 50 51 year old running for another 25 years? accelerator How
More informationCSB.01.A.001. Cellular Booster 850/1900 MHz 2x SMA(F) Connectors and DC Power Connector
CSB.01.A.001 Specification Part No. Product Name Features CSB.01.A.001 Cellular Booster 850/1900 MHz 2x SMA(F) Connectors and DC Power Connector 15dB Gain Cellular Signal Booster Frequency: 824-894MHz,
More informationLinac3 experience for LHC ion runs
Linac3 experience for LHC ion runs G Bellodi for the Linac3 team Keywords: beam performance reliability set up time results of MDs remaining unknowns 1 A year in perspective Source removed: change of main
More informationMonthly Progress Report Stanford Synchrotron Radiation Laboratory
Monthly Progress Report Stanford Synchrotron Radiation Laboratory April 2003 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 3 2. Cost Data 5 B. Design and Fabrication Reports 1.1 Magnets &
More informationA Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.
A1.01 PROJECT MANAGEMENT BNL/Cornell Michnoff A1.01.01 Milestones BNL/Cornell Michnoff This scope is a placeholder for all project high level milestones for NYSERDA. There is no cost or labor related to
More informationFILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017
FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017 G. Iadarola*, L. Mether, G. Rumolo, CERN, Geneva, Switzerland Abstract Several measures implemented in the 2016-17 Extended Year End Technical Stop (EYETS)
More informationLEARN FRENCH BY PODCAST
LEARN FRENCH BY PODCAST AUDIO PODCASTS FOR LEARNERS OF FRENCH AS A FOREIGN LANGUAGE Lesson 6 Discussing your interests Plus Publications Bramley Douglas Road Cork Ireland (t) 353-(0)21-4847444 (f) 353-(0)21-4847675
More informationP. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract
Abstract 7 0 0 k W M A I N I N J E C T O R O P E R A T I O N S F O R N O νa AT FNAL P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA Following a successful career as an antiproton
More informationTranslated in English Literal Meaning / Audio
Translated in English Literal Meaning / Audio 365 Days of French Expressions by Frédéric BIBARD Contents Introduction: 4 Week1-52 5-255 How to download the MP3? 256 About the author: 257 Questions about
More information2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2
PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND
More informationElectron Clouds in the SPS: progress in the analysis of cures/mitigations measures and potential schedule of implementation J.M.
Electron Clouds in the SPS: progress in the analysis of cures/mitigations measures and potential J.M. Jimenez This talk is a summary of my views meant for a recommendation. For detailed results and pictures,
More informationTuesday, March 3rd Cinema
Tuesday, March 3rd Cinema since / for = depuis Technology has really changed the way we experience movies - since the beginning of the century ( since : avec un repère) - for 123 years ( for : avec une
More informationCLIC Feasibility Demonstration at CTF3
CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for
More informationLHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump
2016-01-07 Chiara.Bracco@cern.ch LHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump C. Bracco,R. Bruce and E. Quaranta CERN, Geneva, Switzerland Keywords: asynchronous dump, abort
More informationCryostat Instrumentation Cabling Grounding and Shielding. Eric Hazen Boston University 12/15/08 1
Cryostat Instrumentation Cabling Grounding and Shielding Eric Hazen Boston University 12/15/08 1 Electromagnetic Compatibility We need to classify our instrumentation in terms of Emission and Susceptibility
More informationJoseph Balsamo Alexandre Dumas
Joseph Balsamo Alexandre Dumas Thank you for downloading. Maybe you have knowledge that, people have look hundreds times for their favorite books like this, but end up in infectious downloads. Rather than
More informationLockit Timecode Beetle ACN-BT
Lockit Timecode Beetle experience quality. Table of contents page 1. Introduction 2 2. Package Contents 2 3. Warranty & Approvals 3 Warranty 3 Approvals 4 www.ambient.de/en 1 1. Introduction The Beetle,
More informationGE Interlogix Fiber Options S700V & S702V. Instruction Manual FIBER-OPTIC VIDEO TRANSMISSION SYSTEM
g GE Interlogix Fiber Options Instruction Manual S700V & S702V FIBER-OPTIC VIDEO TRANSMISSION SYSTEM Federal Communications Commission and Industry Canada Radio Frequency Interference Statements This equipment
More informationLESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV)
LESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV) E.B. Holzer, B. Dehning, E. Effinger, J. Emery, S. Grishin, C. Jr Hajdu, H. Ikeda,
More informationTHE ANTIPROTON DECELERATOR (AD)
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN - PS DIVISION CERN/PS 99-50 (HP) THE ANTIPROTON DECELERATOR (AD) S. Maury (on behalf of the AD team) Abstract To continue an important part of the LEAR physics
More informationGCSE FRENCH 8658/LH. Higher Tier Paper 1 Listening
SPEIMEN MTERIL GSE FRENH Higher Tier Paper 1 Listening H Specimen 2018 Morning Time allowed: 45 minutes (including 5 minutes reading time before the test) You will need no other materials. The pauses are
More informationThe FAIR plinac RF Systems
The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)
More informationStatus of the X-ray FEL control system at SPring-8
Status of the X-ray FEL control system at SPring-8 T.Fukui 1, T.Hirono 2, N.Hosoda 1, M.Ishii 2, M.Kitamura 1 H.Maesaka 1,T.Masuda 2, T.Matsushita 2, T.Ohata 2, Y.Otake 1, K.Shirasawa 1,M.Takeuchi 2, R.Tanaka
More informationAccelerator Controls Part2: CERN central timing system
Accelerator Controls Part2: CERN central timing system CAS 2009@Divonne Hermann Schmickler Outline Part 2 Requested Functionality of the CERN timing system Implementation: Hardware Details Software Details:
More informationPLEIADES. ORFEO First Methodology and Thematic teams meeting 23 & 24 march Paris 1
PLEIADES ORFEO First Methodology and Thematic teams meeting 23 & 24 march 2006 - Paris 1 In orbit satellite configuration Star Tracker (+Y) Orbit Normal (+Y) Velocity (+X) Solar Array Instrument Radiators
More informationCommissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)
Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning
More informationFRENCH. 2 UNIT GENERAL LISTENING SKILLS (30 Marks) STUDENT NUMBER CENTRE NUMBER HIGHER SCHOOL CERTIFICATE EXAMINATION
STUDENT NUMBER CENTRE NUMBER N E W S O U T H W A L E S HIGHER SCHOOL CERTIFICATE EXAMINATION 1996 FRENCH 2 UNIT GENERAL LISTENING SKILLS (30 Marks) DIRECTIONS TO CANDIDATES Write your Student Number and
More informationProton Engineering Frontier Project
Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub
More informationFEATURES AND CONTENTS
HDMI Wireless Incorporates HDMI technology Model: WTR-3000 3D, 1080P Wireless HDMI Transmission Full band IR Extending function INTRODUCTION Thank you for purchasing WTR-3000 HDMI Wireless sender. Your
More informationLibera Hadron: demonstration at SPS (CERN)
Creation date: 07.10.2011 Last modification: 14.10.2010 Libera Hadron: demonstration at SPS (CERN) Borut Baričevič, Matjaž Žnidarčič Introduction Libera Hadron has been demonstrated at CERN. The demonstration
More informationTeamWork 601 Kit Installation Guide
C G G TX RX COM +V APARATUS US 0 TeamWork 0 Kit Installation Guide TeamWork 0 Kit The TeamWork 0 kit consists of an analog and digital video switcher, system controller, Cable Cubby, and cables packaged
More informationA Facility for Accelerator Physics and Test Beam Experiments
A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four
More informationLevel 3 French, 2013
91546 915460 3SUPERVISOR S Level 3 French, 2013 91546 Demonstrate understanding of a variety of extended written and / or visual French texts 9.30 am Thursday 28 November 2013 Credits: Five Achievement
More informationUser s Guide F-SM-MM-02 Stand-Alone Media Converter Fast Ethernet or ATM Singlemode to Multimode
User s Guide F-SM-MM-02 Stand-Alone Media Converter Fast Ethernet or ATM Singlemode to Multimode Transition Networks F-SM-MM-02 Fast Ethernet Media Converter extends Fast Ethernet or ATM over singlemode
More informationPEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings
More information3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline
3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The
More informationHIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY
HIGH-INTENSITY PROTON BEAMS AT CERN AND THE STUDY E. Métral, M. Benedikt, K. Cornelis, R. Garoby, K. Hanke, A. Lombardi, C. Rossi, F. Ruggiero, M. Vretenar, CERN, Geneva, Switzerland Abstract The construction
More informationDELIVERY RECORD. Location: Ibaraki, Japan
DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October
More informationUSER S GUIDE F-SM-MM-06 Stand-Alone Media Converter OC-12 ATM / SONET Singlemode to Multimode
USER S GUIDE F-SM-MM-06 Stand-Alone Media Converter OC-12 ATM / SONET Singlemode to Multimode Transition Networks F-SM-MM-06 Ethernet Media Converter extends ATM or SONET over singlemode fiber-optic cable
More informationStatus of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR
Status of the FAIR Project Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Finland France Germany India Poland Romania Russia Slovenia Sweden UK FAIR Strategic objectives FAIR phase
More informationKS4 curriculum map. Year 10
KS4 curriculum map Year 10 Term 1 Module 1 Moi AQA context and purpose Content Moi et quelques autres Talking about yourself and other people Saying where you are from En and au with the names of the country
More informationAdvanced Photon Source - Upgrades and Improvements
Advanced Photon Source - Upgrades and Improvements Horst W. Friedsam, Jaromir M. Penicka Argonne National Laboratory, Argonne, Illinois, USA 1. INTRODUCTION The APS has been operational since 1995. Recently
More informationPersonal Response Writing
Personal Response Writing What is it? This is the essay that you will have to write after the Listening assessment. The topic for the essay is linked the the Listening. The word count is 120-150 words
More informationSetting Up Your Camera
Setting Up Your Camera Plug in your Camera(s) Indoor LED light Outdoor Micro USB (Optional) Indoor camera stand installation Status Lights on your Camera 82802 (Indoor) 82801 (Outdoor) Colour Status Meaning
More informationCNGS progress report 2004
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN AB DEPARTMENT AB-Note-2004-063-CNGS EDMS No. 478683 CNGS progress report 2004 The CNGS project team L. Bruno, M. Clément, K. Elsener, H. Gaillard, L.A. Lopez-Hernandez,
More informationThe ATLAS Beam Conditions and Beam Loss Monitors
RD09 9th International Conference on Large Scale Applications and Radiation Hardness of Semiconductor Detectors The ATLAS Beam Conditions and Beam Loss Monitors Boštjan Maček J. Stefan Institute, Ljubljana
More informationSUMMARY OF SESSION 4 - UPGRADE SCENARIO 2
Published by CERN in the Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans, Centre de Convention, Archamps, France, 29 31 October 2013, edited by B. Goddard and F. Zimmermann, CERN 2014 006