1 HWC CURRENT STATUS HWC slowly coming to an end (11 circuits remaining) Quench training of RB.A34 resumed (10881 A) Quench training of RB.A45 is slow (10484 A) PGCs ongoing Pre-cycles and ramps being performed on S12, S23, S56, S67 1

2 S67: PRE-CYCLE & RAMP RB RQD/F without RQ4.R6B1/2 and RCD.A67B1/2 2

3 S12 + S23 + S56: PRE-CYCLE S12 S23 S56 without inner triplets 3

4 S12 + S23 + S56: RAMP S12 S23 S56 without RQX.L/R2, RQ4.L6B1/2, RCDs 4

5 BEAM INSTRUMENTATION Most systems ready except: BLM (issue in SX4 some cards give wrong data) Wirescanners (firmware update) FBCCM (DIDT) BGI, BQMIM, BGV not ready before TS1 5

6 COLLIMATORS Collimator tests ongoing (ramps and MP validation) MCS issues to be verified after recent CMW/RDA release Last night: 10 successful ramps with all collimators Application programs & sequencer tasks operational 6

7 RF RF power in good shape RF cavities conditioned to 2MV RFLL commissioning without beam ongoing tuning for 2 days without access to UX45, Thursday + Friday? ADT amplifier exchanged today and new spare underground 7

8 REMAINING ISSUES SECTOR TEST A few SPS SIS interlocks for the LHC not fully operational yet. Economy mode interlock on PCs in lines has to be removed. SIS interlocks on BI in lines to be reviewed. TI8 BLM upstream interlock not resettable and always FALSE. > intervention on 19/3 (access) Issue with DCCT3_TI8 FEI and FGC (new software release done) > to be tested (Verena) Vacuum valve in front of MSI-TI2 (VVGS.29528) interlock to SPS EXT1 master BIC > to be tested once extraction conditions established LHC probe beam re-phasing issues, stability issues => often BQM interlocks > threshold could be increased TT40.BTV : switches can t be read > intervention on 19/3 (S.Burger) BTVDD image orientation > on hold until LBDS experts decide on preference MKE4 problem not fixed (instabilities on clipper switch, heater current not stable) > switch replacement on Thursday morning 8

9 REMAINING ISSUES Controls: issues with CMW/RDA affecting several clients addressed by CO experts; new libraries released, but not yet validated (collimators) CIBDS problem while arming LBDS LBDS-XPOC: Missing BI data: (BCTFR, BSRA, etc..) EN/CV pressure IP5 tunnel/cavern: The air flow is going in the right direction between the different areas but the delta P are worse than before. Investigations and measurements ongoing 9

10 POSSIBLE ROADMAP Access machine closed Aim for complete machine closure tomorrow late afternoon. o Access still possible if needed after that date. Beam Energy Tracking System (BETS) still on simulation. Proposal: Connection (access) to energy defining circuits on Friday 20 RB , Q4 s MSD s at point 6 BETS tests have to be synchronized with training quench campaign in sector 45. Beware: Vacuum sector valves must be closed for any powering tests! BIS inputs Ideally we should activate all BIS inputs of a given point in one step. Proposal: all remaining channels to be fully connected on Monday 23. Access required to activate BIS inputs. 10

11 ACCESS REQUESTS WHO WHERE WHEN WHAT Duration Cryogenics UX65 19/3 am Problem with valve ~2h ALICE UX24? Intervention on detector ½ day LBDS team P6 18/3 CTRV firmware update 3h LBDS team P6 18/3 CIBU 2-3h LBDS team P6 20/3 pm BETS connection to real E 2h ATLAS UX15 21/3 or 23/3 Magnet temperature check 4h EN/MEF LHC 18/3 Check remaining material? 11

12 TENTATIVE SCHEDULE 1/2 12

13 TENTATIVE SCHEDULE 2/2 13

14 NEXT MEETING Friday 8:30 CCC Conference room 14

LHC Machine check out

LHC Machine check out LHC Machine check out R.Giachino / M.Albert 1v1 Be/op 12th March 2012 Hardware Commissioning: M. Pojer, R. Schmidt and M. Solfaroli Summary of week 10 Machine checkout: R. Giachino, M.Albert and J. Wenninger

More information

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS J. Wenninger, CERN, Geneva Abstract A large fraction of the LHC Machine Protection System was commissioned in 2008 in view of the first LHC

More information

Beam systems without failures what can be done?

Beam systems without failures what can be done? Acknowledgements: T.Baer, C.Bracco, G.Bregliozzi, G.Lanza, L.Ponce, S.Redaelli, A.Butterworth Beam systems without failures what can be done? After LS1 Session 07-09 th February 2012 M.Solfaroli/J.Uythoven

More information

LHC Nominal injection sequence

LHC Nominal injection sequence LHC Nominal injection sequence Mike Lamont Acknowledgements: Reyes Alemany Fernandez, Brennan Goddard Nominal injection Overall injection scheme Pilot R1, Pilot R2, Intermediate R1 Optimise Intermediate

More information

LHC COMMISSIONING PLANS

LHC COMMISSIONING PLANS LHC COMMISSIONING PLANS R. Alemany Fernández, CERN, Geneva, Switzerland Abstract Operating the Large Hadron Collider (LHC) at design performance is not going to be easy. The machine is complex and with

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

Injectors. Injectors ready

Injectors. Injectors ready Injectors Injectors ready Linac2 > 04/02 ; PSB > 09/02 ; PS et TT2 > 11/02 ; SPS > 14/04; Ring patrol done Ti8 patrol done DSO Test Done 10/11 Feb EIS tests Ongoing Point 8/2 closed Alice/LHCb closed 12/13

More information

Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators

Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix Rhodri Jones on behalf of BE/BI & all our collaborators - First Results & Next Steps Session 07 - What did we learn with beam in 2008? LHC Performance Workshop Chamonix 2009 Rhodri Jones on behalf of BE/BI & all our collaborators LHC BTV System All screens

More information

Procedures for the Commissioning of the Beam Interlock System for the CNGS and SPS-LHC Transfer Lines

Procedures for the Commissioning of the Beam Interlock System for the CNGS and SPS-LHC Transfer Lines CERN CH-1211 Geneva 23 Switzerland the Large Hadron Collider project CERN Div./Group or Supplier/Contractor Document No. AB-OP EDMS Document No. 735534 Date: 2006-05-16 Interlock Test Procedure Procedures

More information

MACHINE PROTECTION WORKSHOP REVISITED OPEN ISSUES, PROGRESS AND DECISIONS ON MAJOR TOPICS

MACHINE PROTECTION WORKSHOP REVISITED OPEN ISSUES, PROGRESS AND DECISIONS ON MAJOR TOPICS MACHINE PROTECTION WORKSHOP REVISITED OPEN ISSUES, PROGRESS AND DECISIONS ON MAJOR TOPICS D. Wollmann*,, C. Bracco, M. Zerlauth, CERN, Geneva, Switzerland Abstract At the Machine Protection Workshop, held

More information

REVIEW OF LHC OPERATION

REVIEW OF LHC OPERATION REVIEW OF LHC OPERATION M. Lamont, CERN, Geneva, Switzerland Abstract LHC beam commissioning re-started on the 20 th November 2009 and continued for three and a half weeks. A summary of the progress made

More information

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB 07:00 13:00 : Establishing reference orbit golden Jorg Wenninger Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB Offset in vertical plane, ~1 mm seems real. 13:00 14: 00 : Injection oscillation

More information

1. General principles for injection of beam into the LHC

1. General principles for injection of beam into the LHC LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary

More information

INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP

INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP Abstract The initial commissioning of the LHC injections and beam dumps allowed the basic functionality of the systems to be verified, together with

More information

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2 PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND

More information

beam dump from P2 losses this morning

beam dump from P2 losses this morning beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous

More information

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM

OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM OPERATIONAL EXPERIENCE WITH CIRCULATING BEAM S. Redaelli on behalf of the LHC beam commissioning team CERN, Geneva, Switzerland Abstract Following various injection tests, the full LHC beam commissioning

More information

RF PERFORMANCE AND OPERATIONAL ISSUES

RF PERFORMANCE AND OPERATIONAL ISSUES RF PERFORMANCE AND OPERATIONAL ISSUES A. Butterworth, L. Arnaudon, P. Baudrenghien, O. Brunner, E. Ciapala, W. Hofle, J. Molendijk, CERN, Geneva, Switzerland Abstract During the 2009 LHC run, a number

More information

Equipment Installation, Planning, Layout, organisation and updates

Equipment Installation, Planning, Layout, organisation and updates Equipment Installation, Planning, Layout, organisation and updates Simon Mataguez, Julie Coupard with contributions of the LIU-PLI team Table of contents: LIU installation activities Organisation of the

More information

Linac3 experience for LHC ion runs

Linac3 experience for LHC ion runs Linac3 experience for LHC ion runs G Bellodi for the Linac3 team Keywords: beam performance reliability set up time results of MDs remaining unknowns 1 A year in perspective Source removed: change of main

More information

The 2011 LHC Run - Lessons in Beam Diagnostics

The 2011 LHC Run - Lessons in Beam Diagnostics The 2011 LHC Run - Lessons in Beam Diagnostics LHC Performance Workshop Chamonix 2012 6 th 10 th February Rhodri Jones on behalf of the CERN Beam Instrumentation Group Outline This Presentation will focus

More information

LHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump

LHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump 2016-01-07 Chiara.Bracco@cern.ch LHC_MD292: TCDQ-TCT retraction and losses during asynchronous beam dump C. Bracco,R. Bruce and E. Quaranta CERN, Geneva, Switzerland Keywords: asynchronous dump, abort

More information

What can be learned from HERA Experience for ILC Availability

What can be learned from HERA Experience for ILC Availability What can be learned from HERA Experience for ILC Availability August 17, 2005 F. Willeke, DESY HERA Performance Critical Design Decisions What could be avoided if HERA would have to be built again? HERA

More information

Full IEFC workshop Feb.

Full IEFC workshop Feb. How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix How does one keep a 50 51 year old running for another 25 years? accelerator How

More information

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC

A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO2.042-4 (2005) A Fast Magnet Current Change Monitor for Machine Protection in HERA and the LHC M.Werner

More information

RF upgrade program in LHC injectors and LHC machine

RF upgrade program in LHC injectors and LHC machine RF upgrade program in LHC injectors and LHC machine E r k J e n s e n, o n b e h a l f o f B E - RF Many thanks to M. E. Angoletta, O. Brunner, R. Calaga, E. Ciapala, H. Damerau, W. Höfle, E. Montesinos,

More information

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA. A1.01 PROJECT MANAGEMENT BNL/Cornell Michnoff A1.01.01 Milestones BNL/Cornell Michnoff This scope is a placeholder for all project high level milestones for NYSERDA. There is no cost or labor related to

More information

Bunch-by-bunch feedback and LLRF at ELSA

Bunch-by-bunch feedback and LLRF at ELSA Bunch-by-bunch feedback and LLRF at ELSA Dmitry Teytelman Dimtel, Inc., San Jose, CA, USA February 9, 2010 Outline 1 Feedback Feedback basics Coupled-bunch instabilities and feedback Beam and feedback

More information

PICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT?

PICS IN THE INJECTOR COMPLEX WHAT ARE WE TALKING ABOUT? Published by CERN in the Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans, Centre de Convention, Archamps, France, 29 31 October 2013, edited by B. Goddard and F. Zimmermann, CERN 2014 006

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

SUMMARY OF SESSION 4 - UPGRADE SCENARIO 2

SUMMARY OF SESSION 4 - UPGRADE SCENARIO 2 Published by CERN in the Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans, Centre de Convention, Archamps, France, 29 31 October 2013, edited by B. Goddard and F. Zimmermann, CERN 2014 006

More information

Proceedings of the 1997 Workshop on RF Superconductivity, Abano Terme (Padova), Italy

Proceedings of the 1997 Workshop on RF Superconductivity, Abano Terme (Padova), Italy BEAM RELATED THERMAL LOSSES ON THE CRYOGENIC AND VACUUM SYSTEMS OF LEP G. Cavallari, Ph. Gayet, G. Geschonke, D. Kaiser, J.M. Jimenez CERN, 111 GENEVA 3 (Switzerland) Abstract The LEP Collider was operated

More information

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC

Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC Commissioning and Performance of the ATLAS Transition Radiation Tracker with High Energy Collisions at LHC 1 A L E J A N D R O A L O N S O L U N D U N I V E R S I T Y O N B E H A L F O F T H E A T L A

More information

100g cfp Health check Jean-Marie Vilain, Product Specialist, Transport and Datacom

100g cfp Health check Jean-Marie Vilain, Product Specialist, Transport and Datacom 100g cfp Health check Jean-Marie Vilain, Product Specialist, Transport and Datacom As the deployment of 100G links continues to gather steam, the demand for increased bandwidth is at an all-time high and

More information

!"!3

!!3 Abstract A single-mode 500 MHz superconducting cavity cryomodule has been developed at Cornell for the electronpositron collider/synchrotron light source CESR. The Cornell B-cell cavity belongs to the

More information

THE ARCHITECTURE, DESIGN AND REALISATION OF THE LHC BEAM INTERLOCK SYSTEM

THE ARCHITECTURE, DESIGN AND REALISATION OF THE LHC BEAM INTERLOCK SYSTEM 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO2.031-3 (2005) THE ARCHITECTURE, DESIGN AND REALISATION OF THE LHC BEAM INTERLOCK SYSTEM B. Todd

More information

Assembly of the HIE-ISOLDE accelerator cavities in a clean room.

Assembly of the HIE-ISOLDE accelerator cavities in a clean room. Final adjustments being made in the LHC tunnel before the return of beams. On 5 April, particles began circulating in the accelerator for the first time following the Long Shutdown. (CERN-PHOTO-201503-058-1)

More information

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team AREAL- Phase 1 Progress & Status B. Grigoryan on behalf of AREAL team Contents Machine Layout Building & Infrastructure Laser System RF System Vacuum System Cooling System Control System Beam Diagnostics

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

SLS RF operation report 2003

SLS RF operation report 2003 SLS RF operation report 2003 M. Pedrozzi, Jean-Yves Raguin Paul Scherrer Institute, 5232 Villigen PSI, Switzerland SUMMARY LINAC report SR Superconducting Third Harmonic system report SR 500 MHz system

More information

HD Review March 30, 2011 Franz Klein

HD Review March 30, 2011 Franz Klein HD Review March 30, 2011 Franz Klein !! Circularly & linearly polarized photon beam on longitudinally polarized target Circularly polar. photon via helicity transfer from 92 calendar days Linearly polar.

More information

5 Project Costs and Schedule

5 Project Costs and Schedule 93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for

More information

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration

First LHC Beams in ATLAS. Peter Krieger University of Toronto On behalf of the ATLAS Collaboration First LHC Beams in ATLAS Peter Krieger University of Toronto On behalf of the ATLAS Collaboration Cutaway View LHC/ATLAS (Graphic) P. Krieger, University of Toronto Aspen Winter Conference, Feb. 2009 2

More information

Future Circular Collider Study

Future Circular Collider Study Status and Progress M. Benedikt, F. Zimmermann gratefully acknowledging input from FCC coordination group global design study team and all other contributors LHC SPS PS FCC http://cern.ch/fcc Work supported

More information

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract Abstract 7 0 0 k W M A I N I N J E C T O R O P E R A T I O N S F O R N O νa AT FNAL P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA Following a successful career as an antiproton

More information

LESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV)

LESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV) LESSONS LEARNT FROM BEAM COMMISSIONING AND EARLY BEAM OPERATION OF THE BEAM LOSS MONITORS (INCLUDING OUTLOOK TO 5 TEV) E.B. Holzer, B. Dehning, E. Effinger, J. Emery, S. Grishin, C. Jr Hajdu, H. Ikeda,

More information

Electron Clouds in the SPS: progress in the analysis of cures/mitigations measures and potential schedule of implementation J.M.

Electron Clouds in the SPS: progress in the analysis of cures/mitigations measures and potential schedule of implementation J.M. Electron Clouds in the SPS: progress in the analysis of cures/mitigations measures and potential J.M. Jimenez This talk is a summary of my views meant for a recommendation. For detailed results and pictures,

More information

Beam Loss Detection for MPS at FRIB

Beam Loss Detection for MPS at FRIB Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

New Filling Pattern for SLS-FEMTO

New Filling Pattern for SLS-FEMTO SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new

More information

Status of the X-ray FEL control system at SPring-8

Status of the X-ray FEL control system at SPring-8 Status of the X-ray FEL control system at SPring-8 T.Fukui 1, T.Hirono 2, N.Hosoda 1, M.Ishii 2, M.Kitamura 1 H.Maesaka 1,T.Masuda 2, T.Matsushita 2, T.Ohata 2, Y.Otake 1, K.Shirasawa 1,M.Takeuchi 2, R.Tanaka

More information

FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017

FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017 FILLING SCHEMES AND E-CLOUD CONSTRAINTS FOR 2017 G. Iadarola*, L. Mether, G. Rumolo, CERN, Geneva, Switzerland Abstract Several measures implemented in the 2016-17 Extended Year End Technical Stop (EYETS)

More information

A new Interlock Design for the TESLA RF System

A new Interlock Design for the TESLA RF System A new Interlock Design for the TESLA RF System H. Leich 1, A. Kretzschmann 1, S. Choroba 2, T. Grevsmühl 2, N. Heidbrook 2, J. Kahl 2, 1 (DESY Zeuthen) 2 (DESY Hamburg) The Problem The Interlock Architecture

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

High Power Cyclotrons

High Power Cyclotrons Accelerator Reliability Workshop ESRF, Grenoble, 04-06.02.02 High Power Cyclotrons P.A.Schmelzbach 1. The PSI Proton Accelerator Facility 2. Failure Analysis 2000/2001 3. The weak Points 4. How to improve

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

Linac 4 Instrumentation K.Hanke CERN

Linac 4 Instrumentation K.Hanke CERN Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase

More information

Review of Diamond SR RF Operation and Upgrades

Review of Diamond SR RF Operation and Upgrades Review of Diamond SR RF Operation and Upgrades Morten Jensen on behalf of Diamond Storage Ring RF Group Agenda Stats X-ray and LN2 pressure results Cavity Failure Conditioning in the RFTF Cavity Simulations

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

The FAIR plinac RF Systems

The FAIR plinac RF Systems The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

arxiv:hep-ex/ v1 27 Nov 2003

arxiv:hep-ex/ v1 27 Nov 2003 arxiv:hep-ex/0311058v1 27 Nov 2003 THE ATLAS TRANSITION RADIATION TRACKER V. A. MITSOU European Laboratory for Particle Physics (CERN), EP Division, CH-1211 Geneva 23, Switzerland E-mail: Vasiliki.Mitsou@cern.ch

More information

Challenges in Accelerator Beam Instrumentation

Challenges in Accelerator Beam Instrumentation Proceedings of the DPF-2009 Conference, Detroit, MI, July 27-31, 2009 1 Challenges in Accelerator Beam Instrumentation M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, USA The challenges

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

Accelerator Controls Part2: CERN central timing system

Accelerator Controls Part2: CERN central timing system Accelerator Controls Part2: CERN central timing system CAS 2009@Divonne Hermann Schmickler Outline Part 2 Requested Functionality of the CERN timing system Implementation: Hardware Details Software Details:

More information

Application Note DT-AN-2115B-1. DTA-2115B Verification of Specifations

Application Note DT-AN-2115B-1. DTA-2115B Verification of Specifations DTA-2115B Verification of Specifations APPLICATION NOTE January 2018 Table of Contents 1. Introduction... 3 General Description of the DTA-2115B... 3 Purpose of this Application Note... 3 2. Measurements...

More information

Lessons Learnt from LEP/LHC ML

Lessons Learnt from LEP/LHC ML Lessons Learnt from LEP/LHC ML 22-2-18 LESSONS LEARNT? An experience, example, or observation that imparts new knowledge or understanding A: Project management/strategic B: Should have been obvious but

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

arxiv: v1 [physics.acc-ph] 9 Aug 2016

arxiv: v1 [physics.acc-ph] 9 Aug 2016 Beam Transfer and Machine Protection V. Kain CERN, Geneva, Switzerland arxiv:1608.02745v1 [physics.acc-ph] 9 Aug 2016 1 Introduction Abstract Beam transfer, such as injection into or extraction from an

More information

Study of the performances of the ALICE muon spectrometer

Study of the performances of the ALICE muon spectrometer Study of the performances of the ALICE muon spectrometer Blanc Aurélien, December 2008 PhD description Study of the performances of the ALICE muon spectrometer instrumentation/detection. Master Physique

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

FIR Center Report. Development of Feedback Control Scheme for the Stabilization of Gyrotron Output Power

FIR Center Report. Development of Feedback Control Scheme for the Stabilization of Gyrotron Output Power FIR Center Report FIR FU-120 November 2012 Development of Feedback Control Scheme for the Stabilization of Gyrotron Output Power Oleksiy Kuleshov, Nitin Kumar and Toshitaka Idehara Research Center for

More information

Operations of ewelink APP

Operations of ewelink APP Operations of ewelink APP Add WiFi-RF Bridge to APP: 1. In a place where there is a wireless WIFI signal, turn on the WLAN function of the phone, select a wireless network and connect it. 2. After powering

More information

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008 ATF2 milestones for discussion Andrei Seryi, Toshiaki Tauchi December 15-18, 2008 7th ATF2 Project Meeting What are natural milestones for ATF2? ATF2 design: Nominal IP β y* =0.1 mm & L * =1 m this give

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback Journal of Physics: Conference Series PAPER OPEN ACCESS Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback To cite this article: J. Fox et al 2018 J. Phys.: Conf. Ser. 1067 072024

More information

A FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1

A FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1 A FOUR GAIN READOUT INTEGRATED CIRCUIT : FRIC 96_1 J. M. Bussat 1, G. Bohner 1, O. Rossetto 2, D. Dzahini 2, J. Lecoq 1, J. Pouxe 2, J. Colas 1, (1) L. A. P. P. Annecy-le-vieux, France (2) I. S. N. Grenoble,

More information

UNIT-3 Part A. 2. What is radio sonde? [ N/D-16]

UNIT-3 Part A. 2. What is radio sonde? [ N/D-16] UNIT-3 Part A 1. What is CFAR loss? [ N/D-16] Constant false alarm rate (CFAR) is a property of threshold or gain control devices that maintain an approximately constant rate of false target detections

More information

BTV Tuesday 21 November 2006

BTV Tuesday 21 November 2006 Test Review Test from last Thursday. Biggest sellers of converters are HD to composite. All of these monitors in the studio are composite.. Identify the only portion of the vertical blanking interval waveform

More information

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. ANKA Status Report N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. Institute for Synchrotron Radiation KIT - University of the State of Baden-Wuerttemberg and

More information

Information here generates the timing configuration and is hence the definitive source. The situation is quite volatile, new events and telegram

Information here generates the timing configuration and is hence the definitive source. The situation is quite volatile, new events and telegram LHC General Machine Timing g( (GMT) Julian Lewis AB/CO/HT Some general points on LHC timing The Basic-Period in the LHC machine is the UTC second. The millisecond modulo represents the millisecond in the

More information

Undulator Protection for FLASH and for the European XFEL

Undulator Protection for FLASH and for the European XFEL Undulator Protection for FLASH and for the European FLASH sacrificial undulator: beam loss simulations FLASH BLM system plans FLASH sacrificial undulator FLASH Collimators BC2 scraper gun collimator (Ø

More information

Behavior of the TTF2 RF Gun with long pulses and high repetition rates (TESLA note )

Behavior of the TTF2 RF Gun with long pulses and high repetition rates (TESLA note ) Behavior of the TTF2 RF Gun with long pulses and high repetition rates (TESLA note 2003-33) DESY Hamburg TESLA COLLABORATION MEETING DESY Zeuthen, 22 Jan 2004 TTF2 RF GUN SCHEMATIC (ANSYS, F. Marhauser)

More information

TRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT

TRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT Discovery, accelerated 1 TRIUMF CYCLOTRON MAIN MAGNET POWER SUPPLY REPLACEMENT Arthur Leung High Power DC Systems 2018-10-05 TRIUMF stands for TRI University Meson Facility Founded by University of British

More information

Sample BD Tech Concepts LLC

Sample BD Tech Concepts LLC XYZ Corp. Fry Controller FC-1234 Software Test Procedure Copyright 2014 Brian Dunn BD Tech Concepts LLC Last Modified: 00/00/0000 Version Tested: Date Tested: Technician: Results: 1 FC-1234 SW Test Proc.

More information

Scavenger Extraction. Karen Goldsmith Shawn Alverson

Scavenger Extraction. Karen Goldsmith Shawn Alverson Scavenger Extraction Karen Goldsmith Shawn Alverson Topics Beam line and area maps High Power Target (HPT) How to establish first beam to HPT Setting energy (configs, multiknobs, Fast Phase Shifters, etc.)

More information

Experimental Results of the Coaxial Multipactor Experiment. T.P. Graves, B. LaBombard, S.J. Wukitch, I.H. Hutchinson PSFC-MIT

Experimental Results of the Coaxial Multipactor Experiment. T.P. Graves, B. LaBombard, S.J. Wukitch, I.H. Hutchinson PSFC-MIT Experimental Results of the Coaxial Multipactor Experiment T.P. Graves, B. LaBombard, S.J. Wukitch, I.H. Hutchinson PSFC-MIT Summary A multipactor discharge is a resonant condition for electrons in an

More information

CMS Upgrade Activities

CMS Upgrade Activities CMS Upgrade Activities G. Eckerlin DESY WA, 1. Feb. 2011 CMS @ LHC CMS Upgrade Phase I CMS Upgrade Phase II Infrastructure Conclusion DESY-WA, 1. Feb. 2011 G. Eckerlin 1 The CMS Experiments at the LHC

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

HWCommissioning. What else?

HWCommissioning. What else? HWCommissioning. What else? Mirko Pojer WHAT ELSE DID WE LEARN? Acknowledgements: A. Ballarino, S. Claudet, S. Deleval, R. Denz, V. Montabonnet, Y. Thurel, M. Zerlauth B. Bellesia, R. Schmidt, M. Solfaroli,

More information

Model 5405 Dual Analog Sync Generator Data Pack

Model 5405 Dual Analog Sync Generator Data Pack Model 5405 Dual Analog Sync Generator Data Pack E NSEMBLE D E S I G N S Revision 2.1 SW v2.0 This data pack provides detailed installation, configuration and operation information for the 5405 Dual Analog

More information

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling TTF / VUV-FEL Schedule 200 and Project Management Issues Schedule 200 Project Organisation Budget & Controlling Hans Weise / DESY DESY MAC Meeting November 9th, 2004 TTF Linac Start-up After Final Installation

More information

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland

PoS(EPS-HEP2015)525. The RF system for FCC-ee. A. Butterworth CERN 1211 Geneva 23, Switzerland CERN 1211 Geneva 23, Switzerland E-mail: andrew.butterworth@cern.ch O. Brunner CERN 1211 Geneva 23, Switzerland E-mail: olivier.brunner@cern.ch R. Calaga CERN 1211 Geneva 23, Switzerland E-mail: rama.calaga@cern.ch

More information

ARES Status 2004(JFY)

ARES Status 2004(JFY) ARES Status 2004(JFY) Tetsuo Abe for KEKB-RF/ARES-cavity group High Energy Accelerator Research Organization (KEK) Outline 1. Fundamentals of the ARES-cavity system 2. Operation status 3. D04C/ARES multipactoring

More information

Impacts of SEEs. LHC Performance Workshop Chamonix 2009

Impacts of SEEs. LHC Performance Workshop Chamonix 2009 Impacts of SEEs Performance Workshop Chamonix 2009 R2E Taskforce B. Bellesia, M. Brugger, A. Ferrari, D. Kramer, R. Losito, S. Myers, M. Pojer, S. Roesler, M. Solfaroli, A. Vergara, S. Weisz, T. Wijnands

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information