Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

Size: px
Start display at page:

Download "Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17"

Transcription

1 Week 0: PPS Certification and Processing Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Work in tunnel Work in tunnel PPS Certification PPS Certification PPS Certification RF Processing RF Processing Ops/Controls Ops/Controls Ops/Controls AMRF/Ops AMRF/Ops Work in tunnel Sector Search PPS Certification PPS Certification PPS Certification RF Processing RF Processing Ops Ops/Controls Ops/Controls Ops/Controls AMRF/Ops AMRF/Ops Work in tunnel Sector Search PPS Certification PPS Certification PPS Certification RF Processing RF Processing Ops Ops/Controls Ops/Controls Ops/Controls AMRF/Ops AMRF/Ops BAS Issued VV1A, VV1B, VV2 processing complete

2 Week 1: Injector & NDR setup Mon Feb 18 Tue Feb 19 Wed Feb 20 Thu Feb 21 Fri Feb 22 Sat Feb 23 Sun Feb 24 Beam off cathode, bunching Sector 0-1 tuneup LCLS Sector 0-1 tuneup NLTR quad 1494 fix Beam to NRTL Steer NRTL (compressor off) 2e10, 10 Hz 1.5e10, 10 Hz 1.5e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz Stopper 500 NLTR stopper NLTR stopper NRTL stopper NRTL stopper Beam to NLTR Sector 0-1 tuneup Sector 0-1 tuneup Store beam in NDR NDR throughput NRTL compressor on 1.5e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz NLTR stopper NRTL stopper NRTL stopper NRTL stopper NRTL stopper NRTL stopper Sector 0-1 tuneup Sector 0-1 tuneup Phase klystrons Sector 0-1 tuneup NDR tuneup NDR throughput Recommission feedbacks 1.5e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz NLTR stopper NRTL stopper NRTL stopper NRTL stopper NRTL stopper NRTL stopper NRTL stopper Full check-out of Kraken Motors. Full check-out of cameras. Beam stored in NDR NDR Throughput > 80% 12 GeV Sector 10

3 Week 2: Linac setup Mon Feb 25 Tue Feb 26 Wed Feb 27 Thu Feb 28 Fri Mar 1 Sat Mar 2 Sun Mar 3 NRTL tuning Eta match, NRTL into linac Sector 2 steering/emit tuning Establish energy in linac, 21 GeV Beam to FACET dump / initial checkout Emittance tuning 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz NRTL stopper NRTL stopper 2-9 Dump e+ target FACET dump e+ target Beam to 2-9 Sec 10 on, beam down linac, rad survey Establish chirp, compressed beam Recommission linac feedbacks Ops Linac steering Emittance tuning 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 2-9 Dump e+ target e+ target e+ target e+ target e+ target Beta match, NRTL into Linac Phase klystrons, Sectors 2-10 Linac steering Phase klystrons, Sectors Linac BBA, Sec 2-10 Linac BBA, Sec e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 2-9 Dump e+ target 2-9 dump e+ target e+ target e+ target e+ target LCLS-ii radiation survey complete Camera DAQ fully working Cameras removed. Laser bend box and drift assembly. 30 x 3 mm-mrad in LI02, no tails 21 GeV Sector x 5 mm-mrad in GeV

4 Week 3: Pencil beam setup, Sector 20 checkout Mon Mar 4 Tue Mar 5 Wed Mar 6 Thu Mar 7 Fri Mar 8 Sat Mar 9 Sun Mar 10 Chirp off, establish pencil beam LCLS Linac recovery Beam to FACET dump Recommission OTRs Commission new wire scanners 5e9, 10 Hz 1e10, 30 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz e+ target e+ target FACET dump FACET dump FACET dump Optimize linac emittance Linac recovery/tuning Linac realignment checkout Linac steering algorithm devel FACET Exp. Diagnostic checkout (6hrs) 1e10, 10 Hz 5e9, 10 Hz 1e10, 30 Hz 1e10, 30 Hz 1e10, 30 Hz FACET dump e+ target e+ target e+ target e+ target Optimize linac emittance Phase klystrons Sectors 2-10 Phase klystrons Sectors BBA realigned quads Linac ballistic data realigned quads 5e9, 10 Hz 1e10, 30 Hz 1e10, 30 Hz 1e10, 30 Hz 1e10, 30 Hz 1e10, 30 Hz e+ target e+ target e+ target e+ target e+ target e+ target Missed goal: Laser mirror assembly. All screens, cameras and spoilers installed. E-202 samples installed. Missed goal: Alignment of laser transport done. Missed target: OTRs/ Missed target: wires work Missed goal: Movers + SQ commissioned Missed goal: OTRs working Missed goal: Wire scanners working

5 Week 4: Pencil beam, new optics checkout Mon Mar 11 Tue Mar 12 Wed Mar 13 Thu Mar 14 Fri Mar 15 Sat Mar 16 Sun Mar 17 POMM/DOE Visit Linac tuning VVS fault Cooling tower fault E211 CERN BBA FACET Exp. Diagnostic checkout (6 hr) 1e10, 10 Hz 1e10, 10 Hz 5e9, 10 Hz FACET dump FACET dump FACET dump VVS fault Cooling tower fault E211 CERN BBA (12 hr) (9 hr - until 3am) 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10,30 Hz 5e9, 10 Hz FACET dump FACET dump FACET dump e+ target e+ target VVS fault Cooling tower fault E211 CERN BBA E211 CERN BBA Linac tuning (8 hr) (8 hr) 1e10, 30 Hz 5e9, 10 Hz 5e9, 10 Hz e+ target Wires work (Missed goal? No signal seen) Swap polarity Q New optics beam to FACET dump. Tuning procedure validated. E211: Test scripts. Response of beam to correctors mapped. Improve orbit control. BetaRad response measured, light seen on all OTRs, E200 DAQ scripts checked-out, energy scale E201 sample holder, established on Cherenkov Missed goal: pop-ins and spectrometer. Missed goal: diagnostics installed. Notch and Jaw Collimators moving. E-211 Dispersion measurement and DFS tested. Missed : TCAV fully operational. E-211 Full demonstration of CERN BBA. Missed goal: E211: Missed goal: E211: Demonstration of reduced Demonstration of reduced emittance in second half of emittance in second half of linac linac

6 v9 Week 5: Pencil beam new optics tuning, user time Mon Mar 18 Tue Mar 19 Wed Mar 20 Thu Mar 21 Fri Mar 22 Sat Mar 23 Sun Mar 24, LION cal Characterization TCAV Studies (provided vacuum good) Ballistic contingency S20 1e10, 10 Hz 1e10, 10 hz 1e10, 10 Hz User pencil beam [1/2] 1e10, 10 Hz 1e10, 30 Hz FACET dump FACET dump FACET dump FACET dump FACET dump User pencil beam[1] 1e10, 10 Hz User pencil beam [1/2] contingency Restore Chirp 1e10, 10 Hz 1e10, 10 hz User pencil beam[2] 1e10, 10 Hz 1e10, 10 Hz 1e10, 30 Hz FACET dump FACET dump FACET dump FACET dump FACET dump e+ target Linac tuning Linac tuning Linac tuning Linac tuning Linac tuning Linac tuning Linac tuning 1e10, 30 Hz 1e10, 30 Hz 1e10, 30 Hz 1e10, 30 Hz 1e10, 30 Hz 1e10, 30 Hz 1e10, 30 Hz e+ target e+ target e+ target e+ target e+ target e+ target e+ target Pencil beam < 30x30 with new optics Establish beam vector for E- 201 IP. Find beam on E-202 BLIS, pyro and KOTR wires. Expose E-202 camera aligned. samples if conditions are good. Confirm beam vector for Kraken OTR reproduced. E- E-201 CCR complete. TCAV 201 CTR measurement studies complete. Notch complete. YAG studies and Jaw positions complete. Emittance established. Cherenkov measured. Zero-energy resolution measured. spread spots measured on OTRs.

7 v9 Week 6: Compressed beam new optics tuning, 1e10 Mon Mar 25 Tue Mar 26 Wed Mar 27 Thu Mar 28 Fri Mar 29 Sat Mar 30 Sun Mar 31 Linac tuning Low beta optics LCLS Low beta optics Low beta optics Low beta optics Low beta optics 1e10, 30 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz e+ target FACET dump FACET dump FACET dump FACET dump FACET dump Linac tuning Low beta optics Linac tuning Low beta optics Linac tuning Low beta optics 1e10, 30 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz e+ target FACET dump FACET dump FACET dump FACET dump FACET dump Linac tuning IP/Linac tuning IP/Linac tuning IP/Linac tuning IP/Linac tuning IP/Linac tuning 1e10, 30 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz e+ target FACET dump FACET dump FACET dump FACET dump FACET dump FACET dump E-206 THz instruments recommissioned. Transport across copper wire tested. New E-202 samples (set 2) installed. New E-201 samples installed. E-206 THz set-up optimized. E- 203 hardware fully checked out. 50 x 5 mm-mrad in GeV

8 v9 Week 7: User compressed beam, 1e10 Mon Apr 1 Tue Apr 2 Wed Apr 3 Thu Apr 4 Fri Apr 5 Sat Apr 6 Sun Apr 7 IP spot size tuning IP spot size tuning IP spot size tuning IP spot size tuning IP spot size tuning IP spot size tuning 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz FACET dump FACET dump FACET dump FACET dump FACET dump FACET dump User low charge compressed beam User low charge compressed beam User low charge compressed beam User low charge compressed beam User low charge compressed beam User low charge compressed beam 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz FACET dump FACET dump FACET dump FACET dump FACET dump FACET dump IP/Linac tuning IP/Linac tuning IP/Linac tuning IP/Linac tuning IP/Linac tuning IP/Linac tuning 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz FACET dump FACET dump FACET dump FACET dump FACET dump FACET dump FACET dump < 30x30x30 um in Sector 20 E-203 check-out with beam. E-203 demonstration of successful measurement. E-202 exposed samples (set 2). E-201 CCR with tubes. New E-202 samples (set 3) installed. E-203 studies (alt. program E-201) E-202 exposed samples (set 3). E-201 complete E-201 complete CCR slabs. CCR tubes. (alt. program E- (alt. program E-206 THz) 201 slabs complete) E-206 THz measurement

9 Week 8: Low charge users, Linac High-charge, IP Beta-squeeze Mon Apr 8 Tue Apr 9 Wed Apr 10 Thu Apr 11 Fri Apr 12 Sat Apr 13 Sun Apr 14 IP spot size tuning IP spot size tuning Linac Tuning Linac Emittance Tuning Linac Emitance Tuning DOE tour 12-2 Linac High-Charge Tuning 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 2e10, 10 Hz FACET dump FACET dump FACET dump FACET dump FACET dump FACET dump User low charge compressed beam User low charge compressed beam Linac Emittance Tuning IP Beta Squeeze IP Beta Squeeze Linac High-Charge Tuning 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 2e10, 10 Hz FACET dump FACET dump FACET dump FACET dump FACET dump FACET dump IP/Linac tuning IP/Linac tuning Klystron Phasing Klystron Phasing Klystron Phasing SOP/Tuning 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 1e10, 10 Hz 2e10, 10 Hz FACET dump FACET dump FACET dump FACET dump FACET dump FACET dump FACET dump E-206 complete. (Alt. program, MD) E-203 complete. E-202 sample change. Install E-204 metallic structure.

10 Week 9: Linac High-Charge & E200 CTM Studies Mon Apr 15 Tue Apr 16 Wed Apr 17 Thu Apr 18 Fri Apr 19 Sat Apr 20 Sun Apr 21 Linac High-Charge Tuning Linac High-Charge Tuning Linac High-Charge Tuning Linac High-Charge Tuning 2e10, 10 Hz 2e10, 10 Hz 2e10, 10 Hz 2e10, 10 Hz FACET dump FACET dump FACET dump FACET dump IP Beta Squeeze IP Beta Squeeze S20 Lattice S20 Lattice 2e10, 10 Hz 2e10, 10 Hz 2e10, 10 Hz 2e10, 10 Hz E202 Sample Exposure FACET dump FACET dump FACET dump FACET dump E200: CTM E200: CTM SOP/Tuning SOP/Tuning Klystron Phasing Klystron Phasing 2e10, 10 Hz 2e10, 10 Hz 2e10, 10 Hz 2e10, 10 Hz 2e10, 10 Hz FACET dump FACET dump FACET dump FACET dump FACET dump Full check-out of E-200 Rb oven 30x30x30 Etax=Etay<0.5mm, Etax'=Etay'<30mrad Set-up and characterize Sig_y vs TCAV IPOTR with no delta<y> 30x30x30 Etax=Etay<0.5mm, Etax'=Etay'<30mrad CTM vs offset,2 np Also check etax sextupole knobs and tolerances for x/y asymetry at IP Details in Request

11 Week 10: E200 CTM and Mixed Buffer Gas Experiment Mon Apr 22 Tue Apr 23 Wed Apr 24 Thu Apr 25 Fri Apr 26 Sat Apr 27 Sun Apr 28 E200: CTM E200: CTM E200: Mixed Gas E200: Mixed Gas E200: Mixed Gas E200: Mixed Gas 30x30x40 Etax=Etay<0.5mm, Etax'=Etay'<30mrad CTM vs offset, 2 np 30x30x60 Etax=Etay<0.5mm, Etax'=Etay'<30mrad CTM vs offset, 2np Install Li oven, changeout E202 samples 30x30x30 Etax'=Etay'<1mrad Betax/y=10x100cm max beam density. Scan Eloss/Egain vs xwaist +/-0.5m. IP TWISS with multi-screen. Max L, np(sigz) but ~2E17e- /cc. All for varied QS E setp. 30x30x30 Etax'=Etay'<1mrad Betax/y=10x100cm Egain/Eloss and add small % Ar to He buffer gas gas, equilibrate oven. Find x- waist where Ar dark current shuts off. All for varied QS E setp. 30x30x30 Etax'=Etay'<1mrad Betax/y=10x100cm Mixed higher np. All for varied QS E setp. 30x30x30 Etax'=Etay'<1mrad Betax/y=10x100cm Mixed gas at lower np. All for varied QS E setp.

12 Week 11: E200 Mixed Buffer Gas and Tunnel Laser Setup Mon Apr 29 Tue Apr 30 Wed May 1 Thu May 2 Fri May 3 Sat May 4 Sun May 5 Laser Work Laser Work Finishes Laser Contingency/y Laser Contingency/y E200: Mixed Gas E200: Mixed Gas 2e10, 10 Hz 2e10, 10 Hz 2e10, 10 Hz 2e10, 10 Hz FACET dump FACET dump FACET dump FACET dump 30x30x40 Etax'=Etay'<1mrad Betax/y=10x100cm Pure He buffer gas, Egain/Eloss nominal np, scan x-waist. All for varied QS E setp. 30x30x40 Etax'=Etay'<1mrad Betax/y=10x100cm Mixed gas, Egain/Eloss vs Ar % near optimum waist location for trapping, scan x-waist. All for varied QS E setp. Laser Work in Tunnel Laser Work in Tunnel Laser Work in Tunnel Laser Work in Tunnel Laser Work in Tunnel

13 Week 12: E200 Beam/Laser Overlap & Pre/Beam Ionized Plasma Mon May 6 Tue May 7 Wed May 8 Thu May 9 Fri May 10 Sat May 11 Sun May 12 E200: Laser Alignment E200: Laser Alignment E202 sample exposure E200: Pre/beam ionized E200: Pre/beam ionized E200: Pre/beam ionized 30x30x30 E200 Gold orbit, Etax=Etay<1mm, Etax'=Etay'<1mrad, enx/eny<60x10µm, E200 gold orbit Max Lp, np optimized for sigz, align beam & laser to overlap on IPOTRA & B. Egain/Eloss for pre and beam ionized plasma. All for varied QS E setp. E200 unless noted otherwise 30x30x30 E200 Gold orbit, Etax=Etay<1mm, Etax'=Etay'<1mrad, enx/eny<60x10µm, E200 gold orbit Egain/Eloss vs plasma column translation to measure effective width of ionized channel. Decrease laser energy if time allows. 30x30x30 E200 Gold orbit, Etax=Etay<1mm, Etax'=Etay'<1mrad, enx/eny<60x10µm, E200 gold orbit Egain/Eloss vs waist location (laser ON, laser OFF, oven OUT). All for varied QS E setp. 30x30x30 E200 Gold orbit, Etax=Etay<1mm, Etax'=Etay'<1mrad, enx/eny<60x10µm, E200 gold orbit Vary np, Egain/Eloss vs plasma column translation to measure effective width of ionized channel. Decrease laser energy if time allows. All for varied QS E setp. 30x30x50 E200 Gold orbit, Etax=Etay<1mm, Etax'=Etay'<1mrad, enx/eny<60x10µm, E200 gold orbit Lower np, Egain/Eloss vs plasma column translation to measure effective width of ionized channel. Decrease laser energy if time allows. All for varied QS E setp.

14 Week 13: E201 & E200 Single Bunch Cleanup Mon May 13 Tue May 14 Wed May 15 Thu May 16 Fri May 17 Sat May 18 Sun May 19 E200 float or E201 E201 E200 2nd Pass at Week 12 E200 2nd Pass at Week 12 E200 2nd Pass at Week 12 E200 2nd Pass at Week 12

15 Week 14: 10mm R56 Config Development Mon May 20 Tue May 21 Wed May 22 Thu May 23 Fri May 24 Sat May 25 Sun May 26

16 Week 15: E200 Two Bunch Development Mon May 27 Tue May 28 Wed May 29 Thu May 30 Fri May 31 Sat Jun 1 Sun Jun 2 E200 E200 E200 E200 E200 E200 Will create and characterize two bunches with Notch Collimator and TCAV, maintaining beam quality at IP, then send into plasma. Will iterate, with slow variations in plasma density

17 Week 16: E200 With Two Bunches and Pre-ionized Plasma Mon Jun 3 Tue Jun 4 Wed Jun 5 Thu Jun 6 Fri Jun 7 Sat Jun 8 Sun Jun 9 Will create and characterize two bunches with Notch Collimator and TCAV, maintaining beam quality at IP, then send into plasma. Will iterate, with slow variations in plasma density, beam waist

18 Week 17: Mon Jun 10 Tue Jun 11 Wed Jun 12 Thu Jun 13 Fri Jun 14 Sat Jun 15 Sun Jun 16

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

Beam Losses During LCLS Injector Phase-1 1 Operation

Beam Losses During LCLS Injector Phase-1 1 Operation Beam Losses During LCLS Injector Phase-1 1 Operation & Paul Emma September 28, 2006 Radiation Safety Committee Review Scope of Phase 1 Operation Request for Three Operating Modes Operating Plan for Phase

More information

A Facility for Accelerator Physics and Test Beam Experiments

A Facility for Accelerator Physics and Test Beam Experiments A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four

More information

30 GHz Power Production / Beam Line

30 GHz Power Production / Beam Line 30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team AREAL- Phase 1 Progress & Status B. Grigoryan on behalf of AREAL team Contents Machine Layout Building & Infrastructure Laser System RF System Vacuum System Cooling System Control System Beam Diagnostics

More information

Status of SOLARIS Arkadiusz Kisiel

Status of SOLARIS Arkadiusz Kisiel Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

Scavenger Extraction. Karen Goldsmith Shawn Alverson

Scavenger Extraction. Karen Goldsmith Shawn Alverson Scavenger Extraction Karen Goldsmith Shawn Alverson Topics Beam line and area maps High Power Target (HPT) How to establish first beam to HPT Setting energy (configs, multiknobs, Fast Phase Shifters, etc.)

More information

Hall-B Beamline Commissioning Plan for CLAS12

Hall-B Beamline Commissioning Plan for CLAS12 Hall-B Beamline Commissioning Plan for CLAS12 Version 1.5 S. Stepanyan December 19, 2017 1 Introduction The beamline for CLAS12 utilizes the existing Hall-B beamline setup with a few modifications and

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

Photoinjector Laser Operation and Cathode Performance

Photoinjector Laser Operation and Cathode Performance Photoinjector Laser Operation and Cathode Performance Daniele Sertore, INFN Milano LASA Siegfried Schreiber, DESY Laser operational experience Laser beam properties Cathode performances Outlook TTF and

More information

TWO BUNCHES WITH NS-SEPARATION WITH LCLS*

TWO BUNCHES WITH NS-SEPARATION WITH LCLS* TWO BUNCHES WITH NS-SEPARATION WITH LCLS* F.-J. Decker, S. Gilevich, Z. Huang, H. Loos, A. Marinelli, C.A. Stan, J.L. Turner, Z. van Hoover, S. Vetter, SLAC, Menlo Park, CA 94025, USA Abstract The Linac

More information

Photo cathode RF gun -

Photo cathode RF gun - Photo cathode RF gun - *),,, ( 05 Nov. 2004 Spring8 UTNL Linac & Mg Photocathode RF Gun Mg photocathode NERL, 18 MeV Linac and the RF gun Electron Beam Mg photocathode Mg photocathode RF gun of SPring8

More information

LCLS Injector Technical Review

LCLS Injector Technical Review LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4 2003 Review Committee Members: Prof. Patrick O Shea Chair University of Maryland Dr. E. Colby Stanford Linear Accelerator

More information

Future Performance of the LCLS

Future Performance of the LCLS Future Performance of the LCLS J. Welch for many* SLAC National Accelerator Laboratory FLS 2010, ICFA Beam Dynamics Workshop on Future Light Sources, March 1-5, 2010. SLAC National Accelerator Laboratory,

More information

LCLS-II Injector Tuning Procedures. F. Zhou (SLAC) & F. Sannibale (LBNL) 2/6/2017

LCLS-II Injector Tuning Procedures. F. Zhou (SLAC) & F. Sannibale (LBNL) 2/6/2017 LCLSII-TN-17-3 LCLS-II Injector Tuning Procedures F. Zhou (SLAC) & F. Sannibale (LBNL) /6/17 1. Introduction Figure 1 shows

More information

Status of Elettra, top-up and other upgrades

Status of Elettra, top-up and other upgrades Status of Elettra, top-up and other upgrades Emanuel Karantzoulis ELETTRA / Trieste, Italy / 2010 November 25-26 Past and Present Configurations 1994-2007 From 2008 No full energy injection Full energy

More information

Summary of the 1 st Beam Line Review Meeting Injector ( )

Summary of the 1 st Beam Line Review Meeting Injector ( ) Summary of the 1 st Beam Line Review Meeting Injector (23.10.2006) 15.11.2006 Review the status of: beam dynamics understanding and simulations completeness of beam line description conceptual design of

More information

Beam Instrumentation for X-ray FELs

Beam Instrumentation for X-ray FELs Beam Instrumentation for X-ray FELs 05/16/2011 1 1 Outline X-ray FEL overview Diagnostics requirements for X-ray FELs Transverse Diagnostics Longitudinal Diagnostics Summary 2 2 X-ray FEL Overview 100

More information

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling TTF / VUV-FEL Schedule 200 and Project Management Issues Schedule 200 Project Organisation Budget & Controlling Hans Weise / DESY DESY MAC Meeting November 9th, 2004 TTF Linac Start-up After Final Installation

More information

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2 Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010 Plan of the program at ILC2010 Focus of efforts Work on parameter set for a possible

More information

Beam Instrumentation for CTF3 and CLIC

Beam Instrumentation for CTF3 and CLIC Beam Instrumentation for CTF3 and CLIC Beam loss - Beam halo monitoring developments CLIC diagnostic Common developments with other projects Specific requirements for CLIC Beam Loss and Beam Halo measurement

More information

Requirements for the Beam Abort Magnet and Dump

Requirements for the Beam Abort Magnet and Dump Requirements for the Beam Abort Magnet and Dump A beam abort kicker (pulsed dipole magnet) and dump are required upbeam of the LCLS undulator in order to protect the undulator from mis-steered and poor

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

LCLS Linac Technical Design Review Diagnostics and Controls

LCLS Linac Technical Design Review Diagnostics and Controls Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Linac Technical Design Review Diagnostics and Controls December 12, 12, 2003 Requirements for for beamline instrumentation Upgrades

More information

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers Non-Invasive for the JLAB Experimental Program via Synchrotron Light Interferometers P. Chevtsov, T. Day, A.P. Freyberger, R. Hicks Jefferson Lab J.-C. Denard Synchrotron SOLEIL 20th March 2005 1. Energy

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

An Overview of Beam Diagnostic and Control Systems for AREAL Linac An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic

More information

Availability and Reliability Issues for the ILC

Availability and Reliability Issues for the ILC Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some

More information

Screen investigations for low energetic electron beams at PITZ

Screen investigations for low energetic electron beams at PITZ 1 Screen investigations for low energetic electron beams at PITZ S. Rimjaem, J. Bähr, H.J. Grabosch, M. Groß Contents Review of PITZ setup Screens and beam profile monitors at PITZ Test results Summary

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

JLab 10kW FEL Driver Beam Diagnostics

JLab 10kW FEL Driver Beam Diagnostics JLab 10kW Driver Beam Diagnostics Kevin Jordan, S. V. Benson, J. Coleman, D. Douglas, R. Evans, A. Grippo, D. Gruber, G. Krafft, W. Moore, N. Nishimori, P. Piot, D. Sexton, J. Song and S. Zhang Outline.

More information

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

An Operational Diagnostic Complement for Positrons at CEBAF/JLab An Operational Diagnostic Complement for Positrons at CEBAF/JLab Michael Tiefenback JLab, CASA International Workshop on Physics with Positrons at Jefferson Lab 12-15 September 2017 Operating CEBAF with

More information

Top-Up Experience at SPEAR3

Top-Up Experience at SPEAR3 Top-Up Experience at SPEAR3 Contents SPEAR 3 and the injector Top-up requirements Hardware systems and modifications Safety systems & injected beam tracking Interlocks & Diagnostics SPEAR3 Accelerator

More information

Design Studies For The LCLS 120 Hz RF Gun Injector

Design Studies For The LCLS 120 Hz RF Gun Injector BNL-67922 Informal Report LCLS-TN-01-3 Design Studies For The LCLS 120 Hz RF Gun Injector X.J. Wang, M. Babzien, I. Ben-Zvi, X.Y. Chang, S. Pjerov, and M. Woodle National Synchrotron Light Source Brookhaven

More information

Linac 4 Instrumentation K.Hanke CERN

Linac 4 Instrumentation K.Hanke CERN Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase

More information

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16

More information

12GeV CEBAF Commissioning

12GeV CEBAF Commissioning 12GeV CEBAF Commissioning Operations Dept. Accelerator Division JLAB Outline 1 Process Integrated Process Overview Accelerator Readiness Review Process Internal Reviews/Process Process Recap 2 Beam Commissioning

More information

KEKB Accelerator Physics Report

KEKB Accelerator Physics Report KEKB Accelerator Physics Report Y. Funakoshi for the KEKB commissioning group KEK, 1-1 Oho, Tsukuba, Ibaraki 305-0801,Japan Abstract 1 INTRODUCTION The KEKB B-Factory is an electron-positron double ring

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

Drive Laser Operations

Drive Laser Operations Drive-Laser Operations Drive Laser Thales laser Transport system Recent Laser Milestones Safety Technical Where do we stand today? Laser Acceptance Status Laser Commissioning UV on cathode Injector Commissioning

More information

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006 SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006 FFTB will soon be gone! The Problem: On April 10, 2006, the Final Focus Test Beam (FFTB)

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

Electron Bypass Line (EBL) Design Electrons to A-line bypassing LCLS T. Fieguth, R. Arnold

Electron Bypass Line (EBL) Design Electrons to A-line bypassing LCLS T. Fieguth, R. Arnold September 2007 SLAC-TN-08-001 Electron Bypass Line (EBL) Design Electrons to A-line bypassing LCLS T. Fieguth, R. Arnold Introduction Forty one years ago, September 20, 1966, the first beam entered End

More information

Operation of CEBAF photoguns at average beam current > 1 ma

Operation of CEBAF photoguns at average beam current > 1 ma Operation of CEBAF photoguns at average beam current > 1 ma M. Poelker, J. Grames, P. Adderley, J. Brittian, J. Clark, J. Hansknecht, M. Stutzman Can we improve charge lifetime by merely increasing the

More information

The FLASH objective: SASE between 60 and 13 nm

The FLASH objective: SASE between 60 and 13 nm Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR

FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR BNL-94942-2011-CP FINAL DESIGN OF ILC RTML EXTRACTION LINE FOR SINGLE STAGE BUNCH COMPRESSOR S. Sletskiy and N. Solyak Presented at the 2011 Particle Accelerator Conference (PAC 11) New York, NY March

More information

BUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY

BUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY Proceedings of IBIC, Tsukuba, Japan MOPB8 BUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY Gian Luca Orlandi, Masamitsu Aiba, Simona Bettoni, Bolko Beutner, Helge Brands,

More information

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Status of the FAIR Project Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Finland France Germany India Poland Romania Russia Slovenia Sweden UK FAIR Strategic objectives FAIR phase

More information

WG2 Group Summary. Chris Adolphsen Terry Garvey Hitoshi Hayano

WG2 Group Summary. Chris Adolphsen Terry Garvey Hitoshi Hayano WG2 Group Summary Chris Adolphsen Terry Garvey Hitoshi Hayano Linac Options Fest On Thursday afternoon, various experts summarized the linac baseline options. Although hard choices have yet to be made,

More information

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team

PEP-II Status. U. Wienands, PEP-II Run Coordinator for the PEP-II team PEP-II Status U. Wienands, PEP-II Run Coordinator for the PEP-II team Outline of Talk Run 4 Synopsis Machine tuning & improvements Issues encountered during Run 4 Other improvements and MD items Outlook:

More information

The 2011 LHC Run - Lessons in Beam Diagnostics

The 2011 LHC Run - Lessons in Beam Diagnostics The 2011 LHC Run - Lessons in Beam Diagnostics LHC Performance Workshop Chamonix 2012 6 th 10 th February Rhodri Jones on behalf of the CERN Beam Instrumentation Group Outline This Presentation will focus

More information

PITZ Introduction to the Video System

PITZ Introduction to the Video System PITZ Introduction to the Video System Stefan Weiße DESY Zeuthen June 10, 2003 Agenda 1. Introduction to PITZ 2. Why a video system? 3. Schematic structure 4. Client/Server architecture 5. Hardware 6. Software

More information

THE NEW LASER FAMILY FOR FINE WELDING FROM FIBER LASERS TO PULSED YAG LASERS

THE NEW LASER FAMILY FOR FINE WELDING FROM FIBER LASERS TO PULSED YAG LASERS FOCUS ON FINE SOLUTIONS THE NEW LASER FAMILY FOR FINE WELDING FROM FIBER LASERS TO PULSED YAG LASERS Welding lasers from ROFIN ROFIN s laser sources for welding satisfy all criteria for the optimized laser

More information

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX T. Koseki, M. Ikegami, M. Tomizawa, Accelerator Laboratory, KEK, Tsukuba, Japan F. Noda, JAEA, Tokai, Japan Abstract The J-PARC (Japan Proton

More information

CLIC Feasibility Demonstration at CTF3

CLIC Feasibility Demonstration at CTF3 CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for

More information

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera

Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Bingxin Yang, Alex H. Lumpkin, Katherine Harkay, Louis Emery, Michael Borland, and Frank Lenkszus Advanced

More information

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator

Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Tutorial: Trak design of an electron injector for a coupled-cavity linear accelerator Stanley Humphries, Copyright 2012 Field Precision PO Box 13595, Albuquerque, NM 87192 U.S.A. Telephone: +1-505-220-3975

More information

Challenges in Accelerator Beam Instrumentation

Challenges in Accelerator Beam Instrumentation Proceedings of the DPF-2009 Conference, Detroit, MI, July 27-31, 2009 1 Challenges in Accelerator Beam Instrumentation M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, USA The challenges

More information

STATUS OF THE SwissFEL C-BAND LINAC

STATUS OF THE SwissFEL C-BAND LINAC STATUS OF THE SwissFEL C-BAND LINAC F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L. Paly, J.-Y. Raguin, L. Schulz, R. Zennaro, C. Zumbach,

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

Station-100. From its Definition to its Realization both in the Tunnel and Outside. 05/05/05 Catherine LeCocq STA

Station-100. From its Definition to its Realization both in the Tunnel and Outside. 05/05/05 Catherine LeCocq STA Station-100 From its Definition to its Realization both in the Tunnel and Outside Definition The 2 mile SLAC linac is actually 10000 ft. It was designed with a downward slope heading eastward. In its middle,

More information

1. General principles for injection of beam into the LHC

1. General principles for injection of beam into the LHC LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary

More information

SLAC ILC Accelerator R&D Program

SLAC ILC Accelerator R&D Program SLAC ILC Accelerator R&D Program SLUO Meeting September 26 th, 2005 Tor Raubenheimer SLAC 2005 ILC Program NLC group was redirected towards ILC Developed a program aimed at the topics identified in the

More information

PEP II STATUS AND PLANS *

PEP II STATUS AND PLANS * PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex

More information

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer

Suggested ILC Beam Parameter Range Rev. 2/28/05 Tor Raubenheimer The machine parameters and the luminosity goals of the ILC were discussed at the 1 st ILC Workshop. In particular, Nick Walker noted that the TESLA machine parameters had been chosen to achieve a high

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

OPERATIONAL EXPERIENCE AT J-PARC

OPERATIONAL EXPERIENCE AT J-PARC OPERATIONAL EXPERIENCE AT J-PARC Hideaki Hotchi, ) for J-PARC commissioning team ), 2), ) Japan Atomic Energy Agency (JAEA), Tokai, Naka, Ibaraki, 39-95 Japan, 2) High Energy Accelerator Research Organization

More information

CD 0.4 Damping Ring. LBL / SLAC collaboration. M. Ross April 25, M. Ross. J. Corlett. J. Rasson. K. Jobe R&D. J. Corlett

CD 0.4 Damping Ring. LBL / SLAC collaboration. M. Ross April 25, M. Ross. J. Corlett. J. Rasson. K. Jobe R&D. J. Corlett CD 0.4 Damping Ring M. Ross J. Corlett J. Rasson B. McKee D. Atkinson Project/ Systems S. Marks R. Rimmer K. Kennedy Engineering/R&D K. Jobe R&D J. Corlett Accelerator Physics G. Koehler N. Hartman

More information

CLEX (CLIC Experimental Area)

CLEX (CLIC Experimental Area) CLEX (CLIC Experimental Area) Status and plans G.Geschonke for Hans Braun CERN CT3 coll meetg 2005 CLEX 1 CT3 objectives R1.1 CLIC accelerating structure, R1.2 rive beam scheme with a fully loaded linac

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics June 22, 2006 JLab CASA Seminar 2 Background During 2000-2001,

More information

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings

More information

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES *

HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * HIGH POWER BEAM DUMP AND TARGET / ACCELERATOR INTERFACE PROCEDURES * J. Galambos, W. Blokland, D. Brown, C. Peters, M. Plum, Spallation Neutron Source, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract Satisfying

More information

High QE Photocathodes lifetime and dark current investigation

High QE Photocathodes lifetime and dark current investigation High QE Photocathodes lifetime and dark current investigation Paolo Michelato INFN Milano - LASA Main Topics High QE photocathode lifetime QE vs. time (measurements on several cathodes, FLASH data) QE

More information

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008 ATF2 milestones for discussion Andrei Seryi, Toshiaki Tauchi December 15-18, 2008 7th ATF2 Project Meeting What are natural milestones for ATF2? ATF2 design: Nominal IP β y* =0.1 mm & L * =1 m this give

More information

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006 Program Risks Risk Analysis Fallback Plans for the PEP-II B-FactoryB John T. Seeman DOE PEP-II Operations Review April 26, 2006 OPS Review Topics Are there any PEP-II program risks? Has the laboratory

More information

beam dump from P2 losses this morning

beam dump from P2 losses this morning beam dump from P2 losses this morning Some observations on the beam dump from P2 losses this morning 29.10.10 at 01:26:39: - single bunch intensity (average) was ~1.3e11 - significantly higher than previous

More information

Advanced Photon Source - Upgrades and Improvements

Advanced Photon Source - Upgrades and Improvements Advanced Photon Source - Upgrades and Improvements Horst W. Friedsam, Jaromir M. Penicka Argonne National Laboratory, Argonne, Illinois, USA 1. INTRODUCTION The APS has been operational since 1995. Recently

More information

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study EUROFEL-Report-2007-DS4-095 EUROPEAN FEL Design Study Deliverable N : D 4.3 Deliverable Title: Task: Authors: Generation of 3rd harmonic photons at 90 nm DS-4 see next page Contract N : 011935 Project

More information

CONSTRUCTION AND COMMISSIONING OF BEPCII

CONSTRUCTION AND COMMISSIONING OF BEPCII Abstract CONSTRUCTION AND COMMISSIONING OF BEPCII C. Zhang, J.Q. Wang, L. Ma and G.X.Pei for the BEPCII Team, IHEP, CAS P.O.Box 918, Beijing 100049, China BEPCII is the major upgrade of BEPC (Beijing Electron-

More information

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CEBAF Accelerator Update Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CLAS12 Collaboration Meeting, June 13-16, 2017 1 Accelerator Division Leadership On April 30 Andrew

More information

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste

News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste News from HZB / BESSY Wolfgang Anders at ESLS-RF Meeting September 2010 Trieste Outline Status Klystrons / IOT Modifications of transmitters New LINAC for BESSY II Status BERLinPro HoBiCaT Extension --

More information

Sérgio Rodrigo Marques

Sérgio Rodrigo Marques Sérgio Rodrigo Marques (on behalf of the beam diagnostics group) sergio@lnls.br Outline Introduction Stability Requirements General System Requirements FOFB Strategy Hardware Overview Performance Tests:

More information

Polarized Source Development Run Results

Polarized Source Development Run Results Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008 Outline Injector Parity DAQ and Helicity Board Pockels Cell Alignment Fast Helicity Reversal Studies: o 30 Hz, 250

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010

Recent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010 Recent APS Storage Ring Instrumentation Developments Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010 Ring Diagnostics Overview RF beam position monitor technology Photon beam position

More information

FEL TEST PLAN WORKSHEET

FEL TEST PLAN WORKSHEET FEL TEST PLAN WORKSHEET PROGRAM DEPUTY APPROVAL FEL Exp Coordinator Signoff: Date: PI Reviewer Signoff: Date: Expiration Date (max. 90 days from approval): Presentation Required? yes no COMPLETION INFORMATION

More information

AN OPTICAL AND TERAHERTZ INSTRUMENTATION SYSTEM AT THE FAST LINAC AT FERMILAB*

AN OPTICAL AND TERAHERTZ INSTRUMENTATION SYSTEM AT THE FAST LINAC AT FERMILAB* FERMILAB-CONF-17-369-AD AN OPTICAL AND TERAHERTZ INSTRUMENTATION SYSTEM AT THE FAST LINAC AT FERMILAB* R. Thurman-Keup, A. H. Lumpkin, J. Thangaraj, FNAL, Batavia, IL, 60510, USA Abstract FAST is a facility

More information

TESLA FEL-Report

TESLA FEL-Report Determination of the Longitudinal Phase Space Distribution produced with the TTF Photo Injector M. Geitz a,s.schreiber a,g.von Walter b, D. Sertore a;1, M. Bernard c, B. Leblond c a Deutsches Elektronen-Synchrotron,

More information

Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH.

Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH. Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH. Christopher Behrens for the FLASH team Deutsches Elektronen-Synchrotron (DESY) FLS-2010 Workshop at SLAC, 4. March 2010 C.

More information