LCLS Linac Technical Design Review Diagnostics and Controls
|
|
- Louisa Morgan
- 5 years ago
- Views:
Transcription
1 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Linac Technical Design Review Diagnostics and Controls December 12, 12, 2003 Requirements for for beamline instrumentation Upgrades for for conventional diagnostics BPMs, BPMs, PROFs, PROFs,, Wire Wire scanners, scanners, Toroids, Toroids,, Collimators, Collimators, Stoppers Stoppers Prototyping developments for for bunch length and and timing devices Definition of of control system requirements Patrick Krejcik,
2 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Beamline instrumentation Conventional diagnostics and their upgrades BPMs, Toroids,, Wire Wire scanners, Prof Prof Monitors, Synchrotron Radiation, Beam Phase, Collimation, Loss monitors Bunch length and timing diagnostics Fast, single-bunch relative length measurement for for tuning Linac Linac energy energy wakeloss wakelossscan scan THz THz spectral spectral power power OTR OTR CSR CSR Absolute bunch length determination Average Average bunch bunch length length from from CTR CTR autocorrelation autocorrelation 3-bunch 3-bunch measurement measurement with with transverse transverse RF RF deflecting deflecting cavity cavity Single Single shot shot electro electro optic optic pump pump probe probe measurement measurement Patrick Krejcik,
3 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls Modes of of beam operation Control system architecture requirements Single pulse reading and and id id in in a shared SLC/Epics system Timing requirements Low level RF control Feedback requirements. Pulse-to-pulse control of of MPS Orbit position & angle, energy, beam phase, bunch length Stoppers and and beam dumpers PPS Control room Patrick Krejcik,
4 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Conventional diagnostics and their upgrades BPMS Linac BPM modules to to be be upgraded Resolution requirements 5 um um for for nc nc New New modules may may be be either camac or or VME packaging Long Long lead lead item, item, no no resources resources as as yet. yet. New New stripline BPMs to to be be fabricated for for chicanes um um res. res. for for nc ncin in a 3 cm cm x x cm cm chamber chamber New New stripline BPMs to to be be fabricated for for the the LTU LTU in in addition to to existing FFTB BPM Last Last 8 LTU LTU BPMs redundant with with undulator-style cavity BPMs 1 um um resolution resolution at at nc nc Patrick Krejcik,
5 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Conventional diagnostics and their upgrades Wire Wire scanners average, projected emittance Lattice Lattice locations optimized for for phase phase advance Small Small wire wire diameters for for low low emittance beams beams Compromise between high high Z for for signal signal and and low low Z carbon carbon wires wires in in the t the LTU LTU to to minimize beam beam loss loss in in the the undulator Prof Prof Monitors single shot shot beam size, size, energy spread High High resolution measurement of of small small spots spots to to be be achieved with with OTR OOTR screens ( (disruptive) But But requires requires careful, careful, remote remote optics optics engineering engineering layout layout and and digital digital video video acquisition acquisition OTR OTR screens screens require require optical optical alignment alignment gaining gaining experience experience at at SPPS SPPS Can Can distinguish distinguish OTR OTR from from sync sync rad. rad.. in in chicane chicane bends bends with with polarizers polarizers SPPS SPPS BC BC chicane chicane measured measured energy energy spread spread SR background Patrick Krejcik,
6 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Synchrotron Radiation: single shot projected energy spread Generated from from vertical chicane wiggler in in a horizontal dispersion region Lattice optimized for for high high E E resolution: low low β x, x, high high η x x Optical resolution set set by by divergence of of x-rays, x filter filter out out low low energy x-rays x with with foil foil and and use use thin thin fluorescent crystal Patrick Krejcik,
7 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Synchrotron Radiation: single shot projected energy spread Single Single shot shot measurement measurement of of x-ray x-ray stripe stripe Compared Compared to to energy energy spread spread at at dump dump spectrometer spectrometer E Single pulse x-ray Dumpline spectrometer Patrick Krejcik,
8 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Conventional diagnostics and their upgrades Beam Phase Monitors Use Use linac linac style style S-band S monitor monitor cavities cavities Measure pulse-to-pulse phase phase jitter jitter Subject Subject to to thermal thermal drift drift so so can t can t use use for for feedback control control of of phase phase Thermal Thermal stabilization stabilization technology technology (as (as required required for for the the undulator) undulator) may may make make this this possible possible in in the the future. future. Beam Beam phase phase can can be be measured w.r.t. w.r.t. RF RF distribution distribution Laser Laser from from injector injector or or at at experiment experiment Patrick Krejcik,
9 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Conventional diagnostics and their upgrades Collimation Movable energy collimator in in each chicane Diagnostic, Diagnostic, and and later later for for foil foil slits slits Pair Pair of of adjustable energy collimators in in the the dog-leg bend of of the the LTU LTU Three x & y adjustable collimators in in the the matching section of of the the e LTU LTU Two Two betatron betatron phases phases and and one one clean-up clean-up in in each each plane plane Beam Loss Monitors PLIC cables along the the length of of the the machine Protection Ion Ion Chambers at at Injection, Injection, BC1 BC1 & BC2, BC2, dog-leg dog-leg bend, bend, collimation collimation section section Toroid average current comparators around BC1 BC1 & BC2 BC2 Experience Experience with with SPPS SPPS Patrick Krejcik,
10 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Bunch length and timing diagnostics Fast, single-bunch relative length measurement Linac energy wakeloss scan Shorter Shorter bunches lose lose more more energy energy from from longitudinal wakes wakes in in the the linac linac Use Use energy energy feedback in in LTU LTU dog-leg bend bend Plus Plus energy energy feedback in in BC2 BC2 to to maintain fixed fixed energy energy while while scanning L2 L2 phase phase Demonstrated at at SPPS SPPS as as tuning tuning tool tool Confirmation of of model model for for longitudinal wakes wakes in in S-band S linac linac for for short short bunches Patrick Krejcik,
11 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Relative bunch length measurement at at SPPS based on on wakefield energy loss loss scan scan Energy change measured at the end of the linac as a function of the linac phase (chirp) upstream of the compressor chicane Predicted shape due to wakeloss plus RF curvature Shortest bunch has greatest energy loss Predicted wakeloss (EMMA) For bunch length s z Patrick Krejcik,
12 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Bunch length and timing diagnostics Fast, single-bunch relative length measurement THz THz spectral power Coherent Coherent radiation radiation from from the the bunch bunch increases increases in in power power at at shorter shorter wavelengths wavelengths as as bunch bunch length length is is reduced reduced Coherent Coherent radiation radiation detected detected as as either either OTR OTR from from a a thin thin foil foil demonstrated demonstrated at at SLAC/SPPS SLAC/SPPS CSR CSR from from a a bend bend field field demonstrated demonstrated at at TJNAF TJNAF Difficult Difficult to to calibrate calibrate as as an an absolute absolute bunch bunch length length measurement measurement But But relative relative changes changes in in signal signal clearly clearly show show minimum minimum bunch bunch length length in in tuning tuning scans scans Simple Simple spectral spectral analysis analysis showing showing power power at at different different wavelengths wavelengths can can be be used used to to tune tune to to arbitrary arbitrary wavelengths wavelengths under under test test DESY/SPPS DESY/SPPS Patrick Krejcik,
13 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Bunch length and timing diagnostics THz spectral power OTR issues studied at at SPPS Intercepting Intercepting thin thin foil foil (OTR) (OTR) versus versus foil foil with with hole hole (ODR) (ODR) Wavelength Wavelength response response of of vacuum vacuum window window Fused Fused silica silica Mylar Mylar foil foil vacuum vacuum window window Window Window diameter diameter Wavelength Wavelength response response of of water water vapor vapor Dry Dry nitrogen nitrogen blanket blanket Hole experiment! Patrick Krejcik,
14 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Far-Infrared Detection of of Wakefields from Ultra-Short Bunches Comparison of bunch length minimized according to wakefield loss and THz power 500 Linac Wake Loss foil energy loss [MeV] Wake energy loss LINAC Wakefield diffraction radiation wavelength comparable to bunch length Pyroelectric detector Pyrometer signal [arb. units] FFTB Pyrometer Signal Linac phase THz power FFTB linac phase offset from crest [deg. S-Band] GADC Patrick Krejcik,
15 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Absolute bunch length determination Average bunch bunch length length from from CTR CTR autocorrelation Radiation Radiation from from the the OTR OTR screen screen is is focused focused into into an an interferometer interferometer One One arm arm of of interferometer interferometer is is movable, movable, so so two two profiles profiles are are swept swept through through each each other other Measured Measured bunch bunch length length is is calibrated calibrated in in microns microns of of arm arm motion motion Averaged Averaged over over many many pulses, pulses, so so integrates integrates any any bunch bunch length length jitter jitter OAP Mylar window S1 D1 D2/D1 M. Hogan, P. Mugli SPPS 48 fs rms D2 S2 M2 M1 M2 posn. Patrick Krejcik,
16 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Bunch length and timing diagnostics Microbunching diagnostics At At exit exit of of BC1 BC1 & BC2 BC2 Coherent Coherent transition transition radiation radiation Spectral Spectral power power measurements measurements measurements measurements can can resolve resolve micron- micronsized sized substructure substructure in in the the bunch, bunch, demonstrated demonstrated at at LEUTL LEUTL at at um um scale scale (Lumpkin) (Lumpkin) Coherent Coherent synchrotron synchrotron monitor monitor from from final final BC BC bend bend Spectral Spectral power power measurements measurements Analyze Analyze as as radiation radiation from from an an edge edge Z. Z. Huang: Huang: expect expect to to observe observe microstructure microstructure at at l l 0 /comp.fact 0 /comp.fact Patrick Krejcik,
17 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Bunch length and timing diagnostics Absolute bunch length determination 3-bunch measurement with with transverse RF RF deflecting cavity Tested Tested at at SPPS SPPS Initial Initial transverse transverse tilt tilt to to the the bunch bunch from from transverse transverse wakes wakes requires requires res measuring measuring at at both both zero zero phase phase crossings crossings Absolute Absolute calibration calibration of of bunch bunch length length in in units units of of screen screen dimensions dimensions versus versus deg. deg. S-bandS S-band Resolution Resolution determined determined by by ratio ratio of of RF RF vertical vertical kick kick to to vertical vertical beam bbeam size size Achieved Achieved um um resolution resolution in in SPPS SPPS at at GeV GeV with with 5 5 um um emittance emittance 1 Hz Hz pulse stealing mode of of operation (new) (new) pulsed pulsed magnet magnet deflects deflects beam beam onto onto off-axis off-axis screen screen Future option is is an an x-band x Tcav.. in in the the LTU LTU Patrick Krejcik,
18 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Bunch Length Measurements with with the the RF RFTransverse Deflecting Cavity 2.4 m 30 MW σ y Bunch length reconstruction Measure streak at 3 different phases (Streak size) 2 X A = E-02 STD DEV = E-03 B = STD DEV = C = STD DEV = RMS FIT ERROR = * * Cavity on Cavity off * E σ z = 90 µm SBST LI29 1 PDES (S-29-1) Cavity on * * E * Asymmetric parabola indicates incoming tilt to beam Patrick Krejcik, 1-APR-03 20:21:16
19 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Calibration scan for RF transverse deflecting cavity Beam centroid [pixels] Bunch lenght calibrated in units of the wavelength of the S-band RF Further requirements for : High resolution OTR screen Wide angle, linear view optics Cavity phase [deg. S-Band] Patrick Krejcik,
20 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Slice parameters from transverse RF deflecting cavity OTR screen down stream of of the Tcav.. can be be used in in conjunction with a quadrupole scan to to measure horizontal slice emittance σ x (β) Distance along the bunch OTR screen down stream of of the Tcav.. At At a horizontal dispersion location, large η x, x, small β x, x, can measure slice energy spread Ε Distance along the bunch Patrick Krejcik,
21 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Bunch length and timing diagnostics Absolute bunch length determination Single shot shot electro optic pump probe measurement Transforms Transforms the the problem problem of of measuring measuring short short electron electron bunch bunch length length to to measuring measuring a short short pulse pulse of of laser laser light. light. Electro-optic Electro-optic optic process process is is inherently inherently fast, fast, < 2 fs fs Time Time resolution resolution is is dependant dependant on on crystal crystal geometry geometry and and laser laser BW BW Investigating Investigating two two geometries geometries at at SPPS SPPS Femtosecond Femtosecond laser laser systems systems are are complex complex Innovation Innovation at at SPPS SPPS is is transport transport a compressed compressed beam beam to to the the e-e e-beamline with with a long long fiber fiber Patrick Krejcik,
22 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Electro Optic Bunch Length Measurement Defining aperture M1 EO xtal M2 Beam axis Geometry chosen to measure direct electric field from bunch, not wakefield Modelled by H. Schlarb Probe laser electrons Patrick Krejcik,
23 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Resolution limit in in temporal-to-spectral translation BW limited pulse Short chirp T res = TT 0 C Long chirp Spectral profiles Temporal profile However, recent work shows this limit can be overcome with noncollinear cross correlation of the light before and after the EO crystal S.P. Jamison, Optics Letters, 28, 1710, 2003 Patrick Krejcik,
24 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Temporal to to spatial geometry under test at at SPPS E r electrons P EO Xtal E r Elevation view End view Principal of temporal-spatial correlation Line image camera E r Plan view Patrick Krejcik,
25 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory SPPS Electro Optic bunch length measurements Adrian Adrian Cavalieri Cavalieri et et al al 6 ps Patrick Krejcik,
26 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory SPPS --EO signal vs vstime and single bunch thick crystal with long bunch > 1 ps Patrick Krejcik,
27 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory SPPS --time sequence of of multiple EO images Patrick Krejcik,
28 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls Modes of of beam operation No No beam, beam, injector injector in in controlled controlled access access laser laser to to cathode cathode permissive, permissive, but but no no high-power high-power RF RF permissive permissive Injector Injector operation operation with with beam beam to to the the sector sector dump dump in in the the linac linachousing 1 1 nc nc at at Hz Hz maximum maximum Beam Beam to to the the BSY, BSY, stopped stopped in in the the BSY BSY 1 1 nc nc at at Hz Hz maximum maximum Beam Beam to to the the LTU LTU (linac (linac to to undulator) undulator) single single bunch bunch beam beam dump dump 1 1 nc nc at at Hz Hz maximum maximum Beam Beam to to the the undulator undulator entrance entrance tune-up tune-up up dump dump 1 1 nc nc at at Hz Hz maximum maximum Beam Beam to to the the final final beam beam dump dump 1 1 nc nc at at Hz Hz maximum maximum Lase r 1 Injector dump linac BSY BSY dump Muon shield DL2 SBBD Tuneup dump undulato r dump Patrick Krejcik,
29 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls Timing requirements Choice of of frequencies The The linac linac RF RF operates operates at at MHz MHz The The laser laser for for the the RF RF photoinjector photoinjector will will be be synchronized synchronized to to the the 24th 224th subharmonic subharmonic at at MHz MHz The The timing system counts cycles of of MHz MHz and and can can be be adjusted in iin inter inter periods of of this this frequency, giving a timing step step size size of of ns. ns. Time slots slots chosen to to avoid PEP PEP II II phase shifts on on the the MDL Preferable Preferable solution solution is is if if PEP PEP II II phase phase shifts shifts are are removed removed from from MDLM MDL Trigger resolution of of ns ns and and stability of of ps psadequate Although Although doesn t doesn t provide provide absolute absolute RF RF bucket bucket determination determination Pulse identification, buffering and and feedback RF RF phase locking and and stability Patrick Krejcik,
30 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls - system architecture requirements SLC SCP displays How to to preserve single pulse reading and id id in in a shared SLC/Epics system VMS operating system SLC Control Program System support software Facilities software application software Workstations OS: SunOS, Solaris HPUX DEC-UNIX SGIX Windows NT Linux ethernet EPICS Network protocols database I/O Controllers OS: vxworks Star network Communication line Field I/O Field I/O Field I/O Field I/O MPG µ-processor µ-processor camac crate timing Low level RF distribution Preserve the phase-locked timing fiducials carried by the SLAC low-level RF And the multi-tasking beam pattern broadcast Patrick Krejcik,
31 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Control system hybrid Requires multi-protocol support on on the the LAN LAN RPC ENS Equipment Name Server timing API Application Program Interface Device Class Libraries RPC EPICS Display Device Class Libraries VME Crate CPU + Hard Drive EPICS IOC CAMAC Crate RPC CA RPC RPC CA RPC CA API Library SDDS Display SDDS toolkit Library API Library fiducial PLC Programmable Logic Controller e.g. MPS RPC RPC CA LabView Display VI Library API Library Matlab Display RPC CA API Library? SCP SLC Control Program RF distribution LAN Ethernet backbone Patrick Krejcik,
32 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls - Low level RF Sector Drive Line Present parallel input-output processor (PIOP) control of of phase and and amplitude does not not meet specs Feasibility study to to packaging of of new new module in in either camac or or VME/epics Long Long lead lead item, item, but but no no resources allocated so so far far Some klystrons will will run run unsaturated with with individual phase and and amplitude control using solid solid state subboosters New Solid-State Sub-Booster and Electronic Phase Shifter IPA - Isolator Phase Attenuator Klystron SLED Cavity Output Coupler SSSB PIOP driver CAMAC Sector Phase Reference Line PAD Phase Amplitude Detector Patrick Krejcik,
33 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls - Low level RF Low-noise, low-drift RF RF source in in sect sect Change from from CDR, CDR, now now lock lock at at MHz MHz Sector 0 Sector 20 Master Oscillator x MHz Xtal 8.5 MHz 476 MHz 60 W Fiducial Generator 1/360 s Main Drive Line 360 Hz Trigger Generator Laser Trig Laser Mode Lock 119 MHz Gun Klystron 2856 MHz x6 476 MHz Master Oscillator Σ To L0, L1 klystrons Fiber Optic Driver To Experiments 1/120 s PEP Timing Generator 119 MHz Fiber Optic coupler To Exp. laser X4 119 MHz Xtal Gated Lock New 119 Experiments MHz Trigger Gen. Laser Trig 2856 MHz Patrick Krejcik,
34 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls - Low level RF Low-noise, low-drift RF RF oscillator issues Oscillator and and distribution housed housed in in thermally stabilized enclosure In In spite spite of of this this there there will will be be some some drift drift requiring requiring beam-based beam-based based feedback feedback Advances in in technology have have allowed us us to to choose choose MHz MHz over over previous MHz MHz Greatly Greatly simplifies simplifies timing timing system system as as we we are are now now in in synchronization synchronization n with with existing existing timing timing fiducials fiducials Big Big advantage advantage for for experimenters experimenters who who can can mode mode lock lock their their lasers lasers to to photoinjector photoinjector laser laser with with MHz MHz optical optical pulses pulses and and always always be be in in the the same same RF RF bucketb bucket Lesson Lesson learned learned from from SPPS SPPS that that exp exp laser laser is is susceptible susceptible to to bucket bucket jumps jumps will will operate on on a different time time slot slot from from PEP PEP II II Avoid Avoid phase phase jumps jumps on on MDL MDL during during PEP PEP injection injection Feasibility Feasibility study study to to reconfigure reconfigure phase phase shifters shifters and and avoid avoid MDL MDL phase phase jumps jumps Patrick Krejcik,
35 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls Feedback requirements. Pulse-to-pulse control of of Orbit Orbit position & angle, angle, energy energy as as in in SLC SLC beam beam phase, phase, Necessary, Necessary, for for example, example, to to measure measure orbit orbit after after RF RF deflecting deflecting cavity cavity to to maintain maintain cavity cavity at at zero zero phase phase crossing crossing bunch bunch length length Use Use relative relative signal signal strength strength from from OTR OTR THz THz spectral spectral power power measurement measurement ment Demonstrated Demonstrated at at SPPS SPPS with with dither dither feedback feedback to to minimize minimize bunch bunch length length Needs Needs power power measurement measurement at at several several THz THz wavelengths wavelengths to to tune tune to to arbitrary arbitrary bunch bunch lengths lengths Decouple Decouple longitudinal longitudinal feedback feedback requirements requirements Energy Energy feedback feedback maintains maintains constant constant energy energy at at the the BC BC chicane chicane Bunch Bunch length length feedback feedback controls controls the the linac linac phase phase (energy (energy chirp) chirp) Patrick Krejcik,
36 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls Energy feedback Klystron off on φ +φ Klystron 1 Klystron 2 Energy Energy feedback feedback at at SPPS SPPS chicane chicane responding responding to to a step step energy energy change change Energy Energy measured at at a dispersive BPM, BPM, Actuator is is a klystron phase phase shifter shifter Energy Energy jitter jittermeasured from from chicane chicane feedback feedback system system MeV MeVrms 0.06% 0.06% Patrick Krejcik,
37 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Dither feedback control of of bunch length minimization -- L. L. Hendrickson Hendrickson Bunch length monitor response Feedback correction signal optimum ping Dither time steps of 10 seconds Linac phase Jitter Jitter in in bunch bunch length length signal signal over over seconds seconds ~10% ~10% rms rms Patrick Krejcik,
38 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls MPS Stoppers and and beam dumpers (tune-up up dumps) Injector Injector energy energy spectrometer spectrometer (full (full rate) rate) BSY, BSY, D2 D2 (full (full rate) rate) Exit Exit of of muon muon shield, shield, formerly formerly known known as as ST61 ST61 (10 (10 Hz) Hz) Single Single bunch bunch beam beam dumper dumper (SBBD) (SBBD) after after LTU LTU dogleg dogleg (full (full rate) rate) SLC SLC design design End End of of LTU LTU (10 (10 Hz) Hz) Bunch compressor MPS PLIC, PLIC, PICs, PICs,, Av. Av. Current Current monitor monitor comparator comparator interlocked interlocked to to gun gun rate rate control control LTU LTU Collimator MPS PLIC, PLIC, PICs PICsinterlocked to to SBBD SBBD Allows Allows full full rate rate in in the the linac linac and and arbitrary arbitrary rate rate to to the the undulator undulator Patrick Krejcik,
39 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls PPS zones 1. injector Laser Key entrance gate PPS Key entrance gate Shield wall D2 stopper PPS Key entrance gate PPS Key entrance gate Injector stopper 2. LINAC gate 3. BSY + Sect. 30 muon shield 4. LTU gate 5. undulator gate 6. FEE BAS II stopper Sector entrances PPS Key entrance gate Equipment & emergency gate Dump 7. Near Hall x-ray transport 8. Far Hall Patrick Krejcik,
40 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls - PPS Patrick Krejcik,
41 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Controls - PPS Changes to to linac PPS Following preliminary discussions with with Saleski, Rokni Upgrade linac linac entries for for controlled access Keybanks, Keybanks,, video video Possibly combine 5 sectors instead of of 2 into into one one PPS PPS zone Fewer Fewer systems systems to to certify certify Each Each zone zone contains contains an an equipment equipment hatch hatch Interlock sect sect modulators individually sect. sect VVS VVS not not turned turned off off for for injector injector vault vault entries entries while while PEP PEP II II running running Sect.19 BAS BAS II II beam stopper to to become a backward beam stopper Allows Allows access access to to the the linac linac upstream upstream of of sect. sect while while running running ng System upgrades Migrate to to PLC PLC instead of of relay logic logic Try Try and and do do this this in in the the BSY BSY before starts Patrick Krejcik,
42 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Control Room will will double double present present occupancy and and number of of consoles Feasibility study study to to expand expand space space by by removing old old racks racks and and replacing with with modular consoles N Room 114 Room 100 Room Room Patrick Krejcik,
43 Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Conclusion Upgrades to to conventional diagnostic instrumentation have been listed Linac relies heavily on on several new and complex bunch length and timing diagnostics Development work on on these has has started at at SPPS Control system faces challenge of of compatibility with existing systems and integrating new, multi-protocol systems Have defined the the constraints this this system faces, plus plus the the requirements for for, particularly the the timing stability Some conceptual designs discussed for for SLC/EPICS hybrid (Bob Dalaseio) ) but but now now needs engineering design Patrick Krejcik,
LCLS RF Reference and Control R. Akre Last Update Sector 0 RF and Timing Systems
LCLS RF Reference and Control R. Akre Last Update 5-19-04 Sector 0 RF and Timing Systems The reference system for the RF and timing starts at the 476MHz Master Oscillator, figure 1. Figure 1. Front end
More informationP. Emma, et al. LCLS Operations Lectures
P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1
More informationTWO BUNCHES WITH NS-SEPARATION WITH LCLS*
TWO BUNCHES WITH NS-SEPARATION WITH LCLS* F.-J. Decker, S. Gilevich, Z. Huang, H. Loos, A. Marinelli, C.A. Stan, J.L. Turner, Z. van Hoover, S. Vetter, SLAC, Menlo Park, CA 94025, USA Abstract The Linac
More informationLCLS Injector Technical Review
LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4 2003 Review Committee Members: Prof. Patrick O Shea Chair University of Maryland Dr. E. Colby Stanford Linear Accelerator
More informationBeam Instrumentation for X-ray FELs
Beam Instrumentation for X-ray FELs 05/16/2011 1 1 Outline X-ray FEL overview Diagnostics requirements for X-ray FELs Transverse Diagnostics Longitudinal Diagnostics Summary 2 2 X-ray FEL Overview 100
More informationSimulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH.
Simulations on Beam Monitor Systems for Longitudinal Feedback Schemes at FLASH. Christopher Behrens for the FLASH team Deutsches Elektronen-Synchrotron (DESY) FLS-2010 Workshop at SLAC, 4. March 2010 C.
More informationDigital BPMs and Orbit Feedback Systems
Digital BPMs and Orbit Feedback Systems, M. Böge, M. Dehler, B. Keil, P. Pollet, V. Schlott Outline stability requirements at SLS storage ring digital beam position monitors (DBPM) SLS global fast orbit
More informationSummary of the 1 st Beam Line Review Meeting Injector ( )
Summary of the 1 st Beam Line Review Meeting Injector (23.10.2006) 15.11.2006 Review the status of: beam dynamics understanding and simulations completeness of beam line description conceptual design of
More informationThe basic parameters of the pre-injector are listed in the Table below. 100 MeV
3.3 The Pre-injector The high design brightness of the SLS requires very high phase space density of the stored electrons, leading to a comparatively short lifetime of the beam in the storage ring. This,
More informationLinac-Beam Characterizations at 600 MeV Using Optical Transition Radiation Diagnostics *
Linac-Beam Characterizations at 6 MeV Using Optical Transition Radiation Diagnostics * A. H. Lumpkin, W. J. Berg, B. X. Yang, and M. White Advanced Photon Source, Argonne National Laboratory 97 South Cass
More informationNew Filling Pattern for SLS-FEMTO
SLS-TME-TA-2009-0317 July 14, 2009 New Filling Pattern for SLS-FEMTO Natalia Prado de Abreu, Paul Beaud, Gerhard Ingold and Andreas Streun Paul Scherrer Institut, CH-5232 Villigen PSI, Switzerland A new
More informationFuture Performance of the LCLS
Future Performance of the LCLS J. Welch for many* SLAC National Accelerator Laboratory FLS 2010, ICFA Beam Dynamics Workshop on Future Light Sources, March 1-5, 2010. SLAC National Accelerator Laboratory,
More informationSABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006
SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006 FFTB will soon be gone! The Problem: On April 10, 2006, the Final Focus Test Beam (FFTB)
More informationA Facility for Accelerator Physics and Test Beam Experiments
A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four
More informationBUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY
Proceedings of IBIC, Tsukuba, Japan MOPB8 BUNCH-COMPRESSOR TRANSVERSE PROFILE MONITORS OF THE SwissFEL INJECTOR TEST FACILITY Gian Luca Orlandi, Masamitsu Aiba, Simona Bettoni, Bolko Beutner, Helge Brands,
More informationBeam Instrumentation for CTF3 and CLIC
Beam Instrumentation for CTF3 and CLIC Beam loss - Beam halo monitoring developments CLIC diagnostic Common developments with other projects Specific requirements for CLIC Beam Loss and Beam Halo measurement
More informationLinac 4 Instrumentation K.Hanke CERN
Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase
More informationDetailed Design Report
Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...
More information30 GHz Power Production / Beam Line
30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression
More informationSPEAR 3: Operations Update and Impact of Top-Off Injection
SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3
More informationPEP II Design Outline
PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,
More informationAn Overview of Beam Diagnostic and Control Systems for AREAL Linac
An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic
More informationCLIC Feasibility Demonstration at CTF3
CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, for the CLIC/CTF3 Collaboration http://cern.ch/clic-study LINAC 10 MO303 13 Sep 2010 The Key to CLIC Efficiency NC Linac for
More informationJLab 10kW FEL Driver Beam Diagnostics
JLab 10kW Driver Beam Diagnostics Kevin Jordan, S. V. Benson, J. Coleman, D. Douglas, R. Evans, A. Grippo, D. Gruber, G. Krafft, W. Moore, N. Nishimori, P. Piot, D. Sexton, J. Song and S. Zhang Outline.
More informationRecent APS Storage Ring Instrumentation Developments. Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010
Recent APS Storage Ring Instrumentation Developments Glenn Decker Advanced Photon Source Beam Diagnostics March 1, 2010 Ring Diagnostics Overview RF beam position monitor technology Photon beam position
More informationThe FLASH objective: SASE between 60 and 13 nm
Injector beam control studies winter 2006/07 talk from E. Vogel on work performed by W. Cichalewski, C. Gerth, W. Jalmuzna,W. Koprek, F. Löhl, D. Noelle, P. Pucyk, H. Schlarb, T. Traber, E. Vogel, FLASH
More informationCharacterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera
Characterizing Transverse Beam Dynamics at the APS Storage Ring Using a Dual-Sweep Streak Camera Bingxin Yang, Alex H. Lumpkin, Katherine Harkay, Louis Emery, Michael Borland, and Frank Lenkszus Advanced
More informationRequirements for the Beam Abort Magnet and Dump
Requirements for the Beam Abort Magnet and Dump A beam abort kicker (pulsed dipole magnet) and dump are required upbeam of the LCLS undulator in order to protect the undulator from mis-steered and poor
More informationNorth Damping Ring RF
North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution
More informationPhotoinjector Laser Operation and Cathode Performance
Photoinjector Laser Operation and Cathode Performance Daniele Sertore, INFN Milano LASA Siegfried Schreiber, DESY Laser operational experience Laser beam properties Cathode performances Outlook TTF and
More informationPhoto cathode RF gun -
Photo cathode RF gun - *),,, ( 05 Nov. 2004 Spring8 UTNL Linac & Mg Photocathode RF Gun Mg photocathode NERL, 18 MeV Linac and the RF gun Electron Beam Mg photocathode Mg photocathode RF gun of SPring8
More informationStart to End Simulations
Start to End Simulations Motivation, Methods, and Examples Michael Borland Operations Analysis Group APS Operations Division March 20, 2005 A Laboratory Operated by The University of Chicago Motivation
More informationScavenger Extraction. Karen Goldsmith Shawn Alverson
Scavenger Extraction Karen Goldsmith Shawn Alverson Topics Beam line and area maps High Power Target (HPT) How to establish first beam to HPT Setting energy (configs, multiknobs, Fast Phase Shifters, etc.)
More informationThe Elettra Storage Ring and Top-Up Operation
The Elettra Storage Ring and Top-Up Operation Emanuel Karantzoulis Past and Present Configurations 1994-2007 From 2008 5000 hours /year to the users 2010: Operations transition year Decay mode, 2 GeV (340mA)
More informationLHC Beam Instrumentation Further Discussion
LHC Beam Instrumentation Further Discussion LHC Machine Advisory Committee 9 th December 2005 Rhodri Jones (CERN AB/BDI) Possible Discussion Topics Open Questions Tune measurement base band tune & 50Hz
More informationAN OPTICAL AND TERAHERTZ INSTRUMENTATION SYSTEM AT THE FAST LINAC AT FERMILAB*
FERMILAB-CONF-17-369-AD AN OPTICAL AND TERAHERTZ INSTRUMENTATION SYSTEM AT THE FAST LINAC AT FERMILAB* R. Thurman-Keup, A. H. Lumpkin, J. Thangaraj, FNAL, Batavia, IL, 60510, USA Abstract FAST is a facility
More information4.4 Injector Linear Accelerator
4.4 Injector Linear Accelerator 100 MeV S-band linear accelerator based on the components already built for the S-Band Linear Collider Test Facility at DESY [1, 2] will be used as an injector for the CANDLE
More informationTESLA FEL-Report
Determination of the Longitudinal Phase Space Distribution produced with the TTF Photo Injector M. Geitz a,s.schreiber a,g.von Walter b, D. Sertore a;1, M. Bernard c, B. Leblond c a Deutsches Elektronen-Synchrotron,
More informationStatus of Elettra, top-up and other upgrades
Status of Elettra, top-up and other upgrades Emanuel Karantzoulis ELETTRA / Trieste, Italy / 2010 November 25-26 Past and Present Configurations 1994-2007 From 2008 No full energy injection Full energy
More informationStatus of the X-ray FEL control system at SPring-8
Status of the X-ray FEL control system at SPring-8 T.Fukui 1, T.Hirono 2, N.Hosoda 1, M.Ishii 2, M.Kitamura 1 H.Maesaka 1,T.Masuda 2, T.Matsushita 2, T.Ohata 2, Y.Otake 1, K.Shirasawa 1,M.Takeuchi 2, R.Tanaka
More informationWeek 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17
Week 0: PPS Certification and Processing Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Work in tunnel Work in tunnel PPS Certification PPS Certification PPS Certification
More informationSummary report on synchronization, diagnostics and instrumentation
Summary report on synchronization, diagnostics and instrumentation A.P. Freyberger and G.A. Krafft Jefferson Lab, 12000 Jefferson Avenue, Newport News, VA. 23606 Abstract The proceedings of Working Group
More informationSoft x-ray optical diagnostics, concepts and issues for NGLS
Soft x-ray optical diagnostics, concepts and issues for NGLS Tony Warwick (for the NGLS project team) EuroXFEL user meeting 2013 Satellite workshop on photon beam diagnostics 24 January 2013 NGLS approach
More informationTop-Up Experience at SPEAR3
Top-Up Experience at SPEAR3 Contents SPEAR 3 and the injector Top-up requirements Hardware systems and modifications Safety systems & injected beam tracking Interlocks & Diagnostics SPEAR3 Accelerator
More informationCurrent status of XFEL/SPring-8 project and SCSS test accelerator
Current status of XFEL/SPring-8 project and SCSS test accelerator Takahiro Inagaki for XFEL project in SPring-8 inagaki@spring8.or.jp Outline (1) Introduction (2) Key technology for compactness (3) Key
More informationHall-B Beamline Commissioning Plan for CLAS12
Hall-B Beamline Commissioning Plan for CLAS12 Version 1.5 S. Stepanyan December 19, 2017 1 Introduction The beamline for CLAS12 utilizes the existing Hall-B beamline setup with a few modifications and
More informationBunch-by-bunch feedback and LLRF at ELSA
Bunch-by-bunch feedback and LLRF at ELSA Dmitry Teytelman Dimtel, Inc., San Jose, CA, USA February 9, 2010 Outline 1 Feedback Feedback basics Coupled-bunch instabilities and feedback Beam and feedback
More informationPROJECT DESCRIPTION. Longitudinal phase space monitors for the ILC injectors and bunch compressors
PROJECT DESCRIPTION Longitudinal phase space monitors for the ILC injectors and bunch compressors Personnel and Institution(s) requesting funding Philippe Piot Northern Illinois University Dept of Physics,
More informationCompact, e-beam based mm-and THzwave light sources
Compact, e-beam based mm-and THzwave light sources S.G. Biedron, S.V. Milton (CSU) and G.P. Gallerano (ENEA) Frontiers of THz Science Workshop Sept. 5-6, 2012 SLAC 1 Collaborators involved with the enclosed
More informationReport on the LCLS Injector Technical Review
Report on the LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4, 2003 Committee Members Prof. Patrick G. O Shea, Chair, University of Maryland Dr. Eric Colby, Stanford Linear
More informationNon-Invasive Energy Spread Monitoring for the JLAB Experimental Program via Synchrotron Light Interferometers
Non-Invasive for the JLAB Experimental Program via Synchrotron Light Interferometers P. Chevtsov, T. Day, A.P. Freyberger, R. Hicks Jefferson Lab J.-C. Denard Synchrotron SOLEIL 20th March 2005 1. Energy
More informationScreen investigations for low energetic electron beams at PITZ
1 Screen investigations for low energetic electron beams at PITZ S. Rimjaem, J. Bähr, H.J. Grabosch, M. Groß Contents Review of PITZ setup Screens and beam profile monitors at PITZ Test results Summary
More informationEUROFEL-Report-2007-DS EUROPEAN FEL Design Study
EUROFEL-Report-2007-DS4-095 EUROPEAN FEL Design Study Deliverable N : D 4.3 Deliverable Title: Task: Authors: Generation of 3rd harmonic photons at 90 nm DS-4 see next page Contract N : 011935 Project
More informationRadiation Safety System for Stanford Synchrotron Radiation Laboratory*
SLAC PUB-8817 April 16, 2001 Radiation Safety System for Stanford Synchrotron Radiation Laboratory* James C. Liu, N. E. Ipe and R. Yotam Stanford Linear Accelerator Center, P. O. Box 4349, Stanford, CA
More informationBeam Losses During LCLS Injector Phase-1 1 Operation
Beam Losses During LCLS Injector Phase-1 1 Operation & Paul Emma September 28, 2006 Radiation Safety Committee Review Scope of Phase 1 Operation Request for Three Operating Modes Operating Plan for Phase
More informationExperience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation
Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF
More informationIntra-train Longitudinal Feedback for Beam Stabilization at FLASH
Intra-train Longitudinal Feedback for Beam Stabilization at FLASH Ch. Behrens 1), M.-K. Bock 1), M. Felber 1), P. Gessler 1), K. Hacker 1), W. Koprek 1), H. Schlarb 1), S. Wesch 1), C.Schmidt 1), S. Schulz
More informationPEP II STATUS AND PLANS *
PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex
More informationSTATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR
Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.
More informationCBF500 High resolution Streak camera
High resolution Streak camera Features 400 900 nm spectral sensitivity 5 ps impulse response 10 ps trigger jitter Trigger external or command 5 to 50 ns analysis duration 1024 x 1024, 12-bit readout camera
More informationBeam Diagnostics for the BNL Energy Recovery Linac Test Facility
Beam Diagnostics for the BNL Energy Recovery Linac Test Facility Peter Cameron, Ilan Ben-Zvi, Michael Blaskiewicz, Michael Brennan, Roger Connolly, William Dawson, Chris Degen, Al DellaPenna, David Gassner,
More informationPresent Status and Future Upgrade of KEKB Injector Linac
Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future
More informationProduction of quasi-monochromatic MeV photon in a synchrotron radiation facility
Production of quasi-monochromatic MeV photon in a synchrotron radiation facility Presentation at University of Saskatchewan April 22-23, 2010 Yoshitaka Kawashima Brookhaven National Laboratory NSLS-II,
More informationCLIC Feasibility Demonstration at CTF3
CLIC Feasibility Demonstration at CTF3 Roger Ruber Uppsala University, Sweden, KVI Groningen 20 Sep 2011 The Key to CLIC Efficiency NC Linac for 1.5 TeV/beam accelerating gradient: 100 MV/m RF frequency:
More informationElectron Bypass Line (EBL) Design Electrons to A-line bypassing LCLS T. Fieguth, R. Arnold
September 2007 SLAC-TN-08-001 Electron Bypass Line (EBL) Design Electrons to A-line bypassing LCLS T. Fieguth, R. Arnold Introduction Forty one years ago, September 20, 1966, the first beam entered End
More informationRF considerations for SwissFEL
RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary
More informationChallenges in Accelerator Beam Instrumentation
Proceedings of the DPF-2009 Conference, Detroit, MI, July 27-31, 2009 1 Challenges in Accelerator Beam Instrumentation M. Wendt Fermi National Accelerator Laboratory, Batavia, IL 60510, USA The challenges
More informationDesign Studies For The LCLS 120 Hz RF Gun Injector
BNL-67922 Informal Report LCLS-TN-01-3 Design Studies For The LCLS 120 Hz RF Gun Injector X.J. Wang, M. Babzien, I. Ben-Zvi, X.Y. Chang, S. Pjerov, and M. Woodle National Synchrotron Light Source Brookhaven
More informationSSRF Beam Diagnostics Commissioning. LENG Yongbin on behalf of SSRF BI group
SSRF Beam Diagnostics Commissioning LENG Yongbin on behalf of SSRF BI group 2009.05.25 Outline Instruction of SSRF Overview of SSRF BI system Subsystem Beam position monitor Tune monitor Current & charge
More informationLLRF at SSRF. Yubin Zhao
LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip
More informationJefferson Lab Experience with Beam Halo, Beam Loss, etc.
Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,
More informationKARA and FLUTE RF Overview/status
KARA and FLUTE RF Overview/status Nigel Smale on behalf of IBPT and LAS teams Laboratory for Applications of Synchrotron radiation (LAS) Institute for Beam Physics and Technology (IBPT) KARA KIT The Research
More informationOperational Experience with Jefferson Lab ERL/FEL Machine Protection System (MPS) Kevin Jordan & the FEL Team October 18, 2011
Operational Experience with Jefferson Lab ERL/FEL Machine Protection System (MPS) Kevin Jordan & the FEL Team October 18, 2011 Outline Machine layout Sources of losses How to detect losses - BLMs How to
More informationTrigger-timing signal distribution system for the KEK electron/positron injector linac
Trigger-timing signal distribution system for the KEK electron/positron injector linac T. Suwada, 1 K. Furukawa, N. Kamikubota, and M. Satoh, Accelerator Laboratory, High Energy Accelerator Research Organization
More informationDevelopment of beam-collision feedback systems for future lepton colliders. John Adams Institute for Accelerator Science, Oxford University
Development of beam-collision feedback systems for future lepton colliders P.N. Burrows 1 John Adams Institute for Accelerator Science, Oxford University Denys Wilkinson Building, Keble Rd, Oxford, OX1
More informationANKA Status Report. N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach.
ANKA Status Report N.Smale, on behalf of all ANKA colleagues, Directors : A.-S. Müller, C Heske, T Baumbach. Institute for Synchrotron Radiation KIT - University of the State of Baden-Wuerttemberg and
More information2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)
2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution
More informationAn Operational Diagnostic Complement for Positrons at CEBAF/JLab
An Operational Diagnostic Complement for Positrons at CEBAF/JLab Michael Tiefenback JLab, CASA International Workshop on Physics with Positrons at Jefferson Lab 12-15 September 2017 Operating CEBAF with
More informationSuppression of Timing drift between laser and electron beam driven photo-cathode RF gun
Suppression of Timing drift between laser and electron beam driven photo-cathode RF gun A. Sakumi, M. Uesaka, Y. Muroya, T. Ueda Nuclear Professional School, University of Tokyo J. Urakawa, KEK, Japan
More informationRADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER
SLAC-PUB-7786 (August 1998) RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER J. C. Liu, X. S. Mao, W. R. Nelson, J. Seeman, D. Schultz, G. Nelson, P. Bong, B. Gray Stanford
More informationAccelerator Systems of the TPS
Ambient Ground Motion and Civil Engineering for Low Emittance Electron Storage Ring July 2-22, 2005, Hsinchu, Taiwan Accelerator Systems of the TPS Preinjector, Booster Synchrotron, Transfer Line, and
More informationStatus of CTF3. G.Geschonke CERN, AB
Status of CTF3 G.Geschonke CERN, AB CTF3 layout CTF3 - Test of Drive Beam Generation, Acceleration & RF Multiplication by a factor 10 Drive Beam Injector ~ 50 m 3.5 A - 2100 b of 2.33 nc 150 MeV - 1.4
More informationMahdad Manavi LOTS Technology, Inc.
Presented by Mahdad Manavi LOTS Technology, Inc. 1 Authors: Mahdad Manavi, Aaron Wegner, Qi-Ze Shu, Yeou-Yen Cheng Special Thanks to: Dan Soo, William Oakley 2 25 MB/sec. user data transfer rate for both
More informationPEP-II longitudinal feedback and the low groupdelay. Dmitry Teytelman
PEP-II longitudinal feedback and the low groupdelay woofer Dmitry Teytelman 1 Outline I. PEP-II longitudinal feedback and the woofer channel II. Low group-delay woofer topology III. Why do we need a separate
More informationDiamond RF Status (RF Activities at Daresbury) Mike Dykes
Diamond RF Status (RF Activities at Daresbury) Mike Dykes ASTeC What is it? What does it do? Diamond Status Linac Booster RF Storage Ring RF Summary Content ASTeC ASTeC was formed in 2001 as a centre of
More information3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline
3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The
More informationTITLE PAGE. Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton. Author Affiliation: Jefferson Lab. Requested Proceedings:
TITLE PAGE Title of paper: PUSH-PULL FEL, A NEW ERL CONCEPT Author: Andrew Hutton Author Affiliation: Jefferson Lab Requested Proceedings: Unique Session ID: Classification Codes: Keywords: Energy Recovery,
More informationConnection for filtered air
BeamWatch Non-contact, Focus Spot Size and Position monitor for high power YAG, Diode and Fiber lasers Instantly measure focus spot size Dynamically measure focal plane location during start-up From 1kW
More informationCommissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling
Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be
More informationPrecision measurements of beam current, position and phase for an e+e- linear collider
Precision measurements of beam current, position and phase for an e+e- linear collider R. Corsini on behalf of H. Braun, M. Gasior, S. Livesley, P. Odier, J. Sladen, L. Soby INTRODUCTION Commissioning
More informationThe PEFP 20-MeV Proton Linear Accelerator
Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.
More informationFeatures of the 745T-20C: Applications of the 745T-20C: Model 745T-20C 20 Channel Digital Delay Generator
20 Channel Digital Delay Generator Features of the 745T-20C: 20 Independent delay channels - 100 ps resolution - 25 ps rms jitter - 10 second range Output pulse up to 6 V/50 Ω Independent trigger for every
More informationLCLS Machine Protection System Engineering Design Specifications
LCLS Engineering Specifications Document# 1.1-315 Project Management Revision 2 LCLS Machine Protection System Engineering Design Specifications Stephen Norum Author Signature Date Hamid Shoaee System
More informationAccelerator Instrumentation RD. Monday, July 14, 2003 Marc Ross
Monday, Marc Ross Linear Collider RD Most RD funds address the most serious cost driver energy The most serious impact of the late technology choice is the failure to adequately address luminosity RD issues
More informationFIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC
FIRST SIMULTANEOUS TOP-UP OPERATION OF THREE DIFFERENT RINGS IN KEK INJECTOR LINAC M. Satoh #, for the IUC * Accelerator Laboratory, High Energy Accelerator Research Organization (KEK) 1-1 Oho, Tsukuba,
More informationSLAC ILC Accelerator R&D Program
SLAC ILC Accelerator R&D Program SLUO Meeting September 26 th, 2005 Tor Raubenheimer SLAC 2005 ILC Program NLC group was redirected towards ILC Developed a program aimed at the topics identified in the
More informationGFT Channel Digital Delay Generator
Features 20 independent delay Channels 100 ps resolution 25 ps rms jitter 10 second range Output pulse up to 6 V/50 Ω Independent trigger for every channel Fours Triggers Three are repetitive from three
More informationSTATUS REPORT ON THE COMMISSIONING OF THE JAPANESE XFEL AT SPRING-8
STATUS REPORT ON THE COMMISSIONING OF THE JAPANESE XFEL AT SPRING-8 H. Tanaka #, RIKEN/SPring-8, 1-1-1, Kouto, Sayo-cho, Sayo-gun, Hyogo 679-5148, Japan. Abstract The X-ray free electron laser (XFEL) facility,
More informationCERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS
Marc Delrieux, CERN, BE/OP/PS CERN S PROTON SYNCHROTRON COMPLEX OPERATION TEAMS AND DIAGNOSTICS APPLICATIONS CERN s Proton Synchrotron (PS) complex How are we involved? Review of some diagnostics applications
More informationDrive Laser Operations
Drive-Laser Operations Drive Laser Thales laser Transport system Recent Laser Milestones Safety Technical Where do we stand today? Laser Acceptance Status Laser Commissioning UV on cathode Injector Commissioning
More information