12GeV CEBAF Commissioning

Size: px
Start display at page:

Download "12GeV CEBAF Commissioning"

Transcription

1 12GeV CEBAF Commissioning Operations Dept. Accelerator Division JLAB

2 Outline 1 Process Integrated Process Overview Accelerator Readiness Review Process Internal Reviews/Process Process Recap 2 Beam Commissioning Schedule and Execution 3 Summary 2/ 24

3 Integrated Process Overview Accelerator Installation Int. Commisioning Reviews Dir. Commisioning Review System Reviews Accelerator Readiness Rev. Geographic Reviews System Checkout Beam Operations May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May LSD pre HCO HCO HCO ACC I Beam! ACC I SAD HCO ACC II ACC II We are here Review process start in May-2013 with the rst Commissioning Advisory Board review (internal) which preceded the external Dir. Commissioning Review in June Installation activities on-going in parallel with review process. Internal reviews at the system and geographic level. Hot Check Out (HCO) process validates hardware at the element level SAD 3/ 24

4 ARR Highlights 2013-Jun Director's Review of the 12GeV commissioning plan. External review of the beam commissioning plan in preparation for the upcoming ARR reviews Aug ARR Phase IA CEBAF beam commissioning up to 5.5 passes. Focus on process, planning and documentation Oct ARR Phase IB Complete Phase I review, pre-start ndings dened and local team formed to verify resolution of pre-start ndings. Focus on hardware and sta readiness for operations Jan ARR Phase II Reviewed beam commissioning (including CW beam) to Hall-A including Hall-A experimental readiness and beam commissioning to the Tagger Vault. All ndings from these reviews have been closed, with the exception of the pre-start sign-o on the remaining beamline sections. 4/ 24

5 ARR pre-start sign-os aka The Green Team ARR review resulted in pre-start ndings. A local team formed to verify that pre-start ndings have been closed. Composition: Mike Epps DOE Site-oce. Harry Fanning ARR committee representative, Accelerator Division Safety Ocer. Steve Smith Green team facilitator, EHS&Q Quality Assurance Continuous Improvement Manager. Scope: ABIL Verify that all hardware by-passes (jumpers) are appropriately documented. ATLis Verify that applicable work planning tasks are documented and closed. HCO Verify that Hot Check Out has been completed up to the proposed beam destination. 5/ 24

6 Green Team Frequency To date pre-start sign os: 2013-Dec-10 Beam to end of the injector (inline dump) Jan-14 Beam to 1R dumplette (half-pass) Jan-24 Beam to 2R dumplette (one-pass) Mar-11 Beam to 6R dumplette (three-pass) Mar-20 Beam to Hall-A, ready to start commissioning with beam in Hall-A. Anticipated pre-start sign os:: 2014-Apr Beam to Hall-D tagger vault (5.5pass) 2014-Sep If required, post ARR-III. Readiness to begin beam commissioning and operations in Hall-D Jan If required, post ARR-IV. Readiness to begin beam commissioning and operations in Hall-B and Hall-C. 6/ 24

7 System Readiness: Three Layers Inspections Frequent inspections of the tunnel and service buildings. Issues tracked. System Reviews Each system to undergo a review before the ARR. Recommendations tracked. Geographical Reviews Each geographical section to undergo a review before the ARR. Recommendations tracked.

8 Hot Check Out System checkout and tracking at the element level. Provides one-stop shopping to check the hardware status for all elements up to a specied beam termination. Component View: Sign-o View: 8/ 24

9 Program Planning and Execution 12GeV APM 12GeV CAM 9/ 24

10 Process Overview 10/ 24

11 Outline 1 Process 2 Beam Commissioning Schedule and Execution Schedule and Goals: To Date Progress: To Date Remaining Schedule and Goals: AccII Schedule and Goals: AccIII and beyond 3 Summary 11/ 24

12 Beam Commissioning Schedule Beam Commissioning is schedule in Run Periods with Scheduled Accelerator Downs (SAD) periods between run periods. Each run period has specic goals, nominally 12GeV project goals, but also OPS goals. Each run period builds on the progress made in the previous operations, cannot commission 5.5passes until 1-pass is accomplished. 12/ 24

13 Acc-I and Acc-II Run Period Goals Acc-I 2013-Dec pass beam to 2R dumplette (2014-Jan-31) KPP Demonstrate 2.2GeV/pass of energy gain with acceptable availability (2014-Feb-05) Acc-II Demonstrate full injection design energy of 123MeV. (2014-Mar-10) Establish multi-pass beams in CEBAF for the rst time in the 12GeV era. (2014-Mar-15) Establish CW operations to Hall-A, rst CW operations beyond the injector. (2014-Mar-26) MS 2-09 Establish 3-pass beam to Hall-A with E beam > 6GeV. ( ) MS 2-03 Establish 5.5pass to the Hall-D dumplette with E beam > 10GeV. (Scheduled for Apr-25) 13/ 24

14 January : Beam to 2R Dumplette!! ITV0R05 ITV1S01 Dec Jan E: 34MeV 6 E: 1124MeV Q Q QQ s ITV2R01 Feb E: 2214MeV!!! C ITV2S01 Jan C C C C C CW E: 2214MeV ITV1R01 C C CW Jan E: 1124MeV 14/ 24

15 February : 2.214GeV beam availability Beam Availability at IPM2R02 (%) IPM2R02 Wire Sum (arb. units) Wed Wed Wed Wed Wed Wed Wed Wed Wed Wed Wed Wed

16 RF gradients Feb GeV/pass RF and ARC1:p/ARC2:p status at: :05 Linac Type Ncav <GMES> GMES RMS Min-Max Egain (MV) (MV) (MV) (MeV) Inj C NL C NL C NL C SL C SL C SL C Linac Egain Σ E Spectrometer Momentum (MeV) (MeV) (MeV/c) Injector INJ:p North Arc1:p South Arc2:p Injector Beam Current(IBC0R08): / 24

17 Inj. RF gradients Mar. 10: E inj = 123 MeV RF and INJ:p status at: :50 Linac Type Ncav <GMES> GMES RMS Min-Max Egain (MV) (MV) (MV) (MeV) Inj C Inj R Linac Egain Σ E Spectrometer Momentum (MeV) (MeV) (MeV/c) Injector INJ:p Injector Beam Current(IBC0L02): / 24

18 Multi-pass operation 3-Pass beam to 6R! Pathlength monitors (yellow trace) measures the phase dierence of each pass to the Master Oscillator reference (10mV/degree). Pass-1 Pass-2 Pass-3 ITV6R01 Mar E: 4889MeV 18/ 24

19 Beam-Target Interactions in Hall-A Beam on viewer at entrance to A-Dump Beam on Carbon Target Mar E: 4889MeV 19/ 24

20 Beam-Target Interactions with E beam > 6 GeV Shower+Preshower ADC Sum (Chan Beam on Carbon Target Apr E: 6112MeV 3 Gas Cerenkov ADC Sum (Channel) 4000 Hall A Right HRS Run st 1 April 2014 Time: 22:35 - e 20/ 24

21 Future: Near Term Remaining goals for Acc-II run period: MS 2-03 Establish 5.5pass to the Hall-D dumplette with E beam > 10GeV. (Scheduled for Apr-25) 21/ 24

22 Future: AccIII and beyond Fall2014, Oct Dec. 2014: Acc-III KPP Hall-D detector commissioning RF separation, establish multi-beam capability for the rst time in 12GeV CEBAF era. Spring2016, Dates and Run Period Name TBD KPP Commission with beam the Hall-B transport line and start Hall-B detector commissioning. KPP Commission with beam the Hall-C transport line and start Hall-C detector commissioning.

23 Outline 1 Process 2 Beam Commissioning Schedule and Execution 3 Summary The Summary Slide 23/ 24

24 Summary 12GeV CEBAF Beam Commissioning has had a very successful start. 2.2GeV/pass energy gain has been demonstrated. Injector has been commissioned at design energy. Multi-pass operations have been established. Beam transported to Hall-A end-station. Beam-target interactions have been recorded in Hall-A, Hall-A has started their commissioning process. With a bit less than 9weeks of beam operations, signicant progress has been made. Beam has been transported through 55% of CEBAF proper and 25% of the transport lines to the halls. Plan is to have beam through 100% of CEBAF proper and 50% of the hall transport lines by end of Acc-II (2014-May). Systematic, thorough, detailed check-out and documentation of the accelerator hardware has resulted in generally ecient use of beam operations. 24/ 24

CEBAF 12GeV Commissioning: Status and Plans

CEBAF 12GeV Commissioning: Status and Plans CEBAF 12GeV Commissioning: Status and Plans Arne Freyberger Dept. Accelerator Division JLAB Talk Outline 1 The Past Timeline Hot Check Out Cryogenics ACC-I & ACC-II Plan, Goals and Accomplishments 2 Lessons

More information

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis Dianne Napier Outline Part II Review Charges Addressed in this Presentation: Issues raised in Part I Review Report adequately addressed

More information

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CEBAF Accelerator Update Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CLAS12 Collaboration Meeting, June 13-16, 2017 1 Accelerator Division Leadership On April 30 Andrew

More information

Beam Losses During LCLS Injector Phase-1 1 Operation

Beam Losses During LCLS Injector Phase-1 1 Operation Beam Losses During LCLS Injector Phase-1 1 Operation & Paul Emma September 28, 2006 Radiation Safety Committee Review Scope of Phase 1 Operation Request for Three Operating Modes Operating Plan for Phase

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information

BBU threshold current study for 6 GeV beam in 12 GeV beamline setup

BBU threshold current study for 6 GeV beam in 12 GeV beamline setup BBU threshold current study for 6 GeV beam in 12 GeV beamline setup Ilkyoung Shin and Byung C. Yunn JLAB-TN-09-004 January 12, 2009 1. Introduction The study of BBU threshold current is done for a 6 GeV

More information

Diamond RF Status (RF Activities at Daresbury) Mike Dykes

Diamond RF Status (RF Activities at Daresbury) Mike Dykes Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

An Operational Diagnostic Complement for Positrons at CEBAF/JLab An Operational Diagnostic Complement for Positrons at CEBAF/JLab Michael Tiefenback JLab, CASA International Workshop on Physics with Positrons at Jefferson Lab 12-15 September 2017 Operating CEBAF with

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac

First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac First Simultaneous Top-up Operation of Three Different Rings in KEK Injector Linac Masanori Satoh (Acc. Lab., KEK) for the injector upgrade group 2010/9/16 1 Overview of Linac Beam Operation 2010/9/16

More information

Hall-B Beamline Commissioning Plan for CLAS12

Hall-B Beamline Commissioning Plan for CLAS12 Hall-B Beamline Commissioning Plan for CLAS12 Version 1.5 S. Stepanyan December 19, 2017 1 Introduction The beamline for CLAS12 utilizes the existing Hall-B beamline setup with a few modifications and

More information

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008

Andrei Seryi, Toshiaki Tauchi. December 15-18, 2008 ATF2 milestones for discussion Andrei Seryi, Toshiaki Tauchi December 15-18, 2008 7th ATF2 Project Meeting What are natural milestones for ATF2? ATF2 design: Nominal IP β y* =0.1 mm & L * =1 m this give

More information

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Week 0: PPS Certification and Processing Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Work in tunnel Work in tunnel PPS Certification PPS Certification PPS Certification

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information

Upgrade of CEBAF to 12 GeV

Upgrade of CEBAF to 12 GeV Upgrade of CEBAF to 12 GeV Leigh Harwood (for 12 GeV Accelerator team) Page 1 Outline Background High-level description Schedule Sub-system descriptions and status Summary Page 2 CEBAF Science Mission

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

Monthly Progress Report Stanford Synchrotron Radiation Laboratory Monthly Progress Report Stanford Synchrotron Radiation Laboratory April 2003 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 3 2. Cost Data 5 B. Design and Fabrication Reports 1.1 Magnets &

More information

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

Photocathodes FLASH: Quantum Efficiency (QE)

Photocathodes FLASH: Quantum Efficiency (QE) Photocathodes Studies @ FLASH: Quantum Efficiency (QE) L. Monaco, D. Sertore, P. Michelato J. H. Han, S. Schreiber Work supported by the European Community (contract number RII3-CT-4-568) /8 Main Topics

More information

30 GHz Power Production / Beam Line

30 GHz Power Production / Beam Line 30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression

More information

Welcome and FRIB Project Status. FRIB Highlights and Plan Ahead

Welcome and FRIB Project Status. FRIB Highlights and Plan Ahead Welcome and FRIB Project Status Thomas Glasmacher Project Manager This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

The Construction Status of CSNS Linac

The Construction Status of CSNS Linac The Construction Status of CSNS Linac Sheng Wang Dongguan branch, Institute of High Energy Physics, CAS Sep.2, 2014, Geneva Outline The introduction to CSNS accelerators The commissoning of ion source

More information

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems

LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end

More information

CBETA Quarterly Report 7

CBETA Quarterly Report 7 Submission date: 15 September 2018 CBETA Quarterly Report 7 Project Director (BNL): Steve Peggs Peggs@bnl.gov Project Manager (BNL): Rob Michnoff Michnoff@bnl.gov Project Manager (Cornell): Karl Smolenski

More information

5 Project Costs and Schedule

5 Project Costs and Schedule 93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

Digital BPMs and Orbit Feedback Systems

Digital BPMs and Orbit Feedback Systems Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit

More information

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,

More information

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers

Non-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers Non-Invasive for the JLAB Experimental Program via Synchrotron Light Interferometers P. Chevtsov, T. Day, A.P. Freyberger, R. Hicks Jefferson Lab J.-C. Denard Synchrotron SOLEIL 20th March 2005 1. Energy

More information

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen

J/NLC Progress on R1 and R2 Issues. Chris Adolphsen J/NLC Progress on R1 and R2 Issues Chris Adolphsen Charge to the International Linear Collider Technical Review Committee (ILC-TRC) To assess the present technical status of the four LC designs at hand,

More information

Summary report on synchronization, diagnostics and instrumentation

Summary report on synchronization, diagnostics and instrumentation Summary report on synchronization, diagnostics and instrumentation A.P. Freyberger and G.A. Krafft Jefferson Lab, 12000 Jefferson Avenue, Newport News, VA. 23606 Abstract The proceedings of Working Group

More information

Glast beam test at CERN

Glast beam test at CERN Glast beam test at CERN Glast Collaboration Meeting 2005 R. Bellazzini 1 LAT beam test at CERN Main goals LAT-TD-02152, see Steve slides Required beam types and related measurements 1. tagged-photon beam

More information

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager

Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager Outline Facility overview Organization Shift schedule

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006 SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006 FFTB will soon be gone! The Problem: On April 10, 2006, the Final Focus Test Beam (FFTB)

More information

Periodic Seasonal Variation of Magnets Level of the STB ring

Periodic Seasonal Variation of Magnets Level of the STB ring Periodic Seasonal Variation of Magnets Level of the STB ring Shigenobu Takahashi Laboratory of Nuclear Science,Tohoku University, Mikamine 1-2-1, Taihaku-ku, Sendai 982-0826, Japan 1. Introduction The

More information

Study of the performances of the ALICE muon spectrometer

Study of the performances of the ALICE muon spectrometer Study of the performances of the ALICE muon spectrometer Blanc Aurélien, December 2008 PhD description Study of the performances of the ALICE muon spectrometer instrumentation/detection. Master Physique

More information

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room 6MSD Weekly Scheduling Meeting Wednesday @ 1:30, MCC Conference Room July 6, 2011 1) Glance Back and 2-Week Look Ahead (F. Pilat)... 10 mins 2) PMI Report (P. Collins)... 5 mins 3) Critical Path Service

More information

Precision measurements of beam current, position and phase for an e+e- linear collider

Precision measurements of beam current, position and phase for an e+e- linear collider Precision measurements of beam current, position and phase for an e+e- linear collider R. Corsini on behalf of H. Braun, M. Gasior, S. Livesley, P. Odier, J. Sladen, L. Soby INTRODUCTION Commissioning

More information

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac

More information

Status of the X-ray FEL control system at SPring-8

Status of the X-ray FEL control system at SPring-8 Status of the X-ray FEL control system at SPring-8 T.Fukui 1, T.Hirono 2, N.Hosoda 1, M.Ishii 2, M.Kitamura 1 H.Maesaka 1,T.Masuda 2, T.Matsushita 2, T.Ohata 2, Y.Otake 1, K.Shirasawa 1,M.Takeuchi 2, R.Tanaka

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

The Elettra Storage Ring and Top-Up Operation

The Elettra Storage Ring and Top-Up Operation The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)

More information

Status of CTF3. G.Geschonke CERN, AB

Status of CTF3. G.Geschonke CERN, AB Status of CTF3 G.Geschonke CERN, AB CTF3 layout CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10 Drive Beam Injector ~ 50 m 3.5 A - 2100 b of 2.33 nc 150 MeV - 1.4

More information

DAQ Systems in Hall A

DAQ Systems in Hall A CODA Users Workshop Data Acquisition at Jefferson Lab Newport News June 7, 2004 DAQ Systems in Hall A Overview of Hall A Standard Equipment: HRS, Beamline,... Parity Experiments Third Arms: BigBite, RCS

More information

LCLS Injector Technical Review

LCLS Injector Technical Review LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4 2003 Review Committee Members: Prof. Patrick O Shea Chair University of Maryland Dr. E. Colby Stanford Linear Accelerator

More information

CONSTRUCTION AND COMMISSIONING OF BEPCII

CONSTRUCTION AND COMMISSIONING OF BEPCII Abstract CONSTRUCTION AND COMMISSIONING OF BEPCII C. Zhang, J.Q. Wang, L. Ma and G.X.Pei for the BEPCII Team, IHEP, CAS P.O.Box 918, Beijing 100049, China BEPCII is the major upgrade of BEPC (Beijing Electron-

More information

Status of SOLARIS Arkadiusz Kisiel

Status of SOLARIS Arkadiusz Kisiel Status of SOLARIS Arkadiusz Kisiel Solaris National Synchrotron Light Source Jagiellonian University Czerwone Maki 98 30-392 Kraków www.synchrotron.uj.edu.pl Arkadiusz.Kisiel@uj.edu.pl On behalf of SOLARIS

More information

Accelerator Controls Part2: CERN central timing system

Accelerator Controls Part2: CERN central timing system Accelerator Controls Part2: CERN central timing system CAS 2009@Divonne Hermann Schmickler Outline Part 2 Requested Functionality of the CERN timing system Implementation: Hardware Details Software Details:

More information

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments

Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments Status of the Jefferson Lab Polarized Beam Physics Program and Preparations for Upcoming Parity Experiments P. Adderley, M. Baylac, J. Clark, A. Day, J. Grames, J. Hansknecht, M. Poelker, M. Stutzman PESP

More information

LHC Beam Instrumentation Further Discussion

LHC Beam Instrumentation Further Discussion LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz

More information

Screen investigations for low energetic electron beams at PITZ

Screen investigations for low energetic electron beams at PITZ 1 Screen investigations for low energetic electron beams at PITZ S. Rimjaem, J. Bähr, H.J. Grabosch, M. Groß Contents Review of PITZ setup Screens and beam profile monitors at PITZ Test results Summary

More information

1. General principles for injection of beam into the LHC

1. General principles for injection of beam into the LHC LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary

More information

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX

COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX COMMISSIONING SCENARIOS FOR THE J-PARC ACCELERATOR COMPLEX T. Koseki, M. Ikegami, M. Tomizawa, Accelerator Laboratory, KEK, Tsukuba, Japan F. Noda, JAEA, Tokai, Japan Abstract The J-PARC (Japan Proton

More information

Top-Up Experience at SPEAR3

Top-Up Experience at SPEAR3 Top-Up Experience at SPEAR3 Contents SPEAR 3 and the injector Top-up requirements Hardware systems and modifications Safety systems & injected beam tracking Interlocks & Diagnostics SPEAR3 Accelerator

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room 6MSD Weekly Scheduling Meeting Wednesday @ 1:30, MCC Conference Room August 24, 2011 1) Glance Back and 2-Week Look Ahead (F. Pilat)... 10 mins 2) PMI Report (P. Collins)... 5 mins 3) Critical Path Service

More information

1 Digital BPM Systems for Hadron Accelerators

1 Digital BPM Systems for Hadron Accelerators Digital BPM Systems for Hadron Accelerators Proton Synchrotron 26 GeV 200 m diameter 40 ES BPMs Built in 1959 Booster TT70 East hall CB Trajectory measurement: System architecture Inputs Principles of

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

JEFFERSON LAB, A STATUS REPORT*

JEFFERSON LAB, A STATUS REPORT* JEFFERSON LAB, A STATUS REPORT* B. M. Dunham Thomas Jefferson National Accelerator Facility 12000 Jefferson Ave., Newport News, VA 23606 Abstract Thomas Jefferson National Accelerator Facility (Jefferson

More information

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center

Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Particle Beam Production - A Synchrotron-Based System - Prof. Dr. Thomas Haberer Scientific-technical Director Heidelberg Iontherapy Center Outline Situation/Rationale Requirements Synchrotron choice Functions

More information

Energy Upgrade Options for the LCLS-I Linac

Energy Upgrade Options for the LCLS-I Linac Energy Upgrade Options for the LCLS-I Linac LCLS-II TN-14-10 11/12/2014 John Sheppard, F.J. Decker, R. Iverson, H.D. Nuhn, M. Sullivan, J. Turner November 18, 2014 LCLSII-TN-14-07 LCLS 1 Linac Energy Increase

More information

5 MeV Mott Polarization Measurement Procedure--DRAFT

5 MeV Mott Polarization Measurement Procedure--DRAFT 5 MeV Mott Polarization Measurement Procedure--DRAFT Document Number: Revision Number: Rev. 5; November 22, 2000 Technical Custodian:? Estimated Time to Perform: 20 minutes Procedure Overview This procedure

More information

Senior Math Studies Lesson Planning Date Lesson Events

Senior Math Studies Lesson Planning Date Lesson Events Senior Math Studies Lesson Planning 2014-2015 Date Lesson Events Aug 25 Style of Class: Student-led work teams (SLWTs) Facilitated (as opposed to taught) by the teacher Considering MS topics what areas

More information

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback

Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback Journal of Physics: Conference Series PAPER OPEN ACCESS Control of Intra-Bunch Vertical Motion in the SPS with GHz Bandwidth Feedback To cite this article: J. Fox et al 2018 J. Phys.: Conf. Ser. 1067 072024

More information

High QE Photocathodes lifetime and dark current investigation

High QE Photocathodes lifetime and dark current investigation High QE Photocathodes lifetime and dark current investigation Paolo Michelato INFN Milano - LASA Main Topics High QE photocathode lifetime QE vs. time (measurements on several cathodes, FLASH data) QE

More information

Photo cathode RF gun -

Photo cathode RF gun - Photo cathode RF gun - *),,, ( 05 Nov. 2004 Spring8 UTNL Linac & Mg Photocathode RF Gun Mg photocathode NERL, 18 MeV Linac and the RF gun Electron Beam Mg photocathode Mg photocathode RF gun of SPring8

More information

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:

TITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings: TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,

More information

PEP II Status. H. - Ulrich (UZi) Wienands PEP-II Run Coordinator. SLAGEPAC Meeting November 8,200O. Intro; 11/7/O 19:55

PEP II Status. H. - Ulrich (UZi) Wienands PEP-II Run Coordinator. SLAGEPAC Meeting November 8,200O. Intro; 11/7/O 19:55 PEP II Status H. - Ulrich (UZi) Wienands PEP-II Run Coordinator SLAGEPAC Meeting November 8,200O Intro; 11/7/O 19:55 Run Statistics In CY 2000, PEP delivered 23.6 fb- (86% of 27.3 fb- ) of which BaBar

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling TTF / VUV-FEL Schedule 200 and Project Management Issues Schedule 200 Project Organisation Budget & Controlling Hans Weise / DESY DESY MAC Meeting November 9th, 2004 TTF Linac Start-up After Final Installation

More information

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR

RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR RUNNING EXPERIENCE OF FZD SRF PHOTOINJECTOR Rong Xiang On behalf of the BESSY-DESY-FZD-MBI collaboration and the ELBE team FEL 2009, Liverpool, United Kingdom, August 23 ~ 28, 2009 Outline Introduction

More information

LSD Bi-Weekly Resource Planning Meeting Agenda 25 July 2012

LSD Bi-Weekly Resource Planning Meeting Agenda 25 July 2012 LSD Bi-Weekly Resource Planning Meeting Agenda 25 July 2012 Glance Back / 2-Week Look Ahead / Change-Control Board (CCB) Report (10 min) F. Pilat Safety Report (5 min) M. Logue Special Topic (5 min) Puddles

More information

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility

Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Presentation at University of Saskatchewan April 22-23, 2010 Yoshitaka Kawashima Brookhaven National Laboratory NSLS-II,

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2

Focus of efforts. ILC 2010, Mar/27/10 A. Seryi, BDS: 2 Beam Delivery System Updates Andrei Seryi for BDS design and ATF2 commissioning teams LCWS 2010 / ILC 2010 March 28, 2010 Plan of the program at ILC2010 Focus of efforts Work on parameter set for a possible

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

KARA and FLUTE RF Overview/status

KARA and FLUTE RF Overview/status KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research

More information

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010

More information

JLab 10kW FEL Driver Beam Diagnostics

JLab 10kW FEL Driver Beam Diagnostics JLab 10kW Driver Beam Diagnostics Kevin Jordan, S. V. Benson, J. Coleman, D. Douglas, R. Evans, A. Grippo, D. Gruber, G. Krafft, W. Moore, N. Nishimori, P. Piot, D. Sexton, J. Song and S. Zhang Outline.

More information

Cathode Studies at FLASH: CW and Pulsed QE measurements

Cathode Studies at FLASH: CW and Pulsed QE measurements Cathode Studies at FLASH: CW and Pulsed QE measurements L. Monaco, D. Sertore, P. Michelato S. Lederer, S. Schreiber Work supported by the European Community (contract number RII3-CT-2004-506008) 1/27

More information

AN302 Anconda 3BR 3BA

AN302 Anconda 3BR 3BA AN302 Anconda 3BR 3BA Summary 3 BR 3 Bath Condo - sleeps up to 8 Description AN302 Anconda 3BR 3BA -- Short Walk to Super B Chairlift -- Shared Heated Garage -- Outdoor Hot Tub and Laundry -- Gas Fireplace

More information

Online Monitoring of L1CT in Run IIa. bonus: experience from Run I

Online Monitoring of L1CT in Run IIa. bonus: experience from Run I Online Monitoring of L1CT in Run IIa bonus: experience from Run I Philippe Laurens 20-Feb-2003 L1 Cal Monitoring Monitoring can mean many things Anything related to observation of system s operation Different

More information

HD Review March 30, 2011 Franz Klein

HD Review March 30, 2011 Franz Klein HD Review March 30, 2011 Franz Klein !! Circularly & linearly polarized photon beam on longitudinally polarized target Circularly polar. photon via helicity transfer from 92 calendar days Linearly polar.

More information

The basic parameters of the pre-injector are listed in the Table below. 100 MeV

The basic parameters of the pre-injector are listed in the Table below. 100 MeV 3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,

More information

Towards an X-Band Power Source at CERN and a European Structure Test Facility

Towards an X-Band Power Source at CERN and a European Structure Test Facility Towards an X-Band Power Source at CERN and a European Structure Test Facility Erk Jensen and Gerry McMomagle CERN The X-Band Accelerating Structure Design and Test-Program Workshop Day 2: Structure Testing

More information

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study

EUROFEL-Report-2007-DS EUROPEAN FEL Design Study EUROFEL-Report-2007-DS4-095 EUROPEAN FEL Design Study Deliverable N : D 4.3 Deliverable Title: Task: Authors: Generation of 3rd harmonic photons at 90 nm DS-4 see next page Contract N : 011935 Project

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

Full IEFC workshop Feb.

Full IEFC workshop Feb. How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix How does one keep a 50 51 year old running for another 25 years? accelerator How

More information

PROJECT DESCRIPTION. Longitudinal phase space monitors for the ILC injectors and bunch compressors

PROJECT DESCRIPTION. Longitudinal phase space monitors for the ILC injectors and bunch compressors PROJECT DESCRIPTION Longitudinal phase space monitors for the ILC injectors and bunch compressors Personnel and Institution(s) requesting funding Philippe Piot Northern Illinois University Dept of Physics,

More information

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS

CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications

More information

Update on DAQ for 12 GeV Hall C. Brad Sawatzky

Update on DAQ for 12 GeV Hall C. Brad Sawatzky Update on DAQ for 12 GeV Hall C Brad Sawatzky SHMS/HMS Trigger/Electronics H. Fenker 2 SHMS / HMS Triggers SCIN = 3/4 hodoscope planes CER = Cerenkov(s) STOF = S1 + S2 EL-Hi = SCIN + PSh_Hi EL-Lo = 2/3{SCIN,

More information

Availability and Reliability Issues for the ILC

Availability and Reliability Issues for the ILC Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some

More information

RF Power Upgrade at Jefferson Lab

RF Power Upgrade at Jefferson Lab RF Power Upgrade at Jefferson Lab Rick Nelson*, Andrew Kimber *nelson@jlab.org * Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE- AC05-06OR23177. The U.S. Government

More information