1 PEP-II Operation and Machine Development U. Wienands PEP-II Run Coordinator for the PEP-II Team

2 Outline of Talk PEP Run 4 Plan & Progress Parameters, Run statistics Machine Development How we run the machine program Examples of MD Conclusion Run 5 Outlook

3 PEP-II Parameters Design Achieved (delivery) Energies e / e+ (GeV) Currents e / e+ (A) Single beam currents (A) (2.45) 2.10 Number of bunches Bunch currents e / e+ (ma) Bunch spacing (m) IP spot size σ * x / σ * y (µm) Luminosity ( /cm 2 /sec) Tune shift horiz. e / e Tune shift vert. e / e Integrated lumi. / 3 shifts (pb 1 ) Integrated lumi. / week (pb 1 ) Integrated lumi. / 7 days (pb 1 ) Integrated lumi. / month (fb 1 ) Beam crossing angle 0 (head-on) 0 (head-on)

4 The Director s Challenges Director s s Challenge I: To deliver 100/fb to BaBar during Run 4 Sept. 9, 03 until July 31, 04; 2wk winter break Previous performance for a similar period: 50/fb (Run 3 pro-rated) Projected total delivery since beginning 253/fb Director s s Challenge II: To exceed cm -2 s -1 and to exceed 850/fb for a day.

5 Run 4 Delivered Luminosity Actual delivery (>90/fb now) The Director s Challenge >100/fb delivered in Run 4

6

7 Typical (best) Day of PEP Running

8 PEP-II Run Time Dist. FY 04 M. Stanek Pre-trickle LER-trickle Double-trickle

9 Managing the Running Program The Run Coordinator is responsible for detailed planning of the PEP program The Program Deputy keeps the program on track (PEP & other) An Engineer Operator In Charge directs the operators on shift Typically 3 operators+eoic+pep acc. phys./shift Briefing every morning at 8:00 Followed by meeting PEP/BaBar Mgt. Followed by the Maintenance Meeting Acc. Plans mtg 1/week Acc. Plans mtg 1/week Integration with other activities

10 Communication with BaBar Daily Morning meeting (PEP RC) Weekly coordination meeting (BaBar TC) Review machine performance Review backgrounds Review trip rates Background meeting (WK) Background meeting (WK) Understanding of current issues Simulations for present & future IR configuration Long-term projection & mitigation

11 Meeting our Luminosity Goals Reliability of hardware 95% availability (PEP only) for Run 4 88% if injector is included. Delivering the Goods Peak luminosity , 3 times design ( ) Average luminosity => Trickle Charge (Continuous injection) Prevent beam aborts Background aborts by BaBar, Rf, beam instab.

12 Machine Development MD is managed in a bi-weekly meeting (Mo-Th) Review state of the machine Review detailed MD plans, analysis of previous MD Put together MD teams & recovery team On average, 1 MD shift/week (+ recovery) Machine Characterization every wks Ph.-advance,, MIA, sometimes coupling, chrom., Rolling 2-month plan, but maintain flexibility Standby MD items in case we cannot deliver only one ring avail., injector or detector problem,

13 MD Schedule June 2004 July 2004 M. Sullivan Also keep track of actual happenings on this schedule

14 Example: Plan for Xangle MD MD Preparation & planning is an involved process with attention to detail (2 pages from a 7-page MD plan, for a 1-shift MD)

15 Setting MD Directions We follow a few well defined goals: Meet or exceed the plan (104/fb for Run 4) Meet or exceed the Director s Challenge II L > cm -2 s -1, 850/pb/diem Prepare for next Run s success, e.g.: characterize thermal behaviour of critical comp. Lower ß y *, shorten bunches, wiggler operation Take data critical for upgrades, e.g.: Understand effect of crossing angle Understand scaling of backgrounds

16 MD Studies Run 4 Dedicated time (bold: resulted in new setting of machine, new hw/sw) Trickle Charge LER Lower ß y * LER & HER Steer the HER Crossing-angle effect on Lumi Vacuum-comp. heating vs V rf Bunch-length parameterization New llrf module commissioning ORM, MIA data taking LGD Woofer commissioning Parasitic or opportunistic Trickle Charge HER Lower ß x * LER Steer the LER Damping-partition variation Background parametrization Grow-damp measurements HER Beam-abort gap reduction Machine characterization Klystron linearizer test LER solenoid effect on Lumi Effect of bunch patterns Raise Vrf in the HER, LER Bunch length measurements HOMs in vacuum components Rf working point explorations Llrf temperature drift investig. LER energy aperture LER Octupole effects Injection-kicker matching Beam-size, background variation Online leak checking IP knob calibration Orbit-feedback development C/S software maintenance

17 Trickle-Charge LER Large MD Items Trickle Charge HER Steer HER 1 test, 1 impl. MD 2 test, 1 impl. MD 1 impl. 3-shift MD Lower HER ßy* 1 test, 2 impl. MD Lower LER ßy* 1 test, 1 impl. MD Lower LER ßx* 1 test/impl. MD

18 PEP Run 4 MD List PEP MD List updated 15-Jun-04 Date MD Result 18-Sep-03 Characterization, ORM, MIA, IP apertures, Lumi scan data taken 29-Sep-03 HER BBA, Rf processing 10 BPM offsets 30-Sep-03 HER beta beat, MIA, Rf processing Knob works, but ßx* goes up 7-Oct-03 LER Trickle test Struggle with background 20-Oct-03 RF tuning, Characterization, Coupling 21-Oct-03 Coupling 23-Oct-03 HER Rf 7-stn. running, LER knobs 7-stn. running commissioned 28-Oct-03 HER rf 4-1, LER BBA, Characterization 4 BPM offsets, 4-1 not yet ready 30-Oct-03 by-2 pattern left in! 4 BPM offsets, ßx beat knob works but 4-Nov-03 LER BBA, HER ßx-beat knob test, HER rf wrong sign, calibration 13-Nov-04 LER trickle test, HER TFB 0.5/fb for BaBar in tricklemode Barry here:better procedure & tuning, 20-Nov-03 HER TFB tuning, LER BBA several LER BPM ofsets 2-Dec-03 LER trickle forever, HER injection, BPM upgrades SUCCESS! LER TRICKLES! 9-Dec , 12-1 klystron magnet tuning, LER BBA 8-1 klys. better, 12-1 not by much Lum scales as expected; ORM data taken, 11-Dec-03 Lumi vs bunch#, HER, LER ORM, HER ßx* knnob ßx* knob? 16-Dec-03 HER ßy* knob test, LER LGDW test knobs work as expected. 1st test LGDW 23-Dec-03 Last shift: push currents, lumi 7.20E+33 7-Jan-04 Turn-on 4-1, HER 8-station running

19 PEP Run 4 MD List (cont d) 8-Jan-04 HER steering 13-Jan-04 HER ßy*, Characterization 15-Jan-04 HER grow-damp (Long.), LER BBA, IP knobs 27-Jan-04 Background characterization 1-Feb-04 HER transverse grow-damps 3-Feb-04 LER ßy* knob test, HER ORM 5-Feb-04 HER trickle test 10-Feb-04 LER steering, HER ßxbeat test, pilolt gate 24-Feb-04 HER LGDW test, LER pilot timing 2-Mar-04 HER trickle test 11-Mar-04 Double trickle test & operation 16-Mar-04 Crossing Angle I 25-Mar-04 Crossing Angle II 4-May-04 ßy* reduction in both rings 6-May-04 LGD Woofer install, LER 4-5 rfp 11-May-04 Crossing angle III 18-May-04 HER lfb amps, LER 4-3 klys tuning 25-May-04 Vary HER damping partition, charact. 8-Jun-04 Heating vs bunch length 10-Jun-04 HER ORM data, LER ßx* knob test HER steered, new orbit ref. ßy* left in more LER BPM offsets, IP knobs calibrated needed for BaBar Roadmap Committee gain margins, system tuning (ok) SIMPLE & JLT knob, both work, sort-of, ORM data taken avg. trickle noise ok, bad fliers LER backed out due to ßx beat, HER ßx beat knob lifetime issue factor 2 in damping, fix FIR. Pilots difficult Fliers gone! Lumi break-even Success! We are double trickling! Lum vs Xangle, low & high I dto., fix tunes mm, LER/-1.25 mm, HER Success! LGD Woofer in. 4-5 lost config... difficult recovery lfb amps fixed, new fans; 4-3 klys somewhat better Prediction of beam sizes verified. data taken ßx* knob good, left in. ORM data taken

20 Achievements this Run Trickle Charge operational for both rings Lowered ß y * to 10.5 mm in both rings Lowered ß x * to 33 cm in the LER Successfully flattened and maintained HER orbit Raised beam currents [2.45 A (LER), 1.55 A (LER)] & no. of bunches Raised Rf voltages to 3.8 MV (LER), 16 MV (HER) Understand & maintain coupling of the rings.

21 Staffing (MD) Roster of 20 (engineering-) physicists in AD, with varying fractions of effort on PEP Typically, each person has specialties, e.g. Injection (Decker, Iverson) Optics, lattice (Donald, UW) Collective, HOM (Novokhatski) Vacuum, e-cloud (Kulikov) Backgrounds, IR (Kozanecki, Sullivan) (but not rigid assigments) MD shifts typically staffed by proponents & interested parties includes non-ad people (e.g. NLC, ARD, ESD)

22 Shift & MD Roster (AD) Brachmann Clendenin Decker Erickson Fisher Iverson Kozanecki Kulikov Luh Novokhatski Pivi Schuh Sonnad Turner Wienands Yocky Ecklund Sullivan Seeman Donald 16 Shift-takers (4 8 shifts/mo./ea.), Program Deputies, MD-shift takers 5 shifts=1 work-week! 4 add l MD-shift takers + experts as needed (rf, ctrl, BaBar) Regular shifts: 1 shifter day & eve + PD MD shifts: as needed up to 5 during day, 0 2 owl

23 Accelerator Physics Meetings Lattice & Optics (UW) correction & development of present machine optics upgrades (low a, low ß) Beam-beam (JTS, FP) Simulations of operating scenarios Study effect of upgrades Backgrounds (WK) Simulation of existing machine Extrapolation to future conditions Recommendations of remedial measures Provide direction, integrates PEP-effort by AD, ARDA, NLC dept. members.

24 PEP-II Performance Reviews 2-day meeting happening after run ends Presentations by topic & by system Run performance AP issues System issues Record of proceedings List of Action Items

25 Run 3 Review Action Items After Run 2003 Review - Action Item List Date Ix Speaker Assign To Item Description Status 11-Jul-07 1 Seeman Kozanecki Figure out cap sigma knob calibration and put in correct value online. Reconcile old knobs done corrected data with John Seeman's luminosity analysis 11-Jul-07 2 Wienands White Make Global Orbit Feedback (GOF) work in trickle mode done 11-Jul-07 3 Wienands Turner Investigate using GOF steering changes to diagnose or find bad BPMs ongoing 11-Jul-07 4 Wienands White Find cause of energy drift by GOF ongoing 11-Jul-07 5 Wienands Donald Make a LER energy knob using correctors (like HER knob) done 11-Jul-07 6 Wienands White In steering, make minimize corrector strength work for PEP rings. 11-Jul-07 7 Wienands Hendrickson Improve HERO and LERO operation. Needs study of how they couple through IP feedback. LERO done 18-Jul-07 8 Sullivan Decker What are orbit bumps that increased luminosity really doing. Need MD?, FJD should give ongoing report. 18-Jul-07 9 Sullivan Faster luminosity feedback would be useful, and could be done with faster hardware. 18-Jul Sullivan BBA team Study BPM offsets mostly done 18-Jul Stanek Which power supplies are failing, RF PS? ongoing 18-Jul Stanek Location dependence of power supply failures ongoing 18-Jul Stanek Make friendly page on SCP of Aborts/Day progress 18-Jul Stanek OPS/SWE GOF improvements. Display on a separate terminal, Make it a SCP application so its status can be viewed from any SCP SW spec'd, in process 18-Jul Op List SWE BPM CUD monitor done 18-Jul Op List Standardize doesn't always reproduce rings better often 18-Jul Op List SWE RF system - don't know "right" settings in process 18-Jul Op List SWE Need better Trickle displays and tools mostly done 18-Jul Op List Fisher Tune tracker - switch between pilot and colliding bunches? difficult

26 Run 3 Action Items (cont d) 18-Jul Op List SWE Improved post-abort analysis progress 18-Jul Fox v. Winkle Address abort reporting from RF system to get real cause of abort done 18-Jul Ecklund Ecklund Look at all thermocouples and predict future heating. Mine data from HSTB files. mostly done (Remigius Karl Mommsen to help mine and analyze data) 18-Jul Wienands Decker Find out why LER injection vertical aperture is too small. done 18-Jul Wienands Wienands, Turner Look at trickle background in EMC; HER or LER ongoing 18-Jul Wienands Chestnut Smooth out trickle-algorithm in BIC, avoid stoppage (including cleaning up BIC-MPG communication). progress 18-Jul Wienands Chestnut Get EPICS bar-chart display showing rate of injection/bunch. also want display of total injection rate chart done 18-Jul Wienands Controls Get a hardware real-time injection indicator (pulsed LED or counter). 18-Jul Wienands Ops Make sure LI03 energy-feedback needs to be updated so feedback is valid for small quanta done 18-Jul Wienands Ops Stabilize setup of quanta (intensity, energy). done 18-Jul Wienands BaBar BaBar need to update its interlocks (add SIAM) done 18-Jul Wienands Weaver Speed up refresh of injection-trigger histograms (Weaver-display). done 18-Jul Kozanecki Decker Tune Feed Forward tune vs. I coefficients done 33 Kozanecki Study and fix SLM systematics: HER x, HER y, LER y. 18-Jul Kozanecki kozanecki HER IP knobs need calibration. (we are using old Feb 2000 calibration) done 18-Jul Kozanecki Fisher Check calibration of tune knobs to tracker measurement 18-Jul Kozanecki kozanecki Measure current dependence of single beam tunes part. done 18-Jul Kozanecki Wienands Translate SLM sizes to IP size 18-Jul Kozanecki BaBar Get IP data from BaBar: (x,y,z, sigma x, sigma z, x-z angle ) done 18-Jul Cai Cai, Narsky Put hourglass into beam-beam code to compare with experimental data. Correct experimental data for IP knob calibration. Use correct beta x. done

27 Beam Aborts Three sources of beam aborts: Rf system trips BaBar-radiation aborts Beam-loss due to instability or tuning error (often causing one of the above) Each abort costs min. recovery time about 8 16/pb at the going delivery rate On an ok shift we have 2 2 aborts /pb lost (10%) Effective abort reduction is very resource- intensive, esp. in rf/instability area!

28 Rf Trips since Jan D. van Winkle

29 S. Foulkes, BaBar coll. SVT Trips and Aborts 56% (9/16) of the stable beam fast aborts were SVTRAD aborts

30 Run 4 Conclusion A lot has been achieved with limited resources PEP performance has doubled during this run Progress with rf stability, trickle injection, beam currents, optics understanding Influx of resources has improved rate of progress On track to exceed plan, reach cm -2 s -1 Our operational model is effective flexibility of staff & breadth of experience key. Next year is going to be tougher!

31 Run 5 Projected Luminosity Lum (/fb) Lum (/fb) October NovemberDecember January February Month March April May June S October November December January February March April May June Month

32 Run 5 Challenges We are getting closer to the hardware limits Thermal loads will double Growth rates will go up 50% (LER) Expectations are higher We will need to fully commission the LER wiggler lattice. More pressure on background control More pressure on lattice improvements ß* reduction damping-partition manipulation

33 Hardware Projects to Support Run 5 Goals 2 more Rf stations (LER 4-2, HER 12-1 split) HER low-α lattice New LER feedback kickers Upgrade low-level rf, feedback systems New LER SRM Selected vacuum component upgrades

34 Run 5 PEP-II Parameters Run 5 Now (delivery) Energies e / e+ (GeV) Currents e / e+ (A) Single beam currents (A) (2.45) 2.40 Number of bunches Bunch currents e / e+ (ma) Bunch spacing (m) IP spot size σ * x / σ * y (µm) Luminosity ( /cm 2 /sec) Tune shift horiz. e / e Tune shift vert. e / e Integrated lumi. / 3 shifts (pb 1 ) Integrated lumi. / week (pb 1 ) Integrated lumi. / 7 days (pb 1 ) Integrated lumi. / month (fb 1 ) Beam crossing angle 0 (head-on) 0 (head-on)

35 The End

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team PEP-II Status U. Wienands, PEP-II Run Coordinator for the PEP-II team Outline of Talk Run 4 Synopsis Machine tuning & improvements Issues encountered during Run 4 Other improvements and MD items Outlook:

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

PEP-II Status and Outlook

PEP-II Status and Outlook PEP-II Status and Outlook H.-U. Wienands, M.E. Biagini, F.-J. Decker, M.H. Donald, S. Ecklund, A. Fisher, R.L. Holtzapple, R.H. Iverson, P. Krejcik, A.V. Kulikov, T. Meyer, J. Nelson, A. Novokhatski, I.

More information

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006 Program Risks Risk Analysis Fallback Plans for the PEP-II B-FactoryB John T. Seeman DOE PEP-II Operations Review April 26, 2006 OPS Review Topics Are there any PEP-II program risks? Has the laboratory

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

PEP II Status. H. - Ulrich (UZi) Wienands PEP-II Run Coordinator. SLAGEPAC Meeting November 8,200O. Intro; 11/7/O 19:55

PEP II Status. H. - Ulrich (UZi) Wienands PEP-II Run Coordinator. SLAGEPAC Meeting November 8,200O. Intro; 11/7/O 19:55 PEP II Status H. - Ulrich (UZi) Wienands PEP-II Run Coordinator SLAGEPAC Meeting November 8,200O Intro; 11/7/O 19:55 Run Statistics In CY 2000, PEP delivered 23.6 fb- (86% of 27.3 fb- ) of which BaBar

More information

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ

LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ SLAC-PUB-11706 LEPTON COLLIDER OPERATION WITH CONSTANT CURRENTS Λ U. Wienands y, SLAC, Stanford, CA, USA Abstract Electron-positron colliders have been operating in a topup-and-coast fashion with a cycle

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

New Filling Pattern for SLS-FEMTO

New Filling Pattern for SLS-FEMTO SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new

More information

PEP II STATUS AND PLANS *

PEP II STATUS AND PLANS * PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex

More information

beam dump from P2 losses this morning

beam dump from P2 losses this morning beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac

More information

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV

LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 209 GEV LEP OPERATION AND PERFORMANCE WITH ELECTRON-POSITRON COLLISIONS AT 29 GEV R. W. Aßmann, CERN, Geneva, Switzerland Abstract The Large Electron-Positron Collider (LEP) at CERN completed its operation in

More information

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman

PEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman PEP-II longitudinal feedback and the low groupdelay woofer Dmitry Teytelman 1 Outline I. PEP-II longitudinal feedback and the woofer channel II. Low group-delay woofer topology III. Why do we need a separate

More information

LEP Status and Performance in 2000

LEP Status and Performance in 2000 LEP Status and Performance in 2 R. Assmann, SL/OP for the SL Division Outline: Operational strategy Overview on luminosity and energy performance Energy reach Luminosity performance Other issues Further

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010

More information

PEP-II IR-2 Alignment

PEP-II IR-2 Alignment SLAC-PUB-10328 January 2004 PEP-II IR-2 Alignment A. Seryi, S. Ecklund, C. Le Cocq, R. Pushor, R. Ruland, Z. Wolf SLAC, Stanford, CA 94025, USA This paper describes the first results and preliminary analysis

More information

PEP II Status and Plans

PEP II Status and Plans SLAC-PUB-6854 September 1998 PEP II Status and Plans By John T. Seeman Invited talk presented at the 16th IEEE Particle Accelerator Conference (PAC 95) and International Conference on High Energy Accelerators,

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

KEKB Accelerator Physics Report

KEKB Accelerator Physics Report KEKB Accelerator Physics Report Y. Funakoshi for the KEKB commissioning group KEK, 1-1 Oho, Tsukuba, Ibaraki 305-0801,Japan Abstract 1 INTRODUCTION The KEKB B-Factory is an electron-positron double ring

More information

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2

2008 JINST 3 S LHC Machine THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND EXPERIMENTS. Lyndon Evans 1 and Philip Bryant (editors) 2 PUBLISHED BY INSTITUTE OF PHYSICS PUBLISHING AND SISSA RECEIVED: January 14, 2007 REVISED: June 3, 2008 ACCEPTED: June 23, 2008 PUBLISHED: August 14, 2008 THE CERN LARGE HADRON COLLIDER: ACCELERATOR AND

More information

Status of Elettra, top-up and other upgrades

Status of Elettra, top-up and other upgrades Status of Elettra, top-up and other upgrades Emanuel Karantzoulis ELETTRA / Trieste, Italy / 2010 November 25-26 Past and Present Configurations 1994-2007 From 2008 No full energy injection Full energy

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

Bunch-by-bunch feedback and LLRF at ELSA

Bunch-by-bunch feedback and LLRF at ELSA Bunch-by-bunch feedback and LLRF at ELSA Dmitry Teytelman Dimtel, Inc., San Jose, CA, USA February 9, 2010 Outline 1 Feedback Feedback basics Coupled-bunch instabilities and feedback Beam and feedback

More information

The 2011 LHC Run - Lessons in Beam Diagnostics

The 2011 LHC Run - Lessons in Beam Diagnostics The 2011 LHC Run - Lessons in Beam Diagnostics LHC Performance Workshop Chamonix 2012 6 th 10 th February Rhodri Jones on behalf of the CERN Beam Instrumentation Group Outline This Presentation will focus

More information

June 2005 Advanced Electronics Group, ARDA

June 2005 Advanced Electronics Group, ARDA Advanced Electronics Group, ARDA J. Fox, T. Mastorides, C. Rivetta, D.Teytelman, D. Van Winkle, Y. Zhou Advanced Electronics - Overview The ARDA Advanced electronics group combines interests in accelerator

More information

Beam systems without failures what can be done?

Beam systems without failures what can be done? Acknowledgements: T.Baer, C.Bracco, G.Bregliozzi, G.Lanza, L.Ponce, S.Redaelli, A.Butterworth Beam systems without failures what can be done? After LS1 Session 07-09 th February 2012 M.Solfaroli/J.Uythoven

More information

A Facility for Accelerator Physics and Test Beam Experiments

A Facility for Accelerator Physics and Test Beam Experiments A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CEBAF Accelerator Update Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CLAS12 Collaboration Meeting, June 13-16, 2017 1 Accelerator Division Leadership On April 30 Andrew

More information

LHC Nominal injection sequence

LHC Nominal injection sequence LHC Nominal injection sequence Mike Lamont Acknowledgements: Reyes Alemany Fernandez, Brennan Goddard Nominal injection Overall injection scheme Pilot R1, Pilot R2, Intermediate R1 Optimise Intermediate

More information

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Bingxin Yang, Alex H. Lumpkin, Katherine Harkay, Louis Emery, Michael Borland, and Frank Lenkszus Advanced

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

Status of SOLARIS Arkadiusz Kisiel

Status of SOLARIS Arkadiusz Kisiel Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS

More information

Top-Up Experience at SPEAR3

Top-Up Experience at SPEAR3 Top-Up Experience at SPEAR3 Contents SPEAR 3 and the injector Top-up requirements Hardware systems and modifications Safety systems & injected beam tracking Interlocks & Diagnostics SPEAR3 Accelerator

More information

LHC COMMISSIONING PLANS

LHC COMMISSIONING PLANS LHC COMMISSIONING PLANS R. Alemany Fernández, CERN, Geneva, Switzerland Abstract Operating the Large Hadron Collider (LHC) at design performance is not going to be easy. The machine is complex and with

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC

FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,

More information

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback Journal of Physics: Conference Series PAPER OPEN ACCESS Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback To cite this article: J. Fox et al 2018 J. Phys.: Conf. Ser. 1067 072024

More information

1. General principles for injection of beam into the LHC

1. General principles for injection of beam into the LHC LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary

More information

Modeling and simulation of longitudinal dynamics for Low Energy Ring-High Energy Ring at the Positron-Electron Project 1

Modeling and simulation of longitudinal dynamics for Low Energy Ring-High Energy Ring at the Positron-Electron Project 1 SLAC-PUB-12374 February, 27 Modeling and simulation of longitudinal dynamics for Low Energy Ring-High Energy Ring at the Positron-Electron Project 1 C. Rivetta, T. Mastorides, J. D. Fox, D. Teytelman,

More information

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2 Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010 Plan of the program at ILC2010 Focus of efforts Work on parameter set for a possible

More information

Current status of XFEL/SPring-8 project and SCSS test accelerator

Current status of XFEL/SPring-8 project and SCSS test accelerator Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key

More information

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross

Accelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross Monday, Marc Ross Linear Collider RD Most RD funds address the most serious cost driver energy The most serious impact of the late technology choice is the failure to adequately address luminosity RD issues

More information

Requirements for the Beam Abort Magnet and Dump

Requirements for the Beam Abort Magnet and Dump Requirements for the Beam Abort Magnet and Dump A beam abort kicker (pulsed dipole magnet) and dump are required upbeam of the LCLS undulator in order to protect the undulator from mis-steered and poor

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

PEP-II STATUS REPORT *

PEP-II STATUS REPORT * PEP-II STATUS REPORT * Jonathan Dorfan Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA For the SLAC, LBNL, LLNL PEP-II group Abstract The main design features of the PEP-II

More information

PEP-I1 RF Feedback System Simulation

PEP-I1 RF Feedback System Simulation SLAC-PUB-10378 PEP-I1 RF Feedback System Simulation Richard Tighe SLAC A model containing the fundamental impedance of the PEP- = I1 cavity along with the longitudinal beam dynamics and feedback system

More information

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings

More information

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer The machine parameters and the luminosity goals of the ILC were discussed at the 1 st ILC Workshop. In particular, Nick Walker noted that the TESLA machine parameters had been chosen to achieve a high

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske.

ANKA Status Report. N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske. ANKA Status Report N.Smale, A.-S. Müller, E. Huttel, M.Schuh Slides courtesy of A.-S. Müller and C.Heske. KIT - University of the State of Baden-Wuerttemberg and National Laboratory of the Helmholtz Association

More information

OPERATIONAL EXPERIENCE AT J-PARC

OPERATIONAL EXPERIENCE AT J-PARC OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization

More information

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information

Scavenger Extraction. Karen Goldsmith Shawn Alverson

Scavenger Extraction. Karen Goldsmith Shawn Alverson Scavenger Extraction Karen Goldsmith Shawn Alverson Topics Beam line and area maps High Power Target (HPT) How to establish first beam to HPT Setting energy (configs, multiknobs, Fast Phase Shifters, etc.)

More information

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

TWO BUNCHES WITH NS-SEPARATION WITH LCLS* TWO BUNCHES WITH NS-SEPARATION WITH LCLS* F.-J. Decker, S. Gilevich, Z. Huang, H. Loos, A. Marinelli, C.A. Stan, J.L. Turner, Z. van Hoover, S. Vetter, SLAC, Menlo Park, CA 94025, USA Abstract The Linac

More information

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Week 0: PPS Certification and Processing Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Work in tunnel Work in tunnel PPS Certification PPS Certification PPS Certification

More information

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator S. Cousineau (On behalf of the SNS project) HB2016, Sweden July 04, 2016 ORNL is managed by UT-Battelle for the US Department

More information

Photoinjector Laser Operation and Cathode Performance

Photoinjector Laser Operation and Cathode Performance Photoinjector Laser Operation and Cathode Performance Daniele Sertore, INFN Milano LASA Siegfried Schreiber, DESY Laser operational experience Laser beam properties Cathode performances Outlook TTF and

More information

CONSTRUCTION AND COMMISSIONING OF BEPCII

CONSTRUCTION AND COMMISSIONING OF BEPCII Abstract CONSTRUCTION AND COMMISSIONING OF BEPCII C. Zhang, J.Q. Wang, L. Ma and G.X.Pei for the BEPCII Team, IHEP, CAS P.O.Box 918, Beijing 100049, China BEPCII is the major upgrade of BEPC (Beijing Electron-

More information

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB

Friday 05/03/ :00 13:00 : Establishing reference orbit golden Jorg Wenninger. Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB 07:00 13:00 : Establishing reference orbit golden Jorg Wenninger Problems Wrong polarity on MCBXH3.L8 Polarity flag changed in DB Offset in vertical plane, ~1 mm seems real. 13:00 14: 00 : Injection oscillation

More information

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev.

Phase (deg) Phase (deg) Positive feedback, 317 ma. Negative feedback, 330 ma. jan2898/1638: beam pseudospectrum around 770*frev. Commissioning Experience from PEP-II HER Longitudinal Feedback 1 S. Prabhakar, D. Teytelman, J. Fox, A. Young, P. Corredoura, and R. Tighe Stanford Linear Accelerator Center, Stanford University, Stanford,

More information

Availability and Reliability Issues for the ILC

Availability and Reliability Issues for the ILC Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some

More information

Linac3 experience for LHC ion runs

Linac3 experience for LHC ion runs Linac3 experience for LHC ion runs G Bellodi for the Linac3 team Keywords: beam performance reliability set up time results of MDs remaining unknowns 1 A year in perspective Source removed: change of main

More information

REVIEW OF LHC OPERATION

REVIEW OF LHC OPERATION REVIEW OF LHC OPERATION M. Lamont, CERN, Geneva, Switzerland Abstract LHC beam commissioning re-started on the 20 th November 2009 and continued for three and a half weeks. A summary of the progress made

More information

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM

COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM COMMISSIONING OF THE ALBA FAST ORBIT FEEDBACK SYSTEM A. Olmos, J. Moldes, R. Petrocelli, Z. Martí, D. Yepez, S. Blanch, X. Serra, G. Cuni, S. Rubio, ALBA-CELLS, Barcelona, Spain Abstract The ALBA Fast

More information

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling TTF / VUV-FEL Schedule 200 and Project Management Issues Schedule 200 Project Organisation Budget & Controlling Hans Weise / DESY DESY MAC Meeting November 9th, 2004 TTF Linac Start-up After Final Installation

More information

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK)

SuperTRISTAN. A possibility of ring collider for Higgs factory. 13 Feb K. Oide (KEK) A possibility of ring collider for Higgs factory 13 Feb. 2012 K. Oide (KEK) Inspired by A. Blondel and F. Zimmermann, A High Luminosity e+e- Collider in the LHC tunnel to study the Higgs Boson, V2.1 -

More information

The FLASH objective: SASE between 60 and 13 nm

The FLASH objective: SASE between 60 and 13 nm Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH

More information

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.

ANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. ANKA Status Report N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. Institute for Synchrotron Radiation KIT - University of the State of Baden-Wuerttemberg and

More information

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA. A1.01 PROJECT MANAGEMENT BNL/Cornell Michnoff A1.01.01 Milestones BNL/Cornell Michnoff This scope is a placeholder for all project high level milestones for NYSERDA. There is no cost or labor related to

More information

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16

More information

Hall-B Beamline Commissioning Plan for CLAS12

Hall-B Beamline Commissioning Plan for CLAS12 Hall-B Beamline Commissioning Plan for CLAS12 Version 1.5 S. Stepanyan December 19, 2017 1 Introduction The beamline for CLAS12 utilizes the existing Hall-B beamline setup with a few modifications and

More information

Beam Loss Detection for MPS at FRIB

Beam Loss Detection for MPS at FRIB Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

12GeV CEBAF Commissioning

12GeV CEBAF Commissioning 12GeV CEBAF Commissioning Operations Dept. Accelerator Division JLAB Outline 1 Process Integrated Process Overview Accelerator Readiness Review Process Internal Reviews/Process Process Recap 2 Beam Commissioning

More information

Proceedings of the 1997 Workshop on RF Superconductivity, Abano Terme (Padova), Italy

Proceedings of the 1997 Workshop on RF Superconductivity, Abano Terme (Padova), Italy BEAM RELATED THERMAL LOSSES ON THE CRYOGENIC AND VACUUM SYSTEMS OF LEP G. Cavallari, Ph. Gayet, G. Geschonke, D. Kaiser, J.M. Jimenez CERN, 111 GENEVA 3 (Switzerland) Abstract The LEP Collider was operated

More information

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * J. Galambos, W. Blokland, D. Brown, C. Peters, M. Plum, Spallation Neutron Source, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract Satisfying

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments P. Adderley, M. Baylac, J. Clark, A. Day, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman PESP

More information

What can be learned from HERA Experience for ILC Availability

What can be learned from HERA Experience for ILC Availability What can be learned from HERA Experience for ILC Availability August 17, 2005 F. Willeke, DESY HERA Performance Critical Design Decisions What could be avoided if HERA would have to be built again? HERA

More information

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University

Development of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University Development of beam-collision feedback systems for future lepton colliders P.N. Burrows 1 John Adams Institute for Accelerator Science, Oxford University Denys Wilkinson Building, Keble Rd, Oxford, OX1

More information

COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE

COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE Proceedings of DIPAC9, Basel, Switzerland MOOB2 COMMISSIONING RESULTS OF BEAM DIAGNOSTICS FOR THE PETRA III LIGHT SOURCE K. Balewski #, G. Kube, K. Wittenburg, A. Brenger, H.-T. Duhme, V. Gharibyan, J.

More information

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008 ATF2 milestones for discussion Andrei Seryi, Toshiaki Tauchi December 15-18, 2008 7th ATF2 Project Meeting What are natural milestones for ATF2? ATF2 design: Nominal IP β y* =0.1 mm & L * =1 m this give

More information

SUMMARY OF THE ILC R&D AND DESIGN

SUMMARY OF THE ILC R&D AND DESIGN SUMMARY OF THE ILC R&D AND DESIGN B. C. Barish, California Institute of Technology, USA Abstract The International Linear Collider (ILC) is a linear electron-positron collider based on 1.3 GHz superconducting

More information

Precision measurements of beam current, position and phase for an e+e- linear collider

Precision measurements of beam current, position and phase for an e+e- linear collider Precision measurements of beam current, position and phase for an e+e- linear collider R. Corsini on behalf of H. Braun, M. Gasior, S. Livesley, P. Odier, J. Sladen, L. Soby INTRODUCTION Commissioning

More information

High QE Photocathodes lifetime and dark current investigation

High QE Photocathodes lifetime and dark current investigation High QE Photocathodes lifetime and dark current investigation Paolo Michelato INFN Milano - LASA Main Topics High QE photocathode lifetime QE vs. time (measurements on several cathodes, FLASH data) QE

More information

Development of an Abort Gap Monitor for High-Energy Proton Rings *

Development of an Abort Gap Monitor for High-Energy Proton Rings * Development of an Abort Gap Monitor for High-Energy Proton Rings * J.-F. Beche, J. Byrd, S. De Santis, P. Denes, M. Placidi, W. Turner, M. Zolotorev Lawrence Berkeley National Laboratory, Berkeley, USA

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

Activities on FEL Development and Application at Kyoto University

Activities on FEL Development and Application at Kyoto University Activities on FEL Development and Application at Kyoto University China-Korea-Japan Joint Workshop on Electron / Photon Sources and Applications Dec. 2-3, 2010 @ SINAP, Shanghai Kai Masuda Inst. Advanced

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information