1 6MSD Weekly Scheduling Meeting 1:30, MCC Conference Room July 27, ) Glance Back and 2-Week Look Ahead (W. Oren) mins 2) PMI Report (P. Collins)... 5 mins 3) Critical Path Service Provider Reports mins (a) Alignment (Curtis) (b) Magnet Refurbishment (Baggett) (c) Installation/Alignment (Wilson) (d) HPRF (Mounts) 4) Halls Status Report (E. Folts) mins 5) Special Topics: None... 0 mins 6) Safety Report (R. Owen)... 5 mins 7) Meeting Recap and Action Items (All)... 5 mins

2 6MSD: Glance back & look ahead Will Oren for Fulvia Pilat 6MSD Meeting July 27, 2011

3 Progress Wed July 20 - Wed July 27 Weeks: 11 down, 16 to go Highlights: Magnet rework, measurement and installation going well on the East and West arcs! South side reinstallation complete with alignment hookupcheckout ongoing. C100 tests continue, R100 aligned in final resting spot in zone SL23 RF into shorts for all stations in zone SL24 Progress on in rush currentbreaker issue being made. Installation and testing proceeding elsewhere. All hands safety meetings conducted Areas of attention: Continue vigilance on safety Let s tighten up our work practices and planning Continue vigilance on cryomodule schedule: acceptance tests, installation, test with beam Hall C beam dump work scope/planning etc.

4 CCB The following 6MSD CRs & NTFs have been submitted, reviewed, and approved: Installation of R100 and Admiral & Updated C100 installation plan Decision on Location and installation/commissioning activities (CR) C100 1, C100 2 install as planned in SL24, SL25; Admiral to be removed; R100 installation for SL23 (aligned only). The 6MSD Daily Calendar will be updated the 6MSD progress schedule will show the changes in the 29 July 2011 progress schedule ( Change Requests/Notes to File in the Pipeline: Hall C Current Cavities (CR) Hall C Current Cavities upgrade/enhancement work. CCB reviewed the page one and are working with support resource groups for schedule impacts. Change Requests/Notes to File Upcoming/Placeholders: Tunnel Penetrations Repair (CR) Captures additional detailed scope for the repair work on defined penetrations. Once repair work scope is defined by A&E (end of July 2011), this CR will be reviewed FML Stair Repair at the FEL Block removal for egress (CR/NTF) FML's current plan in the schedule is to repair the FEL stairs. Additional work to remove some of the blocks at the truck ramp roll up door to provide an egress during the repair work. Block removal and crane rental is done by MSINST group. System Testing/Hot Checkout/Restart Operations Plan (CR/NTF) M. Spata is leading the preparation and planning for overall testing, hot checkout and restoration of operations for the 6 GeV run. The plan will be presented and discussed in the second half of August. Hall C Ion Chamber/Dump Work (CR) Hall C ion chamber and dump work being reviewed by engineering division and accelerator operations for scope. More details to come. Plan Still Pending

5 4 weeks look ahead C100 1 install in Zone SL24 ~ August 3rd Completion of magnet rework/reinstallation PSS Certs begin week of Aug 8 th CHL to 2k week of Aug 8 th with planned power outage on Aug 11th CM commissioning begins August 12 th S. Linac locked up day/swing shifts starting Aug 13 th, Installation substantially complete in the south side. ESR cooldown for Hdice and Hall A magnets by Sept 1. BSY Penetration construction begins Phase 3 tunnel extension completion RF installation & testing LCW upgrades Peppo installation Halls HDice to Hall B, G2P continues Facilities: TEDF, repair FEL stairs, maintenance

6 4 week look ahead warm topics Safety and job planning Vigilance Lockup for cryomodule testing Monitor progress Integrated plan for testing/hot check out/back to ops Hall C Dump Work Scope/Schedule Length and optimization of physics run (balance of experiments goals, length and scope of work of shutdown, X mas running, power rates, etc. etc. multi parameter optimization)

7 PM&IP 6MSD 7/27/11 Weekly Progress Meeting (7/22/11 Data) Report #11

8 PM&IP Schedule Issues: Hall D Phase 3 Tunnel Extension is ~5 Days behind schedule. Cryomodules C100-1 & 2 have been added to the production schedule. R100 schedule has been descoped. Resource issues: None

9 PM&IP Other Schedule Information at Four Week Look Ahead - Shows all activities that have started that are not complete and any activities due to start in the next four weeks Critical Path Shows all MUST activities that have 2 days or less float. Schedule Variance - Shows all MUST activities that are not 100% complete and that the Start/Finish dates have slipped by at least 5 days.

10 Shutdown Work Summary Organization: Alignment Name: Will Oren for Chris Curtis Date: 27th July, 2011 Last Week Work That Went Better Than / As Expected: Step 2A (initial alignment) of east arc dipoles started south side is completed. G2p FZ2 magnet stand aligned. R100 aligned in slot SL23. South linac waveguide survey continued in zones SL22 & 26. All south waveguide has been surveyed. Qweak Region 2 chamber as builts rad work dealt with Work That Went Slower Than Expected, Delays, and Issues: Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) 12 Gev Arcs X TBD Alignment of re installed dipoles in west and east arcs. Arc 10 Magnets X Opportunistic Quad and dipole Step 2A alignment. Will be concentrating on east arc Step 2B with 2 crews, & restart Step 2A W. Arc as available Continue 6MSD weekly mtg Align Jul 27 Page 1 of 2

11 Hall A G2P X TBD Harp fiducialization & motion Fill work as appropriate check, FZ2 Magnet Alignment 12 Gev Linacs X TBD Cryomodule Alignment C alignment in Slot SL24 Hall C Q Weak X TBD Region 1 Collimator As builts Scheduled for next week. Rad work with special prep contamination concerns 12 Gev Linacs X TBD Cryomodule end can inspections Continuing will need to coordinate equipment needs with Hall work. Hall D x TBD Tagger Wall Survey Scheduled for next week. Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) 12 GeV Arcs X TBD Dipole re alignment. Continuing on north part of west and east arcs for the next 2+ weeks. 12 GeV Linac X Before testing Warm region/dummy CM alignment New Work Requests Requiring Schedule Changes: None Permits Not Already in Hand (hot work, lifting, blind penetrations): None 6MSD weekly mtg Align Jul 27 Page 2 of 2 Ongoing Significant Problems Pending (delays, technical issues, resource issues, scheduling): None Staffing Outlook: Still good but Jim s talking about retirement. Treat him nicely! (Only kidding!) Complete before lockup for testing of CM.

12 Organization: Magnet Measurement Name: Ken Baggett Date: July 27, 2011 Last Week Shutdown Work Summary Work That Went Better Than Expected: Magnet Refurbishment Currently working on last stack of WA. Measurement Moved back to WA. Completing more detailed measurements. (Arcs 2, 4, 8 almost completed). Installation pacing with measurement Work That Went Slower Than Expected, Delays, and Issues: LCW pump trips continue to cause problems. Experiencing about 4 5/week. Voltage for the building is going to be adjusted Friday and may help. Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) 12GeV x ongoing Refurbish Stacks Complete WA. Begin EA (north) 12GeV x ongoing Measure Stacks Continue at current pace. Should be within striking distance of completing WA. 12GeV x ongoing Re install Stacks Keep pace with measurement team. MMF_July_27_2011 Page 1 of 5

13 Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) Injector x August Map 2 magnets/complete solenoid. In the queue. Will integrate into work flow opportunistically. New Work Requests Requiring Schedule Changes: None Permits Not Already in Hand (hot work, lifting, blind penetrations): None Significant Problems Pending (delays, technical issues, resource issues, scheduling): None Staffing Outlook: good MMF_July_27_2011 Page 2 of 5

14 MMF_July_27_2011 Page 3 of 5

15 MMF_July_27_2011 Page 4 of 5

16 _July_27_2011 MMF Page 5 of 5

17 Shutdown Work Summary Organization: MSINST Name: Neil Wilson Date: 7/27/11 Last Week Work That Went Better Than Expected/Completed: East Arc South Beam Line Installed, Pumped & Leak Checked G2P Region 1 Beam line installed & Leak Checked Fabrication of parts for SLM Ion Pump Replacement Turbo Pump Maint. West Arc South Tightness checks Completed Grouted FZ2 Stand East Arc South Hoses all Connected Cartridge & Stem Work for East Arc Work That Went Slower Than Expected, Delays, and Issues: Hydro Pump failure caused a re think and change, new pump ordered, using new flushing rig presently. Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) 12GeV X Dipole Hook Up LCW & Vac. West Arc North 12GeV X LCW Tightness Checks East Arc South G2P X FZ2 Installation Weekly Report Page 1 of 2

18 12GeV X Fabricating Headers for Klystron Working Racks & CPS s SL25 12GeV X Arc 10 Dipole & Girder On Going Installation 12GeV X SL Warm Region Girder & DP Station Installation SL20, 21, 22, 26 & 27. DP in Zone 26 12GeV X Weld in Additional LCW Tap in SL Working Mat l Hall D X Photon Beam Pipe Monitoring On Going 6GeV X Swapping Out Vacuum Valves On Going FEL X Vacuum Support On Going Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) 12GeV X Fabricating Headers for Klystron Awaiting Manifolds Racks & CPS s Hall D X LCW Piping Installation Most Mat l In 6GeV X Vacuum Valve Limit Switch Replacement 6GeV X Vac. Turbo Pmp. Maint New Work Requests Requiring Schedule Changes: SL MO LCW Tap Installation/Welding Permits Not Already in Hand (hot work, lifting, blind penetrations): None Significant Problems Pending (delays, technical issues, resource issues, scheduling): None Staffing Outlook: Weekly Report Page 2 of 2

19 Organization: HPRF Name: Clyde Mounts for Andrew Kimber Date: 27 July 2011 Last Week Shutdown Work Summary Work That Went Better Than/As Expected: Testing of 2L24 o Whole zone tested at HV and with RF! o Klystrons driven up to ~10 kw for #1, various levels for the rest (apart from #3, suspect circulator) o LLRF system driving RF Installation of 2L25 o All 8 klystrons in place, 80% of cabling, LLRF chassis is place, LCW parts being worked Installation of 2L23 o General cable installation continues, card cages in manufacture, LCW parts being worked Work That Went Slower Than Expected, Delays, and Issues: Testing of 2L24: CPS taking out the upstream 400A breaker (solved) 1 circulator needs to be swapped out (high reflected power reading) Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) 12GeV HPRF x ongoing Further testing of 2L24 Refine power measurements LLRF calibration 12GeV HPRF x 8/5/11 2L25 installation continues General cabling, LCW manifolds Shutdown Work Summary AJK 27JUL11 1_cm Page 1 of 3

20 12GeV HPRF x Late Aug 2L23 installation continues Installation ahead of schedule, will be waiting for klystrons Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) 12GeV HPRF x 8/19/11 2L25 Test into shorts complete Most problems being found on 2L24 and fixes incorporated before installation in 2L25. 12GeV HPRF x Mid August Installation of CPS#6 in 1L22 Bolt pedestals to floor in NLSB? New Work Requests Requiring Schedule Changes: N/A Permits Not Already in Hand (hot work, lifting, blind penetrations): n/a Significant Problems Pending (delays, technical issues, resource issues, scheduling): Updates from last week: o Solenoid PS still late, second first article due 27 th July (today). o 2 FA HOM filters due the end of July, vendor reports an additional 1 week delay putting this work beginning 8th August; remainder due 12 th September (just in time for 2 nd CM?) o Manufacture for custom waveguide underway, flanges being made, custom lengths with machine shop Staffing Outlook: good Shutdown Work Summary AJK 27JUL11 1_cm Page 2 of 3

21 Shutdown Work Summary AJK 27JUL11 1_cm Page 3 of 3

22 Shutdown Work Summary Organization: Hall A Name: E. Folts Date: 7/27/11 Last Week Work That Went Better Than Expected: FZ 2 stand installation Work That Went Slower Than Expected, Delays, and Issues: Target stand parts Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) G2P Water x continuing Water manifold work G2P Target x continuing Modifying Septum platform Parts are becoming an issue G2P Target x continuing Building refrigerator G2P x continuing Power supply installation Final hookup Hall maintenance x continuing General repair and maintenance Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) G2P x Septum platform installation Parts are becoming an issue Hall B: Concerns about HDice, and working on detectors and vacuum pump Hall C: SOS spectrometer, Moller Magnet repair, Detector alignment Shutdown Work Summary Page 1 of 1

23 Shutdown Work Summary Organization: Hall B Name: Doug Tilles Date: 7/27/2011 Last Week Region 3&2 Sector 4 Drift Chamber 100% Remove R3S4 Steel work 100% Start installation of R3S1 Steel work 100% Deck Replacement with ALUM Decking 100% Work That Went Slower Than Expected, Delays, and Issues: None Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) 6 GeV repairs Setup and pull Region 3 Sector 1 Drift chamber Cosmic test of Drift Chamber X X Wed Morning Start Region 3 Sector 1 Repairs After Repairs 6/22 Page 1 of 2

24 HDice Lab work Electron Run Blower 12GeV Drift chamber Region 1 shipment. x On Going Target On Going new Electron blower pump on order X ESB Building Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) Region 3 S2 removal and repair x New Work Requests Requiring Schedule Changes: HDice Hall Alignment in three weeks Permits Not Already in Hand (hot work, lifting, blind penetrations): None needed Hot work complete Significant Problems Pending (delays, technical issues, resource issues, scheduling): None Staffing Outlook: OK 6/22 Page 2 of 2

25 Shutdown Work Summary Organization: Hall C Name: W. Kellner Date: Ongoing Shutdown Work Table 1: Next Week's Work ( green = no concerns; yellow = some concerns; red = serious concerns) 6Gev SOS 95 % Plasma cutting holes into the hydraulic cylinder support structure to check inside welds Unscheduled Other 80% Move 50 S4 steel shielding blocks Unscheduled out of Hall C and replace with 10 S2 blocks 6Gev Q weak 40% Moller magnet repair Drawings for lifting fixtures approved, end plate has been cut and removed, magnet is accessible for electrical work Table 2: Other Upcoming Work ( green = no concerns; yellow = some concerns; red = serious concerns) 6Gev SOS On hold Prep work for removal of the SOS detector hut lead shielding panels 6Gev Q weak 10% Remove lead sheets from main detector Waiting for Decontamination approval/plan Shutdown Work Summary July Page 1 of 2

26 6Gev Q weak Ongoing Alignment work on region II detector and collimators New Work Requests Requiring Schedule Changes: None Shutdown Work Summary July Page 2 of 2

27 Good Day! First Aid Injury *Click on symbol in calendar for details Recordable Injury *Click on symbol in calendar for details Project to Date: First Aid: 15 Recordable: 2 DART: 2 Other Noteworthy Events *Click on symbol in calendar for details

28 July 2011 Events Date Location Event 07/01/11 Hall D Construction Site Subcontractor was struck on hard hat with a 2 foot hollow metal spackling rod. Subcontractor was evaluated by JLab Occupational Health Nurse and no treatment was rendered. Subcontractor returned to work with no restrictions. 07/06/11 North Linac Employee bumped his right shin against a blue metal brace causing an abrasion of right shin. Occupational Medicine cleaned the wound, applied over the counter antibiotic ointment, and covered it with a Band Aid. Employee returned to work with no restrictions. 07/07/11 South Linac Coworker spilled PVC glue which then splashed onto right side of student's face and right forearm. Student suffered a first degree chemical burn of right forearm which was evaluated by Dr. Chandler. The exposed areas were irrigated and washed and the student returned to work with no restrictions. 07/07/11 Hall D Construction Site The mechanical fasteners connecting the strut to the linear rail of atrench box in the NE Stub excavation failed. All the other fasteners are in place. No personnel were injured and work inside the trench box was secured by the subcontractor. Access to the trench box has been cordoned off with danger tape. 07/11/11 Hall D Ramp Employee punctured their arm on exposed rebar wire ties in the ramp. Employee was evaluated by Occupational Medicine and was treated for a puncture wound to right arm. The wound was cleaned, and then over the counter antibiotic ointment and band aid was applied. Employee returned to work with no restrictions.

29 July 2011 Events con t Date Location Event 07/11/11 North Access Building Subcontractor slipped in a puddle of water injuring right knee. Subcontractor suffered a right knee sprain and was treated with a cold pack and they were sent off site for further evaluation. Prescription medicine was not medically indicated. Subcontractor is to return to work tomorrow on regular duty. 07/13/11 Hall D Site Subcontractor had sudden onset of low back pain while squatting and was diagnosed with unspecified back injury. Subcontractor was evaluated and treated at emergency department. The subcontractor s work restrictions are that the subcontractor is out of work until 7/16/2011 with, no heavy lifting until cleared by physician. 07/19/11 FEL Vault Student called to report that while brushing off a piece of aluminum, he cut the index finger of his left hand. Student reported superficial laceration to the left index finger and stated that he cleaned the laceration, applied over the counter antibiotic ointment and a bandaid. Student returned to work regular duty. 07/20/11 West Side TED Building During pre shift stretching activity, subcontractor experienced episode of lower back discomfort. Occupational Medicine evaluated and diagnosed subcontractor with lower back strain. Subcontractor took one dose of over the counter medicine prior to coming to JLab Occupational Medicine. Subcontractor returned to regular duty on 7/21/11.

30 July 2011 Events con t Date Location Event 07/22/11 TLA building second floor After working several hours in the TLA building subcontractor began to experience symptoms of heat exhaustion. Subcontractor was evaluated and treated in JLab Occupational Medicine. They applied cold packs and gave him oral fluids. Subcontractor was sent home for remainder of the day and will return to work on next scheduled work day on regular duty.

31 Safety Observations Through 7/26/ Observations made of 6MD related work 73% were all safe Category Number of Observations Percent of Observations All Safe % Housekeeping 16 5% PPE 16 5% Ladders 14 4%

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room 6MSD Weekly Scheduling Meeting Wednesday @ 1:30, MCC Conference Room July 6, 2011 1) Glance Back and 2-Week Look Ahead (F. Pilat)... 10 mins 2) PMI Report (P. Collins)... 5 mins 3) Critical Path Service

More information

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room

6MSD Weekly Scheduling Meeting. 1:30, MCC Conference Room 6MSD Weekly Scheduling Meeting Wednesday @ 1:30, MCC Conference Room August 24, 2011 1) Glance Back and 2-Week Look Ahead (F. Pilat)... 10 mins 2) PMI Report (P. Collins)... 5 mins 3) Critical Path Service

More information

LSD Bi-Weekly Resource Planning Meeting Agenda 25 July 2012

LSD Bi-Weekly Resource Planning Meeting Agenda 25 July 2012 LSD Bi-Weekly Resource Planning Meeting Agenda 25 July 2012 Glance Back / 2-Week Look Ahead / Change-Control Board (CCB) Report (10 min) F. Pilat Safety Report (5 min) M. Logue Special Topic (5 min) Puddles

More information

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis

LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis LSD Review December 2012 Schedule, Re-Baseline, & Resource Analysis Dianne Napier Outline Part II Review Charges Addressed in this Presentation: Issues raised in Part I Review Report adequately addressed

More information

RF Upgrades & Experience At JLab. Rick Nelson

RF Upgrades & Experience At JLab. Rick Nelson RF Upgrades & Experience At JLab Rick Nelson Outline Background: CEBAF / Jefferson Lab History, upgrade requirements & decisions Progress & problems along the way Present status Future directions & concerns

More information

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab

Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Operating Experience and Reliability Improvements on the 5 kw CW Klystron at Jefferson Lab Richard Walker & Richard Nelson Jefferson Lab, Newport News VA Jefferson Lab is a $600M Department of Energy facility

More information

Monthly Progress Report Stanford Synchrotron Radiation Laboratory

Monthly Progress Report Stanford Synchrotron Radiation Laboratory Monthly Progress Report Stanford Synchrotron Radiation Laboratory April 2003 TABLE OF CONTENTS A. Project Summary 1. Technical Progress 3 2. Cost Data 5 B. Design and Fabrication Reports 1.1 Magnets &

More information

Upgrade of CEBAF to 12 GeV

Upgrade of CEBAF to 12 GeV Upgrade of CEBAF to 12 GeV Leigh Harwood (for 12 GeV Accelerator team) Page 1 Outline Background High-level description Schedule Sub-system descriptions and status Summary Page 2 CEBAF Science Mission

More information

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline

3 cerl. 3-1 cerl Overview. 3-2 High-brightness DC Photocathode Gun and Gun Test Beamline 3 cerl 3-1 cerl Overview As described before, the aim of the cerl in the R&D program includes the development of critical components for the ERL, as well as the construction of a test accelerator. The

More information

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007

PEP-II Overview & Ramp Down Plan. J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007 Topics Overview of the PEP-II Collider PEP-II turns off September 30, 2008. General list of components and buildings

More information

HD Review March 30, 2011 Franz Klein

HD Review March 30, 2011 Franz Klein HD Review March 30, 2011 Franz Klein !! Circularly & linearly polarized photon beam on longitudinally polarized target Circularly polar. photon via helicity transfer from 92 calendar days Linearly polar.

More information

Hall-B Beamline Commissioning Plan for CLAS12

Hall-B Beamline Commissioning Plan for CLAS12 Hall-B Beamline Commissioning Plan for CLAS12 Version 1.5 S. Stepanyan December 19, 2017 1 Introduction The beamline for CLAS12 utilizes the existing Hall-B beamline setup with a few modifications and

More information

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team

AREAL- Phase 1. B. Grigoryan on behalf of AREAL team AREAL- Phase 1 Progress & Status B. Grigoryan on behalf of AREAL team Contents Machine Layout Building & Infrastructure Laser System RF System Vacuum System Cooling System Control System Beam Diagnostics

More information

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack

Next Linear Collider. The 8-Pack Project. 8-Pack Project. Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Four 50 MW XL4 X-band klystrons installed on the 8-Pack The Demonstrate an NLC power source Two Phases: 8-Pack Phase-1 (current): Multi-moded SLED II power compression Produce NLC baseline power: 475

More information

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006

Program Risks Risk Analysis Fallback Plans for the. John T. Seeman DOE PEP-II Operations Review April 26, 2006 Program Risks Risk Analysis Fallback Plans for the PEP-II B-FactoryB John T. Seeman DOE PEP-II Operations Review April 26, 2006 OPS Review Topics Are there any PEP-II program risks? Has the laboratory

More information

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017

CEBAF Accelerator Update. Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CEBAF Accelerator Update Michael Tiefenback CASA Accelerator Physics Experimental Liaison June 14, 2017 CLAS12 Collaboration Meeting, June 13-16, 2017 1 Accelerator Division Leadership On April 30 Andrew

More information

RF Power Upgrade at Jefferson Lab

RF Power Upgrade at Jefferson Lab RF Power Upgrade at Jefferson Lab Rick Nelson*, Andrew Kimber *nelson@jlab.org * Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE- AC05-06OR23177. The U.S. Government

More information

P. Emma, et al. LCLS Operations Lectures

P. Emma, et al. LCLS Operations Lectures P. Emma, et al. LCLS Operations Lectures LCLS 1 LCLS Accelerator Schematic 6 MeV 135 MeV 250 MeV σ z 0.83 mm σ z 0.83 mm σ z 0.19 mm σ δ 0.05 % σ δ 0.10 % σ δ 1.6 % Linac-0 L =6 m rf gun L0-a,b Linac-1

More information

Availability and Reliability Issues for the ILC

Availability and Reliability Issues for the ILC Availability and Reliability Issues for the ILC SLAC Presented at PAC07 26 June 07 Contents Introduction and purpose of studies The availability simulation What was modeled (important assumptions) Some

More information

5 Project Costs and Schedule

5 Project Costs and Schedule 93 5 Project Costs and Schedule 5.1 Overview The cost evaluation for the integrated version of the XFEL with 30 experiments and 35 GeV beam energy as described in the TDR-2001 yielded 673 million EUR for

More information

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project

Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Oak Ridge Spallation Neutron Source Proton Power Upgrade Project and Second Target Station Project Workshop on the future and next generation capabilities of accelerator driven neutron and muon sources

More information

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation

Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Experience with the Cornell ERL Injector SRF Cryomodule during High Beam Current Operation Matthias Liepe Assistant Professor of Physics Cornell University Experience with the Cornell ERL Injector SRF

More information

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting

Status of BESSY II and berlinpro. Wolfgang Anders. Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting Status of BESSY II and berlinpro Wolfgang Anders Helmholtz-Zentrum Berlin for Materials and Energy (HZB) 20th ESLS-RF Meeting 16.-17.11.2016 at PSI Outline BESSY II Problems with circulators Landau cavity

More information

Jefferson Lab Experience with Beam Halo, Beam Loss, etc.

Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Jefferson Lab Experience with Beam Halo, Beam Loss, etc. Pavel Evtushenko with a lot of input from many experienced colleagues Steve Benson, Dave Douglas, Kevin Jordan, Carlos Hernandez-Garcia, Dan Sexton,

More information

Summer / Fall 2004 Downtime AEG Preparation Work

Summer / Fall 2004 Downtime AEG Preparation Work Summer / Fall 2004 Downtime AEG Preparation Work In general the Alignment Engineering Group consulted with individuals involved in many of the scheduled downtime activities. Equipment was checked, manpower

More information

Extraction/Separator Setup. Michael Spata Operations Stay Treat July 16, 2015

Extraction/Separator Setup. Michael Spata Operations Stay Treat July 16, 2015 Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015 Accelerator Overview Extraction System Design settings for magnets and RF Separators come from CED All beamlines have been commissioned

More information

12GeV CEBAF Commissioning

12GeV CEBAF Commissioning 12GeV CEBAF Commissioning Operations Dept. Accelerator Division JLAB Outline 1 Process Integrated Process Overview Accelerator Readiness Review Process Internal Reviews/Process Process Recap 2 Beam Commissioning

More information

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA.

A Cathode Development Cornell Cultera This scope includes all labor and purchases required produce photocathodes required by CBETA. A1.01 PROJECT MANAGEMENT BNL/Cornell Michnoff A1.01.01 Milestones BNL/Cornell Michnoff This scope is a placeholder for all project high level milestones for NYSERDA. There is no cost or labor related to

More information

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team

Status of SOLARIS. Paweł Borowiec On behalf of Solaris Team Status of SOLARIS Paweł Borowiec On behalf of Solaris Team e-mail: pawel.borowiec@uj.edu.pl XX ESLS-RF Meeting, Villingen 16-17.11.2016 Outline 1. Timeline 2. Injector 3. Storage ring 16-17.11.2016 XX

More information

Beam Losses During LCLS Injector Phase-1 1 Operation

Beam Losses During LCLS Injector Phase-1 1 Operation Beam Losses During LCLS Injector Phase-1 1 Operation & Paul Emma September 28, 2006 Radiation Safety Committee Review Scope of Phase 1 Operation Request for Three Operating Modes Operating Plan for Phase

More information

Upgrading LHC Luminosity

Upgrading LHC Luminosity 1 Upgrading LHC Luminosity 2 Luminosity (cm -2 s -1 ) Present (2011) ~2 x10 33 Beam intensity @ injection (*) Nominal (2015?) 1 x 10 34 1.1 x10 11 Upgraded (2021?) ~5 x10 34 ~2.4 x10 11 (*) protons per

More information

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15

RF Power Klystrons & 20 Year Look. R. Nelson 7/15/15 RF Power Klystrons & 20 Year Look R. Nelson 7/15/15 RF Power klystrons 8 x 13 kw klystrons Page 2 Why A klystron? Best (only) choice at the time - 1988 Easy to use: Input (drive), output (to CM), power

More information

SRS and ERLP developments. Andrew moss

SRS and ERLP developments. Andrew moss SRS and ERLP developments Andrew moss Contents SRS Status Latest news Major faults Status Energy Recovery Linac Prototype Latest news Status of the RF system Status of the cryogenic system SRS Status Machine

More information

Linac3 experience for LHC ion runs

Linac3 experience for LHC ion runs Linac3 experience for LHC ion runs G Bellodi for the Linac3 team Keywords: beam performance reliability set up time results of MDs remaining unknowns 1 A year in perspective Source removed: change of main

More information

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006

SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006 SABER A Facility for Accelerator Physics and Test Beam Experiments Roger Erickson SABER Workshop March 15, 2006 FFTB will soon be gone! The Problem: On April 10, 2006, the Final Focus Test Beam (FFTB)

More information

PEP-II Disassembly Technical Systems

PEP-II Disassembly Technical Systems PEP-II Disassembly Technical Systems PEP-II D&D Review 6-Aug-2007 S.DeBarger S.Ecklund, A.Hill, D.Kharakh, M.Zurawel Outline Project safety Disassembly of technical systems Shielding Vac/Mechanical Cable

More information

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens

Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens Preparations for Installation, Testing and Commissioning based on Experience at CERN, SNS and Siemens Eugène Tanke FRIB / MSU ESS Seminar, Lund, 6 March 2013 Outline Project Goal for the Accelerator Path

More information

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR

Status of the FAIR Project. Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Status of the FAIR Project Jürgen Henschel FAIR Project Leader / Technical Director GSI & FAIR Finland France Germany India Poland Romania Russia Slovenia Sweden UK FAIR Strategic objectives FAIR phase

More information

The FAIR plinac RF Systems

The FAIR plinac RF Systems The FAIR plinac RF Systems Libera Workshop Sep. 2011 Gerald Schreiber Gerald Schreiber, GSI RF Department 2 (1) Overview GSI / FAIR (2) FAIR Proton Linear Accelerator "plinac" (3) plinac RF Systems (4)

More information

An Operational Diagnostic Complement for Positrons at CEBAF/JLab

An Operational Diagnostic Complement for Positrons at CEBAF/JLab An Operational Diagnostic Complement for Positrons at CEBAF/JLab Michael Tiefenback JLab, CASA International Workshop on Physics with Positrons at Jefferson Lab 12-15 September 2017 Operating CEBAF with

More information

A Facility for Accelerator Physics and Test Beam Experiments

A Facility for Accelerator Physics and Test Beam Experiments A Facility for Accelerator Physics and Test Beam Experiments U.S. Department of Energy Review Roger Erickson for the FACET Design Team February 20, 2008 SLAC Overview with FACET FACET consists of four

More information

FEL Gun Test Stand (GTS) from construction to beam operations

FEL Gun Test Stand (GTS) from construction to beam operations FEL Gun Test Stand (GTS) from construction to beam operations Carlos Hernandez-Garcia for the FEL team CASA Beam Physics Seminar June 19 2008 The DC photocathode gun Outline The enclosure and all other

More information

The PEFP 20-MeV Proton Linear Accelerator

The PEFP 20-MeV Proton Linear Accelerator Journal of the Korean Physical Society, Vol. 52, No. 3, March 2008, pp. 721726 Review Articles The PEFP 20-MeV Proton Linear Accelerator Y. S. Cho, H. J. Kwon, J. H. Jang, H. S. Kim, K. T. Seol, D. I.

More information

Welcome and FRIB Project Status. FRIB Highlights and Plan Ahead

Welcome and FRIB Project Status. FRIB Highlights and Plan Ahead Welcome and FRIB Project Status Thomas Glasmacher Project Manager This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

North Damping Ring RF

North Damping Ring RF North Damping Ring RF North Damping Ring RF Outline Overview High Power RF HVPS Klystron & Klystron EPICS controls Cavities & Cavity Feedback SCP diagnostics & displays FACET-specific LLRF LLRF distribution

More information

CBETA Quarterly Report 7

CBETA Quarterly Report 7 Submission date: 15 September 2018 CBETA Quarterly Report 7 Project Director (BNL): Steve Peggs Peggs@bnl.gov Project Manager (BNL): Rob Michnoff Michnoff@bnl.gov Project Manager (Cornell): Karl Smolenski

More information

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY

IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY IOT OPERATIONAL EXPERIENCE ON ALICE AND EMMA AT DARESBURY LABORATORY A. Wheelhouse ASTeC, STFC Daresbury Laboratory ESLS XVIII Workshop, ELLETRA 25 th 26 th November 2010 Contents Brief Description ALICE

More information

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER

RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER SLAC-PUB-7786 (August 1998) RADIATION SAFETY SYSTEM OF THE B-FACTORY AT THE STANFORD LINEAR ACCELERATOR CENTER J. C. Liu, X. S. Mao, W. R. Nelson, J. Seeman, D. Schultz, G. Nelson, P. Bong, B. Gray Stanford

More information

The LEP Superconducting RF System

The LEP Superconducting RF System The LEP Superconducting RF System K. Hübner* for the LEP RF Group CERN The basic components and the layout of the LEP rf system for the year 2000 are presented. The superconducting system consisted of

More information

Approved by: / / R. Battaglia 12/16/2016

Approved by: / / R. Battaglia 12/16/2016 Fabrication Laboratory Revision: H Rev Date: 12/16/16 Approved by: Process Engineer / / R. Battaglia 12/16/2016 Equipment Engineer 1 SCOPE The purpose of this document is to detail the use of the Varian

More information

Beam Loss Detection for MPS at FRIB

Beam Loss Detection for MPS at FRIB Beam Loss Detection for MPS at FRIB Zhengzheng Liu Beam Diagnostics Physicist This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661.

More information

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling

Commissioning the TAMUTRAP RFQ cooler/buncher. E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling Commissioning the TAMUTRAP RFQ cooler/buncher E. Bennett, R. Burch, B. Fenker, M. Mehlman, D. Melconian, and P.D. Shidling In order to efficiently load ions into a Penning trap, the ion beam should be

More information

Status and Plans for PEP-II

Status and Plans for PEP-II Status and Plans for PEP-II John Seeman SLAC Particle and Particle-Astrophysics DOE HEPAP P5 Review April 21, 2006 Topics Luminosity records for PEP-II in October 2005 Fall shut-down upgrades Run 5b turn

More information

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR

STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR Proceedings of FEL213, New York, NY, USA STATUS OF THE SWISSFEL C-BAND LINEAR ACCELERATOR F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L.

More information

INFN School on Electron Accelerators. RF Power Sources and Distribution

INFN School on Electron Accelerators. RF Power Sources and Distribution INFN School on Electron Accelerators 12-14 September 2007, INFN Sezione di Pisa Lecture 7b RF Power Sources and Distribution Carlo Pagani University of Milano INFN Milano-LASA & GDE The ILC Double Tunnel

More information

PEP II STATUS AND PLANS *

PEP II STATUS AND PLANS * PEP II STATUS AND PLANS * John T. Seeman + Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA The PEP II B-Factory 1 project is an e + e - colliding beam storage ring complex

More information

Proton Engineering Frontier Project

Proton Engineering Frontier Project Proton Engineering Frontier Project OECD Nuclear Energy Agency Fifth International Workshop on the Utilisation and Reliability of High Power Proton Accelerators (HPPA5) (6-9 May 2007, Mol, Belgium) Yong-Sub

More information

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017

Summary of CBETA Independent Cost Reviews. R. Michnoff January 19, 2017 Summary of CBETA Independent Cost Reviews R. Michnoff January 19, 2017 Overview On January 18 th and 19 th, 2017, independent cost reviews were conducted by phone between BNL and Cornell University for

More information

SPEAR 3: Operations Update and Impact of Top-Off Injection

SPEAR 3: Operations Update and Impact of Top-Off Injection SPEAR 3: Operations Update and Impact of Top-Off Injection R. Hettel for the SSRL ASD 2005 SSRL Users Meeting October 18, 2005 SPEAR 3 Operations Update and Development Plans Highlights of 2005 SPEAR 3

More information

Linac 4 Instrumentation K.Hanke CERN

Linac 4 Instrumentation K.Hanke CERN Linac 4 Instrumentation K.Hanke CERN CERN Linac 4 PS2 (2016?) SPL (2015?) Linac4 (2012) Linac4 will first inject into the PSB and then can be the first element of a new LHC injector chain. It will increase

More information

CEBAF 12GeV Commissioning: Status and Plans

CEBAF 12GeV Commissioning: Status and Plans CEBAF 12GeV Commissioning: Status and Plans Arne Freyberger Dept. Accelerator Division JLAB Talk Outline 1 The Past Timeline Hot Check Out Cryogenics ACC-I & ACC-II Plan, Goals and Accomplishments 2 Lessons

More information

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi)

Commissioning of Accelerators. Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) Commissioning of Accelerators Dr. Marc Munoz (with the help of R. Miyamoto, C. Plostinar and M. Eshraqi) www.europeanspallationsource.se 6 July, 2017 Contents General points Definition of Commissioning

More information

PEP II Design Outline

PEP II Design Outline PEP II Design Outline Balša Terzić Jefferson Lab Collider Review Retreat, February 24, 2010 Outline General Information Parameter list (and evolution), initial design, upgrades Collider Ring Layout, insertions,

More information

report L.M. Fraile, CERN PH/IS Impact of technical issues Running statistics 2006 Planning for 2007

report L.M. Fraile, CERN PH/IS Impact of technical issues Running statistics 2006 Planning for 2007 ISOLDE ISOLDE scientific scientific coordinator s s report report ISOLDE ISOLDE Collaboration Collaboration Committee, Committee, 15 15 February February 2007 2007 L.M. Fraile, CERN PH/IS Impact of technical

More information

CHIEF BROADCAST ENGINEER

CHIEF BROADCAST ENGINEER PERSONNEL COMMISSION Class Code: 5150 Salary Range: 45 (M2) CHIEF BROADCAST ENGINEER JOB SUMMARY Under general direction, plan, organize, manage and participate in the on-air/technical operations and maintenance

More information

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala)

2 Work Package and Work Unit descriptions. 2.8 WP8: RF Systems (R. Ruber, Uppsala) 2 Work Package and Work Unit descriptions 2.8 WP8: RF Systems (R. Ruber, Uppsala) The RF systems work package (WP) addresses the design and development of the RF power generation, control and distribution

More information

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics

High Brightness Injector Development and ERL Planning at Cornell. Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics High Brightness Injector Development and ERL Planning at Cornell Charlie Sinclair Cornell University Laboratory for Elementary-Particle Physics June 22, 2006 JLab CASA Seminar 2 Background During 2000-2001,

More information

1. General principles for injection of beam into the LHC

1. General principles for injection of beam into the LHC LHC Project Note 287 2002-03-01 Jorg.Wenninger@cern.ch LHC Injection Scenarios Author(s) / Div-Group: R. Schmidt / AC, J. Wenninger / SL-OP Keywords: injection, interlocks, operation, protection Summary

More information

LCLS Injector Technical Review

LCLS Injector Technical Review LCLS Injector Technical Review Stanford Linear Accelerator Center November 3&4 2003 Review Committee Members: Prof. Patrick O Shea Chair University of Maryland Dr. E. Colby Stanford Linear Accelerator

More information

Installation Operation Maintenance

Installation Operation Maintenance Installation Operation Maintenance Rooftop Energy Recovery Module for TKD / TKH / WKD / WKH YKD / YKH / DKD / DKH # 125-155-175-200 250 265-290-340 # 275-300-350-400-500-600 April 2011 RT-SVX42B-E4 General

More information

ANKA RF System - Upgrade Strategies

ANKA RF System - Upgrade Strategies ANKA RF System - Upgrade Strategies Vitali Judin ANKA Synchrotron Radiation Facility 2014-09 - 17 KIT University of the State Baden-Wuerttemberg and National Laboratory of the Helmholtz Association www.kit.edu

More information

BBU threshold current study for 6 GeV beam in 12 GeV beamline setup

BBU threshold current study for 6 GeV beam in 12 GeV beamline setup BBU threshold current study for 6 GeV beam in 12 GeV beamline setup Ilkyoung Shin and Byung C. Yunn JLAB-TN-09-004 January 12, 2009 1. Introduction The study of BBU threshold current is done for a 6 GeV

More information

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling

TTF / VUV-FEL. Schedule 2005 and Project Management Issues. Schedule 2005 Project Organisation Budget & Controlling TTF / VUV-FEL Schedule 200 and Project Management Issues Schedule 200 Project Organisation Budget & Controlling Hans Weise / DESY DESY MAC Meeting November 9th, 2004 TTF Linac Start-up After Final Installation

More information

STATUS OF THE SwissFEL C-BAND LINAC

STATUS OF THE SwissFEL C-BAND LINAC STATUS OF THE SwissFEL C-BAND LINAC F. Loehl, J. Alex, H. Blumer, M. Bopp, H. Braun, A. Citterio, U. Ellenberger, H. Fitze, H. Joehri, T. Kleeb, L. Paly, J.-Y. Raguin, L. Schulz, R. Zennaro, C. Zumbach,

More information

Full IEFC workshop Feb.

Full IEFC workshop Feb. How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix How does one keep a 50 51 year old running for another 25 years? accelerator How

More information

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL

Performance of a DC GaAs photocathode gun for the Jefferson lab FEL Nuclear Instruments and Methods in Physics Research A 475 (2001) 549 553 Performance of a DC GaAs photocathode gun for the Jefferson lab FEL T. Siggins a, *, C. Sinclair a, C. Bohn b, D. Bullard a, D.

More information

Detailed Design Report

Detailed Design Report Detailed Design Report Chapter 4 MAX IV Injector 4.6. Acceleration MAX IV Facility CHAPTER 4.6. ACCELERATION 1(10) 4.6. Acceleration 4.6. Acceleration...2 4.6.1. RF Units... 2 4.6.2. Accelerator Units...

More information

Equipment Installation, Planning, Layout, organisation and updates

Equipment Installation, Planning, Layout, organisation and updates Equipment Installation, Planning, Layout, organisation and updates Simon Mataguez, Julie Coupard with contributions of the LIU-PLI team Table of contents: LIU installation activities Organisation of the

More information

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB

KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB KEKB INJECTOR LINAC AND UPGRADE FOR SUPERKEKB S. Michizono for the KEK electron/positron Injector Linac and the Linac Commissioning Group KEK KEKB injector linac Brief history of the KEK electron linac

More information

LLRF at SSRF. Yubin Zhao

LLRF at SSRF. Yubin Zhao LLRF at SSRF Yubin Zhao 2017.10.16 contents SSRF RF operation status Proton therapy LLRF Third harmonic cavity LLRF Three LINAC LLRF Hard X FEL LLRF (future project ) Trip statistics of RF system Trip

More information

Station-100. From its Definition to its Realization both in the Tunnel and Outside. 05/05/05 Catherine LeCocq STA

Station-100. From its Definition to its Realization both in the Tunnel and Outside. 05/05/05 Catherine LeCocq STA Station-100 From its Definition to its Realization both in the Tunnel and Outside Definition The 2 mile SLAC linac is actually 10000 ft. It was designed with a downward slope heading eastward. In its middle,

More information

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17

Week 0: PPS Certification and Processing. Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Week 0: PPS Certification and Processing Mon Feb 11 Tue Feb 12 Wed Feb 13 Thu Feb 14 Fri Feb 15 Sat Feb 16 Sun Feb 17 Work in tunnel Work in tunnel PPS Certification PPS Certification PPS Certification

More information

PEP II Status and Plans

PEP II Status and Plans SLAC-PUB-6854 September 1998 PEP II Status and Plans By John T. Seeman Invited talk presented at the 16th IEEE Particle Accelerator Conference (PAC 95) and International Conference on High Energy Accelerators,

More information

SLS RF operation report 2003

SLS RF operation report 2003 SLS RF operation report 2003 M. Pedrozzi, Jean-Yves Raguin Paul Scherrer Institute, 5232 Villigen PSI, Switzerland SUMMARY LINAC report SR Superconducting Third Harmonic system report SR 500 MHz system

More information

Support Frame STB Technical Instruction Manual

Support Frame STB Technical Instruction Manual Support Frame STB Technical Instruction Manual Fig. 2.1: Support frame STB 450 Fig. 2.2: Support frame STB 300 Fig. 2.3: Brace bracket SK 150 Product Characteristics The support frames are mainly used

More information

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator

A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator A Fifteen Year Perspective on the Design and Performance of the SNS Accelerator S. Cousineau (On behalf of the SNS project) HB2016, Sweden July 04, 2016 ORNL is managed by UT-Battelle for the US Department

More information

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture

Introduction: CW SRF linac types, requirements and challenges High power RF system architecture RF systems for CW SRF linacs S. Belomestnykh Cornell University Laboratory for Elementary-Particle Physics LINAC08, Victoria, Canada October 1, 2008 Outline L band Introduction: CW SRF linac types, requirements

More information

30 GHz Power Production / Beam Line

30 GHz Power Production / Beam Line 30 GHz Power Production / Beam Line Motivation & Requirements Layout Power mode operation vs. nominal parameters Beam optics Achieved performance Problems Beam phase switch for 30 GHz pulse compression

More information

Engineered to meet your needs T he oldest name in stud welding,

Engineered to meet your needs T he oldest name in stud welding, Engineered to meet your needs T he oldest name in stud welding, Nelson Stud Welding Inc., continues it s leadership role into the 21st century with the introduction of a full line of new drawn-arc welding

More information

RF considerations for SwissFEL

RF considerations for SwissFEL RF considerations for H. Fitze in behalf of the PSI RF group Workshop on Compact X-Ray Free Electron Lasers 19.-21. July 2010, Shanghai Agenda Introduction RF-Gun Development C-band development Summary

More information

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION

ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION ABORT DIAGNOSTICS AND ANALYSIS DURING KEKB OPERATION H. Ikeda*, J. W. Flanagan, T. Furuya, M. Tobiyama, KEK, Tsukuba, Japan M. Tanaka, MELCO SC,Tsukuba, Japan Abstract KEKB has stopped since June 2010

More information

THE JLAB 12 GEV ENERGY UPGRADE OF CEBAF *

THE JLAB 12 GEV ENERGY UPGRADE OF CEBAF * THE JLAB 12 GEV ENERGY UPGRADE OF CEBAF * Leigh Harwood (for the JLab 12 GeV project team) Thomas Jefferson National Accelerator Facility, Newport News, VA 23606 USA Abstract CEBAF at Jefferson Lab was

More information

Status of RF Power and Acceleration of the MAX IV - LINAC

Status of RF Power and Acceleration of the MAX IV - LINAC Status of RF Power and Acceleration of the MAX IV - LINAC Dionis Kumbaro ESLS RF Workshop 2015 MAX IV Laboratory A National Laboratory for synchrotron radiation at Lunds University 1981 MAX-lab is formed

More information

An Overview of Beam Diagnostic and Control Systems for AREAL Linac

An Overview of Beam Diagnostic and Control Systems for AREAL Linac An Overview of Beam Diagnostic and Control Systems for AREAL Linac Presenter G. Amatuni Ultrafast Beams and Applications 04-07 July 2017, CANDLE, Armenia Contents: 1. Current status of existing diagnostic

More information

The SPEAR 3 Upgrade Project Close-out Report April 2004

The SPEAR 3 Upgrade Project Close-out Report April 2004 The SPEAR 3 Upgrade Project Close-out Report April 2004-1 - The SPEAR 3 Project 1. The Beginning Project Plan and Approval 2. The Project Start Design and Fabrication Progress 2.10 CY 1999 2.20 CY 2000

More information

USER MANUAL. GOLDMUND LOGOS 1N-2N SPEAKER SYSTEM Active Speaker

USER MANUAL. GOLDMUND LOGOS 1N-2N SPEAKER SYSTEM Active Speaker USER MANUAL GOLDMUND LOGOS 1N-2N SPEAKER SYSTEM Active Speaker Thank you for purchasing the Goldmund LOGOS 1N-2N SPEAKER SYSTEM The Goldmund Logos line fully incorporates the technological expertise developed

More information

Undulator Protection for FLASH and for the European XFEL

Undulator Protection for FLASH and for the European XFEL Undulator Protection for FLASH and for the European FLASH sacrificial undulator: beam loss simulations FLASH BLM system plans FLASH sacrificial undulator FLASH Collimators BC2 scraper gun collimator (Ø

More information

28 & 32 & 40 & 55 & 65 & 84-INCH TFT-LCD 4K MONITOR

28 & 32 & 40 & 55 & 65 & 84-INCH TFT-LCD 4K MONITOR 28 & 32 & 40 & 55 & 65 & 84-INCH TFT-LCD 4K MONITOR INSTRUCTION MANUAL Please read this manual thoroughly before use, and keep it handy for future reference. TABLE OF CONTENTS 1, General information...

More information

MICROFOCUS X-RAY SOURCE PROJECT*

MICROFOCUS X-RAY SOURCE PROJECT* MICROFOCUS X-RAY SOURCE PROJECT* Dan Mancuso, CHESS, Cornell University, NY, USA ABSTRACT At the Cornell High Energy Synchrotron Source (CHESS), scientists in all fields and from all over the world utilize

More information

Present Status and Future Upgrade of KEKB Injector Linac

Present Status and Future Upgrade of KEKB Injector Linac Present Status and Future Upgrade of KEKB Injector Linac Kazuro Furukawa, for e /e + Linac Group Present Status Upgrade in the Near Future R&D towards SuperKEKB 1 Machine Features Present Status and Future

More information