1 ESS Naming Conven.on Karin Rathsman

2 Introduction

3 ESS Naming Convention The ESS Naming Conven<on apply to all devices and signals in technical systems and conven<onal facili<es. operator screens inventory system drawings design schema<cs computer sofware project databases equipment name tags test procedures other sources of technical informa<on at ESS.

4 Guidelines Names shall be short, yet meaningful and organized consistently. Primary scope is for opera<ons. Names are not necessarily structured according to WBS or PBS. - - These are mainly for op<mizing design and construc<on. Device names should however be used to name equipment in these structures. Database integra<on is vital.

5 From the ICS point of view, all equipment is modeled as devices Devices

6 Definition Device is the basic unit of granularity of the ICS the smallest that can s<ll be standalone and loosely coupled to other components. Device is an abstrac<on that can represent either single pieces of equipment (low level code for interfacing with the hardware)......or higher- level en<<es of the ICS ( e.g., device models, subsystems, instruments...)

7 This is a device... and this is also a device

8 Having parallel conven<ons for mnemonic names will inevitably cause confusion. Concurrent Conventions

9 Identification codes Devices at ESS will be assigned several iden<fica<on codes in for example Work break down structure (WBS), Project break down structure (PBS) Inventory BSAB 96 codes (conven<onal facili<es).

10 Restrictions! To avoid confusion equipment iden<fica<on codes other than device and signal names must not be mnemonic, i.e. it shall not contain abbrevia<ons or acronyms. simulate the naming conven<on syntax. Device names shall be used in other systems as azributes.

11 Expect thousands different kind of devices. Devices are categorised on three levels in the naming conven<on. Device Category Structure

12 Level 1 Discipline Branch of knowledge that indicates the context in which a device is used, Example: Vacuum (Vac) Water Cooling (WtrC) Cryogenics (Cryo) Proton Beam Instrumenta<on (PBI) Proton Beam Op<cs (PBO) Controls (Ctrl)

13 Level 3 Generic Device Type Two devices of the same generic type provide the same func<on Example: Pump (Pmp) Controlled Valve (CV) Temperature Sensor (TSn) These are interdisciplinary devices of e.g. Vacuum, Cryogenics as well as Water Cooling.

14 Level 4 Specific Device Type Two devices of the same specific type are iden<cal from a controls perspec<ve and among others have the same set of control signals. Configura<on of a device in the top- down approach is ini<ated by selec<ng the specific device type.

15 Device Identifiers Naming conven<on users prefer to use generic device type (level 3) as device iden<fier DDDD in the names. Therefore: Device names will be constructed using the generic device iden<fier (Level 3). Naming Conven<on users are s<ll responsible for selec<ng the correct specific device type (Level 4).

16 Device Type Reference List 9/25/2013 Karin Rathsman ID Device Type Name Comment Date Beam Magnets and Deflectors (BMD) Choppers 16 Chopper Chop Dipoles 31 Horizontal Dipole DH Misc 30 Vertical Dipole DV 34 Proton Beam Window PBW As indicator... 5/31/2013 Octupoles 43 Octupole, folding in horizontal plane OctH 32 Octupole, folding in vertical plane OctV Quadrupoles 18 Chopper quadrupole QChp 13 Horizontal Focusing Quadrupole QH 14 Vertical Focusing Quadrupole QV 53 Horizontal Permanent Magnet Quadrupole PMQH As indicator 5/31/ Vertical Permanent Magnet Quadrupole PMQV As indicator... 5/31/2013 Solenoids 2 Solenoid Sol Steerers 50 Steerer Str Cryogenics (Cryo) Indicators 94 Flow Indicator FIn follow up? 3/14/ Level Indicator LIn follow up 3/14/ Pressure Indicator PIn follow up 3/14/2013 Misc 80 Temperature Indicator TIn follow up? 3/14/2013

17 Zones, buildings and sec<ons shall be named and labelled afer the technical systems so that device and signal names can be linked to physical loca<on. Logical Area Structure

18 Level 1 Super Section High level zones and buildings such as Accelerator Target Sta<on Neutron Science Central Services

19 Level 2 Section 13 Accelerator Sec<ons: Ion Source (ISrc) Low Energy Beam Transport (LEBT). Dump Line (DmpL) 16 Target Systems: Monolith (Mnlt) Ac<ve Handling (ActH) Neutron Science Instruments Central Services. Water Cooling Plant (WCP) Cryo Plant (CP)

20 Level 3 Subsection Accelerator has numbered subsec<ons e.g., First HBL subsec<on (HBL-01) Thir<es HBL subsec<on (HBL-30) Target Sta<on has 80 subsec<ons in total, for example Water purifica<on system (ActF-WtrP) Ac<ve gas storage (ActF-Gsg) Central Services High Beta Water Substa<on (WCP-HBWS) is a subsec<on under the Water Cooling Plant.

21 Labeling Conven<onal facili<es have agreed to label the structures according to the sec<on- subsec<ons. The numbering system used by CF as iden<fica<ons for buildings, rooms and sec<ons, is independent on the ESS Naming Conven<on.

22 Section Reference List Karin Rathsman 6/14/2013 Accelerator ID Section Name Comment Date 1 Ion Source ISrc Low energy beam transport included 6/4/ Low Energy Beam Transport LEBT Not in use (part of ISrc.) 6/4/ Radio Frequency Quadrupole RFQ 4 Medium Energy Beam Transport MEBT 5 Drift Tube Linac DTL 7 Spoke Linac Spk 8 Medium Beta Linac MBL Changed from MB to MBL 6/4/ High Beta HBL Changed from HB to HBL 6/4/ Upper High Beta UHB 23 Dogleg DgLg HEBT split into DgLg and A2T 5/15/ Accelerator to Target A2T HEBT split up into DgLg and A2T 5/15/ Monolith beam Line MnBL Belongs to target? 2/22/ DumpLine DmpL Added 5/15/ Bent Dump Line HEBD Not in use (to be deleted) 5/15/2013 Target Station Active Cells ActC Active Fluids ActF Active Handling ActH Active Workshops ActWS Handling mock-up HMU Intermediate cooling Systems Inm Mobile Active Vacuum ActVM Moderator-Reflector MR Monolith Mnlt Proton Beam Window PBW 33 Radioactive Gaseous Effluent Confinement RGEC Section? Accelerator Subsection Reference List Karin Rathsman 6/14/2013 ID Subsection Name Composed Name Ion Source (ISrc) ISrc ISrc ISrc-03 Radio Frequency Quadrupole (RFQ) RFQ-01 Medium Energy Beam Transport (MEBT) MEBT MEBT MEBT MEBT-04 Drift Tube Linac (DTL) DTL DTL DTL DTL-04 Spoke Linac (Spk) Level 1 Super Level 2 Section Level 3 Subsection Spk Spk Spk Spk Shielding TSh Section? 37 Target Tgt The actual target (the wheel) 38 Target Safety System TSS Section? Utilities TS Storage TSg Tune-up dump TDmp 30 Water cooling plant WCP Added 4/4/ Cryo Plant CP Maybe CrP 2/15/ Spk Spk Spk Spk Spk Spk Spk Spk Spk

23 All informa<on needed to construct device names (except for the quan<fier III)is contained in the device category and area breakdown structures. Name Construction

24 Naming Process Logical Area Structure Level 1 Level 2 Level 3 Device Category Level 1 Level 3 Level 4 Tools Rules SSSS-BBBB:DDDD-III

25 Name Components System SSSS Sec<on conven<on name Subsystem BBBB T- type: Subsec<on conven<on name A- type: Discipline conven<on Name Device Iden<fier DDDD Generic device iden<fier Device Quan<fier III T- type: Instance number and/or Alphanumeric qualifier A- type: Subsec<on number immediately followed by alphabe<c numbering (a, b, c or d etc.)

26 Alice is an engineer who, for whatever reason, would like to connect a espresso machine to the control system. In this context Alice is our device editor. Workflow

27 Workflow 1.Browse the device category list generic device type: 1.Alice browses the device category structure to search for a generic device type she can add her espresso machine under. She looks under the discipline controls (Ctrl), but cannot find an generic device type for the espresso machine. 2.Search for a name component 1.Maybe the espresso machine is categorized under a different discipline? Alice enters «espresso» into the search field, but she can s<ll not find the generic device type. She decides to add an espresso machine to the list of generic device types.

28 Workflow 1.Add a new generic device type: 1.Alice selects Controls (Ctrl) => Miscellaneous (Misc) from the menu list of device categories. 2.Alice clicks the the + buzon to add a generic device type under the category Miscellaneous (Misc). 3.In the field labeled Full Name she enters «Espresso Machine». 4.She enters «EspMch» in the mnemonic name field. Alice receives a warning since the mnemonic name is longer than the recommended 2-4 character length. Alice ignores the warning. She knows that six characters is allowed. 5.Alice adds a comment «Device to prepare espresso.» in the comment field. 6.Alice clicks the submit buzon. As a device editor Alice can only add new generic device types as draf. To make the generic device type ac<ve it has to be approved by a super user. A no<fica<on is sent to Bob, the super user specialized on controls, about the request for a new generic device type.

29 Workflow 1.Add a signal name 1.Alice selects the specific device type «Alices» from the device category menu list. 2.Alice clicks the + buzon to add a signal name. 3.Alice enters the full name «Pressure in bar» in the field labeled full name. 4.Alice enters the «Pres» in the mnemonic name field. 5.Alice enters a comment «Nominal» 6.Alice presses the submit buzon.

30 Workflow 1.Add an instance of device to the naming database 1.Alice selects her specific device type from the device category list Discipline=>Category=>Generic Device Type=>Specific Device Type, guided by the ques<on «What kind of device is it?». Alice selects Controls (Ctrl) => Miscellaneous (Misc) => Espresso Machine (EspMch) => Espresso Machine Special (Alice). 2.AFer having read the leading ques<on «Which part of the facility does the device provide service to?» Alice selects Head Quarter (HQ)=>Integrated Control Center (ICC)=> Main Control Room (MCR) from the Area breakdown menu list. 3.Alice presses the Add buzon (or delete buzon or edit). A draf naming conven<on name is generated, with correct quan<fier and everything. It will be ac<ve only afer Bob has approved the generic device qualifier.

31 Workflow 1.Approve or reject a requested device name 1.Bob receives an that a new generic device name has been added. 2.Bob clicks the link in the which directs him to the review page for the generic device type Espresso Machine (EspMch) 3.Bob selects the reject radio buzon. 4.Into the message field, which is mandatory if device type is rejected, Bob enters «Use the generic device type Coffee Machine (CoMa) under the Office (Offs) => Miscellaneous (Misc) instead.»

32 Web- based tools are under development to support the process of naming devices. Use- cases are being studied to collect requirements, e.g., filtering and sor<ng capabili<es, as well as automated name genera<on. Tools

33 Proteus (Discs Collaboration) Figure 2 Naming System Home Page

34

35 Naming Part Descrip<on Requirements Assigned by Dis Discipline Naming CommiZee Cat Category Naming CommiZee gdev Generic Device Type Naming CommiZee sdev Specific Device type Device Editor Sup Super Sec<on Naming CommiZee Sec Sec<on Naming CommiZee Sub Subsec<on Naming CommiZee TTT Type Device Editor III Instance Device Editor XXX Suffix Device Editor

36 Selection tool Users should not have to be informed in detail on defini<ons of sec<on, subsec<on, discipline or the dis<nc<on between generic and specific device types. Ask explicitly: - - What kind of device is it? Which part of the facility does the device provide services to?(do NOT ask: Where is the device located? ) The answer shall be selected from a menu type list.

37 Name Integrity 1.To assure integrity of names the naming conven<on users will be asked to select 1.device type from the device category structure 2.subsec<on from the three level logical area structure 2.Device names are generated automa<cally.

38 Those are my principles. If you don t like them I have others. Groucho Marx The End

Beam Lattice and Tomatoes. Karin Rathsman

Beam Lattice and Tomatoes. Karin Rathsman Beam Lattice and Tomatoes Karin Rathsman 2013-09-19 Manually add -Beginning of sections and subsections -Beginning and end of slots Includes -Beam instruments -Device Names -Beamlines and slots Beam Instruments

More information

New La'ce Import Status. Karin Rathsman

New La'ce Import Status. Karin Rathsman New La'ce Import Status Karin Rathsman 2013-11- 25 Manually add - Beginning of secnons and subsecnons - Beginning and end of slots Beam Instruments Includes - Beam instruments - Device Names - Beamlines

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1

ESS: The Machine. Bucharest, 24 April Håkan Danared Deputy Head Accelerator Division. H. Danared Industry & Partner Days Bucharest Page 1 ESS: The Machine Bucharest, 24 April 2014 Håkan Danared Deputy Head Accelerator Division H. Danared Industry & Partner Days Bucharest Page 1 2025 ESS construction complete 2009 Decision: ESS will be built

More information

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics

The ESS Accelerator. For Norwegian Industry and Research. Oslo, 24 Sept Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The ESS Accelerator For Norwegian Industry and Research Oslo, 24 Sept 2013 Håkan Danared Deputy Head Accelerator Division Group Leader Beam Physics The Hadron Intensity Frontier Courtesy of M. Seidel (PSI)

More information

Linac 4 Instrumentation K.Hanke CERN

Linac 4 Instrumentation K.Hanke CERN Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase

More information

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

DELIVERY RECORD. Location: Ibaraki, Japan

DELIVERY RECORD. Location: Ibaraki, Japan DELIVERY RECORD Client: Japan Atomic Energy Agency (JAEA) High Energy Accelerator Research Organization (KEK) Facility: J-PARC (Japan Proton Accelerator Research Complex) Location: Ibaraki, Japan 1 October

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

OPERATIONAL EXPERIENCE AT J-PARC

OPERATIONAL EXPERIENCE AT J-PARC OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization

More information

HD Review March 30, 2011 Franz Klein

HD Review March 30, 2011 Franz Klein HD Review March 30, 2011 Franz Klein !! Circularly & linearly polarized photon beam on longitudinally polarized target Circularly polar. photon via helicity transfer from 92 calendar days Linearly polar.

More information

This Review: the Charge

This Review: the Charge The Commi)ee is asked to review whether the design of the project will be able to support the design performance and whether the engineering design of the project, including all technical subsystems, is

More information

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator S. Cousineau (On behalf of the SNS project) HB2016, Sweden July 04, 2016 ORNL is managed by UT-Battelle for the US Department

More information

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens Eugène Tanke FRIB / MSU ESS Seminar, Lund, 6 March 2013 Outline Project Goal for the Accelerator Path

More information

The FAIR plinac RF Systems

The FAIR plinac RF Systems The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)

More information

The European Spallation Source

The European Spallation Source The European Spallation Source Roger Ruber Uppsala University NIKHEF industriemiddag 21 september 2011 The European Spallation Source Roger Ruber - The European Spallation Source NIKHEF, 21-Sep-2011 page

More information

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX T. Koseki, M. Ikegami, M. Tomizawa, Accelerator Laboratory, KEK, Tsukuba, Japan F. Noda, JAEA, Tokai, Japan Abstract The J-PARC (Japan Proton

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

PRESENT STATUS OF J-PARC

PRESENT STATUS OF J-PARC PRESENT STATUS OF J-PARC # F. Naito, KEK, Tsukuba, Japan Abstract Japan Proton Accelerator Research Complex (J-PARC) is the scientific facility with the high-intensity proton accelerator aiming to realize

More information

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Status of the FAIR Project Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Finland France Germany India Poland Romania Russia Slovenia Sweden UK FAIR Strategic objectives FAIR phase

More information

1. Do we have any informa1on on rack space layout?

1. Do we have any informa1on on rack space layout? 1. Do we have any informa1on on rack space layout? Karl. Currently there are two efforts on this front: 1) John Barley is collec:ng a spreadsheet of all components that need to be rack mounted, accoun:ng

More information

Design Note TRI-DN ARIEL Front-End Design Note. Release: 3 Release Date June 2, Name: Signature: Date:

Design Note TRI-DN ARIEL Front-End Design Note. Release: 3 Release Date June 2, Name: Signature: Date: TRIUMF Document-41767 Design Note TRI-DN-11-08 ARIEL Front-End Design Note Document Type: Design Note Release: 3 Release Date June 2, 2011 Author(s): Marco Marchetto Name: Signature: Date: Author: Author:

More information

EPJ Web of Conferences 95,

EPJ Web of Conferences 95, EPJ Web of Conferences 95, 04012 (2015) DOI: 10.1051/ epjconf/ 20159504012 C Owned by the authors, published by EDP Sciences, 2015 The ELENA (Extra Low Energy Antiproton) project is a small size (30.4

More information

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2 PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin

RF plans for ESS. Morten Jensen. ESLS-RF 2013 Berlin RF plans for ESS Morten Jensen ESLS-RF 2013 Berlin Overview The European Spallation Source (ESS) will house the most powerful proton linac ever built. The average beam power will be 5 MW which is five

More information

THE OPERATION EXPERIENCE AT KOMAC*

THE OPERATION EXPERIENCE AT KOMAC* THAM2X01 Proceedings of HB2016, Malmö, Sweden THE OPERATION EXPERIENCE AT KOMAC* Yong-Sub Cho, Kye-Ryung Kim, Kui Young Kim, Hyeok-Jung Kwon, Han-Sung Kim, Young-Gi Song Korea Atomic Energy Research Institute,

More information

LENS Operating Experience

LENS Operating Experience Available online at www.sciencedirect.com Physics Procedia 26 (2012 ) 161 167 Union of Compact Accelerator-driven Neutron Sources I & II LENS Operating Experience T. Rinckel *a, David V. Baxter a,b, J.

More information

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA. A1.01 PROJECT MANAGEMENT BNL/Cornell Michnoff A1.01.01 Milestones BNL/Cornell Michnoff This scope is a placeholder for all project high level milestones for NYSERDA. There is no cost or labor related to

More information

University of Minnesota Nano Fabrication Center Standard Operating Procedure

University of Minnesota Nano Fabrication Center Standard Operating Procedure Equipment Name: Focused Ion Beam (FIB) Coral Name: fib Revision Number: 2 Model: FEI Quanta 200 3D Revisionist: Kevin Roberts Location: Area 3 Date: 9/17/2013 1 Description The Quanta 200 3D is a DualBeam

More information

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Outline Situation/Rationale Requirements Synchrotron choice Functions

More information

WHAT IS NEW AT CERN?

WHAT IS NEW AT CERN? WHAT IS NEW AT CERN? Dominique Missiaen, Antje Behrens, Patrick Bestmann, Jean-Frédéric Fuchs, Jean- Christophe Gayde, Mark Jones, Hélène Mainaud Durand, Antonio Marin, Dirk Mergelkuhl, Mateusz Sosin,

More information

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager Outline Facility overview Organization Shift schedule

More information

APT Accelerator Technology

APT Accelerator Technology APT Accelerator Technology J. David Schneider LER/APT, Los Alamos National Laboratory Los Alamos, New Mexico 87545 U.S. Abstract The proposed accelerator production of tritium (APT) project requires an

More information

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team AREAL- Phase 1 Progress & Status B. Grigoryan on behalf of AREAL team Contents Machine Layout Building & Infrastructure Laser System RF System Vacuum System Cooling System Control System Beam Diagnostics

More information

A Facility for Accelerator Physics and Test Beam Experiments

A Facility for Accelerator Physics and Test Beam Experiments A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four

More information

BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC *

BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC * BEAM DYNAMICS AND EXPERIMENT OF CPHS LINAC * L. Du #, C.T. Du, X.L. Guan, C.X. Tang, R. Tang, X.W. Wang, Q.Z. Xing, S.X. Zheng, Key Laboratory of Particle & Radiation Imaging (Tsinghua University), Ministry

More information

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis Dianne Napier Outline Part II Review Charges Addressed in this Presentation: Issues raised in Part I Review Report adequately addressed

More information

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 The company was created for the development and manufacture of precision microwave vacuum-electron-tube devices (VETD). The main product areas

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

PEP II STATUS AND PLANS *

PEP II STATUS AND PLANS * PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex

More information

TOWARDS THE COMMISSIONING OF J-PARC

TOWARDS THE COMMISSIONING OF J-PARC 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, MO3.5-1O (2005) TOWARDS THE COMMISSIONING OF J-PARC T. Katoh 1, K. Furukawa 1, N. Kamikubota 1, H.

More information

Status of the SNS Linac: An Overview N. Holtkamp for the SNS Collaboration ORNL, Oak Ridge, TN 37830, USA

Status of the SNS Linac: An Overview N. Holtkamp for the SNS Collaboration ORNL, Oak Ridge, TN 37830, USA Lübeck, August 20, 2004 Status of the SNS Linac: An Overview N. Holtkamp for the SNS Collaboration ORNL, Oak Ridge, TN 37830, USA SNS is the Forefront Facility for Future High Beam Power Accelerators Highest

More information

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

An Overview of Beam Diagnostic and Control Systems for AREAL Linac An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic

More information

5 Project Costs and Schedule

5 Project Costs and Schedule 93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for

More information

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY

HIGH-INTENSITY PROTON BEAMS AT CERN AND THE SPL STUDY HIGH-INTENSITY PROTON BEAMS AT CERN AND THE STUDY E. Métral, M. Benedikt, K. Cornelis, R. Garoby, K. Hanke, A. Lombardi, C. Rossi, F. Ruggiero, M. Vretenar, CERN, Geneva, Switzerland Abstract The construction

More information

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN

A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN A HIGH-POWER SUPERCONDUCTING H - LINAC (SPL) AT CERN E. Chiaveri, CERN, Geneva, Switzerland Abstract The conceptual design of a superconducting H - linear accelerator at CERN for a beam energy of 2.2 GeV

More information

PUBLICATION. Measurement setup at light source operational: Milestone M4.3

PUBLICATION. Measurement setup at light source operational: Milestone M4.3 CERN-ACC-2016-0110 Future Circular Collider PUBLICATION Measurement setup at light source operational: Milestone M4.3 Perez, Francis (ALBA) et al. 24 August 2016 The European Circular Energy-Frontier Collider

More information

Hall-B Beamline Commissioning Plan for CLAS12

Hall-B Beamline Commissioning Plan for CLAS12 Hall-B Beamline Commissioning Plan for CLAS12 Version 1.5 S. Stepanyan December 19, 2017 1 Introduction The beamline for CLAS12 utilizes the existing Hall-B beamline setup with a few modifications and

More information

ESS Linac WP8 Radio Frequency Systems and Test Facilities

ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team ESS Linac WP8: RF Systems Outline Work

More information

The Beam Test Facility at the SNS

The Beam Test Facility at the SNS The Beam Test Facility at the SNS R.F. Welton, A. Aleksandrov, B.X. Han, Y.W. Kang, M.M. Middendorf, S.N. Murray, M. Piller, T.R. Pennisi, V. Peplov, R. Saethre, M. Santana, C. Stinson, M.P. Stockli and

More information

Production of accelerators and accelerator components in industry

Production of accelerators and accelerator components in industry Production of accelerators and accelerator components in industry Michael Pekeler RI Research Instruments GmbH Friedrich-Ebert-Str. 1 51429 Bergisch Gladbach 28.04.2009 Foundation of RI Research Instruments

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS*

DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* DESIGN OF 1.2-GEV SCL AS NEW INJECTOR FOR THE BNL AGS* A. G. Ruggiero, J. Alessi, M. Harrison, M. Iarocci, T. Nehring, D. Raparia, T. Roser, J. Tuozzolo, W. Weng. Brookhaven National Laboratory, PO Box

More information

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * J. Galambos, W. Blokland, D. Brown, C. Peters, M. Plum, Spallation Neutron Source, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract Satisfying

More information

Beam Loss Detection for MPS at FRIB

Beam Loss Detection for MPS at FRIB Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

Quad-to-quad correlated motion in FLASH

Quad-to-quad correlated motion in FLASH Quad-to-quad correlated motion in FLASH Ramila Amirikas, Alessandro Bertolini DESY Hamburg Quad-to-quad correlated motion in FLASH Introduction- The experiment - continuous monitoring of vibrations in

More information

PEP II Status and Plans

PEP II Status and Plans SLAC-PUB-6854 September 1998 PEP II Status and Plans By John T. Seeman Invited talk presented at the 16th IEEE Particle Accelerator Conference (PAC 95) and International Conference on High Energy Accelerators,

More information

Availability and Reliability Issues for the ILC

Availability and Reliability Issues for the ILC Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some

More information

DS 400 P. Intelligent Electronic Pressure Switch in Hygienic Stainless Steel Ball Housing. on hygienic process connections

DS 400 P. Intelligent Electronic Pressure Switch in Hygienic Stainless Steel Ball Housing. on hygienic process connections Intelligent Electronic Pressure Switch in Hygienic Stainless Steel Ball Housing Description The electronic pressure switch is the successful combination of hygienic process connections with flush welded

More information

THE ALPI LINAC AS RIB ACCELERATOR

THE ALPI LINAC AS RIB ACCELERATOR CHAPTER VIII THE ALPI LINAC AS RIB ACCELERATOR 8.1 Introduction The linear accelerator ALPI [1], with a β range between about 0.04 and 0.2 and CW operation, represents an ideal re-accelerator for the radioactive

More information

STATUS AND CONCEPTUAL DESIGN OF THE CONTROL SYSTEM FOR THE HEAVY ION THERAPY ACCELERATOR FACILITY HICAT

STATUS AND CONCEPTUAL DESIGN OF THE CONTROL SYSTEM FOR THE HEAVY ION THERAPY ACCELERATOR FACILITY HICAT 10th ICALEPCS Int. Conf. on Accelerator & Large Expt. Physics Control Systems. Geneva, 10-14 Oct 2005, PO1.025-1 (2005) STATUS AND CONCEPTUAL DESIGN OF THE CONTROL SYSTEM FOR THE HEAVY ION THERAPY ACCELERATOR

More information

UPGRADES TO THE ISIS SPALLATION NEUTRON SOURCE

UPGRADES TO THE ISIS SPALLATION NEUTRON SOURCE UPGRADES TO THE ISIS SPALLATION NEUTRON SOURCE C.R. Prior, CCLRC Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, U.K. Abstract With studies of a European Spallation Source (ESS) suspended and high-level

More information

Networks of Things. J. Voas Computer Scientist. National Institute of Standards and Technology

Networks of Things. J. Voas Computer Scientist. National Institute of Standards and Technology Networks of Things J. Voas Computer Scientist National Institute of Standards and Technology 1 2 Years Ago We Asked What is IoT? 2 The Reality No universally-accepted and actionable definition exists to

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

Non-Destructive Examination Benches and Analysis Laboratories in support to the Experimental Irradiation Process in the Future Jules Horowitz MTR

Non-Destructive Examination Benches and Analysis Laboratories in support to the Experimental Irradiation Process in the Future Jules Horowitz MTR Non-Destructive Examination Benches and Analysis Laboratories in support to the Experimental Irradiation Process in the Future Jules Horowitz MTR D. Parrat 1, P. Kotiluoto 2, T. Jäppinen 2, C. Roure 1,

More information

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

B.6-68-ZZ EFFECT OF SUPERMAGNETS ON EXPERIMENTAL AREA LAYOUT. R. Stiening Lawrence Radiation Laboratory ABSTRACT

B.6-68-ZZ EFFECT OF SUPERMAGNETS ON EXPERIMENTAL AREA LAYOUT. R. Stiening Lawrence Radiation Laboratory ABSTRACT B.6-68-ZZ EFFECT OF SUPERMAGNETS ON EXPERIMENTAL AREA LAYOUT R. Stiening Lawrence Radiation Laboratory ABSTRACT The effect of the availability of high-field supermagnets on the layout of ZOO-BeY experimental

More information

Photo cathode RF gun -

Photo cathode RF gun - Photo cathode RF gun - *),,, ( 05 Nov. 2004 Spring8 UTNL Linac & Mg Photocathode RF Gun Mg photocathode NERL, 18 MeV Linac and the RF gun Electron Beam Mg photocathode Mg photocathode RF gun of SPring8

More information

PEP-II Disassembly Technical Systems

PEP-II Disassembly Technical Systems PEP-II Disassembly Technical Systems PEP-II D&D Review 6-Aug-2007 S.DeBarger S.Ecklund, A.Hill, D.Kharakh, M.Zurawel Outline Project safety Disassembly of technical systems Shielding Vac/Mechanical Cable

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

III. Proton-therapytherapy. Rome SB - 3/5 1

III. Proton-therapytherapy. Rome SB - 3/5 1 Outline Introduction: an historical review I Applications in medical diagnostics Particle accelerators for medicine Applications in conventional radiation therapy II III IV Hadrontherapy, the frontier

More information

Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules

Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Ramila Amirikas, Alessandro Bertolini, Jürgen Eschke, Mark Lomperski XFEL Module Meeting, January

More information

DS 200 P DS 200 P. Electronic Pressure Switch with Flush Process Connection

DS 200 P DS 200 P. Electronic Pressure Switch with Flush Process Connection with Flush Process Connection piezoresistive pressure sensor up to independent contacts, configurable optional: analogue output Exprotection (for wire) cooling element up to 00 C nominal pressure ranges

More information

Status of SOLARIS Arkadiusz Kisiel

Status of SOLARIS Arkadiusz Kisiel Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS

More information

A PASSION FOR PERFECTION. OktaLine. The Power Pump Portfolio. Roots Pumps for Every Low and Medium Vacuum Application.

A PASSION FOR PERFECTION. OktaLine. The Power Pump Portfolio. Roots Pumps for Every Low and Medium Vacuum Application. A PASSION FOR PERFECTION OktaLine The Power Pump Portfolio. Roots Pumps for Every Low and Medium Vacuum Application. OktaLine The Power Pump Portfolio. Roots Pumps for Every Low and Medium Vacuum Application.

More information

INFN School on Electron Accelerators. RF Power Sources and Distribution

INFN School on Electron Accelerators. RF Power Sources and Distribution INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel

More information

What can be learned from HERA Experience for ILC Availability

What can be learned from HERA Experience for ILC Availability What can be learned from HERA Experience for ILC Availability August 17, 2005 F. Willeke, DESY HERA Performance Critical Design Decisions What could be avoided if HERA would have to be built again? HERA

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

University of Tennessee at Chattanooga Steady State and Step Response for Filter Wash Station ENGR 3280L By. Jonathan Cain. (Emily Stark, Jared Baker)

University of Tennessee at Chattanooga Steady State and Step Response for Filter Wash Station ENGR 3280L By. Jonathan Cain. (Emily Stark, Jared Baker) University of Tennessee at Chattanooga Steady State and Step Response for Filter Wash Station ENGR 3280L By (Emily Stark, Jared Baker) i Table of Contents Introduction 1 Background and Theory.3-5 Procedure...6-7

More information

Assembly of the HIE-ISOLDE accelerator cavities in a clean room.

Assembly of the HIE-ISOLDE accelerator cavities in a clean room. Final adjustments being made in the LHC tunnel before the return of beams. On 5 April, particles began circulating in the accelerator for the first time following the Long Shutdown. (CERN-PHOTO-201503-058-1)

More information

ADS Basic Automation solutions for the lighting industry

ADS Basic Automation solutions for the lighting industry ADS Basic Automation solutions for the lighting industry Rethinking productivity means continuously making full use of all opportunities. The increasing intensity of the competition, saturated markets,

More information

1.0 Abstract : 2.0 The drift tube Linac for LEHIPA

1.0 Abstract : 2.0 The drift tube Linac for LEHIPA Electromagnetic design and development of quadrupole focussing lenses for drift tube linac email : sanjaym@barc.gov.in Sanjay Malhotra, U.Mahapatra Control Instrumentation Division, Bhabha Atomic Research

More information

A SQUID-BASED BEAM CURRENT MONITOR FOR FAIR / CRYRING

A SQUID-BASED BEAM CURRENT MONITOR FOR FAIR / CRYRING A SQUID-BASED BEAM CURRENT MONITOR FOR FAIR / CRYRING OUTLINE 2 -Future Installations at FAIR -Challenges -Cryogenic Current Comparator (CCC) principle -Experimental results for improved sensitivity -Conclusions

More information

Upgrade of CEBAF to 12 GeV

Upgrade of CEBAF to 12 GeV Upgrade of CEBAF to 12 GeV Leigh Harwood (for 12 GeV Accelerator team) Page 1 Outline Background High-level description Schedule Sub-system descriptions and status Summary Page 2 CEBAF Science Mission

More information

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB 07:00 13:00 : Establishing reference orbit golden Jorg Wenninger Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB Offset in vertical plane, ~1 mm seems real. 13:00 14: 00 : Injection oscillation

More information

Vibration-Free Pulse Tube Cryocooler Systems for Gravitational Wave Detectors II II

Vibration-Free Pulse Tube Cryocooler Systems for Gravitational Wave Detectors II II Vibration-Free Pulse Tube Cryocooler Systems for Gravitational Wave Detectors II II --Cooling Performance and Vibration -- Rui Li A, Y. Ikushima A, T. Koyama A, T. Tomaru B, T. Suzuki B, T. Haruyama B,T.

More information

Implementing a Proton Beam Scanning System within an Operating Clinical Facility

Implementing a Proton Beam Scanning System within an Operating Clinical Facility Implementing a Proton Beam Scanning System within an Operating Clinical Facility Ben Clasie Many thanks to Hassan Bentefour, Hanne Kooy, and Jay Flanz for their help preparing this presentation 1 Francis

More information

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings: TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,

More information

Resource Descrip,on and Access Overview: Making RDA Work

Resource Descrip,on and Access Overview: Making RDA Work Resource Descrip,on and Access Overview: Making RDA Work An Infopeople Webinar Photo Credit: hip://www.flickr.com/photos/17295449@n00/2139208615/ Emily Dust Nimsakont Cataloging Librarian Nebraska Library

More information

HICUBE. The modular pumping stations for all applications in high and ultra-high vacuum

HICUBE. The modular pumping stations for all applications in high and ultra-high vacuum HICUBE The modular pumping stations for all applications in high and ultra-high vacuum HICUBE The modular pumping stations for all applications in high and ultra-high vacuum Ideal for any application Intelligent

More information

The linear proton accelerator for the MYRRHA-ADS

The linear proton accelerator for the MYRRHA-ADS Revue des Questions Scientifiques, 2013, 184 (1) : 99-114 The linear proton accelerator for the MYRRHA-ADS Dirk Vandeplassche, Luis Medeiros RomÃo SCK CEN/ANS/ADT 1. Introduction In order to obtain large

More information

A New 4MW LHCD System for EAST

A New 4MW LHCD System for EAST 1 EXW/P7-29 A New 4MW LHCD System for EAST Jiafang SHAN 1), Yong YANG 1), Fukun LIU 1), Lianmin ZHAO 1) and LHCD Team 1) 1) Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, China E-mail

More information

GOYEN PILOT VALVE ENCLOSURES FOR HAZARDOUS LOCATIONS CLEAN AIR SOLUTIONS PRODUCT LEAFLET

GOYEN PILOT VALVE ENCLOSURES FOR HAZARDOUS LOCATIONS CLEAN AIR SOLUTIONS PRODUCT LEAFLET PILOT VALVE ENCLOSURES FOR HAZARDOUS LOCATIONS CLEAN AIR SOLUTIONS 3-6VFD COMBINATION FLAME AND DUST IGNITION PROOF ENCLOSURES Goyen pilot valve enclosures for hazardous locations are available in a combination

More information

USER MANUAL. 28" 4K Ultra HD Monitor L28TN4K

USER MANUAL. 28 4K Ultra HD Monitor L28TN4K USER MANUAL 28" 4K Ultra HD Monitor L28TN4K TABLE OF CONTENTS 1 Getting Started 2 Control Panel/ Back Panel 3 On Screen Display 4 Technical Specs 5 Care & Maintenance 6 Troubleshooting 7 Safety Info &

More information

The SPL at CERN. slhc. 1. Introduction 2. Description. 3. Status of the SPL study. - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages

The SPL at CERN. slhc. 1. Introduction 2. Description. 3. Status of the SPL study. - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages The SPL at CERN 1. Introduction 2. Description - Stage 1: Linac4 - Stage 2: LP-SPL - Potential further stages 3. Status of the SPL study slhc Roa Garoby for the SPL team 1. Introduction Motivation for

More information

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract

P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA. Abstract Abstract 7 0 0 k W M A I N I N J E C T O R O P E R A T I O N S F O R N O νa AT FNAL P. Adamson, Fermi National Accelerator Laboratory, Batavia, IL 60510, USA Following a successful career as an antiproton

More information