1 PEP-II Status U. Wienands, PEP-II Run Coordinator for the PEP-II team
2 Outline of Talk Run 4 Synopsis Machine tuning & improvements Issues encountered during Run 4 Other improvements and MD items Outlook: the remainder of Run 4 2
3 Run 4 Synopsis PEP is now delivering twice the rate of Run 3 >4 times CDR rate Over 60/fb delivered in Run 4, over 200/fb tot Key improvements: trickle-charge (continuous injection) both rings Raise peak Lumi to 8.34E33 (currents, ß*, orbit) Aggressively track down & reduce rf trips. MD program focused on near-term improvements + strategic studies needed for upgrades. 3
4 Run 4 Delivered Luminosity 4
5 5
6 Running 7-day Integral (2004) 6
7 Run Time Accounting, Run 4 BaBar up from 56% to 60% Tuning/Fill down from 22% to 20% Downtime down from 16 19% to 14% 7
8 9
9 Machine Tuning and Improvements LER & HER trickle charge Steering of the HER Lowering ß y * of the HER (12 >11 mm) Raising of the HER rf voltage Use HER Rf 4-1 Raising the number of bunches & beam currents 10
10 LER Trickle Charge PEP issues mostly resolved last fall BIC, diagnostics software Extended BaBar trickle test late Oct. 03 followed by analysis of data quality Trickle in production beginning Dec. 2,03 Daily luminosity up from 250 to 350/pb 15% is direct trickle gain, remainder is increased efficiency (less trips) Dec. a particularly stable month for rf. 11
11 LER only Trickle Day 12
12 LER Trickle Background Monitor FFT of Injection- triggers (ν s harmonics if off energy) Injection-generated triggers ( also avail. as EPICS PV) 13
13 HER Trickle Charge 1st test in Feb. 04 significant reduction in injection background not at full beam current, high radiation spikes 2nd test mid-march 04 Radiation spikes no longer an issue due to cleanup work in injector Break-even luminosity reached. BaBar state machine now ready for double trickle Double-trickling operationally since March
14 Double-Trickle Gain LER-only trickle av-to-pk = 87% Lum (10^30) 6000 Lumi stable beam 7-Dec-03, 16:00 24:00 frac_on:0.94 av_pk: av_lum: av_to_pk:0.87 tau: Double trickle av-to-pk = 99% => 12% gain 0 Lum (10^30) Time (m) Lumi stable beam 6-Apr-04, 00:00 08: av_lum: av_to_pk:0.99 av_pk: frac_on: Time (m) 15
15 Almost Best Day of PEP-II The best day actually had 669/pb delivered. 16
16 Fill Patterns & Beam Currents At the beam-beam limit need to raise # bunches and beam current to gain lumi. Need to run by-2 (4.2 ns) bunch spacing: How will electron-cloud effects behave? Will luminosity scale with # bunches? What is the effect of parasitic crossings? How will HOM heating behave? (only the last expected to be better) 17
17 Spec. Luminosity vs # Bunches Fixed bunch current in both rings Fixed by-2 pattern with mini trains Vary train length, thus # of bunches 18
18 Spec. Luminosity at 6.3 and 4.2 ns Substantial initial luminosity drop when switching to by-2 pattern. Mostly recovered after a few weeks by 3 (6.3 ns) by 2 (4.2 ns) 19
19 Raising # Bunches & Beam Currents Bunch currents: 1.5 ma (LER) 0.9 ma (HER) fairly constant 20
20 PEP Fill Patterns 1415 bunches trains of 15, 4.2 ns 1550 bunches trains of 33, 4.2 ns Note: 1st and last bunch have lower luminosity: only one parasitic xing Pilot bunches (no parasitics) have even less luminosity! 21
21 Luminosity vs I HER *I LER 22
22 HER Steering Steer the HER flat except for IR 2 this has worked historically IR 2 steering in the past has caused difficulties with coupling Motivation lower vertical dispersion better acceptance better agreement of the lattice with the design 23
23 Orbit (absolute) Y dispersion ß x /ß x,design Coupling (C 12,n ) 24
24 HER ß y * Reduction We used 60% of a knob designed to bring ß* down to 10 mm Before ß y * reduction ß y * 12.3 mm ß x * 28 cm Benefit for luminosity HER beam stronger 3% increase in spec. lumi. Before STDZ After ß y * reduction ß y * 11.0 mm ß x * 27 cm After STDZ ß y * 10 mm ß x * 25 cm ß x * lower due to larger global ß x beat. Significant tuning work required post-stdz to regain luminosity benefit 25
25 Coupling after ß y * Reduction 26
26 Lowering HER ß y * (cont d) To be able to meaningfully reduce ß y *, we are raising the HER rf voltage. At 18 MV we expect 11 mm bunch length. The rate of rise is limited by increased rf trip rate. 27
27 Issues encountered IR 2 vacuum and background issues Rf issues LER orbit & beam optics issues Bunch-by-bunch feedback issues 28
28 The IR 2 Vacuum Problem Late March, we regn d the IR 2 NEGs Pressure and background had been on rise At Run 4 startup, NEGs regen d before 1 st beam After this, LER backgrounds and pressures much worse than before Also, long time constants ( hours) observed Strongly bunch-length dependent Scrubbing very slow, almost 2 weeks NEGs being heated by HOMs to several 100 F 29
29 LER Vac. Gauge close to IR 30
30 LER Vacuum -50 m 31
31 NEG Temperature at -28 m In essence, the NEG is being constantly regen d with beam! 32
32 NEG Pump Chamber TC # hottest Collimator 33
33 Rf Issues Rf has been holding up better than in Run 3 thanks to significant effort of the RFTF The primary issues/causes of trips endemic failure (again) of SCRs in the HVPS phase drifts (esp. LER 4-5) & other board issues various tuner issues klystron issues misc. IOC issues 34
34 PEP Rf Beam Aborts Run 3 Run 4 HER rf trips: 5.0/day LER rf trips: 2.0/day Total: 7.0/day HER rf trips: 2.1/day LER rf trips: 0.9/day Total: 2.3/day incl. l. inst. 3.7/day Despite the overall improvement, # rf trips actually increased significantly after Dec
35 LER Orbit Issues Steer the ring without the IR, as has worked before. LER IR steering perilous due to BPM offsets This caused a large drop in spec. luminosity Root cause was a large beat in ß x, also, dispersion still >50 mm rms. No obvious quick fix => backed out Presently using MIA to try finding a correction strategy. 36
36 LER Steered Orbit 37
37 LER ß x after Steering 38
38 Other improvements and MD BPM improvements Modeling improvements (incl. ORM, C 12 ) Transverse grow-damp measurements Longitudinal grow-damp measurements New RF 8-1 klystron New rf IOCs using PowerPC controllers Injection Crossing-angle experiment 39
39 BPM Improvements BBA on all possible IR 2 BPM/quad pairs Offsets from this BBA now in DB Auto-calibration every 8 hours after a beamdump Timing database updated New procedure to measure timing during delivery See talks by Smith & Ross 40
40 Online Model Improvements Updated online models for both rings Survey data for IR 2 elements More accurate parametrization of QD1 Can run a model against machine config. & orbit Model runs on pepoptics => can use MAD & new version of DIMAD. C 12 coupling analysis now online 41
41 ß_y (m) HER Model vs Measurement(y) Distance (m) ß_y (m) Distance (m) ß_y (m) ß/ß (%) 50 0 green: data, blue: exc. data, red: fitted model HER, ß_y, S240, after steer, new design model, 8-Jan Distance (m) 42 Z_waisty : beta_waisty:
42 History of ß Functions at the IP 43
43 Orbit-Response Measurements ORM (LOCO) running on pepoptics HER and LER data taken ß function analysis consistent with phaseadvance analysis More work needed to understand quadstrength factors => presentation by C. Steier 44
44 HER ORM ß/ß design ? x * = 26.6 cm ? y * = 1.02 cm
45 HER ORM Magnet strengths Relative to design strengths. E(HER) = GeV
46 Multibunch Stability Grow-damp measurements HER: longitudinal & transverse HER transverse: good margin in x, strong nonlinearity in y, longitudinal: only 20 30% margin for lowlying long. modes Low-group-delay Woofer significantly better. As a result of the HER measurements, we raised priority on the new Woofer 47
47 HER TFB Damping (x) HER X damping Data suggest stability up to 2 3 A beam current by-2 fill pattern. 48
48 Crossing Angle Experiment Xing angle or not for the IR upgrade in 2005? Measurements done: Sensitivity of x to beam-beam Sensitivity of Lumi to xing angle vs currents Results: L vs x separation becomes narrow at high I L vs x becomes somewhat narrower at high I 49
49 Xing Angle Expt: Lum. vs X Simulation by I. Narsky using 3-d code by Y. Cai 50
50 Injection Orbit Feedbacks With both rings trickling injection problems are highly visible. We are implementing feedback systems to stabilize the beams LER injecting beam now working, HER to follow requires BPM hardware changes Ring-orbit stabilization under development tricky because of modeling issues (Note: we do not let the GOFs steer at injection) 51
51 LER Injection Orbit Feedback 52
52 Rf Improvements New PowerPC IOC processors Old 68k units above 80% CPU load, causing stalls New LLRF boards New SLAC klystron for HER
53 New SLAC Klystron in
54 Outlook: The remainder of Run 4 Lattice improvements Further ß y * reduction in both rings Complete LER steering (MIA work) Fix HER ß x beat Beam-current increases 55
55 ß* Limits Bunch lengths > 1 cm LER: 3.8 MV (achieved) HER: 18 MV (tough!) ß y * 1 cm feasible & meaningful tested knobs exist for both rings Lowering ß x *?? not meaningful if beam-beam limited in both planes Maintain matched beam sizes 56
56 Global Ring Issues Knob to reduce global HER ß x beat exists good in 1 st order but beam life time reduced need to investigate higher-order effects Correction of global ß x beat in steered LER 1 st MIA solution has some very strong quad changes => may be problematic in practice source of ß beat not yet clearly identified 57
57 HER Beam current limits Rf power limit: 1600 ma Stability: 1400 at present, 1600 ma with new woofer LER Tested up to 2400 ma, likely higher limit with llrf tuning rf power limit 3000 ma thermal issues with TFB, LFB kickers 58
58 July 2004 Parameters (Goal) Parameter HER LER I (ma) n bunches ßy* (cm) 1 1 ξ x ξ y V rf (MV) 18 4 Lum (cm -2 s -1 )
59 Acknowledgments The work reported on in this talk has been done by many, in particular: F.-J. Decker, A. Fisher, R. Iverson, W. Kozanecki, S. Novokhatski, M. Ross, J. Seeman, M. Stanek, M. Sullivan, P. Tenenbaum, D. Teytelman, A. Wolski, C. Steier, M. Woodley, G. Wormser, G. Yocky, et al. 60
PEP-II Operation and Machine Development. U. Wienands PEP-II Run Coordinator for the PEP-II Team
PEP-II Operation and Machine Development U. Wienands PEP-II Run Coordinator for the PEP-II Team Outline of Talk PEP Run 4 Plan & Progress Parameters, Run statistics Machine Development How we run the machine
More informationPEP-II Status and Outlook
PEP-II Status and Outlook H.-U. Wienands, M.E. Biagini, F.-J. Decker, M.H. Donald, S. Ecklund, A. Fisher, R.L. Holtzapple, R.H. Iverson, P. Krejcik, A.V. Kulikov, T. Meyer, J. Nelson, A. Novokhatski, I.
More informationStatus and Plans for PEP-II
Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn
More informationPEP II Design Outline
PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,
More informationProgram Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006
Program Risks Risk Analysis Fallback Plans for the PEP-II B-FactoryB John T. Seeman DOE PEP-II Operations Review April 26, 2006 OPS Review Topics Are there any PEP-II program risks? Has the laboratory
More informationPEP II Status. H. - Ulrich (UZi) Wienands PEP-II Run Coordinator. SLAGEPAC Meeting November 8,200O. Intro; 11/7/O 19:55
PEP II Status H. - Ulrich (UZi) Wienands PEP-II Run Coordinator SLAGEPAC Meeting November 8,200O Intro; 11/7/O 19:55 Run Statistics In CY 2000, PEP delivered 23.6 fb- (86% of 27.3 fb- ) of which BaBar
More informationLEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ
SLAC-PUB-11706 LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ U. Wienands y, SLAC, Stanford, CA, USA Abstract Electron-positron colliders have been operating in a topup-and-coast fashion with a cycle
More informationPEP II STATUS AND PLANS *
PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex
More informationSPEAR 3: Operations Update and Impact of Top-Off Injection
SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3
More informationThe Elettra Storage Ring and Top-Up Operation
The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)
More informationbeam dump from P2 losses this morning
beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous
More informationNorth Damping Ring RF
North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution
More informationBunch-by-bunch feedback and LLRF at ELSA
Bunch-by-bunch feedback and LLRF at ELSA Dmitry Teytelman Dimtel, Inc., San Jose, CA, USA February 9, 2010 Outline 1 Feedback Feedback basics Coupled-bunch instabilities and feedback Beam and feedback
More informationPEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman
PEP-II longitudinal feedback and the low groupdelay woofer Dmitry Teytelman 1 Outline I. PEP-II longitudinal feedback and the woofer channel II. Low group-delay woofer topology III. Why do we need a separate
More informationDigital BPMs and Orbit Feedback Systems
Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit
More informationFast Orbit Feedback at the SLS. Outline
Fast Orbit Feedback at the SLS 2nd Workshop on Beam Orbit Stabilisation (December4-6, 2002, SPring-8) T. Schilcher Outline Noise Sources at SLS Stability / System Requirements Fast Orbit Feedback Implementation
More informationPEP-I1 RF Feedback System Simulation
SLAC-PUB-10378 PEP-I1 RF Feedback System Simulation Richard Tighe SLAC A model containing the fundamental impedance of the PEP- = I1 cavity along with the longitudinal beam dynamics and feedback system
More informationStatus of Elettra, top-up and other upgrades
Status of Elettra, top-up and other upgrades Emanuel Karantzoulis ELETTRA / Trieste, Italy / 2010 November 25-26 Past and Present Configurations 1994-2007 From 2008 No full energy injection Full energy
More informationPEP II Status and Plans
SLAC-PUB-6854 September 1998 PEP II Status and Plans By John T. Seeman Invited talk presented at the 16th IEEE Particle Accelerator Conference (PAC 95) and International Conference on High Energy Accelerators,
More informationLEP Status and Performance in 2000
LEP Status and Performance in 2 R. Assmann, SL/OP for the SL Division Outline: Operational strategy Overview on luminosity and energy performance Energy reach Luminosity performance Other issues Further
More informationKEKB Accelerator Physics Report
KEKB Accelerator Physics Report Y. Funakoshi for the KEKB commissioning group KEK, 1-1 Oho, Tsukuba, Ibaraki 305-0801,Japan Abstract 1 INTRODUCTION The KEKB B-Factory is an electron-positron double ring
More informationNew Filling Pattern for SLS-FEMTO
SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new
More informationLHC Nominal injection sequence
LHC Nominal injection sequence Mike Lamont Acknowledgements: Reyes Alemany Fernandez, Brennan Goddard Nominal injection Overall injection scheme Pilot R1, Pilot R2, Intermediate R1 Optimise Intermediate
More informationABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION
ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010
More informationAccelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross
Monday, Marc Ross Linear Collider RD Most RD funds address the most serious cost driver energy The most serious impact of the late technology choice is the failure to adequately address luminosity RD issues
More informationP. Emma, et al. LCLS Operations Lectures
P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1
More informationLHC Beam Instrumentation Further Discussion
LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz
More informationOPERATIONAL EXPERIENCE AT J-PARC
OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization
More informationANKA RF System - Upgrade Strategies
ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu
More informationExperience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation
Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF
More informationPhase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.
Commissioning Experience from PEP-II HER Longitudinal Feedback 1 S. Prabhakar, D. Teytelman, J. Fox, A. Young, P. Corredoura, and R. Tighe Stanford Linear Accelerator Center, Stanford University, Stanford,
More informationLCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems
LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end
More informationLEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV
LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 29 GEV R. W. Aßmann, CERN, Geneva, Switzerland Abstract The Large Electron-Positron Collider (LEP) at CERN completed its operation in
More informationStatus of SOLARIS. Paweł Borowiec On behalf of Solaris Team
Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX
More informationPEP-II STATUS REPORT *
PEP-II STATUS REPORT * Jonathan Dorfan Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA For the SLAC, LBNL, LLNL PEP-II group Abstract The main design features of the PEP-II
More informationCONSTRUCTION AND COMMISSIONING OF BEPCII
Abstract CONSTRUCTION AND COMMISSIONING OF BEPCII C. Zhang, J.Q. Wang, L. Ma and G.X.Pei for the BEPCII Team, IHEP, CAS P.O.Box 918, Beijing 100049, China BEPCII is the major upgrade of BEPC (Beijing Electron-
More informationPEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings
More informationTop-Up Experience at SPEAR3
Top-Up Experience at SPEAR3 Contents SPEAR 3 and the injector Top-up requirements Hardware systems and modifications Safety systems & injected beam tracking Interlocks & Diagnostics SPEAR3 Accelerator
More informationPresent Status and Future Upgrade of KEKB Injector Linac
Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future
More informationModeling and simulation of longitudinal dynamics for Low Energy Ring-High Energy Ring at the Positron-Electron Project 1
SLAC-PUB-12374 February, 27 Modeling and simulation of longitudinal dynamics for Low Energy Ring-High Energy Ring at the Positron-Electron Project 1 C. Rivetta, T. Mastorides, J. D. Fox, D. Teytelman,
More informationPEP-II IR-2 Alignment
SLAC-PUB-10328 January 2004 PEP-II IR-2 Alignment A. Seryi, S. Ecklund, C. Le Cocq, R. Pushor, R. Ruland, Z. Wolf SLAC, Stanford, CA 94025, USA This paper describes the first results and preliminary analysis
More informationCharacterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera
Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Bingxin Yang, Alex H. Lumpkin, Katherine Harkay, Louis Emery, Michael Borland, and Frank Lenkszus Advanced
More informationFirst Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac
First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16
More informationJune 2005 Advanced Electronics Group, ARDA
Advanced Electronics Group, ARDA J. Fox, T. Mastorides, C. Rivetta, D.Teytelman, D. Van Winkle, Y. Zhou Advanced Electronics - Overview The ARDA Advanced electronics group combines interests in accelerator
More informationA Fifteen Year Perspective on the Design and Performance of the SNS Accelerator
A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator S. Cousineau (On behalf of the SNS project) HB2016, Sweden July 04, 2016 ORNL is managed by UT-Battelle for the US Department
More informationBeam systems without failures what can be done?
Acknowledgements: T.Baer, C.Bracco, G.Bregliozzi, G.Lanza, L.Ponce, S.Redaelli, A.Butterworth Beam systems without failures what can be done? After LS1 Session 07-09 th February 2012 M.Solfaroli/J.Uythoven
More informationSpear3 RF System Sam Park 11/06/2003. Spear3 RF System. High Power Components Operation and Control. RF Requirement.
Spear3 RF System RF Requirement Overall System High Power Components Operation and Control SPEAR 3 History 1996 Low emittance lattices explored 1996 SPEAR 3 proposed 11/97 SPEAR 3 design study team formed
More informationA Facility for Accelerator Physics and Test Beam Experiments
A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four
More informationSynchrotron Light Facility. Operation of ALBA RF. Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo
Operation of ALBA RF Angela Salom on behalf of RF team: Francis Perez, Bea Bravo and Jesus Ocampo Outline ALBA RF Overview: Booster and SR RF Operation with beam Statistics of first year operation Cavities
More informationANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.
ANKA Status Report N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske. KIT - University of the State of Baden-Wuerttemberg and National Laboratory of the Helmholtz Association
More informationScavenger Extraction. Karen Goldsmith Shawn Alverson
Scavenger Extraction Karen Goldsmith Shawn Alverson Topics Beam line and area maps High Power Target (HPT) How to establish first beam to HPT Setting energy (configs, multiknobs, Fast Phase Shifters, etc.)
More informationFIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC
FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,
More informationDevelopment of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University
Development of beam-collision feedback systems for future lepton colliders P.N. Burrows 1 John Adams Institute for Accelerator Science, Oxford University Denys Wilkinson Building, Keble Rd, Oxford, OX1
More informationDiamond RF Status (RF Activities at Daresbury) Mike Dykes
Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of
More informationMULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR
MULTI-BUNCH INSTABILITY DIAGNOSTICS VIA DIGITAL FEEDBACK SYSTEMS AT PEP-II, DAæNE, ALS and SPEAR J. Fox æ R. Larsen, S. Prabhakar, D. Teytelman, A. Young, SLAC y A. Drago, M. Serio, INFN Frascati; W. Barry,
More informationTWO BUNCHES WITH NS-SEPARATION WITH LCLS*
TWO BUNCHES WITH NS-SEPARATION WITH LCLS* F.-J. Decker, S. Gilevich, Z. Huang, H. Loos, A. Marinelli, C.A. Stan, J.L. Turner, Z. van Hoover, S. Vetter, SLAC, Menlo Park, CA 94025, USA Abstract The Linac
More informationFocus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2
Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010 Plan of the program at ILC2010 Focus of efforts Work on parameter set for a possible
More informationSuggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer
The machine parameters and the luminosity goals of the ILC were discussed at the 1 st ILC Workshop. In particular, Nick Walker noted that the TESLA machine parameters had been chosen to achieve a high
More informationThe 2011 LHC Run - Lessons in Beam Diagnostics
The 2011 LHC Run - Lessons in Beam Diagnostics LHC Performance Workshop Chamonix 2012 6 th 10 th February Rhodri Jones on behalf of the CERN Beam Instrumentation Group Outline This Presentation will focus
More informationStatus of SOLARIS Arkadiusz Kisiel
Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS
More informationARES Status 2004(JFY)
ARES Status 2004(JFY) Tetsuo Abe for KEKB-RF/ARES-cavity group High Energy Accelerator Research Organization (KEK) Outline 1. Fundamentals of the ARES-cavity system 2. Operation status 3. D04C/ARES multipactoring
More informationControl of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback
Journal of Physics: Conference Series PAPER OPEN ACCESS Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback To cite this article: J. Fox et al 2018 J. Phys.: Conf. Ser. 1067 072024
More informationWeek 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17
Week 0: PPS Certification and Processing Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Work in tunnel Work in tunnel PPS Certification PPS Certification PPS Certification
More informationANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.
ANKA Status Report N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. Institute for Synchrotron Radiation KIT - University of the State of Baden-Wuerttemberg and
More informationFriday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB
07:00 13:00 : Establishing reference orbit golden Jorg Wenninger Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB Offset in vertical plane, ~1 mm seems real. 13:00 14: 00 : Injection oscillation
More information30 GHz Power Production / Beam Line
30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression
More informationOperation and Performance of a Longitudinal Feedback System Using Digital Signal Processing*
SLAC-PUB-6675 LBL-36174 November 22, 1994 Operation and Performance of a Longitudinal Feedback System Using Digital Signal Processing* D. Teytelman, J. Fox, H. Hindi, J. Hoeflich, I. Linscott, J. Olsen,
More informationDevelopment of an Abort Gap Monitor for High-Energy Proton Rings *
Development of an Abort Gap Monitor for High-Energy Proton Rings * J.-F. Beche, J. Byrd, S. De Santis, P. Denes, M. Placidi, W. Turner, M. Zolotorev Lawrence Berkeley National Laboratory, Berkeley, USA
More informationAvailability and Reliability Issues for the ILC
Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some
More informationCLIC Feasibility Demonstration at CTF3
CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for
More informationSummary of the 1 st Beam Line Review Meeting Injector ( )
Summary of the 1 st Beam Line Review Meeting Injector (23.10.2006) 15.11.2006 Review the status of: beam dynamics understanding and simulations completeness of beam line description conceptual design of
More informationAn Overview of Beam Diagnostic and Control Systems for AREAL Linac
An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic
More informationSTATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR
Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.
More informationThe basic parameters of the pre-injector are listed in the Table below. 100 MeV
3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,
More informationINTRODUCTION. SLAC-PUB-8414 March 2000
SLAC-PUB-8414 March 2 Beam Diagnostics Based on Time-Domain Bunch-by-Bunch Data * D. Teytelman, J. Fox, H. Hindi, C. Limborg, I. Linscott, S. Prabhakar, J. Sebek, A. Young Stanford Linear Accelerator Center
More informationBUNCH BY BUNCH FEEDBACK SYSTEMS FOR SUPERKEKB RINGS
August 8-1, 216, Chiba, Japan PASJ216 TUOM6 BUNCH BY BUNCH FEEDBACK SYSTEMS FOR SUPERKEKB RINGS Makoto Tobiyama, John W. Flanagan, KEK Accelerator Laboratory, 1-1 Oho, Tsukuba 35-81, Japan, and Graduate
More information2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2
PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND
More informationPhotoinjector Laser Operation and Cathode Performance
Photoinjector Laser Operation and Cathode Performance Daniele Sertore, INFN Milano LASA Siegfried Schreiber, DESY Laser operational experience Laser beam properties Cathode performances Outlook TTF and
More informationCERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS
Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications
More informationIOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY
IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE
More information4.4 Injector Linear Accelerator
4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE
More informationCOMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM
COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM A. Olmos, J. Moldes, R. Petrocelli, Z. Martí, D. Yepez, S. Blanch, X. Serra, G. Cuni, S. Rubio, ALBA-CELLS, Barcelona, Spain Abstract The ALBA Fast
More informationLCLS Injector Technical Review
LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4 2003 Review Committee Members: Prof. Patrick O Shea Chair University of Maryland Dr. E. Colby Stanford Linear Accelerator
More informationCLIC Feasibility Demonstration at CTF3
CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, KVI Groningen 20 Sep 2011 The Key to CLIC Efficiency NC Linac for 1.5 TeV/beam accelerating gradient: 100 MV/m RF frequency:
More informationAn Operational Diagnostic Complement for Positrons at CEBAF/JLab
An Operational Diagnostic Complement for Positrons at CEBAF/JLab Michael Tiefenback JLab, CASA International Workshop on Physics with Positrons at Jefferson Lab 12-15 September 2017 Operating CEBAF with
More informationNew Results on the Electron Cloud at the Los Alamos PSR
New Results on the Electron Cloud at the Los Alamos PSR Robert Macek, LANL, 4/15/02 Co-authors: A. Browman, D. Fitzgerald, R. McCrady, T. Spickermann, & T. S. Wang - LANL For more information see the website
More information1. General principles for injection of beam into the LHC
LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary
More informationA Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.
A1.01 PROJECT MANAGEMENT BNL/Cornell Michnoff A1.01.01 Milestones BNL/Cornell Michnoff This scope is a placeholder for all project high level milestones for NYSERDA. There is no cost or labor related to
More informationCOMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE
Proceedings of DIPAC9, Basel, Switzerland MOOB2 COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE K. Balewski #, G. Kube, K. Wittenburg, A. Brenger, H.-T. Duhme, V. Gharibyan, J.
More informationSimulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH.
Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH. Christopher Behrens for the FLASH team Deutsches Elektronen-Synchrotron (DESY) FLS-2010 Workshop at SLAC, 4. March 2010 C.
More informationFuture Performance of the LCLS
Future Performance of the LCLS J. Welch for many* SLAC National Accelerator Laboratory FLS 2010, ICFA Beam Dynamics Workshop on Future Light Sources, March 1-5, 2010. SLAC National Accelerator Laboratory,
More informationReview of Diamond SR RF Operation and Upgrades
Review of Diamond SR RF Operation and Upgrades Morten Jensen on behalf of Diamond Storage Ring RF Group Agenda Stats X-ray and LN2 pressure results Cavity Failure Conditioning in the RFTF Cavity Simulations
More informationSuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK)
A possibility of ring collider for Higgs factory 13 Feb. 2012 K. Oide (KEK) Inspired by A. Blondel and F. Zimmermann, A High Luminosity e+e- Collider in the LHC tunnel to study the Higgs Boson, V2.1 -
More informationNext Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack
The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475
More informationREVIEW OF LHC OPERATION
REVIEW OF LHC OPERATION M. Lamont, CERN, Geneva, Switzerland Abstract LHC beam commissioning re-started on the 20 th November 2009 and continued for three and a half weeks. A summary of the progress made
More informationSUMMARY OF SESSION 4 - UPGRADE SCENARIO 2
Published by CERN in the Proceedings of RLIUP: Review of LHC and Injector Upgrade Plans, Centre de Convention, Archamps, France, 29 31 October 2013, edited by B. Goddard and F. Zimmermann, CERN 2014 006
More informationNLC - The Next Linear Collider Project NLC R&D. D. L. Burke. DOE Annual Program Review SLAC April 9-11, 2003
DOE Annual Program Review SLAC April 9-11, 2003 NLC Activities for the Past Year Accelerator Design centered around ILC-TRC studies. Technology R&D focused on the RF R&D. Modulator, klystron, SLED-II,
More informationLHC COMMISSIONING PLANS
LHC COMMISSIONING PLANS R. Alemany Fernández, CERN, Geneva, Switzerland Abstract Operating the Large Hadron Collider (LHC) at design performance is not going to be easy. The machine is complex and with
More informationarxiv: v1 [physics.acc-ph] 19 Nov 2013
Conditioning of BPM pickup signals for operations of the Duke storage ring with a wide range of single-bunch current * arxiv:1311.4613v1 [physics.acc-ph] 19 Nov 213 XU Wei 1,2;1) LI Jing-Yi 1,2;2) HUANG
More information2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)
2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution
More information