Scavenger Extraction. Karen Goldsmith Shawn Alverson

Size: px
Start display at page:

Download "Scavenger Extraction. Karen Goldsmith Shawn Alverson"

Transcription

1 Scavenger Extraction Karen Goldsmith Shawn Alverson

2 Topics Beam line and area maps High Power Target (HPT) How to establish first beam to HPT Setting energy (configs, multiknobs, Fast Phase Shifters, etc.) Setting up the kicker/dc Extraction PR185 Bend region General Tune-Up Phase Scans MPS HLAM MTLM (TIU) BCS References

3 Beam Line Overview Relocated from target for use in DC Extraction Energy diagnostic region Gunbarrel Collimator Same BPM with different BPMP with offsets for either line HBENDs all on one string (LGPS 3)

4 Tantalum/Tungsten Target Material: 90% Tantalum, 10% Tungsten Target mounted on cam which rotates the target relative to the beam incident position Keeps target from overheating Motor interlocked into TIU Machine Protection System

5 Positron Vault PPS information may not be accurate. PPS stopper permit enable box X2183 Positron vault local PPS panel BSOPOS01 (X) µ R Positron vault PPS door (PVN1 door) Portal blocks and PVN1A control box and status box Shielding block EO 3 EO Positron vault PPS gate (PVN1A gate) Portal blocks Positron vault Portal blocks and PVN1A emergency exit control box East turn around Rask hazard enable box Beamline EO 2 EO Positron target block EO 1 EO P R Equipment shaft Radiation gate reset (X) Radiation gate (X) Radiation gate alcove Linac concrete rolling blocks

6 Establishing First Beam Steps for establishing first beam into the scavenger extraction line: 1 Setup Septa/Bend strength for desired energy 1 Setup Septa/Bend strength for desired energy 2 Setup kicker strength/timing or DC extraction 3 Adjust Sec. 17/18 energy to match bends 4 Fix energy spread using Phase Ramp 5 Clean up steering as needed based on gold reference orbit

7 E+ Tune-Up Panel This panel contains links to the most common tuning devices for the scavand e+ lines. Location: OPERAT_MAINT => E+ Tune-up and Rate OR E+ SYSTEM => Tune-up and Rate

8 Setting Up the Bend Energy Load EXT Magnet and Timing Configs!

9 HLAM In addition to ensuring that the HLAM EMI is turned on, you must also verify that it has been put IN to affect the beam. HLAM Status HLAM In/Out Controls

10 Setting Up the Bend Energy cont. Multiknobs Create knob to scale from configfile Use Scav Energy multiknobs Absolute knobs scale all magnets from design with respect to HBENDs DANGEROUS! Used for large energy changes but you will probably have to manually adjust the septa afterwards to re-match into the quad lattice Relative knob scales all extraction line magnets (bends, septa, quads, and LI19 XCOR 700) uniformly from current value Knob adjusts bend energy by ~0.5 GeV/turn Generally better to use this knob than the absolute to avoid getting lost Magnet Scaling factors: HBEND BDES = SCAV Energy * VBEND BDES = SCAV Energy * HLAM BDES = SCAV Energy * VLAM BDES = SCAV Energy *

11 Setting Up the Bend Energy cont. Positron Multi-Knob Panel Location: Multi_Device_Knobs => POSITN_KNOB_INDEX Absolute Knobs OR E+_TUNEUP_&_RATE => POSITN_KNOB_INDEX Relative Knob

12 Setting Up the Kicker Make sure kicker current scope looks correct Scope is on channel 3-20 Scope signal should look similar to this.

13 Setting Up the Kicker Kicker timing should be close after loading TIMEPOS timing config. If small adjustments are needed, use Fine Multiknob (kicker timing panel) You can also use the Raw signal, but you must Freeze timing feedback before adjusting, put back to Track when done To turn the kicker on safely we must use a macro to slowly ramp up the charge for the thyratron PFN.

14 Setting Up the Kicker Setting the kicker energy: Send beam down to Sector 19 and make sure orbit is generally flat Incoming orbit must be flat in order to reduce unintentional angle into extraction line to insure proper kicker and energy setup Turn on kicker and adjust BDES (actually voltage) to deflect beam by about -7 mm in y on PR171 or LI19 BPMS701 Y EP01BPMS 170 = LI19BPMS Offset May need to tweak VLAM negative to get beam fully into the extraction line.

15 No EP01 Kicker? If EP01 Kicker is not functioning, it is possible to use DC Extraction to send beam into the Scav Extraction Line. Use LI19 YCOR 503 to steer -7 mm on PR171 or LI19 BPMS 701 Y If not enough room on YCOR 503, you can also use EP01 YCORs 145 and 146 (used to be 282)

16 Setting Up Extraction Energy Scavenger beam typically set to extract between around GeV(FACET = 23 GeV) Once beam is deflected into extraction line, adjust Sector 17/18 energy to maximize signal on EP01 TORO 175 and attempt to see beam on PR185 Can make coarse energy adjustment by adding/dropping tubes upstream of Sec. 17/18 Fine energy adjustments made by moving 17/18 PAU fast phase shifters (17_18_FFPHAS off Tune-Up Panel)

17 PR185 Once the beam is on PR185 you can now fine tune energy and energy spread and turn on EP01_SCAV_LOOP energy feedback Feedback uses BPM 186 for state measurement Use Phase Ramp (DR12 PHAS 61) to minimize energy spread on PR185

18 PR185 cont. High Energy is up and to the left, Low Energy is down and to the right. Energy spread can streak the beam wider than the up stream collimator aperture. Adjust phase ramp to ensure that the whole beam is visible and on energy.

19 Gun-Barrel Collimator After PR185, a cylindrical collimator was installed to protect from high power off-energy beams. It is aligned such that the aperture should only accept on energy beams into the bend region Use EP01 TORO 199 to verify that the beam has passed through the collimator If little or no beam on TORO 199: Make sure that the Pos. Vault PPS Stoppers are removed Maximize throughput by adjusting 17/18 fast phase It should not be necessary to move the collimator

20 Bend Region Once past Toroid 199, the beam enters the vertical and horizontal bend region. Beam should be on energy now so it should make it through the bends with a little help from the correctors to steer the orbit on BPMs. -XCORs are trim windings on the bends -YCORs are trim windings on the quads Bends are rolled through the extraction line! -Mostly bend in X but do have a small Y contribution

21 High Power Target In order to steer on the target use: For X: EP01 XCOR 265 and 275 For Y: EP01 YCOR 270 and 280 Diagnostics: PR390 (EP02 Fixed Target) EP01 TORO 375 and PT01 TORO 376

22 General Tune-Up Phase drift Where: Energy spread changes on PR185 What to do: Check upstream throughput, may need to tweak Phase Ramp (DR12 PHAS 61) If Sec. 10 chicane is ON may need to adjust Sec. 2-9 and Sec SBST phases separately to fix Energy drift Where: Beam position shift on PR185 and EP01 BPMs 186 What to do: ScavFeedback should auto-correct, may need to adjust 17/18 Fast Phase or add/drop klystron if change is large

23 Phase Scans The scavenger extraction line can and will be used as the primary dispersion region for phasing klystrons. Y Use energy BPM EP for correlation plot Rough scans can be done using PR185 Two methods exist for scanning tubes upstream of 19-6 (except for Sec. 17 and 18 which are special) BPMS EP X (ELECEP01) = A * (X - B)**2 + C A = E-04 STD DEV = E-06 B = STD DEV = C = STD DEV = E-03 RMS FIT ERROR = E-02 Chi-square/DOF = * * * * * * * * * * * * * * * SBST LI17 1 KPHR (S-17-1) SBST LI17 1 KPHR STEPS=41;3 MIN= MAX= * * * * * * *

24 Phase Scans cont. Phase Scan methods: 1 Move KLYS/SBST KPHR with SCAV energy feedback OFF and look for max energy For BPM 186, Emax= Xmin For PR185, Emax= Up and to the Left 2 Scan KLYS/SBST KPHR with SCAV energy feedback ON and look at feedback actuator Emax = minimum feedback contribution Use FBCK EP01SCAV ENGYSCAV CMND in correlation plot to see feedback contribution

25 Phase Scans cont. For Sectors 17 and 18: Turn OFF SCAV Energy feedback Put the sector you want to scan on crest by moving the fast phase shifter to 0 You will probably have to drop tubes in order to stay on PR185 Scan KLYS/SBST KPHR in correlation plot on EP01 BPMS 186 like normal Dial back fast phase shifter and add tubes to get back to original complement Turn ON SCAV Energy Feedback

26 MPS TIU Interlocks 1553 Interlocks HLAM Interlocks

27 MPS -HLAM Many devices in the Scavenger Extraction Line and Positron Vault are interlocked directly into the HLAM and extraction kicker since these are the primary fast means of inhibiting beam to these areas.

28 MPS -HLAM HLAM interlocks and reset panels - Allows you to check input states and pull valves (if vacuum looks ok) - EP01 and EP02 contain separate inputs into the HLAM/Kicker shut-off path which can be reset from their respective panels HLAM Permit Reset

29 MPS (TIU) Most TIU devices will reset the normal way off of the LinacTIU panel - Exception: Moving Target Logic Module chassis

30 MTLM MPS (TIU) The High Power Target has its own MPS interlocks through the Moving Target Logic Module (MTLM) Module is interlocked through the LinacTIU (Sec. 20) but the TIU input will not reset until the MTLM chassis has been reset itself. MTLM interlock panel Located off Positron Target Control panel Reset the MTLM chassis before the TIU

31 BCS Positron BCS signals located in Zone 2 of the SCP BCS Panel

32 References Eric Reuter Mechanical Design and Development of a High Power Target System for the SLC Positron Source, SLAC-PUB-5369 Dec Scavenger Extraction Beam Line Map, SLAC-I R004 Positron Vault PPS Zone Map, SLAC-I R040

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

A Facility for Accelerator Physics and Test Beam Experiments

A Facility for Accelerator Physics and Test Beam Experiments A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four

More information

Electron Bypass Line (EBL) Design Electrons to A-line bypassing LCLS T. Fieguth, R. Arnold

Electron Bypass Line (EBL) Design Electrons to A-line bypassing LCLS T. Fieguth, R. Arnold September 2007 SLAC-TN-08-001 Electron Bypass Line (EBL) Design Electrons to A-line bypassing LCLS T. Fieguth, R. Arnold Introduction Forty one years ago, September 20, 1966, the first beam entered End

More information

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Week 0: PPS Certification and Processing Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Work in tunnel Work in tunnel PPS Certification PPS Certification PPS Certification

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

1. General principles for injection of beam into the LHC

1. General principles for injection of beam into the LHC LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary

More information

Requirements for the Beam Abort Magnet and Dump

Requirements for the Beam Abort Magnet and Dump Requirements for the Beam Abort Magnet and Dump A beam abort kicker (pulsed dipole magnet) and dump are required upbeam of the LCLS undulator in order to protect the undulator from mis-steered and poor

More information

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR BNL-94942-2011-CP FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR S. Sletskiy and N. Solyak Presented at the 2011 Particle Accelerator Conference (PAC 11) New York, NY March

More information

Status of SOLARIS Arkadiusz Kisiel

Status of SOLARIS Arkadiusz Kisiel Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS

More information

Top-Up Experience at SPEAR3

Top-Up Experience at SPEAR3 Top-Up Experience at SPEAR3 Contents SPEAR 3 and the injector Top-up requirements Hardware systems and modifications Safety systems & injected beam tracking Interlocks & Diagnostics SPEAR3 Accelerator

More information

Hall-B Beamline Commissioning Plan for CLAS12

Hall-B Beamline Commissioning Plan for CLAS12 Hall-B Beamline Commissioning Plan for CLAS12 Version 1.5 S. Stepanyan December 19, 2017 1 Introduction The beamline for CLAS12 utilizes the existing Hall-B beamline setup with a few modifications and

More information

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006 Program Risks Risk Analysis Fallback Plans for the PEP-II B-FactoryB John T. Seeman DOE PEP-II Operations Review April 26, 2006 OPS Review Topics Are there any PEP-II program risks? Has the laboratory

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

TWO BUNCHES WITH NS-SEPARATION WITH LCLS* TWO BUNCHES WITH NS-SEPARATION WITH LCLS* F.-J. Decker, S. Gilevich, Z. Huang, H. Loos, A. Marinelli, C.A. Stan, J.L. Turner, Z. van Hoover, S. Vetter, SLAC, Menlo Park, CA 94025, USA Abstract The Linac

More information

LCLS Linac Technical Design Review Diagnostics and Controls

LCLS Linac Technical Design Review Diagnostics and Controls Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Linac Technical Design Review Diagnostics and Controls December 12, 12, 2003 Requirements for for beamline instrumentation Upgrades

More information

Availability and Reliability Issues for the ILC

Availability and Reliability Issues for the ILC Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some

More information

Radiation Safety System for Stanford Synchrotron Radiation Laboratory*

Radiation Safety System for Stanford Synchrotron Radiation Laboratory* SLAC PUB-8817 April 16, 2001 Radiation Safety System for Stanford Synchrotron Radiation Laboratory* James C. Liu, N. E. Ipe and R. Yotam Stanford Linear Accelerator Center, P. O. Box 4349, Stanford, CA

More information

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER SLAC-PUB-7786 (August 1998) RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER J. C. Liu, X. S. Mao, W. R. Nelson, J. Seeman, D. Schultz, G. Nelson, P. Bong, B. Gray Stanford

More information

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

An Operational Diagnostic Complement for Positrons at CEBAF/JLab An Operational Diagnostic Complement for Positrons at CEBAF/JLab Michael Tiefenback JLab, CASA International Workshop on Physics with Positrons at Jefferson Lab 12-15 September 2017 Operating CEBAF with

More information

Extraction/Separator Setup. Michael Spata Operations Stay Treat July 16, 2015

Extraction/Separator Setup. Michael Spata Operations Stay Treat July 16, 2015 Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015 Accelerator Overview Extraction System Design settings for magnets and RF Separators come from CED All beamlines have been commissioned

More information

SLAC ILC Accelerator R&D Program

SLAC ILC Accelerator R&D Program SLAC ILC Accelerator R&D Program SLUO Meeting September 26 th, 2005 Tor Raubenheimer SLAC 2005 ILC Program NLC group was redirected towards ILC Developed a program aimed at the topics identified in the

More information

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA. A1.01 PROJECT MANAGEMENT BNL/Cornell Michnoff A1.01.01 Milestones BNL/Cornell Michnoff This scope is a placeholder for all project high level milestones for NYSERDA. There is no cost or labor related to

More information

LCLS Injector Technical Review

LCLS Injector Technical Review LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4 2003 Review Committee Members: Prof. Patrick O Shea Chair University of Maryland Dr. E. Colby Stanford Linear Accelerator

More information

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team PEP-II Status U. Wienands, PEP-II Run Coordinator for the PEP-II team Outline of Talk Run 4 Synopsis Machine tuning & improvements Issues encountered during Run 4 Other improvements and MD items Outlook:

More information

Tolerances on Magnetic Misalignments in SESAME Storage Ring

Tolerances on Magnetic Misalignments in SESAME Storage Ring Tolerances on Magnetic Misalignments in SESAME Storage Ring SES-TE-AP-TN-0003 April 20, 2014 Authored by: Reviewed by: Approved by: Access List : Maher Attal Erhard Huttle Erhard Huttle ---Internal ---------

More information

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. ANKA Status Report N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. Institute for Synchrotron Radiation KIT - University of the State of Baden-Wuerttemberg and

More information

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB 07:00 13:00 : Establishing reference orbit golden Jorg Wenninger Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB Offset in vertical plane, ~1 mm seems real. 13:00 14: 00 : Injection oscillation

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

Future Performance of the LCLS

Future Performance of the LCLS Future Performance of the LCLS J. Welch for many* SLAC National Accelerator Laboratory FLS 2010, ICFA Beam Dynamics Workshop on Future Light Sources, March 1-5, 2010. SLAC National Accelerator Laboratory,

More information

Advanced Photon Source - Upgrades and Improvements

Advanced Photon Source - Upgrades and Improvements Advanced Photon Source - Upgrades and Improvements Horst W. Friedsam, Jaromir M. Penicka Argonne National Laboratory, Argonne, Illinois, USA 1. INTRODUCTION The APS has been operational since 1995. Recently

More information

New Filling Pattern for SLS-FEMTO

New Filling Pattern for SLS-FEMTO SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new

More information

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2 Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010 Plan of the program at ILC2010 Focus of efforts Work on parameter set for a possible

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

LHC Nominal injection sequence

LHC Nominal injection sequence LHC Nominal injection sequence Mike Lamont Acknowledgements: Reyes Alemany Fernandez, Brennan Goddard Nominal injection Overall injection scheme Pilot R1, Pilot R2, Intermediate R1 Optimise Intermediate

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

PEP-II IR-2 Alignment

PEP-II IR-2 Alignment SLAC-PUB-10328 January 2004 PEP-II IR-2 Alignment A. Seryi, S. Ecklund, C. Le Cocq, R. Pushor, R. Ruland, Z. Wolf SLAC, Stanford, CA 94025, USA This paper describes the first results and preliminary analysis

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

Status of Elettra, top-up and other upgrades

Status of Elettra, top-up and other upgrades Status of Elettra, top-up and other upgrades Emanuel Karantzoulis ELETTRA / Trieste, Italy / 2010 November 25-26 Past and Present Configurations 1994-2007 From 2008 No full energy injection Full energy

More information

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Bingxin Yang, Alex H. Lumpkin, Katherine Harkay, Louis Emery, Michael Borland, and Frank Lenkszus Advanced

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

ILC Damping Ring Lattice Status Report. Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007

ILC Damping Ring Lattice Status Report. Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007 Status Report Louis Emery and Aimin Xiao Argonne National Laboratory Presented at KEK workshop Dec 18th, 2007 Outline New 8-fold symmetric lattice on ILC Cornell wiki pages, as of 12/18/2007 Separated

More information

30 GHz Power Production / Beam Line

30 GHz Power Production / Beam Line 30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression

More information

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010 Recent APS Storage Ring Instrumentation Developments Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010 Ring Diagnostics Overview RF beam position monitor technology Photon beam position

More information

SUMMARY OF THE ILC R&D AND DESIGN

SUMMARY OF THE ILC R&D AND DESIGN SUMMARY OF THE ILC R&D AND DESIGN B. C. Barish, California Institute of Technology, USA Abstract The International Linear Collider (ILC) is a linear electron-positron collider based on 1.3 GHz superconducting

More information

Summary of the 1 st Beam Line Review Meeting Injector ( )

Summary of the 1 st Beam Line Review Meeting Injector ( ) Summary of the 1 st Beam Line Review Meeting Injector (23.10.2006) 15.11.2006 Review the status of: beam dynamics understanding and simulations completeness of beam line description conceptual design of

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ SLAC-PUB-11706 LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ U. Wienands y, SLAC, Stanford, CA, USA Abstract Electron-positron colliders have been operating in a topup-and-coast fashion with a cycle

More information

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16

More information

Approved by: / / R. Battaglia 12/16/2016

Approved by: / / R. Battaglia 12/16/2016 Fabrication Laboratory Revision: H Rev Date: 12/16/16 Approved by: Process Engineer / / R. Battaglia 12/16/2016 Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the Varian

More information

OPERATIONAL EXPERIENCE AT J-PARC

OPERATIONAL EXPERIENCE AT J-PARC OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization

More information

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS

WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS WHAT WE WILL DO FOR BEAM PREPARATION IN 2009 : BEAM INTERLOCKS J. Wenninger, CERN, Geneva Abstract A large fraction of the LHC Machine Protection System was commissioned in 2008 in view of the first LHC

More information

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract

THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Abstract SLAC PUB 7246 June 996 THE NEXT LINEAR COLLIDER TEST ACCELERATOR: STATUS AND RESULTS * Ronald D. Ruth, SLAC, Stanford, CA, USA Abstract At SLAC, we are pursuing the design of a Next Linear Collider (NLC)

More information

5 Project Costs and Schedule

5 Project Costs and Schedule 93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for

More information

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac

More information

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX T. Koseki, M. Ikegami, M. Tomizawa, Accelerator Laboratory, KEK, Tsukuba, Japan F. Noda, JAEA, Tokai, Japan Abstract The J-PARC (Japan Proton

More information

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006 SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006 FFTB will soon be gone! The Problem: On April 10, 2006, the Final Focus Test Beam (FFTB)

More information

. SLAC-P~ December 1995

. SLAC-P~ December 1995 SLAC-P~-95-7058 December 1995 BEAM-BASED ALIGNMENT OF THE FINAL FOCUS TEST BEAM * P. Tenenbaum, D. Burke, R. Helm, J. Iwin, P. Raimondi Stanford Linear Accelerator Center, Stanford University, Stanford,

More information

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team AREAL- Phase 1 Progress & Status B. Grigoryan on behalf of AREAL team Contents Machine Layout Building & Infrastructure Laser System RF System Vacuum System Cooling System Control System Beam Diagnostics

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * J. Galambos, W. Blokland, D. Brown, C. Peters, M. Plum, Spallation Neutron Source, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract Satisfying

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

beam dump from P2 losses this morning

beam dump from P2 losses this morning beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous

More information

THE OPERATION OF A CATHODE RAY TUBE

THE OPERATION OF A CATHODE RAY TUBE THE OPERATION OF A CATHODE RAY TUBE OBJECT: To acquaint the student with the operation of a cathode ray tube, and to study the effect of varying potential differences on accelerated electrons. THEORY:

More information

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University Development of beam-collision feedback systems for future lepton colliders P.N. Burrows 1 John Adams Institute for Accelerator Science, Oxford University Denys Wilkinson Building, Keble Rd, Oxford, OX1

More information

Upgrade of CEBAF to 12 GeV

Upgrade of CEBAF to 12 GeV Upgrade of CEBAF to 12 GeV Leigh Harwood (for 12 GeV Accelerator team) Page 1 Outline Background High-level description Schedule Sub-system descriptions and status Summary Page 2 CEBAF Science Mission

More information

5 MeV Mott Polarization Measurement Procedure--DRAFT

5 MeV Mott Polarization Measurement Procedure--DRAFT 5 MeV Mott Polarization Measurement Procedure--DRAFT Document Number: Revision Number: Rev. 5; November 22, 2000 Technical Custodian:? Estimated Time to Perform: 20 minutes Procedure Overview This procedure

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

4.4 Injector Linear Accelerator

4.4 Injector Linear Accelerator 4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE

More information

JLab 10kW FEL Driver Beam Diagnostics

JLab 10kW FEL Driver Beam Diagnostics JLab 10kW Driver Beam Diagnostics Kevin Jordan, S. V. Benson, J. Coleman, D. Douglas, R. Evans, A. Grippo, D. Gruber, G. Krafft, W. Moore, N. Nishimori, P. Piot, D. Sexton, J. Song and S. Zhang Outline.

More information

Beam-based Feedback Systems

Beam-based Feedback Systems Beam-based Feedback Systems Philip Burrows Queen Mary, University of London ILC Beam-based Feedback/Feedforward Systems Intra-train (bunch-bunch) feedback at IP: 3 MHz Pulse-pulse feedback at IP: 5 Hz

More information

THE OPERATION OF A CATHODE RAY TUBE

THE OPERATION OF A CATHODE RAY TUBE THE OPERATION OF A CATHODE RAY TUBE OBJECT: To acquaint the student with the operation of a cathode ray tube, and to study the effect of varying potential differences on accelerated electrons. THEORY:

More information

Commissioning of the CNGS Extraction in SPS LSS4

Commissioning of the CNGS Extraction in SPS LSS4 EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN AB DEPARTMENT AB-Note-27-7 OP Commissioning of the CNGS Extraction in SPS LSS4 V. Kain, E. Gaxiola, B. Goddard, M. Meddahi, Heinz Vincke, Helmut Vincke,

More information

Preliminary Layout for LCLS. Direction Stake-out

Preliminary Layout for LCLS. Direction Stake-out Preliminary Layout for LCLS Direction Stake-out Scope of the Job Part 1 Mark the direction of the accelerator in the research yard and to the radiation fence. Chosen solution: Use existing feature such

More information

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

An Overview of Beam Diagnostic and Control Systems for AREAL Linac An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic

More information

Standard Operating Procedure of nanoir2-s

Standard Operating Procedure of nanoir2-s Standard Operating Procedure of nanoir2-s The Anasys nanoir2 system is the AFM-based nanoscale infrared (IR) spectrometer, which has a patented technique based on photothermal induced resonance (PTIR),

More information

CHAPTER 4 OSCILLOSCOPES

CHAPTER 4 OSCILLOSCOPES CHAPTER 4 OSCILLOSCOPES 4.1 Introduction The cathode ray oscilloscope generally referred to as the oscilloscope, is probably the most versatile electrical measuring instrument available. Some of electrical

More information

Beam systems without failures what can be done?

Beam systems without failures what can be done? Acknowledgements: T.Baer, C.Bracco, G.Bregliozzi, G.Lanza, L.Ponce, S.Redaelli, A.Butterworth Beam systems without failures what can be done? After LS1 Session 07-09 th February 2012 M.Solfaroli/J.Uythoven

More information

FEL TEST PLAN WORKSHEET

FEL TEST PLAN WORKSHEET FEL TEST PLAN WORKSHEET PROGRAM DEPUTY APPROVAL FEL Exp Coordinator Signoff: Date: PI Reviewer Signoff: Date: Expiration Date (max. 90 days from approval): Presentation Required? yes no COMPLETION INFORMATION

More information

PEP II STATUS AND PLANS *

PEP II STATUS AND PLANS * PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex

More information

CHA EVAPORATOR. User guidelines. p.1. by Carlos Manzanedo. Last revised: 10/05/2000

CHA EVAPORATOR. User guidelines. p.1. by Carlos Manzanedo. Last revised: 10/05/2000 CHA EVAPORATOR User guidelines by Carlos Manzanedo. Last revised: 10/05/2000 p.1 Introduction. The CHA evaporator has the following characteristics: 1. 2 independent resistive power supplies. 2. 1 Electron

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

Jae-Young Choi On behalf of PLS-II Linac team

Jae-Young Choi On behalf of PLS-II Linac team PLS-II Linac 2015. 4. 8. Jae-Young Choi On behalf of PLS-II Linac team Accelerators in Pohang Accelerator Laboratory XFEL (under construction) 400 M$ Machines under installation PLS-II PAL : Chronology

More information

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267

TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 TECHNICAL SPECIFICATION Multi-beam S-band Klystron type BT267 The company was created for the development and manufacture of precision microwave vacuum-electron-tube devices (VETD). The main product areas

More information

Energy Upgrade Options for the LCLS-I Linac

Energy Upgrade Options for the LCLS-I Linac Energy Upgrade Options for the LCLS-I Linac LCLS-II TN-14-10 11/12/2014 John Sheppard, F.J. Decker, R. Iverson, H.D. Nuhn, M. Sullivan, J. Turner November 18, 2014 LCLSII-TN-14-07 LCLS 1 Linac Energy Increase

More information

Station-100. From its Definition to its Realization both in the Tunnel and Outside. 05/05/05 Catherine LeCocq STA

Station-100. From its Definition to its Realization both in the Tunnel and Outside. 05/05/05 Catherine LeCocq STA Station-100 From its Definition to its Realization both in the Tunnel and Outside Definition The 2 mile SLAC linac is actually 10000 ft. It was designed with a downward slope heading eastward. In its middle,

More information

LHC Machine check out

LHC Machine check out LHC Machine check out R.Giachino / M.Albert 1v1 Be/op 12th March 2012 Hardware Commissioning: M. Pojer, R. Schmidt and M. Solfaroli Summary of week 10 Machine checkout: R. Giachino, M.Albert and J. Wenninger

More information

arxiv: v1 [physics.acc-ph] 9 Aug 2016

arxiv: v1 [physics.acc-ph] 9 Aug 2016 Beam Transfer and Machine Protection V. Kain CERN, Geneva, Switzerland arxiv:1608.02745v1 [physics.acc-ph] 9 Aug 2016 1 Introduction Abstract Beam transfer, such as injection into or extraction from an

More information

INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP

INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP INITIAL BEAM COMMISSIOMING OF INJECTION AND BEAM DUMP Abstract The initial commissioning of the LHC injections and beam dumps allowed the basic functionality of the systems to be verified, together with

More information

Electrical and Electronic Laboratory Faculty of Engineering Chulalongkorn University. Cathode-Ray Oscilloscope (CRO)

Electrical and Electronic Laboratory Faculty of Engineering Chulalongkorn University. Cathode-Ray Oscilloscope (CRO) 2141274 Electrical and Electronic Laboratory Faculty of Engineering Chulalongkorn University Cathode-Ray Oscilloscope (CRO) Objectives You will be able to use an oscilloscope to measure voltage, frequency

More information

Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH.

Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH. Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH. Christopher Behrens for the FLASH team Deutsches Elektronen-Synchrotron (DESY) FLS-2010 Workshop at SLAC, 4. March 2010 C.

More information

The FLASH objective: SASE between 60 and 13 nm

The FLASH objective: SASE between 60 and 13 nm Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH

More information

AFM1 Imaging Operation Procedure (Tapping Mode or Contact Mode)

AFM1 Imaging Operation Procedure (Tapping Mode or Contact Mode) AFM1 Imaging Operation Procedure (Tapping Mode or Contact Mode) 1. Log into the Log Usage system on the SMIF web site 2. Open Nanoscope 6.14r1 software by double clicking on the Nanoscope 6.14r1 desktop

More information

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information